ML18081A118

From kanterella
Jump to navigation Jump to search
NextEra Energy - Part 21 Notification - Inadequate Dedication of Relays
ML18081A118
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/15/2018
From: Lafleur A
ISC Technical Services, Nextera Energy
To: Hoc H
Office of Nuclear Reactor Regulation
References
053262
Download: ML18081A118 (2)


Text

From:

To:

Subject:

Date:

Attachments:

See attached.

Lafleur, Al Hoc. HOO X

[Extemal_Sender] AR 02244814 - NRC Phone Notification Information 3-15 FINAL.docx Thursday, March 15, 2018 9:29:28 AM AR 02244814 - NRC Phone Notification Information 3-15 FINAL.docx ISC Technical Services I Procurement Engineering Manager I NextEra Energy 2455 Port West Blvd, Bldg B2 I West Palm Beach, FL 33407 I Office: (561) 845-3343 I Mobile: (772) 341-9697 I al.lafleur@fpl.com NEXTera-E~

ISC Vision: "Be the commercial hemtbeat ef the compm!J, leading the discovery a11d delivery ef value" Our Values: Committed to Excellence, Do the Right Thing, Treat People with Respect

Part 21 Event Number: 53262 Rep Org: NEXTERA ENERGY - INTEGRATED SUPPLY Notification Date:

CHAIN - DEDICATING ENTITY 3115/18 Licensee: NIA Notification Time: 09:22 Region: NIA

[ET]

City: WEST PALM BEACH State: FL EventDate: l/1612018 County:

Event Time: [ET]

License#:

Last Update Date:

Agreement:

Docket:

NRC Notified By: ALBERT LAFLEUR HQ OPS Officer:

Emergency Class: NON EMERGENCY Person (Organization):

10 CFR Section:

21.21(d)(3)(i)- NOTIFICATION OF DEFECT Event Text PART 21 NOTIFICATION - INADEQUATE DEDICATION OF RELAYS On March 13, NextEra Energy completed its evaluation of a deviation concerning relays dedicated at its Corporate Procurement Engineering & Dedication Facility and concluded that the condition represented a defect under l O CFR 21.

The defect was discovered on January 16, 2018 during pre-installation bench testing. During that bench test, some of the relays exhibited contact chatter. Upon review of the dedication, it was identified that contact chatter had been noted at reduced voltage, and that the condition was improperly dispositioned as acceptable. That conclusion was incorrect as the relays are DC powered and may be required to operate under reduced voltage conditions.

The affected relays were supplied to the Seabrook Nuclear Power Station. None of those relays was installed and all have been quarantined to prevent installation.

Dedicating Entity: NextEra Energy Integrated Supply Chain - Corporate Procurement Engineering & Dedication Facility, West Palm Beach, FL Device: GE Relay, base model CR120BD