ML14027A279: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14027A279
| number = ML14027A279
| issue date = 01/27/2014
| issue date = 01/27/2014
| title = Callaway, Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000483-14-007
| title = Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000483-14-007
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000483/2014007]]
See also: [[see also::IR 05000483/2014007]]


=Text=
=Text=
{{#Wiki_filter:       January 27, 2014  
{{#Wiki_filter:UNITE D S TATE S
Mr. Adam C. Heflin, Senior Vice  
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
President and Chief Nuclear Officer  
                                                    R E G IO N I V
Union Electric Company P.O. Box 620 Fulton, MO 65251  
                                              1600 EAST LAMAR BLVD
                                        AR L I NGTON , TEXAS 7 601 1- 4511
                                            January 27, 2014
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:        CALLAWAY PLANT - INFORMATION REQUEST FOR NRC TRIENNIAL
                BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION
                REPORT 05000483/2014007
Dear Mr. Heflin:
On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection
at the Callaway Plant. A seven-person team will perform this inspection using NRC Inspection
Procedure 71111.21, Component Design Bases Inspection.
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of
seven NRC inspectors, of which six will focus on engineering and one on operations. The
current inspection schedule is as follows:
        Onsite information gathering visit: Week of March 24, 2014
        Onsite weeks: First On-Site Week            - April 14-18, 2014
                          Second On-Site Week - April 28 - May 2, 2014
                          Third On-Site Week        - May 12-16, 2014
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. Additional information and documentation needed to support the inspection will be
identified, including interviews with engineering managers, engineers, and probabilistic safety
assessment staff.
 
A. Heflin                                    -2-
Our experience with these inspections has shown they are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection, we have enclosed a request for information needed
for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the regional office no later than March 17, 2014. Insofar as
possible, this information should be provided electronically to the lead inspector. Since the
inspection will be concentrated on high risk/low margin components, calculations associated
with your list of high risk components should be available to review during the information
gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested are those items that the team will need access to
when onsite and after the inspection samples are selected. The third group lists information
necessary to aid the inspection team in tracking issues identified as a result of the inspection. It
is requested that this information be provided to the lead inspector as the information is
generated during the inspection. It is important that all of these documents are up to date and
completed in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we
request that a contact individual be assigned to each inspector to ensure information requests,
questions, and concerns are addressed in a timely manner.
The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing
engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the
inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via
e-mail at Ron.Kopriva@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
                                                Sincerely,
                                                /RA/
                                                Thomas R. Farnholtz, Chief
                                                Engineering Branch 1
                                                Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure:
Component Design Basis Inspection
  Document Request
cc w/ enclosure: Electronic Distribution for Callaway Plant
 
 
ML14027A279
SUNSI Rev Compl.  Yes  No ADAMS      Yes  No    Reviewer Initials    TRF
Publicly Avail    Yes  No Sensitive  Yes No    Sens. Type Initials  TRF
RIV:SRI:DRS/EB1  BC/EB1
RKopriva        TFarnholtz
/RA/ TRF for    /RA/
01/23/2014        01/23/2014
   
   
                  INFORMATION REQUEST FOR CALLAWAY PLANT
SUBJECT: CALLAWAY PLANT - INFORMATION REQUEST FOR NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION REPORT 05000483/2014007
                  COMPONENT DESIGN BASES (CDBI) INSPECTION
Dear Mr. Heflin:  
Inspection Report:                      05000483/2014007
Information Gathering Dates:           March 24-28, 2014
On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection at the Callaway Plant.  A seven-person team will perform this inspection using NRC Inspection Procedure 71111.21, "Component Design Bases Inspection."
On-site Inspection Dates:              First Week      - April 14-18, 2014
                                        Second Week - April 28 - May 2, 2014
The inspection focuses on components and operator actions that have high risk and low design
                                        Third Week - May 12-16, 2014
margins. The samples reviewed during this inspection will be identified during an information gathering visit and during the subsequent in-office preparation week. In addition, a number of operating experience issues will also be selected for review. 
Inspection Procedure:                  IP 71111.21, Component Design Bases
                                        Inspection
The inspection will include an information gathering site visit by the team leader and a senior
Lead Inspector/Team Leader:            Ronald Kopriva
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of seven NRC inspectors, of which six will focus on engineering and one on operations. The current inspection schedule is as follows:
                                        817-200-1104
Onsite information gathering visit: Week of March 24, 2014 Onsite weeks: First On-Site Week - April 14-18, 2014
                                        Ron.Kopriva@nrc.gov
  Second On-Site Week -  April 28 - May 2, 2014  Third On-Site Week - May 12-16, 2014  The purpose of the information gathering visit is to meet with members of your staff to identify
I.     Information Requested Prior to the information Gathering Visit
potential risk-significant components and operator actions.  The lead inspector will also request
      The following information is requested by March 17, 2014, or sooner, to facilitate
a tour of the plant with members of your operations staff and probabilistic safety assessment staff. Additional information and documentation needed to support the inspection will be identified, including interviews with engineering managers, engineers, and probabilistic safety
      inspection preparation. If you have any questions regarding this information,
assessment staff.
      pleased call the lead inspector as soon as possible. (Please provide the
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
      information electronically in pdf files, Excel, or other searchable formats. The
A. Heflin  - 2 -   Our experience with these inspections has shown they are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection, we have enclosed a request for information needed
      information should contain descriptive names, and be indexed and hyperlinked to
for the inspection. The request has been divided into three groups.  The first group lists
      facilitate ease of use. Information in "lists" should contain enough information to
information necessary for the information gathering visit and for general preparation. This
      be easily understood by someone who has knowledge of boiling water reactor
information should be available to the regional office no later than March 17, 2014.  Insofar as
      technology.)
possible, this information should be provided electronically to the lead inspector. Since the inspection will be concentrated on high risk/low margin components, calculations associated with your list of high risk components should be available to review during the information  
      1.      An excel spreadsheet of equipment basic events (with definitions)
gathering visit to assist in our selection of components based on available design margin.  
                including importance measures sorted by risk achievement worth (RAW)
The second group of documents requested are those items that the team will need access to when onsite and after the inspection samples are selected. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspectionIt
                and Fussell-Vesely (FV) from your internal events probabilistic risk
is requested that this information be provided to the lead inspector as the information is
                assessment (PRA). Include basic events with RAW value of 1.3 or
generated during the inspection.  It is important that all of these documents are up to date and
                greater.
completed in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we request that a contact individual be assigned to each inspector to ensure information requests,
      2.       Provide a list of the top 500 cut-sets from your PRA.
questions, and concerns are addressed in a timely manner.  
      3.      Copies of PRA system notebooks, and the latest PRA summary
   
                document.
The lead inspector for this inspection is Mr. Ronald KoprivaWe understand that our licensing engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via e-mail at Ron.Kopriva@nrc.gov. 
      4.       An excel spreadsheet of PRA human action basic events or risk ranking
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
                of operator actions from your site specific PSA sorted by RAW and FV.
made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                Provide copies of your human reliability worksheets for these items.
      5.      If you have an external events or fire PSA model, provide the information
      Sincerely,
                requested in items 1-4 for external events and fire.
                                              -1-                              Enclosure
      /RA/  Thomas R. Farnholtz, Chief      Engineering Branch 1 Division of Reactor Safety  Docket:  50-483
 
License: NPF-30
6Any pre-existing evaluation or list of components and associated
    calculations with low design margins, (i.e., pumps closest to the design
Enclosure: 
    limit for flow or pressure, diesel generator close to design required output,
Component Design Basis Inspection    Document Request 
    heat exchangers close to rated design heat removal, etc.).
cc w/ enclosure:  Electronic Distribution for Callaway Plant
7.  List of high risk maintenance rule systems/components and functions;
A. Heflin  - 3 -    ADAMS ACCESSION NUMBERML14027A279 SUNSI Rev Compl.  Yes  No ADAMS  Yes  No Reviewer Initials TRFPublicly Avail  Yes  No Sensitive  Yes No Sens. Type Initials TRFRIV:SRI:DRS/EB1 BC/EB1    RKopriva TFarnholtz    /RA/ TRF for /RA/    01/23/2014 01/23/2014    OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax 
    based on engineering or expert panel judgment.
- 1 - Enclosure INFORMATION REQUEST FOR CALLAWAY PLANT  COMPONENT DESIGN BASES (CDBI) INSPECTION 
8A list of operating experience evaluations for the last 2 years.
Inspection Report:    05000483/2014007 
9A list of all time-critical operator actions in procedures.
Information Gathering Dates: March 24-28, 2014 
10. A list of permanent and temporary modifications sorted by component
On-site Inspection Dates:  First Week  - April 14-18, 2014      Second Week -  April 28 - May 2, 2014      Third Week  - May 12-16, 2014  
    identified in Item 1.
11. List of current operator work arounds/burdens.
Inspection Procedure:  IP 71111.21, "Component Design Bases Inspection"  Lead Inspector/Team Leader: Ronald Kopriva      817-200-1104
12. A list of the design calculations, which provide the design margin
    Ron.Kopriva@nrc.gov
    information for components included in Item 1. (Calculations should be
  I. Information Requested Prior to the information Gathering Visit  The following information is requested by March 17, 2014, or sooner, to facilitate
    available during the information gathering visit.)
inspection preparation.  If you have any questions regarding this information,  
13. List of root cause evaluations associated with component failures or
pleased call the lead inspector as soon as possible. (Please provide the information electronically in "pdf" files, Excel, or other searchable formats. The information should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to
    design issues initiated/completed in the last 5 years.
be easily understood by someone who has knowledge of boiling water reactor
14. Current management and engineering organizational charts.
technology.)  1. An excel spreadsheet of equipment basic events (with definitions) including importance measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your internal events probabilistic risk
15. Callaway Plant IPEEE, if available electronically.
assessment (PRA). Include basic events with RAW value of 1.3 or
16. Mechanical piping drawings for:
greater.  2. Provide a list of the top 500 cut-sets from your PRA. 
            Engineered safety features
3. Copies of PRA "system notebooks," and the latest PRA summary document.   4. An excel spreadsheet of PRA human action basic events or risk ranking of operator actions from your site specific PSA sorted by RAW and FV.
            Emergency core cooling Systems
Provide copies of your human reliability worksheets for these items.  
            Emergency diesel generators
5. If you have an external events or fire PSA model, provide the information requested in items 1-4 for external events and fire.  
17 Electrical one-line drawings for:
  - 2 -  6.  Any pre-existing evaluation or list of components and associated calculations with low design margins, (i.e., pumps closest to the design
            Offsite power/switchyard supplies
limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, etc.). 
            Normal ac power systems
7.  List of high risk maintenance rule systems/components and functions; based on engineering or expert panel judgment. 
            Emergency ac/dc power systems including
8. A list of operating experience evaluations for the last 2 years.    9.  A list of all time-critical operator actions in procedures.
            120Vac power, and
            125Vdc/24Vdc safety class systems
10. A list of permanent and temporary modifications sorted by component identified in Item 1.    11.  List of current "operator work arounds/burdens."
18. List of any common-cause failures of components in the last 3 years.
19. An electronic copy of the Design Bases Documents.
12. A list of the design calculations, which provide the design margin information for components included in Item 1.  (Calculations should be available during the information gathering visit.) 
20. An electronic copy of the System Health notebooks.
13.  List of root cause evaluations associated with component failures or design issues initiated/completed in the last 5 years. 
                                    -2-
14.  Current management and engineering organizational charts.    15. Callaway Plant IPEEE, if available electronically.
 
II.    Information Requested to be Available on First Day of Inspection
16. Mechanical piping drawings for:
(April 14, 2014)
  Engineered safety features  Emergency core cooling Systems
        1.    List of condition reports (corrective action documents) associated with
  Emergency diesel generators
              each of the selected components for the last 5 years.
        2.     The corrective maintenance history associated with each of the selected
17 Electrical one-line drawings for:
              components for the last 2 years.
    Offsite power/switchyard supplies  Normal ac power systems
        3.     Copies of calculations associated with each of the selected components
  Emergency ac/dc power systems including    120Vac power, and    125Vdc/24Vdc safety class systems
              (if not previously provided), excluding data files. Please review the
18. List of any common-cause failures of components in the last 3 years.
              calculations and also provide copies of reference material (such as
              drawings, engineering requests, and vendor letters).
19. An electronic copy of the Design Bases Documents.  20. An electronic copy of the System Health notebooks. 
        4.    Copies of operability evaluations associated with each of the selected
  - 3 -  II.  Information Requested to be Available on First Day of Inspection (April 14, 2014) 
              components and plans for restoring operability, if applicable.
1. List of condition reports (corrective action documents) associated with each of the selected components for the last 5 years. 
        5.    Copies of selected operator work-around evaluations associated with
2. The corrective maintenance history associated with each of the selected components for the last 2 years.    3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the
              each of the selected components and plans for resolution, if applicable.
calculations and also provide copies of reference material (such as
        6.     Copies of any open temporary modifications associated with each of the
drawings, engineering requests, and vendor letters).  4. Copies of operability evaluations associated with each of the selected components and plans for restoring operability, if applicable. 
              selected components, if applicable.
5. Copies of selected operator work-around evaluations associated with each of the selected components and plans for resolution, if applicable.  6. Copies of any open temporary modifications associated with each of the selected components, if applicable. 
        7.    Trend data on the selected electrical/mechanical components
7. Trend data on the selected electrical/mechanical components' performance for last 3 years (for example, pumps' performance including in-service testing, other vibration monitoring, oil sample results, etc., as applicable). 
              performance for last 3 years (for example, pumps performance including
8.  A copy of any internal/external self-assessments and associated corrective action documents generated in preparation for the inspection.    9. A copy of engineering/operations related audits completed in the last 2 years. 
              in-service testing, other vibration monitoring, oil sample results, etc., as
10. List of motor operated valves (MOVs) in the program, design margin and risk ranking.  11. List of air operated valves (AOVs) in the valve program, design and risk ranking. 
              applicable).
12. Structure, system and components in the Maintenance Rule (a)(1) category. 
        8.    A copy of any internal/external self-assessments and associated
13.  Site top 10 issues list.
              corrective action documents generated in preparation for the inspection.
        9.    A copy of engineering/operations related audits completed in the last
14. Procedures used to accomplish operator actions associated with the basic events in your PRA.  15.  List of licensee contacts for the inspection team with pager or phone numbers. 
              2 years.
  - 4 -  III. Information Requested to be provided throughout the inspection.  1.  Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. 
        10.    List of motor operated valves (MOVs) in the program, design margin and
2. Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the
              risk ranking.
inspection to each team member).  3. Reference materials (available electronically and as needed during all onsite weeks): 
        11.   List of air operated valves (AOVs) in the valve program, design and risk
  General set of plant drawings  IPE/PRA report  Procurement documents for components selected  Plant procedures (normal, abnormal, emergency, surveillance, etc.)
              ranking.
  Technical Specifications
        12.   Structure, system and components in the Maintenance Rule (a)(1)
  Updated Final Safety Analysis Report
              category.
  Vendor manuals 
        13.    Site top 10 issues list.
Inspector Contact Information: 
        14.   Procedures used to accomplish operator actions associated with the
Ronald Kopriva
              basic events in your PRA.
Senior Reactor Inspector (817) 200-1104 Ron.Kopriva@nrc.gov
        15.    List of licensee contacts for the inspection team with pager or phone
              numbers.
Mailing Address:  RONALD KOPRIVA US NRC, REGION IV
                                            -3-
1600 E LAMAR BLVD
ARLINGTON TX  76011 


III.  Information Requested to be provided throughout the inspection.
      1.    Copies of any corrective action documents generated as a result of the
              teams questions or queries during this inspection.
      2.    Copies of the list of questions submitted by the team members and the
              status/resolution of the information requested (provide daily during the
              inspection to each team member).
      3.    Reference materials (available electronically and as needed during all
              onsite weeks):
              General set of plant drawings
              IPE/PRA report
              Procurement documents for components selected
              Plant procedures (normal, abnormal, emergency, surveillance, etc.)
              Technical Specifications
              Updated Final Safety Analysis Report
              Vendor manuals
Inspector Contact Information:
Ronald Kopriva
Senior Reactor Inspector
(817) 200-1104
Ron.Kopriva@nrc.gov
Mailing Address:
RONALD KOPRIVA
US NRC, REGION IV
1600 E LAMAR BLVD
ARLINGTON TX 76011
                                            -4-
}}
}}

Latest revision as of 10:09, 4 November 2019

Information Request for NRC Triennial Baseline Component Design Bases Inspection NRC Inspection Report 05000483-14-007
ML14027A279
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/27/2014
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Heflin A
Union Electric Co
References
IR-14-007
Download: ML14027A279 (7)


See also: IR 05000483/2014007

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

January 27, 2014

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - INFORMATION REQUEST FOR NRC TRIENNIAL

BASELINE COMPONENT DESIGN BASES INSPECTION NRC INSPECTION

REPORT 05000483/2014007

Dear Mr. Heflin:

On April 14, 2014, the NRC will begin a triennial baseline Component Design Bases Inspection

at the Callaway Plant. A seven-person team will perform this inspection using NRC Inspection

Procedure 71111.21, Component Design Bases Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of

seven NRC inspectors, of which six will focus on engineering and one on operations. The

current inspection schedule is as follows:

Onsite information gathering visit: Week of March 24, 2014

Onsite weeks: First On-Site Week - April 14-18, 2014

Second On-Site Week - April 28 - May 2, 2014

Third On-Site Week - May 12-16, 2014

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. Additional information and documentation needed to support the inspection will be

identified, including interviews with engineering managers, engineers, and probabilistic safety

assessment staff.

A. Heflin -2-

Our experience with these inspections has shown they are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection, we have enclosed a request for information needed

for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than March 17, 2014. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested are those items that the team will need access to

when onsite and after the inspection samples are selected. The third group lists information

necessary to aid the inspection team in tracking issues identified as a result of the inspection. It

is requested that this information be provided to the lead inspector as the information is

generated during the inspection. It is important that all of these documents are up to date and

completed in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection. In order to facilitate the inspection, we

request that a contact individual be assigned to each inspector to ensure information requests,

questions, and concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald Kopriva. We understand that our licensing

engineer contact for this inspection is Mr. Steve Petzel. If there are any questions about the

inspection or the requested materials, please contact the lead inspector at (817) 200-1104 or via

e-mail at Ron.Kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosure:

Component Design Basis Inspection

Document Request

cc w/ enclosure: Electronic Distribution for Callaway Plant

ML14027A279

SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials TRF

Publicly Avail Yes No Sensitive Yes No Sens. Type Initials TRF

RIV:SRI:DRS/EB1 BC/EB1

RKopriva TFarnholtz

/RA/ TRF for /RA/

01/23/2014 01/23/2014

INFORMATION REQUEST FOR CALLAWAY PLANT

COMPONENT DESIGN BASES (CDBI) INSPECTION

Inspection Report: 05000483/2014007

Information Gathering Dates: March 24-28, 2014

On-site Inspection Dates: First Week - April 14-18, 2014

Second Week - April 28 - May 2, 2014

Third Week - May 12-16, 2014

Inspection Procedure: IP 71111.21, Component Design Bases

Inspection

Lead Inspector/Team Leader: Ronald Kopriva

817-200-1104

Ron.Kopriva@nrc.gov

I. Information Requested Prior to the information Gathering Visit

The following information is requested by March 17, 2014, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information,

pleased call the lead inspector as soon as possible. (Please provide the

information electronically in pdf files, Excel, or other searchable formats. The

information should contain descriptive names, and be indexed and hyperlinked to

facilitate ease of use. Information in "lists" should contain enough information to

be easily understood by someone who has knowledge of boiling water reactor

technology.)

1. An excel spreadsheet of equipment basic events (with definitions)

including importance measures sorted by risk achievement worth (RAW)

and Fussell-Vesely (FV) from your internal events probabilistic risk

assessment (PRA). Include basic events with RAW value of 1.3 or

greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary

document.

4. An excel spreadsheet of PRA human action basic events or risk ranking

of operator actions from your site specific PSA sorted by RAW and FV.

Provide copies of your human reliability worksheets for these items.

5. If you have an external events or fire PSA model, provide the information

requested in items 1-4 for external events and fire.

-1- Enclosure

6. Any pre-existing evaluation or list of components and associated

calculations with low design margins, (i.e., pumps closest to the design

limit for flow or pressure, diesel generator close to design required output,

heat exchangers close to rated design heat removal, etc.).

7. List of high risk maintenance rule systems/components and functions;

based on engineering or expert panel judgment.

8. A list of operating experience evaluations for the last 2 years.

9. A list of all time-critical operator actions in procedures.

10. A list of permanent and temporary modifications sorted by component

identified in Item 1.

11. List of current operator work arounds/burdens.

12. A list of the design calculations, which provide the design margin

information for components included in Item 1. (Calculations should be

available during the information gathering visit.)

13. List of root cause evaluations associated with component failures or

design issues initiated/completed in the last 5 years.

14. Current management and engineering organizational charts.

15. Callaway Plant IPEEE, if available electronically.

16. Mechanical piping drawings for:

Engineered safety features

Emergency core cooling Systems

Emergency diesel generators

17 Electrical one-line drawings for:

Offsite power/switchyard supplies

Normal ac power systems

Emergency ac/dc power systems including

120Vac power, and

125Vdc/24Vdc safety class systems

18. List of any common-cause failures of components in the last 3 years.

19. An electronic copy of the Design Bases Documents.

20. An electronic copy of the System Health notebooks.

-2-

II. Information Requested to be Available on First Day of Inspection

(April 14, 2014)

1. List of condition reports (corrective action documents) associated with

each of the selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected

components for the last 2 years.

3. Copies of calculations associated with each of the selected components

(if not previously provided), excluding data files. Please review the

calculations and also provide copies of reference material (such as

drawings, engineering requests, and vendor letters).

4. Copies of operability evaluations associated with each of the selected

components and plans for restoring operability, if applicable.

5. Copies of selected operator work-around evaluations associated with

each of the selected components and plans for resolution, if applicable.

6. Copies of any open temporary modifications associated with each of the

selected components, if applicable.

7. Trend data on the selected electrical/mechanical components

performance for last 3 years (for example, pumps performance including

in-service testing, other vibration monitoring, oil sample results, etc., as

applicable).

8. A copy of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

9. A copy of engineering/operations related audits completed in the last

2 years.

10. List of motor operated valves (MOVs) in the program, design margin and

risk ranking.

11. List of air operated valves (AOVs) in the valve program, design and risk

ranking.

12. Structure, system and components in the Maintenance Rule (a)(1)

category.

13. Site top 10 issues list.

14. Procedures used to accomplish operator actions associated with the

basic events in your PRA.

15. List of licensee contacts for the inspection team with pager or phone

numbers.

-3-

III. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the

inspection to each team member).

3. Reference materials (available electronically and as needed during all

onsite weeks):

General set of plant drawings

IPE/PRA report

Procurement documents for components selected

Plant procedures (normal, abnormal, emergency, surveillance, etc.)

Technical Specifications

Updated Final Safety Analysis Report

Vendor manuals

Inspector Contact Information:

Ronald Kopriva

Senior Reactor Inspector

(817) 200-1104

Ron.Kopriva@nrc.gov

Mailing Address:

RONALD KOPRIVA

US NRC, REGION IV

1600 E LAMAR BLVD

ARLINGTON TX 76011

-4-