Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARL-2024-197, Final Report of a Deviation Associated with a Defect of 2 GE Hitachi CR 120B Relays2024-12-0202 December 2024 Final Report of a Deviation Associated with a Defect of 2 GE Hitachi CR 120B Relays ML21225A0812021-08-0404 August 2021 Lake Engineering Co., Final Report Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML21014A2342020-12-0707 December 2020 Fourth Interim Notification Per 10 CFR Part 21 Re Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 ML20076C8582020-03-12012 March 2020 Bench Test Failure of Model 38878-x, 3-Way, 2-Position Solenoid Vales at Seabrook Station for Use on FWIV Actuator ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18309A0352018-10-31031 October 2018 Submittal of Fisher Information Notice, (FIN) 2018-03 Regarding DVC6000 and DVC6200 Environmental Qualification ML18095A0562018-04-0303 April 2018 NextEra Energy - Integrated Supply Chain - Dedicating Entity Part 21 Notification - General Electric CR120BD Relay ML18081A1182018-03-15015 March 2018 NextEra Energy - Part 21 Notification - Inadequate Dedication of Relays ML17243A1362017-08-28028 August 2017 Fisher Information Notice, (FIN) 2017-04 - Erroneous Rotary Seating Torque Calculation in Flowscanner Software ML17135A3102017-05-0808 May 2017 Part 21 - Interim Notification of a Potential Defect on a Printed Circuit Board SBK-L-16174, Part 21 Notification Re Westinghouse Life Line D Type Lac Induction Motor Model Hsdp 4000V, 700hp2016-11-17017 November 2016 Part 21 Notification Re Westinghouse Life Line D Type Lac Induction Motor Model Hsdp 4000V, 700hp ML16321A4472016-10-20020 October 2016 Part 21 Report on Westinghouse Life Line D Type Lac Induction Motor Failure ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15049A4582015-02-0606 February 2015 Thermo Gamma-Metrics, LLC - Part 21 Report Regarding Shutdown Margin Monitor Environmental Qualification Noncompliance ML14101A3422014-04-10010 April 2014 Notification of Part 21 - Potential Defect in General Electric SB1 Switches and Hea Relays ML14071A4772014-02-26026 February 2014 Report of Potential Defect Per 1OCFR Part 21 Primary Disconnect Assembly ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0392012-11-0808 November 2012 Part 21 - an Operating Mechanism Front Cover Failed During Licensee Receipt Inspection ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations SBK-L-11232, 10 CFR Part 21 Notification, General Electric CR-120B Relays (120 Vac)2011-11-17017 November 2011 10 CFR Part 21 Notification, General Electric CR-120B Relays (120 Vac) ML11306A1942011-11-0101 November 2011 General Electric Part 21 Report Re CR-120B Relays Supplied by National Technical Systems Fail Bench Test ML0903502172009-01-27027 January 2009 Notification of Potential Part 21 Report from Fisher Controls International - Water Quality Deficiency ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0713703092007-03-0707 March 2007 Velan, Inc., Piston Check Cv Information ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0626204942006-09-15015 September 2006 Part 21 Report by Tyco Valves and Controls, LP Re Improper Valve Springs in Pressure Relief Valves. Corrective Actions Taken by Tyco Listed ML0609504012006-04-0303 April 2006 Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 ML0609406522006-03-31031 March 2006 NRC Operations Center Event Report for Whiting Corporation Re Crane Overstress Conditions ML0413205472004-04-23023 April 2004 Deficiency Report Re Potential Safety Hazard That Exists for Woodward Digital Reference Unit (Drus) ML0328805252003-10-0606 October 2003 Boral Spent Fuel Pool Test Coupons Report Pursuant to 10 CFR Part 21.21 ML0326507152003-09-16016 September 2003 Part 21 Report Regarding an Apparent Abnormality Involving Boral Spent Fuel Pool Test Coupons ML0326507092003-09-15015 September 2003 Part 21 Report for Seabrook Re Apparent Abnormality of Boral Coupon That Was Removed from Spent Fuel Pool for Inspection 2024-12-02
[Table view] Category:E-Mail
MONTHYEARML24320A0892024-11-14014 November 2024 EN 57424 Seabrook - Active Link Removed - Part 21 Report ML24285A1682024-10-11011 October 2024 Email Response: LTR-24-0212 David Lochbaum Letter - Public Access to Advisory Committee on Reactor Safeguards Materials - Seabrook ASR ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24115A2362024-03-28028 March 2024 Acceptance Review: Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23156A3042023-05-31031 May 2023 Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from Pressure Temperature Limits and Low Temperature Over Pressure Protection Curves ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23066A1892023-03-0303 March 2023 OEDO-22-00419: Email Dated 3-3-2023 to Petitioner on Seabrook ASR Petition ML23066A0892023-02-24024 February 2023 OEDO-22-00419 - Email Dated 02/24/2023 to Petitioner on Seabrook Unit 1 ASR Petition ML23020A9392023-01-19019 January 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements (EPID L-2022-LLA-0183) (Email) ML23011A3082023-01-11011 January 2023 Request for Additional Information Regarding Relief Request 4RA-22-001 (L-2022-LLR-0074) ML22341A0012022-12-0606 December 2022 Acceptance of Requested Licensing Action Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML22333A7452022-11-22022 November 2022 OEDO-22-00419 - Email: C-10 Response on PRB Initial Assessment - C-10 Petition on Seabrook ASR Concrete Degradation ML22287A1472022-10-13013 October 2022 2.026 Petition Screen-in Email ML22228A0552022-08-15015 August 2022 Request for Additional Information Steam Generator Tube Inspection Report Review ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment ML24285A2022022-07-0202 July 2022 Email Response - LTR-24-0212 - Patricia Skibbee - President C-10 Board of Directors - David Lochbaum ML22153A4152022-05-31031 May 2022 Request for Additional Information Re 120V Inverter LAR from TS Branch - Final ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML22048B5522022-02-17017 February 2022 LTR-22-0010 Reply to Geoff Gilbert Email Concern About Seabrook Station Concrete Degradation ML22062B6642022-02-0707 February 2022 Request for Additional Information 120V Inverter LAR from the Electrical Branch ML22063A0002022-01-25025 January 2022 Requests for Additional Information from Risk Branch Regarding 120V Inverter LAR ML22020A2542022-01-20020 January 2022 LTR-22-0010 Geoff Gilbert, E-mail Concern About Seabrook Station Concrete Degradation ML21097A2512021-04-0707 April 2021 Request for Additional Information Regarding Steam Generator Tube Inspection Report Review for RFO 20 (EPID L-2020-LRO-0066) (Email) ML21054A0482021-02-23023 February 2021 Request for Additional Information Regarding Heat Flux Hot Channel Requirement Amendment Request ML20343A0942020-12-0303 December 2020 Request for Additional Information Regarding Seabrook (COVID-19) Part 73 Force-on-Force Exemption Request (L-2020-LLE-0219) ML20273A2812020-09-22022 September 2020 Acceptance of Requested Licensing Action License Amendment Request to Resolve Non-Conservative Heat Flux Hot Channel Factor Requiments ML20258A1502020-09-14014 September 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding One-Time Change to the AC Sources Operating TS ML20260H4932020-09-11011 September 2020 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Request to Use Later Code Edition of ASME OM Code ML20230A2962020-08-14014 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Allow a One-Time Change to the AC Sources Operating TS ML20167A1842020-06-11011 June 2020 Request for Additional Information Related to Seabrook License Amendment Request Regarding TSTF-411 and TSTF-418 (L-2019-LLA-0237) ML20124A0012020-05-0101 May 2020 Cancellation of Call with Seabrook on Steam Generator Tube Inspections ML20114E1592020-04-23023 April 2020 Email and Request for Additional Information Related to Seabrook License Amendment Request to Degraded Voltage Time Delay Setpoint (L-2020-LLA-0012) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101N0932020-04-10010 April 2020 Acceptance of Requested Licensing Action Re Relief Request to Defer ASME Inspections Due COVID-19 (EPIDs L-2020-LLR-0055, -56, and -57) ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 ML20087K8262020-03-27027 March 2020 Upcoming Steam Generator Tube Inservice Inspection ML20063J9792020-02-28028 February 2020 Acceptance of Requested Licensing Action Amendment Request to Revise Degraded Voltage Time Delay Setpoint ML19347C6732019-12-13013 December 2019 Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-418 ML19296D9122019-10-23023 October 2019 NRR E-mail Capture - Request for Additional Information Related to Seabrook Inverter Amendment (L-2019-LLA-0216) ML19295F5422019-10-15015 October 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise Onsite Power Distribution Requirements ML19275G7832019-10-0101 October 2019 Limited Appearance Statement from New Hampshire State Representative, Robert Harb Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6512019-09-27027 September 2019 Limited Appearance Statement from Joanna Hammond Regarding the Seabrook Station Unit 1 License Amendment Application ML19270E6542019-09-26026 September 2019 Limited Appearance Statement from Brian Campbell Regarding the Seabrook Station Unit 1 License Amendment Application ML19196A3592019-07-15015 July 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Amendment Request to Revise the Emergency Core Cooling System Accumulator Technical Specifications ML19169A2412019-06-13013 June 2019 NRR E-mail Capture - Seabrook Station, Unit No. 1 - Acceptance of Requested Licensing Action Relief Requests for the Containment Building Spray Pump Flow and Vibration Testing (Epids L-2019-LLR-00 and L-2019-LLR-00) ML19162A0662019-06-0404 June 2019 Reply to Mr. Rick Jakious'S E-mail of 5-29-2019 to Stephen B. Comley Sr., We the People with Attachments ML19112A1782019-04-22022 April 2019 NRR E-mail Capture - Point Beach; Seabrook; Turkey Point - Acceptance of Requested Licensing Action Amendment Request to Revise Technical Specifications to Adopt TSTF-563 ML19101A4042019-04-11011 April 2019 NRR E-mail Capture - Point Beach; Seabrook; St. Lucie; Turkey Point - Acceptance of Licensing Action Relief Request to Use Encoded Phased Array Ultrasonic Examination Techniques for Ferritic and Austenitic Welds 2024-05-24
[Table view] |
Text
From:
To:
Subject:
Date:
Attachments:
See attached.
Lafleur, Al Hoc. HOO X
[Extemal_Sender] AR 02244814 - NRC Phone Notification Information 3-15 FINAL.docx Thursday, March 15, 2018 9:29:28 AM AR 02244814 - NRC Phone Notification Information 3-15 FINAL.docx ISC Technical Services I Procurement Engineering Manager I NextEra Energy 2455 Port West Blvd, Bldg B2 I West Palm Beach, FL 33407 I Office: (561) 845-3343 I Mobile: (772) 341-9697 I al.lafleur@fpl.com NEXTera-E~
ISC Vision: "Be the commercial hemtbeat ef the compm!J, leading the discovery a11d delivery ef value" Our Values: Committed to Excellence, Do the Right Thing, Treat People with Respect
Part 21 Event Number: 53262 Rep Org: NEXTERA ENERGY - INTEGRATED SUPPLY Notification Date:
CHAIN - DEDICATING ENTITY 3115/18 Licensee: NIA Notification Time: 09:22 Region: NIA
[ET]
City: WEST PALM BEACH State: FL EventDate: l/1612018 County:
Event Time: [ET]
License#:
Last Update Date:
Agreement:
Docket:
NRC Notified By: ALBERT LAFLEUR HQ OPS Officer:
Emergency Class: NON EMERGENCY Person (Organization):
10 CFR Section:
21.21(d)(3)(i)- NOTIFICATION OF DEFECT Event Text PART 21 NOTIFICATION - INADEQUATE DEDICATION OF RELAYS On March 13, NextEra Energy completed its evaluation of a deviation concerning relays dedicated at its Corporate Procurement Engineering & Dedication Facility and concluded that the condition represented a defect under l O CFR 21.
The defect was discovered on January 16, 2018 during pre-installation bench testing. During that bench test, some of the relays exhibited contact chatter. Upon review of the dedication, it was identified that contact chatter had been noted at reduced voltage, and that the condition was improperly dispositioned as acceptable. That conclusion was incorrect as the relays are DC powered and may be required to operate under reduced voltage conditions.
The affected relays were supplied to the Seabrook Nuclear Power Station. None of those relays was installed and all have been quarantined to prevent installation.
Dedicating Entity: NextEra Energy Integrated Supply Chain - Corporate Procurement Engineering & Dedication Facility, West Palm Beach, FL Device: GE Relay, base model CR120BD