| {{#Wiki_filter:***** SOLIDSTATE CONTROLS Quality Assurance 875 | | {{#Wiki_filter:***** |
| | SOLIDSTATE CONTROLS |
| | *.\METEK Quality Assurance 875 |
|
| |
|
| ==Dearborn Drive,== | | ==Dearborn Drive,== |
| Columbus, OH 43085 U.S.A. | | Columbus, OH 43085 U.S.A. |
| * Telephone: | | * Telephone: 614-846-7500; Direct: 614-410-6293 E-mai.1: ethan.salsbury@ametek.com January 7, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ' |
| 614-846-7500; Direct: 614-410-6293 E-mai.1: ethan.salsbury@ametek.com January 7, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 | | Attention: Document Control Desk |
| ' Attention:
| |
| Document Control Desk | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Notification of Potential Defect -1 OCFR Part 21 *.\METEK Product: AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits AM.ETEK Solidstate Controls (SCI} is providing this report in accordance with 1 OCFR Part 21 as notice of a process defect that resulted in components being provided as safety-related spare parts without being dedicated. | | Notification of Potential Defect - 10CFR Part 21 Product: AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits AM.ETEK Solidstate Controls (SCI} is providing this report in accordance with 10CFR Part 21 as notice of a process defect that resulted in components being provided as safety-related spare parts without being dedicated. |
| * Additional information is attached. | | * Additional information is attached. Please contact me with any further questions. |
| Please contact me with any further questions. | | Ethan Salsbury Quality Manager Ametek Solidstate Controls Page 1 of 2 |
| Ethan Salsbury Quality Manager Ametek Solidstate Controls Page 1 of 2 s\METEK PROBLEM DESCRIPTION: | | |
| Lack of evidence of dedication testing for AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits provided with SCI equiprnent CAUSE: In October 2018, NextEra Seabrook notified SCI of a part number discrepancy with a safety-related fuse that was provided with an operational spare parts kit with an equipment order. After further investigation, it was determined that dedication testing was not performed on the *operational spare parts kits provided with the equipment on various jobs in recent years. | | s\METEK PROBLEM DESCRIPTION: |
| * Generally, spare parts are ordered separately from equipment and a process is in place to direct the parts to quality for commercial grade dedication testing*. | | Lack of evidence of dedication testing for AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits provided with SCI equiprnent CAUSE: |
| In this instance, the parts were ordered as a line item on the sale and the parts in question were selected from inventory without being routed through quality for commercial grade dedication. | | In October 2018, NextEra Seabrook notified SCI of a part number discrepancy with a safety-related fuse that was provided with an operational spare parts kit with an equipment order. After further investigation, it was determined that dedication testing was not performed on the *operational spare parts kits provided with the equipment on various jobs in recent years. |
| PROBLEM YOU COULD SEE: Evidence of dedication testing is not available for operational spare parts kits which were provided with equipment orders, however, there.are no functional concerns with the components provided on these orders. The parts would have been selected at the same time as the. parts that were installed in the systems. Additionally, for the commercial grade items provided, there is no history of failure during dedication testing performed by AMETEK either in equipment or during bench testing. ACTION REQUIRED: | | * Generally, spare parts are ordered separately from equipment and a process is in place to direct the parts to quality for commercial grade dedication testing*. In this instance, the parts were ordered as a line item on the sale and the parts in question were selected from inventory without being routed through quality for commercial grade dedication. |
| | PROBLEM YOU COULD SEE: |
| | Evidence of dedication testing is not available for operational spare parts kits which were provided with equipment orders, however, there.are no functional concerns with the components provided on these orders. The parts would have been selected at the same time as the. parts that were installed in the systems. Additionally, for the commercial grade items provided, there is no history of failure during dedication testing performed by AMETEK either in equipment or during bench testing. |
| | ACTION REQUIRED: |
| Aside from printed circuit boards, the parts supplied as oper~tional spare parts on the following orders will need to be dedicated: | | Aside from printed circuit boards, the parts supplied as oper~tional spare parts on the following orders will need to be dedicated: |
| Order# PO# Customer Name Plant Item 766830 & Duke Energy 96000070 766027 Corporation Brunswick Nuclear Plant 96000070-9-1 Nextera Energy 96000076 2334057 Seabrook, LLC Seabrook 96000076-13-1 North Anna Power Station 96000088 70295702 Dominion, Inc. Unit 1 & 2 96000088-6-1 96000092 3152052/913 NPP Krsko Krsko 96000092-9-1 96000092 3152052/913 NPP Krsko Krsko 96000092-10-1 96000093 3152053/913 NPP Krsko Krsko 96000093-5-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-20-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-19-1 Formosa Nextech Maanshan Nuclear Power 96000103 P0050506001 Co., Ltd. Station 96000103-9-1 Formosa Nextech Maanshan Nuclear Pow~r 96000103 P0050506001 Co., Ltd. Station 96000103-10-1 All printed circuit boards are either procured from a qualified supplier or assembled by SCI. All printed circuit boards undergo testing by SCI. Therefore, no additional dedication testing is required for the printed circuit boards. AMETEK SOLIDSTATE CONTROLS CORRECTIVE ACTION: AMETEK SCI recommends returning the untested items from the purchase orders above and will work with you to arrange returns and retesting. | | Order# PO# Customer Name Plant Item 766830 & Duke Energy 96000070 766027 Corporation Brunswick Nuclear Plant 96000070-9-1 Nextera Energy 96000076 2334057 Seabrook, LLC Seabrook 96000076-13-1 North Anna Power Station 96000088 70295702 Dominion, Inc. Unit 1 & 2 96000088-6-1 96000092 3152052/913 NPP Krsko Krsko 96000092-9-1 96000092 3152052/913 NPP Krsko Krsko 96000092-10-1 96000093 3152053/913 NPP Krsko Krsko 96000093-5-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-20-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-19-1 Formosa Nextech Maanshan Nuclear Power 96000103 P0050506001 Co., Ltd. Station 96000103-9-1 Formosa Nextech Maanshan Nuclear Pow~r 96000103 P0050506001 Co., Ltd. Station 96000103-10-1 All printed circuit boards are either procured from a qualified supplier or assembled by SCI. All printed circuit boards undergo testing by SCI. Therefore, no additional dedication testing is required for the printed circuit boards. |
| Please contact Mr. Mark Shreve of our Client Services group at 1-800-222-9079, 1-614-846-7500 ext. 6332, or mark.shreve@ametek.com. | | AMETEK SOLIDSTATE CONTROLS CORRECTIVE ACTION: |
| | AMETEK SCI recommends returning the untested items from the purchase orders above and will work with you to arrange returns and retesting. Please contact Mr. Mark Shreve of our Client Services group at 1-800-222-9079, 1-614-846-7500 ext. 6332, or mark.shreve@ametek.com. |
| Page 2 of 2}} | | Page 2 of 2}} |
|
---|
Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger ML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21295A2472021-10-18018 October 2021 Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21181A2202021-06-29029 June 2021 Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML21126A1722021-04-29029 April 2021 Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20076C8582020-03-12012 March 2020 Bench Test Failure of Model 38878-x, 3-Way, 2-Position Solenoid Vales at Seabrook Station for Use on FWIV Actuator ML19346H8732019-12-12012 December 2019 Westinghouse Electric Company - Notification of the Potential Existence of Defect Pursuant to 10 CFR Part 21 ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18309A0352018-10-31031 October 2018 Submittal of Fisher Information Notice, (FIN) 2018-03 Regarding DVC6000 and DVC6200 Environmental Qualification ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18095A0562018-04-0303 April 2018 NextEra Energy - Integrated Supply Chain - Dedicating Entity Part 21 Notification - General Electric CR120BD Relay ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18081A1182018-03-15015 March 2018 NextEra Energy - Part 21 Notification - Inadequate Dedication of Relays ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17160A3022017-06-0101 June 2017 Part 21 - Interim Notification of a Potential Defect on a Printed Circuit Board ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17135A3102017-05-0808 May 2017 Part 21 - Interim Notification of a Potential Defect on a Printed Circuit Board ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling SBK-L-16174, Part 21 Notification Re Westinghouse Life Line D Type Lac Induction Motor Model Hsdp 4000V, 700hp2016-11-17017 November 2016 Part 21 Notification Re Westinghouse Life Line D Type Lac Induction Motor Model Hsdp 4000V, 700hp ML16321A4472016-10-20020 October 2016 Part 21 Report on Westinghouse Life Line D Type Lac Induction Motor Failure ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16188A3762016-06-21021 June 2016 Part 21 Interim Evaluation of Deviation - Contractor Failure ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16194A1992016-05-25025 May 2016 Azz/Nli - Update - Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML16154A2052016-05-20020 May 2016 Part 21 Interim Evaluation of a Deviation - Contactor Failure ML16127A5952016-05-0404 May 2016 Rotork Controls Inc. Part 21 Notification Concerning V12 (Pt No. N69-921) and K5 (N69-838 & N69-926) Safety Related Micro Switches ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project 2024-10-28
[Table view] Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval ML24302A2402024-10-28028 October 2024 CFR 21 Report 1-BY-BC-1-LV Battery Charger IR 05000338/20240032024-10-28028 October 2024 – Integrated Inspection Report 05000338-2024003 and 05000339-2024003 ML24302A2342024-10-23023 October 2024 Request for Project Number Related to Dominion Energy Services New Nuclear Program at North Anna Power Station IR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight ML24283A0392024-10-0909 October 2024 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.D ML24281A1372024-10-0707 October 2024 ISFSI - Submittal of Cask Registration for Spent Fuel Storage L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval 05000338/LER-2024-001-01, Automatic Reactor Trip Due to Prni High Negative Rate2024-09-24024 September 2024 Automatic Reactor Trip Due to Prni High Negative Rate IR 05000338/20244202024-09-23023 September 2024 Security Baseline Inspection Report 05000338/2024420 and 05000339/2024420, Cover Letter ML24243A0872024-09-20020 September 2024 Response to EPA Comments Regarding the Final Site Specific Supplement to the Generic Eist for License Renewal North Anna Power Station, Units 1 and 2 ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation IR 05000338/20244022024-09-17017 September 2024 Security Baseline Inspection Report 05000338/2024402 and 05000339/2024402 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24215A2622024-08-28028 August 2024 Transmittal Letter for Subsequent Renewed License IR 05000338/20240052024-08-27027 August 2024 Updated Inspection Plan for North Anna Power Station, Units 1 and 2 (Report 05000338/2024005 and 05000339/2024005) IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves 05000339/LER-2024-001-01, Loss of Generator Field for 2J Eog During 2-PT-82.282024-08-20020 August 2024 Loss of Generator Field for 2J Eog During 2-PT-82.28 ML24234A0742024-08-15015 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-23-63, NEI 03-08 Needed Guidance: PWR Thermal Shield Flexure Inspection Requirements L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . ML24221A1932024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Upper Mattaponi Tribe ML24221A1942024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-United Keetoowah Band of Cherokee Indians in Oklahoma ML24221A1922024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Tuscarora Nation of New York ML24221A1902024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Pamunkey Indian Tribe ML24221A1892024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Nansemond Indian Nation ML24221A1912024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Rappahannock Tribe, Inc ML24221A1862024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Band of Cherokee Indians ML24221A1882024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Monacan Indian Nation ML24221A1872024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Eastern Shawnee Tribe of Oklahoma ML24221A1852024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Tribe of Indians ML24221A1842024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Delaware Nation, Oklahoma ML24221A1832024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Chickahominy Indian Tribe-Eastern Division ML24221A1822024-08-0808 August 2024 Tribal Section 106 Letters - North Anna - Chickahominy Indian Tribe ML24221A1812024-08-0808 August 2024 Tribal Section 106 Letters-North Anna - Catawba Indian Nation ML24208A0142024-08-0808 August 2024 Tribal Section 106 Letters-North Anna-Absentee-Shawnee Tribe of Indians of Oklahoma ML24206A0062024-08-0808 August 2024 Notice of Availability of the Final Environmental Impact Statement for the North Anna Nuclear Power Station Unit Numbers 1 and 2 Subsequent License Renewal (Docket Numbers: 50-338 and 50-339) ML24163A3002024-08-0808 August 2024 Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative 2024-09-04
[Table view] |
Text
SOLIDSTATE CONTROLS
- .\METEK Quality Assurance 875
Dearborn Drive,
Columbus, OH 43085 U.S.A.
- Telephone: 614-846-7500; Direct: 614-410-6293 E-mai.1: ethan.salsbury@ametek.com January 7, 2019 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 '
Attention: Document Control Desk
Subject:
Notification of Potential Defect - 10CFR Part 21 Product: AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits AM.ETEK Solidstate Controls (SCI} is providing this report in accordance with 10CFR Part 21 as notice of a process defect that resulted in components being provided as safety-related spare parts without being dedicated.
- Additional information is attached. Please contact me with any further questions.
Ethan Salsbury Quality Manager Ametek Solidstate Controls Page 1 of 2
s\METEK PROBLEM DESCRIPTION:
Lack of evidence of dedication testing for AMETEK Solidstate Controls Safety-Related Operational Spare Parts Kits provided with SCI equiprnent CAUSE:
In October 2018, NextEra Seabrook notified SCI of a part number discrepancy with a safety-related fuse that was provided with an operational spare parts kit with an equipment order. After further investigation, it was determined that dedication testing was not performed on the *operational spare parts kits provided with the equipment on various jobs in recent years.
- Generally, spare parts are ordered separately from equipment and a process is in place to direct the parts to quality for commercial grade dedication testing*. In this instance, the parts were ordered as a line item on the sale and the parts in question were selected from inventory without being routed through quality for commercial grade dedication.
PROBLEM YOU COULD SEE:
Evidence of dedication testing is not available for operational spare parts kits which were provided with equipment orders, however, there.are no functional concerns with the components provided on these orders. The parts would have been selected at the same time as the. parts that were installed in the systems. Additionally, for the commercial grade items provided, there is no history of failure during dedication testing performed by AMETEK either in equipment or during bench testing.
ACTION REQUIRED:
Aside from printed circuit boards, the parts supplied as oper~tional spare parts on the following orders will need to be dedicated:
Order# PO# Customer Name Plant Item 766830 & Duke Energy 96000070 766027 Corporation Brunswick Nuclear Plant 96000070-9-1 Nextera Energy 96000076 2334057 Seabrook, LLC Seabrook 96000076-13-1 North Anna Power Station 96000088 70295702 Dominion, Inc. Unit 1 & 2 96000088-6-1 96000092 3152052/913 NPP Krsko Krsko 96000092-9-1 96000092 3152052/913 NPP Krsko Krsko 96000092-10-1 96000093 3152053/913 NPP Krsko Krsko 96000093-5-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-20-1 Formosa Nextech Maanshan Nuclear Power 96000095 P0041214001 Co., Ltd. Station 96000095-19-1 Formosa Nextech Maanshan Nuclear Power 96000103 P0050506001 Co., Ltd. Station 96000103-9-1 Formosa Nextech Maanshan Nuclear Pow~r 96000103 P0050506001 Co., Ltd. Station 96000103-10-1 All printed circuit boards are either procured from a qualified supplier or assembled by SCI. All printed circuit boards undergo testing by SCI. Therefore, no additional dedication testing is required for the printed circuit boards.
AMETEK SOLIDSTATE CONTROLS CORRECTIVE ACTION:
AMETEK SCI recommends returning the untested items from the purchase orders above and will work with you to arrange returns and retesting. Please contact Mr. Mark Shreve of our Client Services group at 1-800-222-9079, 1-614-846-7500 ext. 6332, or mark.shreve@ametek.com.
Page 2 of 2