Issue date: 09/17/2024
From: Jannette Worosilo
Division of Reactor Safety II
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
IR 2024402
Download: ML24260A223 (8)


Text

SUBJECT:

NORTH ANNA POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000338/2024402 AND 05000339/2024402

Dear Eric S. Carr:

On September 12, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station and discussed the results of this inspection with A.

Murphy and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000338 and 05000339

License Numbers:

NPF-4 and NPF-7

Report Numbers:

05000338/2024402 and 05000339/2024402

Enterprise Identifier:

I-2024-402-0034

Licensee:

Virginia Electric and Power Company

Facility:

North Anna Power Station

Location:

Mineral, VA

Inspection Dates:

September 09, 2024 to September 12, 2024

Inspectors:

R. Patterson, Senior Physical Security Inspector

J. Stovall, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: (02.06 a-d, 02.08 a, b, f, g)
  • Tier III: (02.10 a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p)(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1: June 2023 through August 2024 Unit 2: June 2023 through August

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 12, 2024, the inspectors presented the security baseline inspection results to A. Murphy and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

239840

239976

245937

250092

254815

255517

259481

Security Related

05/15/2024

259651

259860

Security Related

05/20/2024

260524

Security Related

05/28/2024

261899

Security Related

06/13/2024

Corrective Action

Documents

266409

0-EPM-2503-03

Electrical Preventative Maintenance

Revision 1

0-EPM-2503-03

Electrical Preventative Maintenance

Revision 2

GMP-GM-101

General Maintenance Procedure

Revision 5

SY-AA-117

Search Programs

SY-AA-118

Owner Controlled Area Access Control

Procedures

SY-AA-119

Protected Access Control

Self-Assessments Assessment PIR#

250877

PI-AA-100-1004 - Attachment 2

06/13/2024

59102825303

03/17/2021

59103109763

03/14/2021

71130.02

Work Orders

203316714

05/20/2024

Corrective Action

Documents

261899

71130.09

Procedures

SY-AA-103

Security Plan and Procedures Revision Process

71151

Procedures

SY-AA-126

Regulatory Assessment Performance Indicator Data

Reporting

2