ML14035A402: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:3 rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 2  
{{#Wiki_filter:3rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 2 Arizona Public Service Company                                                                            PVNGS PO Box 52034                                                                                              5801 S. Wintersburg Road Phoenix, AZ 85072-2034                                                                                    Tonopah, AZ 85354 Brannin,          Digitally signed by Brannin, Michael P(Z08286)
Digitally signed by Hansen, Douglas B(Z41530)
Michael          DN: cn=Brannin, Michael P(Z08286)
Hansen, Douglas        DN: cn=Hansen, Douglas B(Z41530)
Reason: I have reviewed this P(Z08286)
Reason: Program Owner Date: 2013.08.28 13:45:20 -07'00'                                B(Z41530)              document Preparer: ____________________________ ___                              Reviewer:          __________________________________
Date: 2013.08.28 13:49:18 -07'00' Digitally signed by Schrecker, Schrecker,    Kenneth D(Z99981)                                                                          Digitally signed by Dilorenzo, Michael DN: cn=Schrecker, Kenneth                                              Dilorenzo, Michael  D(Z99838)
Kenneth        D(Z99981)
DN: cn=Dilorenzo, Michael D(Z99838)
Reason: Program Engineering Department Reason: I am approving this                                            D(Z99838)            Leader D(Z99981)      document Section Leader: _________________________
Date: 2013.08.29 06:55:38 -07'00'        Department Leader: __________________________
Date: 2013.08.29 07:11:30 -07'00' Digitally signed by Hogstrom,                Hogstrom, Robert (YH2450)
DN: cn=Hogstrom, Robert Robert                  (YH2450)
Date: 2013.08.28 14:06:17 ANII (YH2450) _______________________  -07'00' Commercial Service Date: 09-19-1986 Program No: 3INT-ISI-2 Rev. 4 3INT-ISI-2 Rev. 4                                                                            1 of 210


Arizona Public Service Company      PVNGS PO Box 52034        5801 S. Wintersburg Road Phoenix, AZ 85072-2034      Tonopah, AZ 85354
TABLE OF CONTENTS Summary of Changes.3 1.0    Summary ......................................................................................................... 4 2.0    Code Applicability .......................................................................................... 4 3.0    Description ...................................................................................................... 5 3.1  Scope ............................................................................................................ 5 3.2  System Boundaries ....................................................................................... 6 3.3  Accessibility ................................................................................................. 6 3.4  Examination Techniques .............................................................................. 7 3.5  Inspection Intervals...................................................................................... .7 3.6  Examination Categories ............................................................................... .8 3.7  Evaluation and Repair.................................................................................. .8 3.8  System Pressure Tests.................................................................................. .8 3.9  Exemptions .................................................................................................. .8 3.10  Code Cases .............................................................................................. .9 3.11  Outage Plan Table9 3.12  References....10 4.0    ASME Class 1 Summary............................................................................... 11 5.0    ASME Class 2 Summary............................................................................... 38 6.0    ASME Class 3 Summary............................................................................... 69 7.0    Augmented Summary .................................................................................... 76 8.0    Requests for Relief ........................................................................................ 89 9.0    Boundary Drawing Listing ............................................................................ 91 10.0 Zone Drawings .............................................................................................. 93 11.0 Terms and Definitions ................................................................................. 208 3INT-ISI-2 Rev. 4                                                2 of 210


Preparer: ____________________________ ___ Reviewer: __________________________________
==SUMMARY==
Section Leader: _________________________          Department Leader: _
OF CHANGES Revision 4 Cover Page revised Table of Contents Updated Section 1.1, added a reference to TRM Section 3.1.3 Added reference to the Pressure Test Program D1.20, Added DG welded attachments and adjusted percentages per CRAI 4420287 F1.30, Added DG supports and adjusted percentages per CRAI 4420287 3INT-ISI-2 Rev. 4               3 of 210
_______________
__________
ANII _______________________
 
Commercial Service Date: 09-19-1986 Program No: 3INT-ISI-2 Rev. 4 3INT-ISI-2 Rev. 4 1 of 210 Brannin, Michael P(Z08286)Digitally signed by Brannin, Michael P(Z08286)
 
DN: cn=Brannin, Michael
 
P(Z08286)
 
Reason: Program Owner
 
Date: 2013.08.28 13:45:20 -07'00' Hansen, Douglas
 
B(Z41530)Digitally signed by Hansen, Douglas B(Z41530)
 
DN: cn=Hansen, Douglas B(Z41530)
 
Reason: I have reviewed this
 
document Date: 2013.08.28 13:49:18 -07'00'
: Hogstrom, Robert (YH2450)Digitally signed by
 
Hogstrom, Robert (YH2450)
 
DN: cn=Hogstrom, Robert (YH2450) Date: 2013.08.28 14:06:17
 
-07'00'Schrecker, Kenneth D(Z99981)Digitally signed by Schrecker, Kenneth D(Z99981)
 
DN: cn=Schrecker, Kenneth
 
D(Z99981)
Reason: I am approving this document Date: 2013.08.29 06:55:38 -07'00' Dilorenzo, Michael


D(Z99838)Digitally signed by Dilorenzo, Michael D(Z99838)
PALO VERDE NUCLEAR GENERATING STATION UNIT 2 INSERVICE INSPECTION - PROGRAM  
DN: cn=Dilorenzo, Michael D(Z99838)
 
Reason: Program Engineering Department
 
Leader Date: 2013.08.29 07:11:30 -07'00' TABLE OF CONTENTS Summary of Changes------------------------.3 1.0 Summary ......................................................................................................... 4 2.0 Code Applicability .......................................................................................... 4 3.0 Description ...................................................................................................... 5 3.1 Scope ............................................................................................................ 5 3.2 System Boundaries ....................................................................................... 6 3.3 Accessibility ................................................................................................. 6 3.4 Examination Techniques .............................................................................. 7 3.5 Inspection Intervals ...................................................................................... .7 3.6 Examination Categories ............................................................................... .8 3.7 Evaluation and Repair .................................................................................. .8 3.8 System Pressure Tests.................................................................................. .8 3.9 Exemptions .................................................................................................. .8 3.10 Code Cases .............................................................................................. -.9 3.11 Outage Plan Table----------------------9 3.12  References------------------------....10 4.0 ASME Class 1 Summary ............................................................................... 11 5.0 ASME Class 2 Summary ............................................................................... 38 6.0 ASME Class 3 Summary ............................................................................... 69 7.0 Augmented Summary .................................................................................... 76 8.0 Requests for Relief ........................................................................................ 89 9.0 Boundary Drawing Listing ............................................................................ 91 10.0 Zone Drawings .............................................................................................. 93 11.0 Terms and Definitions ................................................................................. 208 3INT-ISI-2 Rev. 4 2 of 210
 
==SUMMARY==
OF CHANGES Revision 4 Cover Page revised Table of Contents Updated Section 1.1, added a reference to TRM Section 3.1.3 Added reference to the Pressure Test Program D1.20, Added DG welded attachments and adjusted percentages per CRAI 4420287 F1.30, Added DG supports and adjusted percentages per CRAI 4420287 3INT-ISI-2 Rev. 4 3 of 210 PALO VERDE NUCLEAR GENERATING STATION UNIT 2 INSERVICE INSPECTION - PROGRAM  


==SUMMARY==
==SUMMARY==
Line 73: Line 45:


==SUMMARY==
==SUMMARY==
1.1    This document contains a detailed description of the 3 rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, Technical Requirements Manual, and the PVNGS UFSAR.
Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.
1.2    The revision is being prepared to update the ISI Program for the 3 rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section


XI with the exceptions noted below: 1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0. These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: "Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a". 1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for B-L-1, B-M-1, and C-G for pump and valve body welds requirements. (Ref. Letter 102-06454 and SER dated 09-18-2012). (ACT 4343138) 1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods. 1.2.4 To support future ISI Programs, reference to the reactor vessel internals aging management program was added (Reference 3.12.3). (CRAI 4353644) 1.3   This revision does not utilize risk informed inservice inspection methodology at this time.
1.1    This document contains a detailed description of the 3rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, Technical Requirements Manual, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.
1.4   The information presented is in a form consistent with the 1 st and 2 nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, "Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3."
1.2 The revision is being prepared to update the ISI Program for the 3rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below:
2.0 CODE APPLICABILITY 2.1   Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3 rd 10 Year Interval (3-18-07), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.
1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0.
These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a.
1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for B-L-1, B-M-1, and C-G for pump and valve body welds requirements. (Ref. Letter 102-06454 and SER dated 09-18-2012). (ACT 4343138) 1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods.
1.2.4 To support future ISI Programs, reference to the reactor vessel internals aging management program was added (Reference 3.12.3). (CRAI 4353644) 1.3 This revision does not utilize risk informed inservice inspection methodology at this time.
1.4 The information presented is in a form consistent with the 1st and 2nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3.
2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3rd 10 Year Interval (3-18-07), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.
* The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.
* The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.
3INT-ISI-2 Rev. 4 4 of 210
3INT-ISI-2 Rev. 4                                   4 of 210
* When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.
* When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.
* The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.
* The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.
Line 88: Line 62:
* IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
* IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
* The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.
* The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.
2.2     If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.
2.2   If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.
2.3     This ISI Program will implement the ASME Section XI 2001 Edition Appendix VIII (Performance Demonstration for Ultrasonic Examination Systems) in accordance with 10 CFR 50.55a. These examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document (Reference 3.12.2) explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program. (CRAI 4378832
2.3   This ISI Program will implement the ASME Section XI 2001 Edition Appendix VIII (Performance Demonstration for Ultrasonic Examination Systems) in accordance with 10 CFR 50.55a. These examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document (Reference 3.12.2) explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program. (CRAI 4378832)
)  


==3.0 DESCRIPTION==
==3.0 DESCRIPTION==
3.1     SCOPE 3.1.1     This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below: 1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2       This program also includes an augmented section that includes examinations for other items required to be examined as identified below. 1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 4materials in accordance with 10CFR50.55a and Code Case N-722-1. 2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1. 3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1. 3INT-ISI-2 Rev. 4 5 of 210
 
: 4. Examination of high energy line piping in accordance with UFSAR 6.6.1(CRAI 4178275). 5. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
3.1     SCOPE 3.1.1     This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below:
: 6. USNRC Circulars, Information Notices, Bulletins, or Orders 7. INPO or other industry operating experiences 8. Combustion Engineering or Westinghouse bulletins or notices 9. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.
: 1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2     This program also includes an augmented section that includes examinations for other items required to be examined as identified below.
3.1.3     Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:
: 1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 4materials in accordance with 10CFR50.55a and Code Case N-722-1.
: 2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1.
: 3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.
3INT-ISI-2 Rev. 4                                     5 of 210
: 4. Examination of high energy line piping in accordance with UFSAR 6.6.1(CRAI 4178275).
: 5. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
: 6. USNRC Circulars, Information Notices, Bulletins, or Orders
: 7. INPO or other industry operating experiences
: 8. Combustion Engineering or Westinghouse bulletins or notices
: 9. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.
3.1.3   Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:
: 1. Pressure testing of ASME Class 1, 2, and 3 piping will be performed in accordance with the Pressure testing Program
: 1. Pressure testing of ASME Class 1, 2, and 3 piping will be performed in accordance with the Pressure testing Program
: 2. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
: 2. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
: 3. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
: 3. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
: 4. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.
: 4. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.
3.2     SYSTEM BOUNDARIES 3.2.1       A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0. 3.2.2       A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. (CRAI4398776) 3.3     ACCESSIBILITY 3.3.1       The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the 1 st and 2 nd 10 Year Intervals and Request for Relief submitted. If included in the required 3 rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3 rd Interval. 3INT-ISI-2 Rev. 4 6 of 210 3.3.2      All items that are scheduled for examination will be examined to the extent practical. In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends. 3.4      EXAMINATION TECHNIQUES 3.4.1      The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below: VT - Visual VT - 1  (General Condition) VT - 2  (Leakage)
3.2   SYSTEM BOUNDARIES 3.2.1   A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0.
VT - 3  (Mechanical and Structural Condition) VE  (Visual Examination)
3.2.2   A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. (CRAI4398776) 3.3   ACCESSIBILITY 3.3.1   The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the 1st and 2nd 10 Year Intervals and Request for Relief submitted. If included in the required 3rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3rd Interval.
S - Surface  PT - Liquid Penetrant  MT - Magnetic Particle ET - Eddy Current VOL - Volumetric  UT - Ultrasonic  RT - Radiography
3INT-ISI-2 Rev. 4                                   6 of 210


3.4.2      All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.
3.3.2    All items that are scheduled for examination will be examined to the extent practical.
In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends.
3.4    EXAMINATION TECHNIQUES 3.4.1    The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below:
VT - Visual VT - 1  (General Condition)
VT - 2   (Leakage)
VT - 3  (Mechanical and Structural Condition)
VE       (Visual Examination)
S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2    All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.
The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.
The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.
3.5     INSPECTION INTERVALS 3.5.1     The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1 st , 2 nd, and 3 rd 10 Year Intervals and corresponding inspection periods are defined below: First Inspection Interval:   09/19/86 to 03/17/97   Second Inspection Interval: 03/18/97 to 03/17/07 Third Inspection Interval: 03/18/07 to 03/17/17   Period One:   03/18/07 to 07/17/10 Period Two: 07/18/10 to 11/17/13 Period Three: 11/18/13 to 03/17/17                         It should be noted that the intervals/periods may change to allow for                         extended outage durations per IWA-2400 of ASME Section XI.
3.5     INSPECTION INTERVALS 3.5.1     The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1st, 2nd, and 3rd 10 Year Intervals and corresponding inspection periods are defined below:
3INT-ISI-2 Rev. 4 7 of 210 3.6       EXAMINATION CATEGORIES 3.6.1       The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0. 3.7       EVALUATION AND REPAIR 3.7.1       The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC. 3.7.2       It should be noted that a relief was requested (Relief Request 36) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007). 3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.
First Inspection Interval:       09/19/86 to 03/17/97 Second Inspection Interval:       03/18/97 to 03/17/07 Third Inspection Interval:       03/18/07 to 03/17/17 Period One:                       03/18/07 to 07/17/10 Period Two:                       07/18/10 to 11/17/13 Period Three:                     11/18/13 to 03/17/17 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.
3.8     SYSTEM PRESSURE TESTS 3.8.1       ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested. 3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.
3INT-ISI-2 Rev. 4                                       7 of 210
3.9       EXEMPTIONS 3.9.1       The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI. 3.9.2       A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review. 3INT-ISI-2 Rev. 4 8 of 210 3.10       CODE CASES 3.10.1     The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable (CRAIs 4338597, 4404322, and 4308456):
 
: 1. N-460 Alternative examination coverage for Class 1 and 2 welds 2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels 3. N-532-4 Alternative requirements to repair and replacement documentation 4. N-534 Alternative Requirements for Pneumatic Pressure Testing. 5. N-537 Location of Ultrasonic Depth-Sizing Flaws (CRAI 4404322) 6. N-566-2 Corrective Action for Leakage Identified at Bolted Connections 7. N-613-1 Ultrasonic examination of full penetration nozzles in vessels 8. N-624 Successive inspections 9. N-652-1 Alternative requirements to categories B-G-1, B-G-2, and C-D bolting 10. N-663 Alternative requirements for Classes 1 and 2 Surface Examinations 11. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections 12. N-685 Lighting Requirements for Surface Examinations 13. N-695   Alternative for Qualification Requirements for Dissimilar Metal Piping Welds,   Appendix VIII Supplement 10 14. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded   Attachments for Examination 15 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy                                       Class 2 or 3 Vessels and Tanks (CRAI 4308456) 3.10.2     The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where  
3.6   EXAMINATION CATEGORIES 3.6.1   The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0.
3.7     EVALUATION AND REPAIR 3.7.1   The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC.
3.7.2   It should be noted that a relief was requested (Relief Request 36) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007).
3.7.3     All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.
3.8     SYSTEM PRESSURE TESTS 3.8.1   ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested.
3.8.2     Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.
3.9     EXEMPTIONS 3.9.1   The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI.
3.9.2   A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.
3INT-ISI-2 Rev. 4                                   8 of 210
 
3.10     CODE CASES 3.10.1   The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable (CRAIs 4338597, 4404322, and 4308456):
: 1.       N-460     Alternative examination coverage for Class 1 and 2 welds
: 2.       N-526     Alternative requirements for successive inspections of Class 1 and 2 vessels
: 3.       N-532-4   Alternative requirements to repair and replacement documentation
: 4.       N-534     Alternative Requirements for Pneumatic Pressure Testing.
: 5.       N-537     Location of Ultrasonic Depth-Sizing Flaws (CRAI 4404322)
: 6.       N-566-2   Corrective Action for Leakage Identified at Bolted Connections
: 7.       N-613-1   Ultrasonic examination of full penetration nozzles in vessels
: 8.       N-624     Successive inspections
: 9.       N-652-1   Alternative requirements to categories B-G-1, B-G-2, and C-D bolting
: 10.     N-663     Alternative requirements for Classes 1 and 2 Surface Examinations
: 11.     N-666     Weld Overlay of Class 1, 2, and 3 Socket Welded Connections
: 12.     N-685     Lighting Requirements for Surface Examinations
: 13.     N-695     Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10
: 14.     N-700     Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 15       N-705     Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks (CRAI 4308456) 3.10.2   The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where applicable:
: 1.      N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
: 2.      N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).
3.10.3  The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:
: 1.      N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials
: 2.      N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds
: 3.      N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities. (Note Reference 3.12.1).
3.11    OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks are also identified.
3INT-ISI-2 Rev. 4                                                  9 of 210
 
3.12      REFERENCES 3.12.1      N001-0604-00903, Calculation PV-23Q-405, dated 5-25-11(CRAI 4348769) 3.12.2      EPRI 2012 Technical Report titled Nondestructive Evaluation:
Performance Demonstration Initiative (PDI) Comparisons to ASME Section XI, Appendix VIII 2007 Edition with 2008 Addendum, and 10CFR50.55a, Year 2011 dated November 2012 (CRAI 4378832) 3.12.3      MN755-A00003 titled PWR Internals Aging Management Program Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3 dated 9-7-12 (CRAI 4353644) 3.12.4      EPRI 2012 Technical Report 1024994, Materials Reliability Program:
Assessment of Residual Heat Removal Mixing Tee Thermal Fatigue in PWR Plants, dated August 2012. (CRAI 4312834) 3INT-ISI-2 Rev. 4                                  10 of 210


applicable:
SECTION 4.0 ASME CLASS 1 EXAMINATION  
: 1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy    Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity  temporarily deferred under the provisions of this Code Case shall be performed during  the next scheduled outage.
: 2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).
3.10.3    The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:
: 1. N-722-1  Additional Examinations for PWR Pressure Retaining Welds in Class 1    Components Fabricated With Alloy 600/82/182 Materials 2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads    With Nozzles Having Pressure-Retaining Partial-Penetration Welds 3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR    Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS    W86182 Weld filler Material With or Without Application of Listed Mitigation    Activities.  (Note Reference 3.12.1).
3.11      OUTAGE PLAN TABLE  The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02,  identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of  calibration blocks are also identified.
3INT-ISI-2 Rev. 4 9 of 210 3.12  REFERENCES 3.12.1      N001-0604-00903, Calculation PV-23Q-405, dated 5-25-11(CRAI 4348769) 3.12.2      EPRI 2012 Technical Report titled "Nondestructive Evaluation: Performance Demonstration Initiative (PDI) Comparisons to ASME Section XI, Appendix VIII 2007 Edition with 2008 Addendum, and 10CFR50.55a, Year 2011" dated November 2012 (CRAI 4378832) 3.12.3      MN755-A00003 titled "PWR Internals Aging Management Program Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3" dated 9-7-12 (CRAI 4353644) 3.12.4 EPRI 2012 Technical Report 1024994, "Materials Reliability Program: Assessment of Residual Heat Removal Mixing Tee Thermal Fatigue in PWR Plants," dated August 2012. (CRAI 4312834) 3INT-ISI-2 Rev. 4 10 of 210 SECTION 4.0 ASME CLASS 1 EXAMINATION  


==SUMMARY==
==SUMMARY==


3INT-ISI-2 Rev. 4 11 of 210 INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves                           B-L-1 & B-M-1 Pressure Retaining Welds in Pump and Valve Bodies                           B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 3INT-ISI-2 Rev. 4 12 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-A; PRESSURE RETAINING WELDS IN REACTOR VESSEL
3INT-ISI-2 Rev. 4 11 of 210
*Auto exam with core barrel removed
 
*RR 40 exam by 2027B1.10SHELL WELDSB1.11CIRCUMFERENTIA L1-Reactor Vesselwelds79173Vol3010 0203*3100 B1.12LONGITUDINAL1-Reactor Vesselwelds79173Vol90100209*3100 B1.20HEAD WELDS B1.21CIRCUMFERENTIA LB1.22MERIDIONAL1-Reactor Vessel Bottom Headweld79173Vol10100201*3100 3INT-ISI-2 Rev. 4 13 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS2-Closure HeadweldN05065-CHA-01Vol0000 RVH Replaced R15B1.30SHELL-TO-FLANGE WELD1-Reactor Vesselweld79173Vol10100201*3100 B1.40HEAD-TO-FLANGE WELD2-Closure HeadweldN05065-CHA-01S & Vol0000 RVH Replaced R15 3INT-ISI-2 Rev. 4 14 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-B; PRESSURE RETAINING WELDS VESSELS OTHER THAN REACTOR VESSELS
INDEX EXAM CATEGORIES B-A       Pressure Retaining Welds in Reactor Vessel B-B       Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D       Full Penetration Welded Nozzles in Vessels B-F       Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1     Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2     Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J       Pressure Retaining Welds in Piping B-K       Welded Attachments for Vessels, Piping, Pumps and Valves B-L-1 & B-M-1 Pressure Retaining Welds in Pump and Valve Bodies B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1     Interior of Reactor Vessel B-N-2     Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3     Removable Core Support Structures B-O       Pressure Retaining Welds in Control Rod Housings B-P       All Pressure Retaining Components B-Q       Steam Generator Tubing F-A       Class 1 Supports 3INT-ISI-2 Rev. 4                               12 of 210
*category running percent----21292257 43100 PRESSURIZERB2.10SHELL -TO-HEAD WELDS B2.11CIRCUMFERENTIAL 5-   Pressurize rweld79373Vol211*13*B2.12LONGITUDINAL **
 
5-   Pressurize rweld79373Vol421**
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM       IDENTIFICATION LINE OR SERIAL                                                     REMARKS METHOD ITEMS AMOUNT   PERIOD     %
**1' of each 23**intesecting circ exam area STEAM GENERATORS ***B2.30HEAD WELDS B2.31CIRCUMFERENTIAL
NO                                                          NO EXAM CATEGORY B-A; PRESSURE                                                                                 *Auto exam with core RETAINING WELDS IN REACTOR VESSEL                                                                           barrel removed
*** Multiple Vessels3-   Steam Generator 1weld212Vol112*
                                                                                                                  *RR 40 exam by 2027 B1.10 SHELL WELDS B1.11 CIRCUMFERENTIAL 1-Reactor Vessel                      welds          79173            Vol    3    0      1        0 0      2        0 3*       3        100 B1.12 LONGITUDINAL 1-Reactor Vessel                      welds          79173            Vol    9    0      1        0 0      2        0 9*       3        100 B1.20 HEAD WELDS B1.21 CIRCUMFERENTIAL B1.22 MERIDIONAL 1-Reactor Vessel Bottom Head          weld          79173            Vol    1    0      1        0 0      2        0 1*       3        100 3INT-ISI-2 Rev. 4                                             13 of 210
4-   Steam Generator 2weld211Vol1B2.40TUBESHEET TO HEAD3-   Steam Generator 1weld212Vol212 4-   Steam Generator 2weld211Vol213*
 
3INT-ISI-2 Rev. 4 15 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-D; FULL PENETRATION WELDED NOZZLES IN VESSELS-INSPECTION PROGRAM B *RR 40 exam by 2027 REACTOR VESSEL B3.90NOZZLE-TO-VESSEL WELDS1-   Reactor VesselOutlets - 2 79173Vol66*3100
ASME                                               DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                                   REMARKS METHOD   ITEMS AMOUNT   PERIOD     %
*Auto exam with Inlets - 4 core barrel removedB3.100NOZZLE INSIDE RADIUS SECTION1-   Reactor VesselOutlets - 2 79173Vol66*3100
NO                                                    NO 2-Closure Head                    weld      N05065-CHA-01          Vol    0    0      0        0    RVH Replaced R15 B1.30 SHELL-TO-FLANGE WELD 1-Reactor Vessel                  weld          79173            Vol    1    0      1        0 0      2        0 1*       3        100 B1.40 HEAD-TO-FLANGE WELD 2-Closure Head                    weld      N05065-CHA-01      S & Vol    0    0      0        0    RVH Replaced R15 3INT-ISI-2 Rev. 4                                           14 of 210
*Auto exam with Inlets - 4 core barrel removed PRESSURIZERB3.110NOZZLE-TO-VESSEL WELDS 5-   Pressurize rSurge - 179373Vol61116Spray - 12250Safeties - 433100 B3.120 NOZZLE INSIDE RADIUS SECTION**
 
5-   Pressurize rSurge - 179373Vol61116Spray - 12250Safeties - 433100 3INT-ISI-2 Rev. 4 16 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS STEAM GENERATORS B3.130NOZZLE-TO-VESSEL WELDS
ASME                                                     DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM       IDENTIFICATION LINE OR SERIAL                                                     REMARKS METHOD ITEMS AMOUNT   PERIOD     %
NO                                                          NO EXAM CATEGORY B-B; PRESSURE RETAINING WELDS VESSELS OTHER THAN REACTOR VESSELS
              *category running percent         -             -                 -   -     2      1        29 2      2        57 4      3        100 PRESSURIZER B2.10 SHELL -TO-HEAD WELDS B2.11 CIRCUMFERENTIAL 5- Pressurizer                          weld          79373            Vol    2    1      1
* 1      3
* B2.12 LONGITUDINAL **
5- Pressurizer                          weld          79373            Vol    4    2      1        **   **1' of each 2      3        **   intesecting circ exam area STEAM GENERATORS ***
B2.30 HEAD WELDS B2.31 CIRCUMFERENTIAL                                                                                              *** Multiple Vessels 3- Steam Generator 1                    weld            212              Vol    1    1      2
* 4- Steam Generator 2                    weld            211              Vol    1 B2.40 TUBESHEET TO HEAD 3- Steam Generator 1                    weld            212              Vol    2    1      2 4- Steam Generator 2                    weld            211              Vol    2    1      3
* 3INT-ISI-2 Rev. 4                                             15 of 210
 
ASME                                                       DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM         IDENTIFICATION LINE OR SERIAL                                                   REMARKS METHOD ITEMS AMOUNT   PERIOD     %
NO                                                            NO EXAM CATEGORY B-D; FULL PENETRATION WELDED NOZZLES IN VESSELS-INSPECTION PROGRAM B
                                                                                                                      *RR 40 exam by 2027 REACTOR VESSEL B3.90 NOZZLE-TO-VESSEL WELDS 1- Reactor Vessel                      Outlets - 2       79173            Vol    6    6*       3        100  *Auto exam with Inlets - 4                                                             core barrel removed B3.100 NOZZLE INSIDE RADIUS SECTION 1- Reactor Vessel                      Outlets - 2       79173            Vol    6    6*       3        100  *Auto exam with Inlets - 4                                                             core barrel removed PRESSURIZER B3.110 NOZZLE-TO-VESSEL WELDS 5- Pressurizer                          Surge - 1        79373            Vol    6    1      1        16 Spray - 1                                      2      2        50 Safeties - 4                                    3      3        100 B3.120 NOZZLE INSIDE RADIUS SECTION**
5- Pressurizer                          Surge - 1        79373            Vol    6    1      1        16 Spray - 1                                      2      2        50 Safeties - 4                                    3      3        100 3INT-ISI-2 Rev. 4                                             16 of 210
 
ASME                                                       DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM          IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                            NO STEAM GENERATORS B3.130 NOZZLE-TO-VESSEL WELDS B3.140 NOZZLE INSIDE RADIUS SECTION**                                                                                **added inner radius
          *B3.130 & B3.140 running percent        -            -                -    -    4      1        30  per 10CFR50.55a 4      2        60 4      3        100 B3.130 3- Steam Generator 1                    Inlet - 1        212              Vol    3    1      1
* Outlet - 2                                      2      2
* 4- Steam Generator 2                    Inlet - 1        211              Vol    3    1      1
* Outlet - 2                                      2      3
* B3.140 NOZZLE INSIDE RADIUS SECTION 3- Steam Generator 1                    Inlet - 1        212              Vol    3    1      1
* Outlet - 2                                      2      2
* 4- Steam Generator 2                    Inlet - 1        211              Vol    3    1      1
* Outlet - 2                                      2      3
* 3INT-ISI-2 Rev. 4                                            17 of 210
 
ASME                                                      DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM         IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                            NO EXAM CATEGORY B-F; PRESSURE RETAINING DISSIMILAR METAL WELDS IN VESSEL NOZZLES PRESSURIZER NOMINAL PIPE SIZE > 4 INCH B5.40 NOZZLE TO SAFEEND BUTT WELDS 20- Surge                            butt welds    RC-028-12        S & Vol    6    *        *
* Mitigated with FSWO 29- Spray                            butt welds      RC-018-4        S & Vol                                Moved to augmented 31- Safeties (4)                      butt welds      RC-001-6        S & Vol RC-003-6        S & Vol RC-005-6        S & Vol RC-007-6        S & Vol 3INT-ISI-2 Rev. 4                                              18 of 210
 
ASME                                                          DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM            IDENTIFICATION LINE OR SERIAL                                               REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                                 NO EXAM CATEGORY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN. IN DIAMETER REACTOR VESSEL B6.10 CLOSURE HEAD NUTS 2- Closure Head                              nuts      7.237 x 7.91"        VT-1  54    18      1        33 18      2        66 18      3        100 B6.20 CLOSURE STUDS 2- Closure Head                              studs    7.380 x 76.37"          Vol  54    18      1        33 18      2        66 18      3        100 B6.40 THREADS IN FLANGE 1- Reactor Vessel                        Stud Holes        79173              Vol  54    0      0        0 0      0          0 54      3        100 B6.50 CLOSURE WASHERS BUSHINGS 2- Closure Head                            Washers      7.50 x 1.27        VT-1  54    18      1        33 18      2        66 18      3        100 3INT-ISI-2 Rev. 4                                    19 of 210
 
ASME                                              DESCRIPTION, NDE TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                                      REMARKS METHOD ITEMS AMOUNT  PERIOD      %
NO                                                    NO PUMPS B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A  Flange Studs  4.33 x 32.87        Vol  16    16      3        100
* Multiple pumps 17- Reactor Coolant Pump 1B  Flange Studs  4.33 x 32.87        Vol  16    *
* 18- Reactor Coolant Pump 2A  Flange Studs  4.33 x 32.87        Vol  16    *
* 19- Reactor Coolant Pump 2B  Flange Studs  4.33 x 32.87        Vol  16    *        *
                                                                                                              ** VT-1 exams on 1 pump FLANGE SURFACE WHEN                                                                                    per interval (with B12.XX B6.190 CONNECTION DISASSEMBLED                                                                                exams) 16- Reactor Coolant Pump 1A    surface        1110-1A            VT-1    1    **      **        **
17- Reactor Coolant Pump 1B    surface        1110-1B            VT-1    1    **      **        **
18- Reactor Coolant Pump 2A    surface        1110-2A            VT-1    1    **      **        **
19- Reactor Coolant Pump 2B    surface        1110-2B            VT-1    1    **      **        **
                                                                                                              ** VT-1 exams on 1 pump per interval (with B12.XX B6.200 NUTS, BUSHINGS, AND WASHERS                                                                            exams) 16- Reactor Coolant Pump 1A  nuts & ring      1110-1A            VT-1  16    **      **        **
17- Reactor Coolant Pump 1B  nuts & ring      1110-1B            VT-1  16    **      **        **
18- Reactor Coolant Pump 2A  nuts & ring      1110-2A            VT-1  16    **      **        **
19- Reactor Coolant Pump 2B  nuts & ring      1110-2B            VT-1  16    **      **        **
3INT-ISI-2 Rev. 4                                              20 of 210
 
ASME                                                      DESCRIPTION, NDE  TOTAL EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM        IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                            NO EXAM CATEGORY B-G-2; PRESSURE RETAINING BOLTING 2 IN. AND LESS IN DIAMETER PRESSURIZER B7.20 BOLTS, STUDS AND NUTS 5- Pressurizer Manway                Studs & Nuts    1.31 x 14.5        VT-1  20    20        ***      ***
STEAM GENERATOR B7.30 BOLTS, STUDS AND NUTS 3- Steam Generator 1 MANWAYS        Studs & Nuts    1.31 x 14.5        VT-1  40    40        ***      ***
4- Steam Generator 2 MANWAYS        Studs & Nuts    1.31 x 14.5        VT-1  40    40        ***      ***
                                                                                                                      **** When disassembled and only once per interval. One bolted connection among a group of similar PIPING                                                                                                          bolted connections.
B7.50 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties            Flange Bolting    RC-001-6            VT-1  8      8      ****    ****
Flange Bolting    RC-003-6            VT-1    8    8      ****    ****
Flange Bolting    RC-005-6            VT-1    8    8      ****    ****
Flange Bolting    RC-007-6            VT-1    8    8      ****    ****
37- Charging Line                    Flange V435      CH-005-2            VT-1  8      8      ****    ****
3INT-ISI-2 Rev. 4                                            21 of 210
 
ASME                                                  DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION  LINE OR SERIAL                                                      REMARKS METHOD  ITEMS AMOUNT   PERIOD       %
NO                                                        NO PUMPS B7.60 BOLTS, STUDS AND NUTS 16- Reactor Coolant Pump 1A      seal cover      1.1 x 8.27        VT-1  16    16        **      **  **VT-1 exams 17- Reactor Coolant Pump 1B      seal cover      1.1 x 8.27        VT-1  16    16        **      **  required once per 18- Reactor Coolant Pump 2A      seal cover      1.1 x 8.27        VT-1  16    16        **      **  interval (B-L-2) 19- Reactor Coolant Pump 2B      seal cover      1.1 x 8.27        VT-1  16    16        **      **
VALVES B7.70 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties          PSV-200        RC-001-6          VT-1  12    12      ****    ***  During VENDOR (Body Bolts)                PSV-201        RC-003-6          VT-1  12    12      ****      ***  disassembly (B-M-2)
PSV-202        RC-005-6          VT-1  12    12      ****    ***
PSV-203        RC-007-6          VT-1  12    12      ****    ***
30- Aux Pressurizer Spray          HV-203        CH-521-2          VT-1    4    4        **      **  **VT-1 exams HV-205        CH-520-2          VT-1    4    4        **      **  required once per interval
                                                                                                                **** When disassembled and only once per CRD HOUSING                                                                                                interval B7.80 BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations  Grayloc Clamps    CEDM 92            VT-1    4    4      ****    ****
CEDM 96            VT-1    4    4      ****    ****
3INT-ISI-2 Rev. 4                                              22 of 210


B3.140 NOZZLE INSIDE RADIUS SECTION**
ASME                                              DESCRIPTION, NDE    TOTAL  EXAM INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                                     REMARKS METHOD   ITEMS AMOUNT   PERIOD     %
**added inner radius
NO                                                      NO EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.10 NPS 4 OR LARGER B9.11
*B3.130 & B3.140 running percent----4130 per 10CFR50.55a426043100B3.1303-  Steam Generator 1Inlet - 1212Vol311*Outlet - 222*4-  Steam Generator 2Inlet - 1211Vol311*Outlet - 223*
* CIRCUMFERENTIAL WELDS 6- RCS Primary Piping HL 1**         butt welds    RC-032-42 ID      S* & Vol  62    7      1        11    ** AUTO EXAM OF HL 2**        butt welds    RC-063-42 ID                        6       2        21    NOZZLE TO EXT AND CL 1A to RCP      butt welds    RC-033-30 ID                        6       3        31    EXT TO PIPE WELDS CL 1B to RCP      butt welds    RC-030-30 ID                                                *SURFACE EXAMS CL 2A to RCP      butt welds    RC-073-30 ID                                                NOT REQUIRED IN CL 2B to RCP      butt welds    RC-084-30 ID                                                CONJUNCTION WITH CL 1A to RPV**      butt welds    RC-034-30 ID                                                AUTO EXAMINATIONS CL 1B to RPV**      butt welds    RC-031-30 ID                                                (EWR-3673722 &
B3.140 NOZZLE INSIDE RADIUS SECTION3-  Steam Generator 1Inlet - 1212Vol311*Outlet - 222*4-  Steam Generator 2Inlet - 1211Vol311*Outlet - 223*
CL 2A to RPV**     butt welds    RC-079-30 ID                                                CODE CASE N663)
3INT-ISI-2 Rev. 4 17 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-F; PRESSURE RETAINING DISSIMILAR METAL WELDS IN VESSEL NOZZLES PRESSURIZER B5.40NOMINAL PIPE SIZE >
CL 2B to RPV**     butt welds    RC-093-30 ID 20- Pressurizer Surge Line    butt welds    RC-028-12        S & Vol    11    1       1         9    DM MOVED TO AUG 2      3        27 21- Shutdown Cooling Loop 1    butt welds    RC-051-16"        S & Vol    24    2      1        8    DM MOVED TO AUG SI-240-16 22- Shutdown Cooling Loop 2    butt welds    RC-068-16        S & Vol    18    2      1        11   DM MOVED TO AUG SI-193-16"                          7      2        38 3      3        66 23- Safety Injection 1A        butt welds      SI-207-14        S & Vol    18    4      1        28    DM MOVED TO AUG SI-203-12 24- Safety Injection 1B        butt welds      SI-223-14        S & Vol    18     5      2        28    DM MOVED TO AUG SI-221-12 25- Safety Injection 2A        butt welds      SI-160-14        S & Vol    22    6      3        27    DM MOVED TO AUG SI-156-12 3INT-ISI-2 Rev. 4                                             23 of 210
4 INCH NOZZLE TO SAFEEND BUTT WELDS 20-   Surgebutt weldsRC-028-12"S & Vol6***
Mitigated with FSWO29-  Spraybutt weldsRC-018-4"S & Vol Moved to augmented31-   Safeties (4)butt weldsRC-001-6"S & VolRC-003-6"S & Vol RC-005-6"S & Vol RC-007-6"S & Vol 3INT-ISI-2 Rev. 4 18 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN. IN DIAMETER REACTOR VESSELB6.10CLOSURE HEAD NUTS2-   Closure Headnuts7.237" x 7.91"VT-15418133 18266 183100 B6.20CLOSURE STUDS2-   Closure Headstuds7.380" x 76.37"Vol541813318266 183100 B6.40THREADS IN FLANGE1-   Reactor VesselStud Holes79173Vol54000000543100B6.50CLOSURE WASHERS BUSHINGS2-   Closure HeadWashers7.50" x 1.27"VT-1541813318266 183100 3INT-ISI-2 Rev. 4 19 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PUMPSB6.180BOLTS AND STUDS16-  Reactor Coolant Pump 1AFlange Studs4.33" x 32.87"Vol16163100
* Multiple pumps17-  Reactor Coolant Pump 1BFlange Studs4.33" x 32.87"Vol16**
18-   Reactor Coolant Pump 2AFlange Studs4.33" x 32.87"Vol16**
19-   Reactor Coolant Pump 2BFlange Studs4.33" x 32.87"Vol16**
B6.190 FLANGE SURFACE WHEN CONNECTION DISASSEMBLED
** VT-1 exams on 1 pump per interval (with B12.XX exams)16-   Reactor Coolant Pump 1Asurface1110-1AVT-11******17-   Reactor Coolant Pump 1Bsurface1110-1BVT-11******
18-   Reactor Coolant Pump 2Asurface1110-2AVT-11******
19-   Reactor Coolant Pump 2Bsurface1110-2BVT-11******B6.200NUTS, BUSHINGS, AND WASHERS
** VT-1 exams on 1 pump per interval (with B12.XX exams)16-   Reactor Coolant Pump 1Anuts & ring1110-1AVT-116******17-   Reactor Coolant Pump 1Bnuts & ring1110-1BVT-116******
18-   Reactor Coolant Pump 2Anuts & ring1110-2AVT-116******
19-   Reactor Coolant Pump 2Bnuts & ring1110-2BVT-116******
3INT-ISI-2 Rev. 4 20 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-G-2; PRESSURE RETAINING BOLTING 2 IN. AND LESS IN DIAMETER PRESSURIZERB7.20BOLTS, STUDS AND NUTS 5-  Pressurizer Manwa yStuds & Nuts1.31" x 14.5"VT-12020******
STEAM GENERATORB7.30BOLTS, STUDS AND NUTS3-  Steam Generator 1 MANWAYSStuds & Nuts1.31" x 14.5"VT-14040******
4-  Steam Generator 2 MANWAYSStuds & Nuts1.31" x 14.5"VT-14040******
PIPING**** When disassembled and


only once per
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                      NO 26- Safety Injection 2B        butt welds      SI-179-14        S & Vol  18    5      3        28    DM MOVED TO AUG SI-175-12 28 & 29- Pressurizer Spray      butt welds      RC-018-4        S & Vol  13    1      1        7 1      2        14 2      3        29 31- Pressurizer Safeties        butt welds      RC-001-6        S & Vol  12    1      1        8 RC-003-6                          1      2        17 RC-005-6                          1      3        25 RC-007-6 36- Letdown Line (delay coil)  butt welds    RC-091-16        S & Vol    4    1      3        25 B9.20 LESS THAN NPS 4
* CIRCUMFERENTIAL WELDS B9.21 OTHER THAN PWR HPSI SYSTEMS 27- Pressurizer Spray 1A        butt welds      RC-062-3              S    38    9      1        26    DM MOVED TO AUG RC-016-3 28- Pressurizer Spray 1B        butt welds      RC-017-3              S    36    10      3        26    DM MOVED TO AUG RC-018-3 30- Aux Pressurizer Spray      butt welds      CH-009-2              S    11    3      2        27 CH-520-2 CH-521-2 32- Drain Line Loop 1A          butt welds      RC-060-2              S    5    1      1        20    DM MOVED TO AUG 33- Drain Line Loop 1B          butt welds      RC-058-2              S    5    1      2        20    DM MOVED TO AUG 34- Drain Line Loop 2A          butt welds      RC-096-2              S    5    2      3        40    DM MOVED TO AUG 3INT-ISI-2 Rev. 4                                          24 of 210


interval. One bolted
ASME                                                    DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM        IDENTIFICATION LINE OR SERIAL                                                  REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                          NO 35- Drain Line Loop 2B              butt welds      RC-089-2            S    5    2      3        40 36- Letdown Line                    butt welds      RC-091-2            S    70    6      1          8  DM MOVED TO AUG CH-001-2                        6      2        16 6      3        25 37- Charging Line                    butt welds      CH-005-3            S    60    5      1          8  DM MOVED TO AUG CH-005-2                        5      2        17 6      3        27 38- Drain Line Loop 1                butt welds      RC-070-2            S    1    1      2        100 CIRCUMFERENTIAL WELDS OF B9.22 PWR HPSI SYSTEMS 39- HPSI Long Term Recirculation 1  butt welds      SI-248-3          Vol    52    8      3        15 40- HPSI Long Term Recirculation 2  butt welds      SI-199-3          Vol    25    3      1        12 10      2        52 BRANCH PIPE CONNECTION B9.30 WELDS B9.31 NPS 4 OR LARGER
* 9.31 running percent          -              -                -    7    1      1        14 1      3        28 6- RCS Primary Piping Surge              branch weld    RC-032-42 ID      S & Vol    1 SD Cooling 1          branch weld    RC-032-42 ID      S & Vol    1 SD Cooling 2          branch weld    RC-063-42 ID      S & Vol    1 SI 1A            branch weld    RC-034-30 ID      S & Vol    1 SI 1B            branch weld    RC-031-30 ID      S & Vol    1 SI 2A            branch weld    RC-079-30 ID      S & Vol    1 SI 2B            branch weld    RC-093-30 ID      S & Vol    1 3INT-ISI-2 Rev. 4                                          25 of 210


connection among
ASME                                                  DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                            REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                        NO B9.32 LESS THAN NPS 4
* 9.32 running percent        -              -                -  14    1      1        7 1      2        14 2      3        28 6- RCS Primary Piping Drain 1A        branch weld    RC-033-30 ID          S    1 PZR Spray 1A        branch weld    RC-034-30 ID          S    1 Drain 1B        branch weld    RC-030-30 ID          S  1 PZR Spray 1B        branch weld    RC-031-30 ID          S    1 Drain 2A        branch weld    RC-073-30 ID          S  1 Charging          branch weld    RC-079-30 ID          S  1 Letdown          branch weld    RC-084-30 ID          S  1 21- Shutdown Cooling Loop 1      branch weld    RC-051-16            S  2 2 Drain & 3" HPSI 22- Shutdown Cooling Loop 2      branch weld    RC-068-16            S  1 3" HPSI 36- Letdown Line                branch weld    RC-091-16            S  4 3INT-ISI-2 Rev. 4                                    26 of 210


a group of similar
ASME                                                    DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                        NO B9.40 SOCKET WELDS
* 9.40 running percent        -              -                -  17    2      1        12 2      2        23 2      3        35 30-  Aux PZR Spray                socket weld    CH-520-2"            S    2 CH-521-2"            S    2 32- Drain Line Loop 1A            socket weld    RC-060-2            S    3 33- Drain Line Loop 1B            socket weld    RC-058-2            S    3 34- Drain Line Loop 2A            socket weld    RC-096-2            S    3 35- Drain Line Loop 2B            socket weld    RC-089-2            S    3 38- Drain Line Loop 1              socket weld    RC-070-2            S    1 EXAM CATEGORY B-K; WELDED ATTACHMENTS FOR VESSELS. PIPING, PUMPS AND VALVES PRESSURE VESSELS B10.10 WELDED ATTACHMENTS                                                                                        **Accessible Side 3- Steam Generator 1
* support skirt      212              S**    1    1      2        100
* Multiple vessels 4 -Steam Generator 2
* support skirt      211              S**    1 5- Pressurizer                    support skirt      79373            S**    1    1      1        50 3INT-ISI-2 Rev. 4                                              27 of 210


bolted connections.B7.50BOLTS, STUDS AND NUTS31Pressurizer SafetiesFlange BoltingRC-001-6"VT-188********Flange BoltingRC-003-6"VT-188********
ASME                                                        DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM          IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
Flange BoltingRC-005-6"VT-188********
NO                                                              NO PIPING B10.20 WELDED ATTACHMENTS
Flange BoltingRC-007-6"VT-188********37-   Charging LineFlange V435CH-005-2"VT-188********
                *B10.20 running percent            -              -                13    1      1        8 1      3        15 22- Shutdown Cooling 2                  attachment      SI-193-16            S    1 RC-068-16"             S    1 27- PZR Spray 1A                        attachment      RC-062-3"             S    1 28- PZR Spray 1B                        attachment      RC-017-3"             S    1 29- Combined PZR Spray                  attachment      RC-18-3"               S    1 36- Letdown Line                        attachment    RC-091-16              S    4 37- Charging Line                      attachment      CH-005-3"              S    3 40- HPSI Long Term 2                   attachment      SI-199-3"             S    1 EXAM CATEGORIES B-L-EXAM CATEGORY B-L-1, PRESSURE                                                                                    1 and B-M-1 deleted in RETAINING WELDS IN PUMP CASINGS; B-M-                                                                           the 2007 Ed., 2008 Add.
3INT-ISI-2 Rev. 4 21 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PUMPSB7.60BOLTS, STUDS AND NUTS16-  Reactor Coolant Pump 1Aseal cover1.1" x 8.27"VT-11616****
1, PRESSURE RETAINING WELDS IN VALVE                                                                            See letter 102-06454 BODIES; B-L-2, PUMP CASINGS; B-M-2,                                                                              and SER dated VALVE BODIES                                                                                                    09/18/2012.
**VT-1 exams17-   Reactor Coolant Pump 1Bseal cover1.1" x 8.27"VT-11616****
B12.20 PUMP CASING 16- Reactor Coolant Pump 1A                casing        1110-1A            VT-3    4    1        *
required once per18-  Reactor Coolant Pump 2Aseal cover1.1" x 8.27"VT-11616****
* 17- Reactor Coolant Pump 1B                casing        1110-1B            VT-3 18- Reactor Coolant Pump 2A                casing        1110-2A            VT-3 19- Reactor Coolant Pump 2B                casing        1110-2B            VT-3 3INT-ISI-2 Rev. 4                                              28 of 210
interval (B-L-2)19-   Reactor Coolant Pump 2Bseal cover1.1" x 8.27"VT-11616****
VALVESB7.70BOLTS, STUDS AND NUTS31-   Pressurizer Safeties PSV-200RC-001-6"VT-11212*******
During VENDOR            (Body Bolts)PSV-201RC-003-6"VT-11212*******
disassembly (B-M-2)PSV-202RC-005-6"VT-11212*******
PSV-203RC-007-6"VT-11212*******30-   Aux Pressurizer SprayHV-203CH-521-2"VT-144****
**VT-1 examsHV-205CH-520-2"VT-144****
required once per interval CRD HOUSING
**** When disassembled and


only once per
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                                      REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                      NO B12.50 VALVE BODY, EXCEEDING NPS 4 16" Borg Warner Gate Valves Utilizing Forged Construction Zone 21          UV-651        RC-051-16          VT-3    4    1        *
* Exam required when UV-653        SI-240-16          VT-3                                valve is disassembled Zone 22          UV-652        RC-068-16          VT-3 UV-654        SI-193-16          VT-3 14" Borg Warner Gate Valves Utilizing Forged Construction Zone 23          UV-634        SI-207-14          VT-3    4    1        *
* Exam required when Zone 24          UV-644        SI-223-14          VT-3                                valve is disassembled Zone 25          UV-614        SI-160-14          VT-3 Zone 26          UV-624        SI-179-14          VT-3 12" Borg Warner Check Valves Utilizing Cast Construction Zone 23          V-542        SI-203-12"          VT-3    4    1        *
* Exam required when Zone 24          V-543        SI-221-12          VT-3                                valve is disassembled Zone 25          V-540        SI-156-12          VT-3 Zone 26          V-541        SI-175-12          VT-3 3INT-ISI-2 Rev. 4                                              29 of 210


intervalB7.80BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc ClampsCEDM 92VT-144********
ASME                                              DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                                     REMARKS METHOD ITEMS AMOUNT   PERIOD     %
CEDM 96VT-144********
NO                                                      NO 14" Borg Warner Check Valves Utilizing Cast Construction Zone 23          V-235        SI-207-14          VT-3   8      1       *
3INT-ISI-2 Rev. 4 22 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.10NPS 4 OR LARGER B9.11* CIRCUMFERENTIAL WELDS 6RCS Primary PipingHL 1**butt weldsRC-032-42" IDS* & Vol627111
* Exam required when V-237        SI-207-14          VT-3                                valve is disassembled Zone 24          V-245        SI-223-14          VT-3 V-247        SI-223-14          VT-3 Zone 25          V-215        SI-160-14          VT-3 V-217        SI-160-14          VT-3 Zone 26          V-225        SI-179-14          VT-3 V-227        SI-179-14          VT-3 Dresser PSV Utilizing Forged Construction Zone 31          PSV-200        RC-001-6          VT-3    4    1        *
** AUTO EXAM OF HL 2**butt weldsRC-063-42" ID6221 NOZZLE TO EXT ANDCL 1A to RCPbutt weldsRC-033-30" ID6331 EXT TO PIPE WELDSCL 1B to RCPbutt weldsRC-030-30" ID
* Exam required when PSV-201        RC-003-6          VT-3                                valve is disassembled PSV-202        RC-005-6          VT-3 PSV-203        RC-007-6          VT-3 3INT-ISI-2 Rev. 4                                             30 of 210
*SURFACE EXAMS CL 2A to RCPbutt weldsRC-073-30" ID NOT REQUIRED INCL 2B to RCPbutt weldsRC-084-30" ID CONJUNCTION WITHCL 1A to RPV**butt weldsRC-034-30" ID AUTO EXAMINATIONSCL 1B to RPV**butt weldsRC-031-30" ID (EWR-3673722 & CL 2A to RPV**butt weldsRC-079-30" ID CODE CASE N663)CL 2B to RPV**butt weldsRC-093-30" ID20-   Pressurizer Surge Linebutt weldsRC-028-12"S & Vol11119 DM MOVED TO AUG232721-   Shutdown Cooling Loop 1butt weldsRC-051-16"S & Vol24218 DM MOVED TO AUG SI-240-16"22-   Shutdown Cooling Loop 2butt weldsRC-068-16"S & Vol182111 DM MOVED TO AUG SI-193-16" 7238336623-   Safety Injection 1Abutt weldsSI-207-14"S & Vol184128 DM MOVED TO AUG SI-203-12"24-   Safety Injection 1Bbutt weldsSI-223-14"S & Vol185228 DM MOVED TO AUG SI-221-12"25-   Safety Injection 2Abutt weldsSI-160-14"S & Vol226327 DM MOVED TO AUG SI-156-12" 3INT-ISI-2 Rev. 4 23 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS26-  Safety Injection 2Bbutt weldsSI-179-14"S & Vol185328 DM MOVED TO AUG SI-175-12"28 & 29- Pressurizer Spraybutt weldsRC-018-4"S & Vol131171214 232931-  Pressurizer Safetiesbutt weldsRC-001-6"S & Vol12118RC-003-6"1217 RC-005-6"1325


RC-007-6"36-  Letdown Line (delay coil)butt weldsRC-091-16"S & Vol41325B9.20LESS THAN NPS 4 B9.21* CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS27-  Pressurizer Spray 1Abutt weldsRC-062-3"S389126 DM MOVED TO AUG RC-016-3"28-  Pressurizer Spray 1Bbutt weldsRC-017-3"S3610326 DM MOVED TO AUG RC-018-3"30-  Aux Pressurizer Spraybutt weldsCH-009-2"S113227 CH-520-2" CH-521-2"32-  Drain Line Loop 1Abutt weldsRC-060-2"S51120 DM MOVED TO AUG 33-  Drain Line Loop 1Bbutt weldsRC-058-2"S51220 DM MOVED TO AUG34-  Drain Line Loop 2Abutt weldsRC-096-2"S52340 DM MOVED TO AUG 3INT-ISI-2 Rev. 4 24 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS35-  Drain Line Loop 2Bbutt weldsRC-089-2"S5234036-  Letdown Linebutt weldsRC-091-2"S70618 DM MOVED TO AUGCH-001-2"6216632537-  Charging Linebutt weldsCH-005-3"S60518 DM MOVED TO AUGCH-005-2"5217632738-  Drain Line Loop 1butt weldsRC-070-2"S112100 B9.22 CIRCUMFERENTIAL WELDS OF PWR HPSI SYSTEMS39-  HPSI Long Term Recirculation 1butt weldsSI-248-3"Vol52831540-  HPSI Long Term Recirculation 2butt weldsSI-199-3"Vol25311210252 B9.30 BRANCH PIPE CONNECTION WELDSB9.31NPS 4 OR LARGER
ASME                                                           DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM         IDENTIFICATION     LINE OR SERIAL                                                   REMARKS METHOD ITEMS AMOUNT  PERIOD     %
* 9.31 running percent---711141328 6-  RCS Primary PipingSurgebranch weldRC-032-42" IDS & Vol1SD Cooling 1branch weldRC-032-42" IDS & Vol1 SD Cooling 2branch weldRC-063-42" IDS & Vol1SI 1Abranch weldRC-034-30" IDS & Vol1 SI 1Bbranch weldRC-031-30" IDS & Vol1 SI 2Abranch weldRC-079-30" IDS & Vol1 SI 2Bbranch weldRC-093-30" IDS & Vol1 3INT-ISI-2 Rev. 4 25 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB9.32LESS THAN NPS 4
NO                                                                 NO EXAM CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL; B-N-2, WELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTS TO REACTOR VESSELS; B-N-3, REMOVABLE CORE SUPPORT STRUCTURES B13.10 VESSEL INTERIOR                                                                                                    At 3 year intervals 1- Reactor Vessel                      accessible areas      79173            VT-3    1    1       1       100  R14, R16, R18, and R20 2      2        100 3      3        100 B13.50 INTERIOR ATTACHMENTS WITHIN BELTLINE REGION 1- Reactor Vessel                      accessible welds      79173            VT-1    1    1*       3        100  *RR 44 exam by 2027 B13.60 INTERIOR ATTACHMENTS BEYOND BELTLINE REGION 1- Reactor Vessel                      accessible welds      79173            VT-3   1    1*      3        100  *RR 44 exam by 2027 B13.70 CORE SUPPORT STRUCTURE 1- Reactor Vessel                      accessible areas      79173            VT-3   1    1*      3        100   *RR 44 exam by 2027 3INT-ISI-2 Rev. 4                                             31 of 210
* 9.32 running percent---141171214 2328 6-   RCS Primary PipingDrain 1Abranch weldRC-033-30" IDS 1 PZR Spray 1 Abranch weldRC-034-30" IDS 1Drain 1Bbranch weldRC-030-30" IDS 1PZR Spray 1Bbranch weldRC-031-30" IDS 1Drain 2Abranch weldRC-073-30" IDS 1Chargingbranch weldRC-079-30" IDS 1Letdownbranch weldRC-084-30" IDS 121-  Shutdown Cooling Loop 1branch weldRC-051-16"S2 2" Drain & 3" HPSI22-  Shutdown Cooling Loop 2branch weldRC-068-16"S1 3" HPSI36-  Letdown Linebranch weldRC-091-16"S4 3INT-ISI-2 Rev. 4 26 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB9.40SOCKET WELDS
* 9.40 running percent---1721122223 233530-    Aux PZR Spraysocket weldCH-520-2"S2CH-521-2"S232-  Drain Line Loop 1Asocket weldRC-060-2"S3 33-  Drain Line Loop 1Bsocket weldRC-058-2"S3 34-  Drain Line Loop 2Asocket weldRC-096-2"S335-  Drain Line Loop 2Bsocket weldRC-089-2"S338-  Drain Line Loop 1socket weldRC-070-2"S1 EXAM CATEGORY B-K; WELDED ATTACHMENTS FOR VESSELS. PIPING, PUMPS AND VALVES PRESSURE VESSELSB10.10WELDED ATTACHMENTS
**Accessible Side3- Steam Generator 1 *support skirt212S**112100
* Multiple vessels4 -Steam Generator 2 *support skirt211S**1 5- Pressurize rsupport skirt79373S**11150 3INT-ISI-2 Rev. 4 27 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PIPINGB10.20WELDED ATTACHMENTS
*B10.20 running percent---13118131522-  Shutdown Cooling 2attachmentSI-193-16"S1RC-068-16"S127-  PZR Spray 1AattachmentRC-062-3"S1 28-  PZR Spray 1BattachmentRC-017-3"S129-  Combined PZR SprayattachmentRC-18-3"S1 36-  Letdown LineattachmentRC-091-16"S437-  Charging LineattachmentCH-005-3"S3 40-  HPSI Long Term 2attachmentSI-199-3"S1 EXAM CATEGORY B-L-1, PRESSURE RETAINING WELDS IN PUMP CASINGS; B-M-1, PRESSURE RETAINING WELDS IN VALVE BODIES; B-L-2, PUMP CASINGS; B-M-2, VALVE BODIES EXAM CATEGORIES B-L
-1 and B-M-1 deleted in the 2007 Ed., 2008 Add.
See letter 102-06454 and SER dated 09/18/2012.B12.20PUMP CASING16-   Reactor Coolant Pump 1Acasing1110-1AVT-341**
17-   Reactor Coolant Pump 1Bcasing1110-1BVT-3 18-   Reactor Coolant Pump 2Acasing1110-2AVT-3 19-   Reactor Coolant Pump 2Bcasing1110-2BVT-3 3INT-ISI-2 Rev. 4 28 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSB12.50VALVE BODY, EXCEEDING NPS 4


16" Borg Warner Gate Valves
ASME                                                        DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM    ZONE-COMPONENT OR SYSTEM          IDENTIFICATION  LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                      ;                                      NO RETAINING WELDS IN CONTROL ROD
            *exam category running percent        -              -                -  126    0      1        *    *Replaced RV Head 10      3        11    R15 B14.10 WELDS IN CRD HOUSING                                                                                            32 peripheral 2- Reactor Vessel                      Lower Housing    66 thru 97          Vol    32 Closure Head CEDM Housings 2- Reactor Vessel                      Upper Housing    66 thru 97          Vol    32 Closure Head CEDM Housings 2- Reactor Vessel                      Lower Tube  66-91,93-95,97          Vol  32 Closure Head                RVLMS        92 and 96 CEDM Housings 2- Reactor Vessel                      Upper Tube  66-91,93-95,97          Vol  30 Closure Head CEDM Housings 3INT-ISI-2 Rev. 4                                            32 of 210


Utilizing Forged ConstructionZone 21UV-651RC-051-16"VT-341**
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM     ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                                                     REMARKS METHOD ITEMS AMOUNT   PERIOD     %
Exam required whenUV-653SI-240-16"VT-3 valve is disassembledZone 22UV-652RC-068-16"VT-3UV-654SI-193-16"VT-3 14" Borg Warner Gate Valves Utilizing Forged ConstructionZone 23UV-634SI-207-14"VT-341**
NO                                                        NO EXAM CATEGORY B-P; ALL PRESSURE                                                                          Note Augmented for VT-2 RETAINING COMPONENTS                                                                                      of insulated bolting B15.10 PRESSURE RETAINING                Class 1      IWB-5222a          VT-2    *    *        *        *   *NOTE Pressure Test COMPONENTS                                                                                                Program B15.10 PRESSURE RETAINING                Class 1      IWB-5222b          VT-2    *    *        *
Exam required whenZone 24UV-644SI-223-14"VT-3 valve is disassembledZone 25UV-614SI-160-14"VT-3 Zone 26UV-624SI-179-14"VT-3 12" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-542SI-203-12"VT-341**
* COMPONENTS
Exam required whenZone 24V-543SI-221-12"VT-3 valve is disassembledZone 25V-540SI-156-12"VT-3Zone 26V-541SI-175-12"VT-3 3INT-ISI-2 Rev. 4 29 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 14" Borg Warner Check Valves Utilizing Cast ConstructionZone 23V-235SI-207-14"VT-381**
                        ;                                                                                                    y TUBING                                                                                                    Specifications B16.20 STEAM GENERATOR TUBING IN              *              *                *    *    *       *
Exam required whenV-237SI-207-14"VT-3 valve is disassembledZone 24V-245SI-223-14"VT-3V-247SI-223-14"VT-3Zone 25V-215SI-160-14"VT-3V-217SI-160-14"VT-3Zone 26V-225SI-179-14"VT-3V-227SI-179-14"VT-3 Dresser PSV Utilizing Forged ConstructionZone 31PSV-200RC-001-6"VT-341**
* U-TUBE DESIGN 3INT-ISI-2 Rev. 4                                             33 of 210
Exam required whenPSV-201RC-003-6"VT-3 valve is disassembledPSV-202RC-005-6"VT-3 PSV-203RC-007-6"VT-3 3INT-ISI-2 Rev. 4 30 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL; B-N-2, WELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTS TO REACTOR VESSELS; B-N-3, REMOVABLE CORE SUPPORT STRUCTURESB13.10VESSEL INTERIOR At 3 year intervals 1-  Reactor Vessel accessible areas 79173VT-3111100 R14, R16, R18, and R202210033100B13.50INTERIOR ATTACHMENTS WITHIN BELTLINE REGION


1Reactor Vessel accessible welds 79173VT-111*3100
ASME                                                    DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM      IDENTIFICATION LINE OR SERIAL                                              REMARKS METHOD  ITEMS AMOUNT   PERIOD      %
*RR 44 exam by 2027B13.60INTERIOR ATTACHMENTS BEYOND BELTLINE REGION
NO                                                            NO EXAM CATEGORY F-A; SUPPORTS F1.10 CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
            *F-A; A running percent        NONE F1.10 CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
            *F-A; B running percent            -              -                -  87    7      1        8 8      2        17 8      3        26 20- Pressurizer Surge Line            supports      RC-28-12          VT-3    1 21- Shutdown Cooling 1                supports      RC-51-16          VT-3  13 SI-240-16 22- Shutdown Cooling                  supports      SI-193-16          VT-3    5 RC-068-16" 23-  Safety Injection 1A              supports      SI-207-14          VT-3    2 24-  Safety Injection 1B              supports      SI-223-14          VT-3    1 25-  Safety Injection 2A              supports      SI-156-12          VT-3    1 26-  Safety Injection 2B              supports      SI-179-14          VT-3    2 SI-175-12 27- Pressurizer Spray 1A              supports      RC-62-3            VT-3    8 RC-16-3 28- Pressurizer Spray 1B              supports      RC-17-3            VT-3  10 RC-18-3 RC-18-4 30-  Aux Pressurizer Spray            supports      CH-521-2          VT-3    1 32-  Drain Line 1A                    supports      RC-60-2            VT-3    1 33-  Drain Line 1B                    supports      RC-58-2            VT-3    1 36-  Letdown Line                    supports      RC-91-2            VT-3  15 CH-001-2 RC-91-16 37- Charging Line                    supports        CH-5-3            VT-3  16 39- HPSI Long Term Recirculation 1    supports      SI-248-3          VT-3    7 40- HPSI Long Term Recirculation 2    supports      SI-199-3          VT-3    3 3INT-ISI-2 Rev. 4                                    34 of 210


1-  Reactor Vessel accessible welds 79173VT-311*3100
ASME                                         DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD ITEMS AMOUNT  PERIOD     %
*RR 44 exam by 2027B13.70CORE SUPPORT STRUCTURE 1-  Reactor Vessel accessible areas 79173VT-311*3100
NO                                               NO 3INT-ISI-2 Rev. 4                                   35 of 210
*RR 44 exam by 2027 3INT-ISI-2 Rev. 4 31 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS;RETAINING WELDS IN CONTROL ROD
*exam category running percent---12601**Replaced RV Head10311 R15B14.10WELDS IN CRD HOUSING 32 peripheral 2-  Reactor Vessel Lower Housing66 thru 97Vol32 Closure Head CEDM Housings 2-  Reactor Vessel Upper Housing66 thru 97Vol32 Closure Head CEDM Housings 2-  Reactor Vessel Lower Tube66-91,93-95,97Vol32 Closure Head RVLMS 92 and 96 CEDM Housings 2-  Reactor Vessel Upper Tube66-91,93-95,97Vol30 Closure Head CEDM Housings 3INT-ISI-2 Rev. 4 32 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS Note Augmented for VT-2 of insulated boltingB15.10PRESSURE RETAININGClass 1IWB-5222aVT-2****
*NOTE Pressure Test COMPONENTS ProgramB15.10PRESSURE RETAININGClass 1IWB-5222bVT-2****
COMPONENTS
   ;TUBING y SpecificationsB16.20STEAM GENERATOR TUBING IN*******
U-TUBE DESIGN 3INT-ISI-2 Rev. 4 33 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY F-A; SUPPORTS F1.10CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
*F-A; A running percentNONE      F1.10CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
*F-A; B running percen t---877188217 832620-  Pressurizer Surge LinesupportsRC-28-12"VT-3121-  Shutdown Cooling 1supportsRC-51-16"VT-313SI-240-16" 22-  Shutdown Cooling supportsSI-193-16"VT-35 RC-068-16"23-  Safety Injection 1AsupportsSI-207-14"VT-32 24-  Safety Injection 1BsupportsSI-223-14"VT-3125-  Safety Injection 2AsupportsSI-156-12"VT-31 26-  Safety Injection 2BsupportsSI-179-14"VT-32 SI-175-12"27-  Pressurizer Spray 1AsupportsRC-62-3"VT-38 RC-16-3"28-  Pressurizer Spray 1BsupportsRC-17-3"VT-310 RC-18-3" RC-18-4"30-  Aux Pressurizer SpraysupportsCH-521-2"VT-31 32-  Drain Line 1AsupportsRC-60-2"VT-31 33-  Drain Line 1BsupportsRC-58-2"VT-31 36-  Letdown LinesupportsRC-91-2"VT-315 CH-001-2" RC-91-16"37-  Charging LinesupportsCH-5-3"VT-316 39-  HPSI Long Term Recirculation 1supportsSI-248-3"VT-37 40-  HPSI Long Term Recirculation 2supportsSI-199-3"VT-33 3INT-ISI-2 Rev. 4 34 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 3INT-ISI-2 Rev. 4 35 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.10CLASS 1 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
*F-A; C running percen t---3841104221 433220-  Pressurizer Surge LinesupportsRC-28-12"VT-3321-  Shutdown Cooling 1supportsSI-240-16"VT-32 22-  Shutdown Cooling supportsRC-68-16"VT-32 23-  Safety Injection 1AsupportsSI-207-14"VT-31 24-  Safety Injection 1BsupportsSI-223-14"VT-32 25-  Safety Injection 2AsupportsSI-160-14"VT-31 26-  Safety Injection 2BsupportsSI-179-14"VT-32 SI-175-12"27-  Pressurizer Spray 1AsupportsRC-62-3"VT-33 28-  Pressurizer Spray 1BsupportsRC-17-3"VT-33 29-  Combined Pressurizer SpraysupportsRC-18-4"VT-3330-  Aux Pressurizer SpraysupportsCH-521-2"VT-3137-  Charging LinesupportsCH-5-3"VT-311 39-  HPSI Long Term Recirculation 1supportsSI-248-3"VT-33 40-  HPSI Long Term Recirculation 2supportsSI-199-3"VT-31 3INT-ISI-2 Rev. 4 36 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
*F-A; B running percen t---394128**14 req'd due to 5256 multiple components631001 - Reactor Vesselcolumns79173VT-34 3 - Steam Generator 1*skirt212VT-31*multiple comp 4 - Steam Generator-2*skirt211VT-31


5 - Pressurize rskirt79373VT-3116-  Reactor Coolant Pump 1A**columns1110-1AVT-38**multiple comp 17-   Reactor Coolant Pump 1B**columns1110-1BVT-38 18-   Reactor Coolant Pump 2A**columns1110-2AVT-38 19-   Reactor Coolant Pump 2B**columns1110-2BVT-38F1.40SUPPORTS OTHER THAN PIPING SUPPORTS
ASME                                                      DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM        IDENTIFICATION LINE OR SERIAL                                              REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
*F-A; C running percen t---8**2150
NO                                                            NO F1.10 CLASS 1 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
**2 req'd due to 23100 multiple components16-   Reactor Coolant Pump 1A**snubbers1110-1AVT-32**multiple comp17-   Reactor Coolant Pump 1B**snubbers1110-1BVT-32 18-   Reactor Coolant Pump 2A**snubbers1110-2AVT-32 19-   Reactor Coolant Pump 2B**snubbers1110-2BVT-32 3INT-ISI-2 Rev. 4 37 of 210  
            *F-A; C running percent            -              -                -  38    4      1        10 4      2        21 4      3        32 20-  Pressurizer Surge Line            supports      RC-28-12          VT-3    3 21-  Shutdown Cooling 1                supports      SI-240-16          VT-3    2 22-  Shutdown Cooling                  supports      RC-68-16          VT-3    2 23-  Safety Injection 1A              supports      SI-207-14          VT-3    1 24-  Safety Injection 1B              supports      SI-223-14          VT-3    2 25-  Safety Injection 2A              supports      SI-160-14          VT-3    1 26-  Safety Injection 2B              supports      SI-179-14          VT-3    2 SI-175-12 27-  Pressurizer Spray 1A              supports      RC-62-3            VT-3    3 28-  Pressurizer Spray 1B              supports      RC-17-3            VT-3    3 29-  Combined Pressurizer Spray        supports      RC-18-4            VT-3    3 30-  Aux Pressurizer Spray            supports      CH-521-2          VT-3    1 37-  Charging Line                    supports        CH-5-3            VT-3  11 39-  HPSI Long Term Recirculation 1    supports      SI-248-3          VT-3    3 40-  HPSI Long Term Recirculation 2    supports      SI-199-3          VT-3    1 3INT-ISI-2 Rev. 4                                    36 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECTION RUNNING ITEM      ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                                    REMARKS METHOD  ITEMS AMOUNT  PERIOD      %
NO                                                      NO F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS
            *F-A; B running percent        -              -                 39    4      1        28  **14 req'd due to 5      2        56  multiple components 6      3        100 1 - Reactor Vessel                columns          79173            VT-3    4 3 - Steam Generator 1*              skirt          212            VT-3    1                            *multiple comp 4 - Steam Generator-2*              skirt          211            VT-3    1 5 - Pressurizer                    skirt          79373            VT-3    1 16- Reactor Coolant Pump 1A**     columns        1110-1A            VT-3    8                            **multiple comp 17- Reactor Coolant Pump 1B**     columns        1110-1B            VT-3    8 18- Reactor Coolant Pump 2A**     columns        1110-2A            VT-3    8 19- Reactor Coolant Pump 2B**     columns        1110-2B            VT-3    8 F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS
            *F-A; C running percent        -             -                 -   8**   2      1        50  **2 req'd due to 2      3        100  multiple components 16- Reactor Coolant Pump 1A**     snubbers      1110-1A            VT-3    2                            **multiple comp 17- Reactor Coolant Pump 1B**     snubbers      1110-1B            VT-3    2 18- Reactor Coolant Pump 2A**     snubbers      1110-2A            VT-3    2 19- Reactor Coolant Pump 2B**     snubbers      1110-2B            VT-3    2 3INT-ISI-2 Rev. 4                                             37 of 210


SECTION 5.0 ASME CLASS 2 EXAMINATION  
SECTION 5.0 ASME CLASS 2 EXAMINATION  
Line 233: Line 302:
==SUMMARY==
==SUMMARY==


3INT-ISI-2 Rev. 4 38 of 210 INDEX   EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-H All Pressure Retaining Components   F-A   Class 2 Supports 3INT-ISI-2 Rev. 4 39 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-A; PRESSURE RETAINING WELDS IN PRESSURE VESSELS
3INT-ISI-2 Rev. 4 38 of 210
*category running percent---23**4123
 
**23 Total, 17 REQ'D8271 multiple vessels53100 STEAM GENERATOR SC1.10SHELL CIRCUMFERENTIAL WELDS (shell to conical section)41-   Steam Generator 1welds212Vol222
INDEX EXAM CATEGORY C-A   Pressure Retaining Welds in Pressure Vessels C-B   Pressure Retaining Nozzle Welds in Vessels C-C   Welded Attachments for Vessels, Piping, Pumps, and Valves C-D   Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-H   All Pressure Retaining Components F-A   Class 2 Supports 3INT-ISI-2 Rev. 4                                   39 of 210
 
ASME                                                     DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM     ZONE-COMPONENT OR SYSTEM         IDENTIFICATION LINE OR SERIAL                                                 REMARKS METHOD ITEMS AMOUNT           %
NO                                                            NO                                  ION EXAM CATEGORY C-A; PRESSURE                                                                 PERIOD RETAINING WELDS IN PRESSURE VESSELS
              *category running percent         -             -                 - 23**   4      1    23    **23 Total, 17 REQ'D 8      2    71    multiple vessels 5      3    100 STEAM GENERATORS C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to conical section) 41- Steam Generator 1                  welds            212              Vol    2    2      2 42- Steam Generator 2                  welds            211              Vol    2 C1.20 HEAD CIRCUMFERENTIAL WELDS (head to shell) 41- Steam Generator 1                  welds            212              Vol    1    1      2 42- Steam Generator 2                  welds            211              Vol    1 C1.30 TUBESHEET-TO-SHELL WELDS 41- Steam Generator 1                  welds            212              Vol    1    1      2 42- Steam Generator 2                  welds            211              Vol    1 REGENERATIVE HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger        welds          79313            Vol    3    3      3 C1.20 HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger        welds          79313            Vol    2    2      3 C1.30 TUBESHEET-TO-SHELL WELDS 68- Regenerative Heat Exchanger        welds          79313            Vol    4    4      2 LETDOWN HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 69- Letdown Heat Exchanger              welds          N2373            Vol    1    1      1 3INT-ISI-2 Rev. 4                                              40 of 210


42-  Steam Generator 2welds211Vol2C1.20HEAD CIRCUMFERENTIAL WELDS (head to shell)41-  Steam Generator 1welds212Vol11242-  Steam Generator 2welds211Vol1C1.30TUBESHEET-TO-SHELL WELDS41-  Steam Generator 1welds212Vol11242-  Steam Generator 2welds211Vol1 REGENERATIVE HEAT EXCHANGE RC1.10SHELL CIRCUMFERENTIAL WELDS 68-  Regenerative Heat Exchangerwelds79313Vol333 C1.20HEAD CIRCUMFERENTIAL WELDS 68-  Regenerative Heat Exchangerwelds79313Vol223C1.30TUBESHEET-TO-SHELL WELDS68-  Regenerative Heat Exchangerwelds79313Vol442 LETDOWN HEAT EXCHANGERC1.10SHELL CIRCUMFERENTIAL WELDS 69-  Letdown Heat ExchangerweldsN2373Vol111 3INT-ISI-2 Rev. 4 40 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C1.30TUBESHEET-TO-SHELL WELDS69-   Letdown Heat ExchangerweldsN2373Vol111 SHUTDOWN COOLING HEAT EXCHC1.10SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84-   SDCHX AweldsS-18343Vol111
ASME                                               DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM     ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD ITEMS AMOUNT           %
NO                                                    NO                                    ION PERIOD C1.30 TUBESHEET-TO-SHELL WELDS 69- Letdown Heat Exchanger      welds          N2373              Vol    1    1      1 SHUTDOWN COOLING HEAT EXCH C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84- SDCHX A                      welds          S-18343            Vol    1    1      1 87- SDCHX B                      welds          S-18344            Vol    1 C1.30 TUBESHEET-TO-SHELL WELDS 84- SDCHX A                      welds          S-18343            Vol    1    1      1 87- SDCHX B                      welds          S-18344            Vol    1 3INT-ISI-2 Rev. 4                                    41 of 210


87SDCHX BweldsS-18344Vol1C1.30TUBESHEET-TO-SHELL WELDS 84-  SDCHX AweldsS-18343Vol111
ASME                                                    DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM      IDENTIFICATION LINE OR SERIAL                                                  REMARKS METHOD   ITEMS AMOUNT            %
NO                                                          NO                                    ION EXAM CATEGORY C-B; PRESSURE                                                                PERIOD RETAINING NOZZLE WELDS IN VESSELS C2.20 NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.
NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)
WELD
              *C2.21 running percent          -              -                  -  20**    2      1    20    ** 20 Total, 10 REQ'D 4      2    60    multiple vessels 4      3    100 41- Steam Generator 1                welds            212            S & Vol  8      4      2 42- Steam Generator 2                welds            211            S & Vol  8      4      3 84- SDCHX A                          welds          S-18343          S & Vol  2      1      1 87- SDCHX B                          welds          S-18344          S & Vol   2      1      1 C2.22 NOZZLE INSIDE RADIUS SECTION
              *C2.22 running percent          -              -                  -  12**    2      1    33    ** 12 Total, 6 REQ'D 2      2    67    multiple vessels 2      3    100 41- Steam Generator 1                welds            212              Vol    4      2      2 42- Steam Generator 2                welds            211              Vol    4      2      3 84- SDCHX A                          welds          S-18343            Vol    2      1      1 87- SDCHX B                          welds          S-18344            Vol    2      1      1 3INT-ISI-2 Rev. 4                                                42 of 210


87-  SDCHX BweldsS-18344Vol1 3INT-ISI-2 Rev. 4 41 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-B; PRESSURE RETAINING NOZZLE WELDS IN VESSELS C2.20NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM     ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                                                 REMARKS METHOD ITEMS AMOUNT           %
NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)
NO                                                        NO                                  ION PERIOD EXAM CATEGORY C-C; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES PRESSURE VESSELS C3.10 WELDED ATTACHMENTS
              *C3.10 running percent          -            -                -  6**    1      1    25    ** 6 Total; 4 REQD 1      2    50    Multiple Vessels 2      3    100  Multiple Vessels 41- Steam Generator 1                  lugs          212                S    2    1      1 1       2 42- Steam Generator 2                  lugs          211                S    2 68- Regenerative Heat Exchanger    supports        79313              S    2     2      3 PIPING C3.20 WELDED ATTACHMENTS
              *C3.20 running percent          -            -                -  298  10      1      3 12      2      7 14      3    12 43- Main Steam SG 1 East          attachment      SG-036              S    2 44- Main Steam SG 1 West          attachment      SG-033              S    2 45- Main Steam SG 2 East          attachment      SG-042              S    2 46- Main Steam SG 2 West          attachment      SG-045              S    2 54- Feedwater SG No. 1            attachment      SG-002              S    6 55- Feedwater SG No. 2            attachment      SG-005              S    6    1      1 56- Feedwater SG No. 1            attachment      SG-202              S    1 57- Feedwater SG No. 2            attachment      SG-205              S    1 3INT-ISI-2 Rev. 4                                              43 of 210


WELD*C2.21 running percent---20**2120
ASME                                               DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM   ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                                         REMARKS METHOD ITEMS AMOUNT           %
** 20 Total, 10 REQ'D4260 multiple vessels43100 41-  Steam Generator 1welds212S & Vol84242-  Steam Generator 2welds211S & Vol84384-  SDCHX AweldsS-18343S & Vol211 87-  SDCHX BweldsS-18344S & Vol211 C2.22NOZZLE INSIDE RADIUS SECTION
NO                                                      NO                                  ION 58- Aux Feed S/G 1              attachment      SG-008              S  1          PERIOD 59- Aux Feed S/G 2              attachment      SG-011              S  2 62- Auxiliary Feedwater SG 1    attachment      AF-018              S  1 63- Auxiliary Feedwater SG 1    attachment      AF-016              S  1 64- Blowdown SG 1                attachment      SG-039              S  7      1      2 SG-053 65- Blowdown SG 2                attachment      SG-048              S  7      2      2 SG-052 70- LPSI Pump Room A Suction    attachment      SI-067              S  3 SI-241 SI-307 71- LPSI Pump Room A Discharge  attachment      SI-078              S  4 SI-087 73- LPSI Pump Room B Suction    attachment      SI-034              S  2 SI-308 74- LPSI Pump Room B Discharge  attachment      SI-129              S  3 76- CS Pump Room A Suction      attachment      SI-009              S   2 SI-067 77- CS Pump Room A Discharge    attachment      SI-079              S   6      2       3 SI-082 79- CS Pump Room B Suction       attachment      SI-033               S   1 SI-034 80- CS Pump Room B Discharge     attachment      SI-119              S   4 3INT-ISI-2 Rev. 4                                   44 of 210
*C2.22 running percent---12**2133
** 12 Total, 6 REQ'D2267 multiple vessels2310041-  Steam Generator 1welds212Vol42242-  Steam Generator 2welds211Vol42384-  SDCHX AweldsS-18343Vol211 87-  SDCHX BweldsS-18344Vol211 3INT-ISI-2 Rev. 4 42 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-C; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES PRESSURE VESSELSC3.10WELDED ATTACHMENTS
*C3.10 running percent---6**1125
** 6 Total; 4 REQD1250 Multiple Vessels23100 Multiple Vessels41-  Steam Generator 1lugs 212S211 1242-  Steam Generator 2lugs 211 S2 68-  Regenerative Heat Exchange r supports 79313S223 PIPING C3.20WELDED ATTACHMENTS
*C3.20 running percent---2981013 1227 1431243-  Main Steam SG 1 East attachmentSG-036S2 44-  Main Steam SG 1 WestattachmentSG-033S2 45-  Main Steam SG 2 EastattachmentSG-042S2 46-  Main Steam SG 2 WestattachmentSG-045S254-  Feedwater SG No. 1attachmentSG-002S655-  Feedwater SG No. 2attachmentSG-005S611 56-  Feedwater SG No. 1attachmentSG-202S1 57-  Feedwater SG No. 2attachmentSG-205S1 3INT-ISI-2 Rev. 4 43 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS58-   Aux Feed S/G 1attachmentSG-008S159-   Aux Feed S/G 2attachmentSG-011S262-   Auxiliary Feedwater SG 1attachment AF-018S163-   Auxiliary Feedwater SG 1attachment AF-016S164-   Blowdown SG 1attachmentSG-039S712 SG-05365-   Blowdown SG 2attachmentSG-048S722 SG-05270-   LPSI Pump Room A SuctionattachmentSI-067S3 SI-241 SI-30771-   LPSI Pump Room A DischargeattachmentSI-078S4 SI-08773-   LPSI Pump Room B SuctionattachmentSI-034S2 SI-30874-   LPSI Pump Room B DischargeattachmentSI-129S3 76-   CS Pump Room A SuctionattachmentSI-009S2 SI-06777-   CS Pump Room A DischargeattachmentSI-079S623 SI-08279-   CS Pump Room B SuctionattachmentSI-033S1 SI-03480-   CS Pump Room B DischargeattachmentSI-119S4 3INT-ISI-2 Rev. 4 44 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS82-  SDCHX Room AattachmentSI-078S3 SI-07983-  SDCHX Room BattachmentSI-070S1121 SI-082 SI-087 SI-089 SI-09085-  SDCHX Room BattachmentSI-119S612 SI-12386-  SDCHX Room BattachmentSI-072S1223 SI-129 SI-134 SI-13588-  East WrapattachmentSI-072S4 SI-07389-  East WrapattachmentSI-173S3 SI-19490-  East WrapattachmentSI-134S1 91-  West WrapattachmentSI-070S4 92-  West WrapattachmentSI-002S411 SI-239 SI-24193-  West WrapattachmentSI-089S1 94-  A Train Pipe Chase & 88'attachmentSI-070S9 SI-089 SI-241 3INT-ISI-2 Rev. 4 45 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS95-  B Train Pipe Chase & 88'attachmentSI-072S912SI-13413 SI-19496-  Containment LPSI to 1AattachmentSI-202S197-  Containment LPSI to 1BattachmentSI-220S3 98-  Containment LPSI to 2AattachmentSI-155S299-  Containment LPSI to 2BattachmentSI-174S312 100-  Containment LPSI A SuctionattachmentSI-007S2 SI-369101-  Containment LPSI B SuctionattachmentSI-030S3 SI-194 SI-368 102-  SI Pump Suction AattachmentSI-008S1211 SI-009 SI-307103-  Refueling Water Suction AattachmentCH-142S913 CH-424104-  SI Pump Suction BattachmentSI-031S1022 SI-033 SI-308105-   Refueling Water Suction BattachmentCH-149S1533 CH-425106-  HPSI Room Discharge AattachmentSI-099S2021 SI-100 SI-105 SI-106 3INT-ISI-2 Rev. 4 46 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS107-  HPSI Room Discharge BattachmentSI-107S1432 SI-112108-   HPSI 88' PipechaseattachmentSI-100S1423 SI-118109-  HPSI 88' PipechaseattachmentSI-107S911 110-  HPSI Discharge West WrapattachmentSI-103S612 SI-107 SI-218 SI-236111-  HPSI Discharge West WrapattachmentSI-100S3112-  HPSI Discharge East WrapattachmentSI-100S4 SI-101 SI-102 SI-176113-  HPSI DischargeattachmentSI-107S4 SI-157 SI-176118-  HPSI Long TermattachmentSI-106S1833119-  HPSI Long TermattachmentSI-114S1221 121- Containment Spray BattachmentSI-130S1 3INT-ISI-2 Rev. 4 47 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS PUMPSC3.30WELDED ATTACHMENTS
*C3.30 running percent---20**2210
**20 Total, 10 REQ'D Multiple Vessels 72-  LPSI Pump Alugs0876-40S375-  LPSI Pump Blugs0876-41S378-  Containment Spray Alugs0876-42S381-  Containment Spray Blugs0876-43S3


116HPSI Alugs0776-16S4117-  HPSI Blugs0776-17S422 3INT-ISI-2 Rev. 4 48 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-D; PRESSURE RETAINING BOLTING GREATER THAN 2 in.
ASME                                              DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD ITEMS AMOUNT            %
NO                                                    NO                                  ION 82- SDCHX Room A              attachment      SI-078              S  3          PERIOD SI-079 83- SDCHX Room B              attachment      SI-070              S  11    2      1 SI-082 SI-087 SI-089 SI-090 85- SDCHX Room B              attachment      SI-119              S  6      1      2 SI-123 86- SDCHX Room B              attachment      SI-072              S  12    2      3 SI-129 SI-134 SI-135 88- East Wrap                  attachment      SI-072              S  4 SI-073 89- East Wrap                  attachment      SI-173              S  3 SI-194 90- East Wrap                  attachment      SI-134              S  1 91- West Wrap                  attachment      SI-070              S  4 92- West Wrap                  attachment      SI-002              S  4      1      1 SI-239 SI-241 93- West Wrap                  attachment      SI-089              S  1 94- A Train Pipe Chase & 88'  attachment      SI-070              S  9 SI-089 SI-241 3INT-ISI-2 Rev. 4                                    45 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD ITEMS AMOUNT            %
NO                                                      NO                                  ION 95- B Train Pipe Chase & 88'      attachment      SI-072              S    9    1    PERIOD 2
SI-134                          1      3 SI-194 96- Containment LPSI to 1A        attachment      SI-202              S    1 97- Containment LPSI to 1B        attachment      SI-220              S    3 98- Containment LPSI to 2A        attachment      SI-155              S    2 99- Containment LPSI to 2B        attachment      SI-174              S    3    1      2 100- Containment LPSI A Suction  attachment      SI-007              S    2 SI-369 101- Containment LPSI B Suction  attachment      SI-030              S    3 SI-194 SI-368 102- SI Pump Suction A            attachment      SI-008              S  12    1      1 SI-009 SI-307 103- Refueling Water Suction A    attachment      CH-142              S  9      1      3 CH-424 104- SI Pump Suction B            attachment      SI-031              S  10    2      2 SI-033 SI-308 105- Refueling Water Suction B    attachment      CH-149              S  15    3      3 CH-425 106- HPSI Room Discharge A        attachment      SI-099              S  20    2      1 SI-100 SI-105 SI-106 3INT-ISI-2 Rev. 4                                   46 of 210
 
ASME                                               DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM   ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                    NO                                  ION 107- HPSI Room Discharge B      attachment      SI-107              S  14    3    PERIOD 2
SI-112 108- HPSI 88 Pipechase        attachment      SI-100              S  14    2      3 SI-118 109- HPSI 88 Pipechase        attachment      SI-107              S  9      1      1 110- HPSI Discharge West Wrap  attachment      SI-103              S    6    1      2 SI-107 SI-218 SI-236 111- HPSI Discharge West Wrap  attachment      SI-100              S    3 112- HPSI Discharge East Wrap  attachment      SI-100              S    4 SI-101 SI-102 SI-176 113- HPSI Discharge            attachment      SI-107              S    4 SI-157 SI-176 118- HPSI Long Term            attachment      SI-106              S  18    3      3 119- HPSI Long Term            attachment      SI-114              S  12    2      1 121- Containment Spray B        attachment      SI-130              S  1 3INT-ISI-2 Rev. 4                                    47 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                                 REMARKS METHOD  ITEMS AMOUNT            %
NO                                                       NO                                  ION PUMPS                                                                                  PERIOD C3.30 WELDED ATTACHMENTS
              *C3.30 running percent        -              -                -  20**    2      2    10    **20 Total, 10 REQ'D Multiple Vessels 72- LPSI Pump A                    lugs          0876-40              S  3 75- LPSI Pump B                    lugs          0876-41              S  3 78- Containment Spray A            lugs          0876-42              S  3 81- Containment Spray B            lugs          0876-43              S  3 116- HPSI A                        lugs          0776-16              S  4 117- HPSI B                        lugs          0776-17              S  4      2      2 3INT-ISI-2 Rev. 4                                              48 of 210
 
ASME                                                      DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM      ZONE-COMPONENT OR SYSTEM        IDENTIFICATION LINE OR SERIAL                                                REMARKS METHOD  ITEMS AMOUNT            %
NO                                                            NO                                  ION EXAM CATEGORY C-D; PRESSURE                                                                 PERIOD RETAINING BOLTING GREATER THAN 2 in.
IN DIAMETER
IN DIAMETER
*category running percent---10**1133
              *category running percent           -             -                 - 10**   1      1    33    **10 total 3 required 1      2    67    Multiple Items 1      3    100 PUMPS C4.30 BOLTS AND STUDS 116- HPSI A                            16 studs        0776-14          VOL    1 117- HPSI B                            16 studs        0776-15          VOL    1      1      1 VALVES C4.40 BOLTS AND STUDS 47- Main Steam SG 1 West               20 studs        UV-170            VOL    1     1       1 48- Main Steam SG 1 East               20 studs        UV-180            VOL    1      1       2 49- Main Steam SG 2 East                20 studs        UV-171            VOL    1 50- Main Steam SG 2 West                20 studs        UV-181            VOL    1 56- Feedwater SG No. 1                  20 studs        UV-132            VOL    1      1      3 UV-174                  1 57- Feedwater SG No. 2                  20 studs        UV-137            VOL    1 UV-177                  1 3INT-ISI-2 Rev. 4                                               49 of 210
**10 total 3 required1267 Multiple Items13100 PUMPSC4.30BOLTS AND STUDS116- HPSI A16 studs0776-14VOL1117- HPSI B16 studs0776-15VOL111 VALVESC4.40BOLTS AND STUDS47-   Main Steam SG 1 West 20 studsUV-170VOL11148-  Main Steam SG 1 East20 studsUV-180VOL112 49-  Main Steam SG 2 East20 studsUV-171VOL150-  Main Steam SG 2 West20 studsUV-181VOL156-  Feedwater SG No. 120 studsUV-132VOL113UV-174157-  Feedwater SG No. 220 studsUV-137VOL1UV-1771 3INT-ISI-2 Rev. 4 49 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING C5.10PIPING WELDS >
3/8 IN NOMINAL WALL THICKNESS FOR PIPING
>NPS 4C5.11CIRCUMFERENTIAL WELD
*C5.11 running percent---5172212
*1101 WELDS USED2524 FOR % DUE TO C-F-14138 See note 2 in code54-  Feedwater SG No. 1Butt WeldsSG-2-14"S & Vol1022 SG-13-14"55-  Feedwater SG No. 2Butt WeldsSG-5-14"S & Vol1013 SG-14-14"58-Aux Feed S/G 16" x 0.562" AF-004S & Vol19416" x 0.432"SG-0088" x 0.500SG-00859-Aux Feed S/G 26" x 0.562" AF-006S & Vol27426" x 0.432"SG-0118" x 0.500SG-01162-Aux Feed S/G 16" x 0.562" AF-004S & Vol2033 A F-01863-Aux Feed S/G 26" x 0.562" AF-006S & Vol1641 A F-01670-LPSI Pump Room A Suction20" x 0.375SI-307S & Vol204173-LPSI Pump Room B SuctionSI-30882 & 85 SDC Heat Exch20" x 0.500"SI-078S & Vol822Room A & BSI-123 3INT-ISI-2 Rev. 4 50 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS83 & 86 SDC Heat Exch14" x 0.375"SI-90S & Vol5672Room A & BSI-13516" x 0.375"SI-70 SI-7220" x 0.500"SI-70 SI-7288 & 91 Safety Injection12" x 0.375"SI-72S & Vol77133East and West WrapsSI-73 SI-70 SI-7112" x 1.125"SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-22020" x 0.500"SI-72 SI-70 90 & 93 Safety Injection24" x 0.375"SI-30S & Vol1021East and West WrapsSI-724" x 0.562"SI-308 SI-307 94 & 95 Safety Injection A &
B20" x 0.500SI-70S & Vol1541SI-7212 3INT-ISI-2 Rev. 4 51 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS96, 97, 98, 99 Containment LPSI12" x 1.125"SI-202S & Vol105143Loop 1A, 1B, 2A & 2BSI-22022 SI-155 SI-17412" x 1.312"SI-202 SI-220 SI-155 SI-174100 & 101 Containment LPSI16" x 1.594SI-241S & Vol812Loop A & B, SuctionSI-19424" x 0.375SI-7 SI-30102-Safety Injection A Suction24" x 0.562" SI-307S & Vol184120" x 0.375"SI-307103-Refueling Water Tank Suction A20" x 0.375"CH-424S & Vol3320" x 0.375"CH-142104-Safety Injection B Suction24" x 0.562"SI-308S & Vol194320" x 0.375"SI-308105-Refueling Water Tank B Suction20" x 0.375"CH-425S & Vol467320" x 0.375"CH-149132 3INT-ISI-2 Rev. 4 52 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C5.20 PIPING WELDS > 1/5 IN NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AND <
NPS 4C5.21CIRCUMFERENTIAL WELD
*C5.21 running percent---5801012 1425 1838104 SI B Train Suction3" X 0.216"CH-150S & Vol413 106 & 107 HPSI Room Discharge4" x 0.438"SI-100S & Vol137101 A and B4" x 0.337"SI-99 SI-1073" x 0.438"SI-106 SI-1072" x 0.344"SI-105 SI-112 108 & 109 HPSI 88' Pipechas e4" x 0.438"SI-100S & Vol86722" x 0344"SI-1184" x 0.377"SI-107110 & 111 HPSI Discharge4" x 0.337"SI-107S & Vol10683West Wrap4" x 0.438"SI-218 SI-100 SI-2363" x 0.438"SI-218 SI-2362" x 0.344"SI-103 SI-107 SI-110 SI-218 SI-236 SI-100 3INT-ISI-2 Rev. 4 53 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS112 & 113 HPSI Discharge4" x 0.337"SI-107S & Vol9782East Wrap4" x 0.438"SI-100 SI-176 SI-1573" x 0.438"SI-176 SI-1572" x 0.344"SI-101 SI-102 SI-108 SI-109 SI-157 SI-176 114 & 115 HPSI Heade r3" x 0.438"SI-218S & Vol4432Loop 1A, 1B, 2A & 2BSI-236 SI-157 SI-176118 & 119 HPSI Long Term3" x 0.438"SI-106S & Vol10693 SI-1142" x 0.344"SI-319C5.30SOCKET WELDS106 & 107 HPSI Room Discharge2" x 0.344"SI-105S31317 A and BSI-112S3 3INT-ISI-2 Rev. 4 54 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS C5.40 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >
NPS 2C5.41CIRCUMFERENTIAL
*C5.41 running percent---27114 127 131182 & 85 SDC Heat Exch20" x 10"SI-78S211Room A & BSI-123S283 & 86 SDC Heat Exch20" x 6"SI-70S413Room A & B20" x 10"SI-72S4 20" x 14"88 & 91 Safety Injection20" x 12"SI-70S1East and West WrapsSI-72S189 & 92 SDC Suction18" x 12"SI-194S1East and West WrapsSI-241S196, 97, 98, 99 Containment LPSI12" x 3"SI-202S112Loop 1A, 1B, 2A & 2BSI-220S1SI-155S1 SI-174S1102-Safety Injection A Suction24" x 10"SI-307S3 24" x 18"24" x 20"104-Safety Injection B Suction24" x 10"SI-308S4 24" x 18" 24" x 20"24" x 3" 3INT-ISI-2 Rev. 4 55 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
** Note exam items are in Aug Summary C5.50PIPING WELDS >
3/8 IN NOMINAL WALL THICKNESS FOR PIPING
>NPS 4C5.51CIRCUMFERENTIAL WELD
*C5.51 running percent---3709121025 163843-  Main Steam SG 1 East Butt WeldsSG-36-28"S & Vol1921 SG-36-32"44-  Main Steam SG 1 WestButt WeldsSG-33-28"S & Vol2122 SG-33-32"45-  Main Steam SG 2 EastButt WeldsSG-42-28"S & Vol1923 SG-42-32"46-  Main Steam SG 2 WestButt WeldsSG-45-28"S & Vol2121SG-45-32"1347-  Main Steam SG 1 West Butt Welds**S & Vol**48-   Main Steam SG 1 EastButt Welds**S & Vol**
49-  Main Steam SG 2 EastButt Welds**S & Vol**
50-   Main Steam SG 2 WestButt Welds**S & Vol**
51-   Atmospheric Dump No. 1Butt Welds**S & Vol**52-  Atmospheric Dump No. 2Butt Welds**S & Vol**
53-  Steam to Aux Feedwate rButt Welds**S & Vol**
3INT-ISI-2 Rev. 4 56 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS54-   Feedwater SG No. 1Butt WeldsSG-2-24"S & Vol4543 SG-2-16"SG-2-14"SG-13-16" SG-13-14"55-  Feedwater SG No. 2Butt WeldsSG-5-24"S & Vol4451SG-5-16"23 SG-5-14"SG-14-16"SG-14-14"56-  Feedwater SG No. 1Butt WeldsSG-201-24"S & Vol**
SG-202-24"57-   Feedwater SG No. 2Butt WeldsSG-204-24"S & Vol**
SG-205-24"58-  Aux & Downcomer FW SG 1Butt WeldsSG-8-6"S & Vol2322 SG-8-8"59-  Aux & Downcomer FW SG 2Butt WeldsSG-11-6"S & Vol1823 SG-11-8"60-  Downcomer Feedwater SG 1Butt WeldsSG-200-8"S & Vol**
SG-008-8"61-  Downcomer Feedwater SG 2Butt WeldsSG-203-8"S & Vol**
SG-11-8"64-  Blowdown SG 1Butt WeldsSG-39-6"S & Vol7562 SG-53-6"SG-522-6"65-  Blowdown SG 2Butt WeldsSG-48-6"S & Vol8553 SG-52-6"SG-523-6"3INT-ISI-2 Rev. 4 57 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS66-  Blowdown SG 1Butt WeldsSG-39-6"S & Vol**67-  Blowdown SG 2Butt WeldsSG 6"S & Vol**
C5.80 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >
NPS 2 Scope from AHE5.81 moved to C5.81. (CRAI


4178275)C5.81CIRCUMFERENTIAL47Main Steam SG 1 West 28" x 12"SG-206-28"S771 28" x 6"48-   Main Steam SG 1 East28" x 12"SG-207-28"S8(1)93 28" x 6"49Main Steam SG 2 East28" x 12"SG-208-28"S8(1)93 28" x 6"50Main Steam SG 2 West28" x 12"SG-209-28"S773 28" x 6"EXAM CATEGORY C-H; ALL PRESSURE RETAINING COMPONENTS EXAM CATEGORY C-G deleted in the 2007 Ed.,
ASME                                                      DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM          IDENTIFICATION LINE OR SERIAL                                                REMARKS METHOD  ITEMS AMOUNT            %
2008 Add. See letter 102
NO                                                            NO                                    ION PERIOD EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING C5.10 >NPS 4 C5.11 CIRCUMFERENTIAL WELD
-06454 and SER dated
              *C5.11 running percent              -            -                -   517   22      1      2    *1101 WELDS USED 25      2      4    FOR % DUE TO C-F-1 41      3      8    See note 2 in code 54- Feedwater SG No. 1                 Butt Welds      SG-2-14        S & Vol    10    2      2 SG-13-14 55- Feedwater SG No. 2                Butt Welds      SG-5-14        S & Vol    10    1       3 SG-14-14 58-Aux Feed S/G 1                       6 x 0.562    AF-004          S & Vol   19    4      1 6 x 0.432    SG-008 8 x 0.500      SG-008 59-Aux Feed S/G 2                      6 x 0.562    AF-006          S & Vol   27    4      2 6 x 0.432    SG-011 8 x 0.500      SG-011 62-Aux Feed S/G 1                      6 x 0.562    AF-004          S & Vol  20    3      3 AF-018 63-Aux Feed S/G 2                      6 x 0.562    AF-006          S & Vol  16    4      1 AF-016 70-LPSI Pump Room A Suction            20 x 0.375      SI-307          S & Vol  20    4      1 73-LPSI Pump Room B Suction                            SI-308 82 & 85 SDC Heat Exch                  20 x 0.500    SI-078          S & Vol    8    2      2 Room A & B                                SI-123 3INT-ISI-2 Rev. 4                                              50 of 210


09/18/2012. (ACT
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                            REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 83 & 86 SDC Heat Exch            14 x 0.375      SI-90          S & Vol  56    7    PERIOD 2
Room A & B                          SI-135 16 x 0.375      SI-70 SI-72 20 x 0.500      SI-70 SI-72 88 & 91 Safety Injection        12 x 0.375      SI-72          S & Vol  77    13      3 East and West Wraps                        SI-73 SI-70 SI-71 12 x 1.125    SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-220 20 x 0.500      SI-72 SI-70 90 & 93 Safety Injection        24 x 0.375      SI-30          S & Vol  10    2      1 East and West Wraps                        SI-7 24 x 0.562    SI-308 SI-307 94 & 95 Safety Injection A & B  20 x 0.500      SI-70          S & Vol  15    4      1 SI-72                            1      2 3INT-ISI-2 Rev. 4                                    51 of 210


4343138)C7.10 PRESSURE RETAINING COMPONENTSClass 2IWC-5222VT-2****
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM        IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD   ITEMS AMOUNT           %
3INT-ISI-2 Rev. 4 58 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS EXAM CATEGORY F-A; SUPPORTS F1.20CLASS 2 PIPING SUPPORTS A-ONE DIRECTIONAL (RODS)
NO                                                          NO                                    ION 96, 97, 98, 99 Containment LPSI      12 x 1.125    SI-202          S & Vol  105  14    PERIOD 3
*F-A; A running percen t---3123383-   SDCHX Room AsupportsSI-87VT-3112106-   HPSI Room Discharge AsupportsSI-100VT-31107-   HPSI Room Discharge BsupportsSI-107VT-31F1.20CLASS 2 PIPING SUPPORTS RESTRAINTS
Loop 1A, 1B, 2A & 2B                        SI-220                            2      2 SI-155 SI-174 12 x 1.312    SI-202 SI-220 SI-155 SI-174 100 & 101 Containment LPSI          16 x 1.594      SI-241          S & Vol    8    1      2 Loop A & B, Suction                        SI-194 24 x 0.375        SI-7 SI-30 102-Safety Injection A Suction      24 x 0.562    SI-307          S & Vol  18    4      1 20 x 0.375    SI-307 103-Refueling Water Tank Suction A  20 x 0.375    CH-424          S & Vol   33 20 x 0.375    CH-142 104-Safety Injection B Suction      24 x 0.562    SI-308          S & Vol   19    4      3 20 x 0.375    SI-308 105-Refueling Water Tank B Suction  20 x 0.375    CH-425          S & Vol   46     7      3 20 x 0.375    CH-149                          13      2 3INT-ISI-2 Rev. 4                                    52 of 210
*F-A; B running percen t---419181423210 3031643-   Main Steam SG 1 East supportsSG-36VT-3211 44Main Steam SG 1 WestsupportsSG-33VT-3145Main Steam SG 2 EastsupportsSG-42VT-3213 46-   Main Steam SG 2 WestsupportsSG-45VT-31 54-  Feedwater SG No. 1supportsSG-002VT-3511 55-   Feedwater SG No. 2supportsSG-005VT-3511 58Aux & Downcomer FW SG 1supportsSG-8VT-3512 59Aux & Downcomer FW SG 2supportsSG-11VT-3612 62Auxiliary Feedwater SG 1supports AF-018VT-3111 3INT-ISI-2 Rev. 4 59 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS 63Auxiliary Feedwater SG 2 supports AF-006VT-33 A F-01664-   Blowdown SG 1supportsSG-39VT-31111SG-53VT-3 1265-   Blowdown SG 2supportsSG-48VT-31232SG-52VT-370LPSI Pump Room A SuctionsupportsSI-067VT-33 SI-241 SI-30771LPSI Pump Room A DischargesupportsSI-87VT-3523 SI-7873-   LPSI Pump Room B SuctionsupportsSI-034VT-33 SI-30874-   LPSI Pump Room B DischargesupportsSI-129VT-331376-   CS Pump Room A SuctionsupportsSI-9VT-34 SI-6777-   CS Pump Room A DischargesupportsSI-79VT-3823 SI-8279-   CS Pump Room B SuctionsupportsSI-033VT-3333 SI-03480-   CS Pump Room B DischargesupportsSI-119VT-351282-  SDCHX Room AsupportsSI-78VT-32 SI-7983-  SDCHX Room AsupportsSI-70VT-31311SI-82VT-3SI-87VT-3 3INT-ISI-2 Rev. 4 60 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSSI-89VT-3SI-90VT-385SDCHX Room BsupportsSI-119VT-3812 SI-12386-   SDCHX Room BsupportsSI-72VT-31023SI-129VT-3SI-134VT-3 SI-135VT-3SI-147VT-388-   East WrapsupportsSI-72VT-35SI-73VT-389-  East WrapsupportsSI-38VT-3411SI-173VT-3SI-194VT-390-  East WrapsupportsSI-130VT-33 SI-13491West WrapsupportsSI-70VT-3711SI-71VT-392-  West WrapsupportsSI-2VT-3511SI-241VT-393West WrapsupportsSI-89VT-3311 94A Train Pipe Chase & 88'supportsSI-70VT-314SI-89VT-3SI-241VT-395-  B Train Pipe Chase & 88'supportsSI-194VT-31433SI-72VT-322SI-134VT-3 3INT-ISI-2 Rev. 4 61 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS96-   Containment LPSI to 1AsupportsSI-202VT-3101297-  Containment LPSI to 1BsupportsSI-220VT-31642 98-   Containment LPSI to 2AsupportsSI-155VT-34 99-   Containment LPSI to 2BsupportsSI-174VT-35100-   Containment LPSI A SuctionsupportsSI-7VT-32SI-369VT-3101-   Containment LPSI B SuctionsupportsSI-30VT-34SI-194VT-3SI-368VT-3 102-   SI Pump Suction AsupportsSI-8VT-31421SI-9VT-3SI-307VT-3103-   Refueling Water Suction AsupportsCH-142VT-314CH-424VT-3104-   SI Pump Suction BsupportsSI-31VT-31212SI-33VT-313SI-308VT-3105-   Refueling Water Suction BsupportsCH-149VT-31963CH-425VT-322106-  HPSI Room Discharge AsupportsSI-100VT-31821 SI-105 SI-106107-  HPSI Room Discharge BsupportsSI-107VT-31432 SI-112 3INT-ISI-2 Rev. 4 62 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS108-   HPSI 88' PipechasesupportsSI-100VT-31643 SI-118109HPSI 88' PipechasesupportsSI-107VT-31111 110-   HPSI Discharge West WrapsupportsSI-103VT-31312 SI-107 SI-110 SI-218 SI-236111-  HPSI Discharge West WrapsupportsSI-100VT-3613 SI-236112HPSI Discharge East WrapsupportsSI-100VT-31013 SI-101 SI-102 SI-176113- HPSI DischargesupportsSI-107VT-31011 SI-108 SI-109 SI-157 SI-176 114 HPSI Heade rsupportsSI-218VT-3212Loop 1A & 1BSI-236 115 HPSI Heade rsupportsSI-157VT-32Loop 2A & 2BSI-176118 - HPSI Long TermsupportsSI-106VT-32233 119 - HPSI Long TermsupportsSI-114VT-31921 SI-319 3INT-ISI-2 Rev. 4 63 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSF1.20CLASS 2 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
 
*F-A; C running percen t---16791511212 1031743-   Main Steam SG 1 East supportsSG-36VT-3144-   Main Steam SG 1 WestsupportsSG-33VT-32 45-   Main Steam SG 2 EastsupportsSG-42VT-31 46Main Steam SG 2 WestsupportsSG-45VT-3247-   Main Steam SG 1 West supportsSG-206VT-3148Main Steam SG 1 EastsupportsSG-207VT-31 49-  Main Steam SG 2 EastsupportsSG-208VT-31 50-   Main Steam SG 2 WestsupportsSG-209VT-31 51Atmospheric Dump No. 1supportsSG-59VT-32 SG-7052-   Atmospheric Dump No. 2supportsSG-84VT-32 SG-10354-  Feedwater SG No. 1supportsSG-002VT-3921SG-013VT-355-   Feedwater SG No. 2supportsSG-005VT-31011 SG-01456-  Feedwater SG No. 1supportsSG-202VT-31 3INT-ISI-2 Rev. 4 64 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS57-   Feedwater SG No. 2supportsSG-205VT-3158-   Aux & Downcomer FW SG 1supportsSG-8VT-31123 AF-4VT-359-  Aux & Downcomer FW SG 2supportsSG-11VT-31122 AF-6VT-360Downcomer Feedwater SG 1supportsSG-200VT-32 61-  Downcomer Feedwater SG 2supportsSG-203VT-3213 62Auxiliary Feedwater SG 1supports AF-018VT-3222 AF-4VT-3 63-  Auxiliary Feedwater SG 2 supports AF-006VT-3264-   Blowdown SG 1supportsSG-39VT-3611 1265-  Blowdown SG 2supportsSG-48VT-3522 71-   LPSI Pump Room A DischargesupportsSI-78VT-31 74-   LPSI Pump Room B DischargesupportsSI-129VT-3313 77-  CS Pump Room A DischargesupportsSI-79VT-32 79-   CS Pump Room B SuctionsupportsSI-034VT-31 80-   CS Pump Room B DischargesupportsSI-119VT-3512 SI-14782-  SDCHX Room AsupportsSI-78VT-31 3INT-ISI-2 Rev. 4 65 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS83-   SDCHX Room AsupportsSI-70VT-3511SI-87VT-3SI-90VT-385-   SDCHX Room BsupportsSI-119VT-32 SI-12386-   SDCHX Room BsupportsSI-72VT-31523 SI-129 SI-134 SI-13588-   East WrapsupportsSI-72VT-3913 SI-7389-   East WrapsupportsSI-194VT-3191-   West WrapsupportsSI-70VT-33 SI-7192-   West WrapsupportsSI-239VT-3411SI-241VT-393-  West WrapsupportsSI-89VT-31 94-   A Train Pipe Chase & 88'supportsSI-89VT-3195-   B Train Pipe Chase & 88'supportsSI-72VT-3413 SI-19496-   Containment LPSI to 1AsupportsSI-202VT-3199Containment LPSI to 2BsupportsSI-174VT-3212 13100-   Containment LPSI A SuctionsupportsSI-241VT-31 3INT-ISI-2 Rev. 4 66 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKS101Containment LPSI B SuctionsupportsSI-194VT-31 102-   SI Pump Suction AsupportsSI-307VT-3111104-   SI Pump Suction BsupportsSI-308VT-3112106HPSI Room Discharge AsupportsSI-99VT-3311 SI-100107-   HPSI Room Discharge BsupportsSI-107VT-3312108HPSI 88' PipechasesupportsSI-100VT-32 SI-118109-   HPSI 88' PipechasesupportsSI-107VT-33 110-  HPSI Discharge West WrapsupportsSI-107VT-3413 SI-218111-   HPSI Discharge West WrapsupportsSI-236VT-31 113- HPSI DischargesupportsSI-157VT-31 118 - HPSI Long TermsupportsSI-106VT-32119 - HPSI Long TermsupportsSI-114VT-3411 SI-319 120Containment Spray AsupportsSI-88VT-31121-   Containment Spray BsupportsSI-130VT-32 3INT-ISI-2 Rev. 4 67 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECT ION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
ASME                                                  DESCRIPTION, NDE   TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                            REMARKS METHOD   ITEMS AMOUNT            %
*F-A; B running percen t---22**2117
NO                                                        NO                                    ION PIPING WELDS > 1/5 IN NOMINAL                                                            PERIOD WALL THICKNESS FOR PIPING >
**22 Total, 12 REQ'D5258 Multiple Items53100 68-  Regenerative Heat Exchange r supports 79313VT-3223 72- LPSI Pump Asupports0876-41VT-33 75- LPSI Pump Bsupports 0876-42VT-333278- CS Pump Asupports 0876-43VT-33 81- CS Pump Bsupports 0876-44VT-3333 116- HPSI Pump A supports 0776-16VT-3421 117- HPSI Pump Bsupports 0776-17VT-3422F1.40SUPPORTS OTHER THAN PIPING SUPPORTS
C5.20 NPS 2 AND < NPS 4 C5.21 CIRCUMFERENTIAL WELD
*F-A; C running percen t---4**1150
              *C5.21 running percent        -             -                 -   580   10      1      2 14      2      5 18      3      8 104 SI B Train Suction            3 X 0.216      CH-150          S & Vol    4    1      3 106 & 107 HPSI Room Discharge    4 x 0.438      SI-100          S & Vol  137   10      1 A and B          4 x 0.337      SI-99 SI-107 3 x 0.438      SI-106 SI-107 2 x 0.344      SI-105 SI-112 108 & 109 HPSI 88 Pipechase      4 x 0.438      SI-100          S & Vol    86    7      2 2 x 0344      SI-118 4 x 0.377      SI-107 110 & 111 HPSI Discharge          4 x 0.337      SI-107          S & Vol   106    8      3 West Wrap          4 x 0.438      SI-218 SI-100 SI-236 3 x 0.438      SI-218 SI-236 2 x 0.344      SI-103 SI-107 SI-110 SI-218 SI-236 SI-100 3INT-ISI-2 Rev. 4                                    53 of 210
**4 Total, 2 REQ'D12100 Multiple Items41-   Steam Generator 1snubbers 212VT-3211 1242-   Steam Generator 2snubbers 211VT-32 3INT-ISI-2 Rev. 4 68 of 210  
 
ASME                                                DESCRIPTION, NDE   TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD   ITEMS AMOUNT            %
NO                                                      NO                                    ION 112 & 113 HPSI Discharge        4 x 0.337      SI-107          S & Vol   97    8    PERIOD 2
East Wrap          4 x 0.438      SI-100 SI-176 SI-157 3 x 0.438      SI-176 SI-157 2 x 0.344      SI-101 SI-102 SI-108 SI-109 SI-157 SI-176 114 & 115 HPSI Header          3 x 0.438      SI-218          S & Vol    44    3      2 Loop 1A, 1B, 2A & 2B                    SI-236 SI-157 SI-176 118 & 119 HPSI Long Term        3 x 0.438      SI-106          S & Vol   106    9      3 SI-114 2 x 0.344      SI-319 C5.30 SOCKET WELDS 106 & 107 HPSI Room Discharge  2 x 0.344      SI-105              S    3    1      3    17 A and B                            SI-112              S    3 3INT-ISI-2 Rev. 4                                     54 of 210
 
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD ITEMS AMOUNT           %
NO                                                        NO                                    ION PIPE BRANCH CONNECTIONS OF                                                                PERIOD C5.40 BRANCH PIPING > NPS 2 C5.41 CIRCUMFERENTIAL
                *C5.41 running percent        -             -                 27    1      1      4 1      2      7 1      3    11 82 & 85 SDC Heat Exch              20 x 10        SI-78                S   2      1      1 Room A & B                            SI-123                S  2 83 & 86 SDC Heat Exch              20 x 6        SI-70                S   4      1      3 Room A & B            20 x 10        SI-72                S  4 20 x 14 88 & 91 Safety Injection            20 x 12        SI-70                S   1 East and West Wraps                        SI-72                S    1 89 & 92 SDC Suction                18 x 12      SI-194                S   1 East and West Wraps                        SI-241                S    1 96, 97, 98, 99 Containment LPSI    12 x 3        SI-202                S  1      1      2 Loop 1A, 1B, 2A & 2B                      SI-220                S    1 SI-155                S   1 SI-174                S  1 102-Safety Injection A Suction      24 x 10      SI-307                S   3 24 x 18 24 x 20 104-Safety Injection B Suction      24 x 10      SI-308                S   4 24 x 18 24 x 20 24 x 3 3INT-ISI-2 Rev. 4                                    55 of 210
 
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                                                 REMARKS METHOD   ITEMS AMOUNT           %
NO                                                        NO                                    ION PERIOD EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW                                                                        ** Note exam items are ALLOY STEEL PIPING                                                                                      in Aug Summary PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING C5.50 >NPS 4 C5.51 CIRCUMFERENTIAL WELD
              *C5.51 running percent        -             -                 -   370    9      1      2 10      2      5 16      3      8 43- Main Steam SG 1 East          Butt Welds      SG-36-28        S & Vol    19    2      1 SG-36-32 44- Main Steam SG 1 West          Butt Welds      SG-33-28        S & Vol    21    2      2 SG-33-32 45- Main Steam SG 2 East          Butt Welds      SG-42-28        S & Vol    19    2      3 SG-42-32 46- Main Steam SG 2 West          Butt Welds      SG-45-28        S & Vol    21    2      1 SG-45-32                        1      3 47- Main Steam SG 1 West          Butt Welds        **            S & Vol    **
48- Main Steam SG 1 East          Butt Welds        **            S & Vol    **
49- Main Steam SG 2 East          Butt Welds        **            S & Vol    **
50- Main Steam SG 2 West          Butt Welds        **            S & Vol    **
51- Atmospheric Dump No. 1        Butt Welds        **            S & Vol    **
52- Atmospheric Dump No. 2        Butt Welds        **            S & Vol    **
53- Steam to Aux Feedwater        Butt Welds        **            S & Vol    **
3INT-ISI-2 Rev. 4                                             56 of 210
 
ASME                                             DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD   ITEMS AMOUNT           %
NO                                                    NO                                    ION 54- Feedwater SG No. 1        Butt Welds      SG-2-24        S & Vol   45    4    PERIOD 3
SG-2-16 SG-2-14 SG-13-16 SG-13-14 55- Feedwater SG No. 2        Butt Welds      SG-5-24        S & Vol   44    5      1 SG-5-16                          2      3 SG-5-14 SG-14-16 SG-14-14 56- Feedwater SG No. 1        Butt Welds    SG-201-24        S & Vol  **
SG-202-24 57- Feedwater SG No. 2        Butt Welds    SG-204-24        S & Vol  **
SG-205-24 58- Aux & Downcomer FW SG 1    Butt Welds      SG-8-6        S & Vol  23    2      2 SG-8-8 59- Aux & Downcomer FW SG 2    Butt Welds      SG-11-6        S & Vol  18    2       3 SG-11-8 60- Downcomer Feedwater SG 1  Butt Welds      SG-200-8        S & Vol   **
SG-008-8 61- Downcomer Feedwater SG 2   Butt Welds      SG-203-8        S & Vol   **
SG-11-8 64- Blowdown SG 1             Butt Welds      SG-39-6        S & Vol   75    6      2 SG-53-6 SG-522-6 65- Blowdown SG 2             Butt Welds      SG-48-6        S & Vol   85    5      3 SG-52-6 SG-523-6 3INT-ISI-2 Rev. 4                                    57 of 210
 
ASME                                                  DESCRIPTION, NDE   TOTAL  EXAM  INSPECT RUNNING ITEM     ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                                                 REMARKS METHOD   ITEMS AMOUNT           %
NO                                                        NO                                    ION 66- Blowdown SG 1                Butt Welds      SG-39-6        S & Vol  **          PERIOD 67- Blowdown SG 2                Butt Welds      SG 6        S & Vol  **
Scope from AHE5.81 PIPE BRANCH CONNECTIONS OF                                                                              moved to C5.81. (CRAI C5.80 BRANCH PIPING > NPS 2                                                                                  4178275)
C5.81 CIRCUMFERENTIAL 47- Main Steam SG 1 West          28 x 12    SG-206-28            S    7      7      1 28 x 6 48- Main Steam SG 1 East          28 x 12    SG-207-28            S   8(1)    9      3 28 x 6 49- Main Steam SG 2 East          28 x 12    SG-208-28            S   8(1)    9      3 28 x 6 50- Main Steam SG 2 West          28 x 12    SG-209-28            S    7      7      3 28 x 6 EXAM CATEGORY C-G deleted in the 2007 Ed.,
2008 Add. See letter 102-06454 and SER dated EXAM CATEGORY C-H; ALL PRESSURE                                                                        09/18/2012. (ACT RETAINING COMPONENTS                                                                                    4343138)
PRESSURE RETAINING C7.10 COMPONENTS                          Class 2      IWC-5222          VT-2    *    *        *
* 3INT-ISI-2 Rev. 4                                              58 of 210
 
ASME                                              DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                    NO                                    ION PERIOD EXAM CATEGORY F-A; SUPPORTS F1.20 CLASS 2 PIPING SUPPORTS A-ONE DIRECTIONAL (RODS)
          *F-A; A running percent        -             -                 -   3    1      2    33 83- SDCHX Room A                supports        SI-87            VT-3    1    1      2 106- HPSI Room Discharge A      supports        SI-100            VT-3    1 107- HPSI Room Discharge B      supports        SI-107            VT-3    1 F1.20 CLASS 2 PIPING SUPPORTS RESTRAINTS
          *F-A; B running percent        -             -                 -   419  18      1      4 23      2    10 30      3    16 43- Main Steam SG 1 East        supports        SG-36              VT-3    2    1      1 44- Main Steam SG 1 West        supports        SG-33              VT-3    1 45- Main Steam SG 2 East        supports        SG-42              VT-3    2    1      3 46- Main Steam SG 2 West        supports        SG-45              VT-3    1 54- Feedwater SG No. 1          supports        SG-002            VT-3    5    1      1 55- Feedwater SG No. 2          supports        SG-005            VT-3    5    1      1 58- Aux & Downcomer FW SG 1    supports        SG-8              VT-3    5    1      2 59- Aux & Downcomer FW SG 2    supports        SG-11              VT-3    6    1      2 62- Auxiliary Feedwater SG 1    supports        AF-018            VT-3    1    1      1 3INT-ISI-2 Rev. 4                                    59 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 63- Auxiliary Feedwater SG 2      supports        AF-006            VT-3  3          PERIOD AF-016 64- Blowdown SG 1                supports        SG-39              VT-3   11    1      1 SG-53              VT-3          1      2 65- Blowdown SG 2                supports        SG-48              VT-3  12    3      2 SG-52              VT-3 70- LPSI Pump Room A Suction      supports        SI-067            VT-3   3 SI-241 SI-307 71- LPSI Pump Room A Discharge    supports        SI-87            VT-3    5    2      3 SI-78 73- LPSI Pump Room B Suction     supports        SI-034            VT-3   3 SI-308 74- LPSI Pump Room B Discharge   supports        SI-129            VT-3   3      1      3 76- CS Pump Room A Suction        supports          SI-9            VT-3    4 SI-67 77- CS Pump Room A Discharge     supports        SI-79            VT-3    8    2      3 SI-82 79- CS Pump Room B Suction        supports        SI-033            VT-3  3      3      3 SI-034 80- CS Pump Room B Discharge      supports        SI-119            VT-3  5      1      2 82- SDCHX Room A                  supports        SI-78            VT-3    2 SI-79 83- SDCHX Room A                  supports        SI-70            VT-3   13    1      1 SI-82            VT-3 SI-87            VT-3 3INT-ISI-2 Rev. 4                                   60 of 210
 
ASME                                             DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM   ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                                           REMARKS METHOD ITEMS AMOUNT           %
NO                                                    NO                                    ION SI-89            VT-3              PERIOD SI-90            VT-3 85- SDCHX Room B               supports        SI-119            VT-3    8    1      2 SI-123 86- SDCHX Room B                supports         SI-72             VT-3  10    2      3 SI-129            VT-3 SI-134            VT-3 SI-135            VT-3 SI-147            VT-3 88- East Wrap                  supports        SI-72            VT-3    5 SI-73            VT-3 89- East Wrap                  supports        SI-38            VT-3    4    1      1 SI-173            VT-3 SI-194            VT-3 90- East Wrap                  supports        SI-130            VT-3    3 SI-134 91- West Wrap                  supports        SI-70            VT-3    7    1      1 SI-71            VT-3 92- West Wrap                  supports          SI-2            VT-3    5    1      1 SI-241            VT-3 93- West Wrap                  supports        SI-89            VT-3    3    1      1 94- A Train Pipe Chase & 88'    supports        SI-70            VT-3  14 SI-89            VT-3 SI-241            VT-3 95- B Train Pipe Chase & 88'    supports        SI-194            VT-3  14    3      3 SI-72            VT-3          2      2 SI-134            VT-3 3INT-ISI-2 Rev. 4                                    61 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 96- Containment LPSI to 1A        supports        SI-202            VT-3  10    1    PERIOD 2
97- Containment LPSI to 1B        supports        SI-220            VT-3  16    4      2 98- Containment LPSI to 2A        supports        SI-155            VT-3    4 99- Containment LPSI to 2B        supports        SI-174            VT-3    5 100- Containment LPSI A Suction    supports          SI-7            VT-3    2 SI-369            VT-3 101- Containment LPSI B Suction    supports        SI-30            VT-3    4 SI-194            VT-3 SI-368            VT-3 102- SI Pump Suction A            supports          SI-8            VT-3  14    2      1 SI-9            VT-3 SI-307            VT-3 103- Refueling Water Suction A    supports        CH-142            VT-3  14 CH-424            VT-3 104- SI Pump Suction B            supports        SI-31            VT-3  12    1      2 SI-33            VT-3          1      3 SI-308            VT-3 105- Refueling Water Suction B    supports        CH-149            VT-3  19    6      3 CH-425            VT-3          2      2 106- HPSI Room Discharge A        supports        SI-100            VT-3  18    2      1 SI-105 SI-106 107- HPSI Room Discharge B        supports        SI-107            VT-3  14    3      2 SI-112 3INT-ISI-2 Rev. 4                                    62 of 210
 
ASME                                              DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                    NO                                  ION 108- HPSI 88 Pipechase          supports        SI-100            VT-3  16    4    PERIOD 3
SI-118 109- HPSI 88 Pipechase          supports        SI-107            VT-3  11    1      1 110- HPSI Discharge West Wrap    supports        SI-103            VT-3  13    1      2 SI-107 SI-110 SI-218 SI-236 111- HPSI Discharge West Wrap    supports        SI-100            VT-3    6    1      3 SI-236 112- HPSI Discharge East Wrap    supports        SI-100            VT-3  10    1      3 SI-101 SI-102 SI-176 113- HPSI Discharge              supports        SI-107            VT-3  10    1      1 SI-108 SI-109 SI-157 SI-176 114 HPSI Header                  supports        SI-218            VT-3    2    1      2 Loop 1A & 1B                        SI-236 115 HPSI Header                  supports        SI-157            VT-3    2 Loop 2A & 2B                        SI-176 118 - HPSI Long Term            supports        SI-106            VT-3  22    3      3 119 - HPSI Long Term            supports        SI-114            VT-3  19    2      1 SI-319 3INT-ISI-2 Rev. 4                                    63 of 210
 
ASME                                              DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                    NO                                  ION F1.20 CLASS 2 PIPING SUPPORTS                                                              PERIOD C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)
          *F-A; C running percent        -              -                -  167    9      1      5 11      2    12 10      3    17 43- Main Steam SG 1 East        supports        SG-36            VT-3    1 44- Main Steam SG 1 West        supports        SG-33            VT-3    2 45- Main Steam SG 2 East        supports        SG-42            VT-3    1 46- Main Steam SG 2 West        supports        SG-45            VT-3    2 47- Main Steam SG 1 West        supports        SG-206            VT-3    1 48- Main Steam SG 1 East        supports        SG-207            VT-3    1 49- Main Steam SG 2 East        supports        SG-208            VT-3    1 50- Main Steam SG 2 West        supports        SG-209            VT-3    1 51- Atmospheric Dump No. 1      supports        SG-59            VT-3    2 SG-70 52- Atmospheric Dump No. 2      supports        SG-84            VT-3    2 SG-103 54- Feedwater SG No. 1          supports        SG-002            VT-3    9    2      1 SG-013            VT-3 55- Feedwater SG No. 2          supports        SG-005            VT-3  10    1      1 SG-014 56- Feedwater SG No. 1          supports        SG-202            VT-3    1 3INT-ISI-2 Rev. 4                                    64 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 57- Feedwater SG No. 2            supports        SG-205            VT-3  1          PERIOD 58- Aux & Downcomer FW SG 1      supports        SG-8              VT-3  11    2      3 AF-4              VT-3 59- Aux & Downcomer FW SG 2      supports        SG-11              VT-3  11    2      2 AF-6              VT-3 60- Downcomer Feedwater SG 1      supports        SG-200            VT-3  2 61- Downcomer Feedwater SG 2      supports        SG-203            VT-3  2      1      3 62- Auxiliary Feedwater SG 1      supports        AF-018            VT-3  2      2      2 AF-4              VT-3 63- Auxiliary Feedwater SG 2      supports        AF-006            VT-3  2 64- Blowdown SG 1                supports        SG-39              VT-3  6      1      1 1      2 65- Blowdown SG 2                supports        SG-48              VT-3  5      2      2 71- LPSI Pump Room A Discharge    supports        SI-78            VT-3  1 74- LPSI Pump Room B Discharge    supports        SI-129            VT-3  3      1      3 77- CS Pump Room A Discharge      supports        SI-79            VT-3  2 79- CS Pump Room B Suction        supports        SI-034            VT-3  1 80- CS Pump Room B Discharge      supports        SI-119            VT-3  5      1      2 SI-147 82- SDCHX Room A                  supports        SI-78            VT-3  1 3INT-ISI-2 Rev. 4                                    65 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 83- SDCHX Room A                  supports        SI-70            VT-3    5    1    PERIOD 1
SI-87            VT-3 SI-90            VT-3 85- SDCHX Room B                  supports        SI-119            VT-3  2 SI-123 86- SDCHX Room B                  supports        SI-72            VT-3  15    2      3 SI-129 SI-134 SI-135 88- East Wrap                      supports        SI-72            VT-3    9    1      3 SI-73 89- East Wrap                      supports        SI-194            VT-3  1 91- West Wrap                      supports        SI-70            VT-3    3 SI-71 92- West Wrap                      supports        SI-239            VT-3  4      1      1 SI-241            VT-3 93- West Wrap                      supports        SI-89            VT-3    1 94- A Train Pipe Chase & 88'      supports        SI-89            VT-3  1 95- B Train Pipe Chase & 88'      supports        SI-72            VT-3  4      1      3 SI-194 96- Containment LPSI to 1A        supports        SI-202            VT-3  1 99- Containment LPSI to 2B        supports        SI-174            VT-3  2      1      2 1      3 100- Containment LPSI A Suction    supports        SI-241            VT-3  1 3INT-ISI-2 Rev. 4                                    66 of 210
 
ASME                                                DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                          REMARKS METHOD  ITEMS AMOUNT            %
NO                                                      NO                                    ION 101- Containment LPSI B Suction    supports        SI-194            VT-3  1          PERIOD 102- SI Pump Suction A            supports        SI-307            VT-3  1      1      1 104- SI Pump Suction B            supports        SI-308            VT-3  1      1      2 106- HPSI Room Discharge A        supports        SI-99            VT-3  3      1      1 SI-100 107- HPSI Room Discharge B        supports        SI-107            VT-3  3      1      2 108- HPSI 88 Pipechase            supports        SI-100            VT-3  2 SI-118 109- HPSI 88 Pipechase            supports        SI-107            VT-3  3 110- HPSI Discharge West Wrap      supports        SI-107            VT-3  4      1      3 SI-218 111- HPSI Discharge West Wrap      supports        SI-236            VT-3  1 113- HPSI Discharge                supports        SI-157            VT-3  1 118 - HPSI Long Term              supports        SI-106            VT-3  2 119 - HPSI Long Term              supports        SI-114            VT-3  4      1      1 SI-319 120- Containment Spray A          supports        SI-88            VT-3  1 121- Containment Spray B          supports        SI-130            VT-3  2 3INT-ISI-2 Rev. 4                                    67 of 210
 
ASME                                                  DESCRIPTION, NDE  TOTAL  EXAM  INSPECT RUNNING ITEM    ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                                                REMARKS METHOD  ITEMS AMOUNT            %
NO                                                        NO                                  ION F1.40 SUPPORTS OTHER THAN                                                                    PERIOD PIPING SUPPORTS
            *F-A; B running percent          -              -                -  22**    2      1    17    **22 Total, 12 REQ'D 5      2    58    Multiple Items 5      3    100 68- Regenerative Heat Exchanger    supports        79313            VT-3    2    2      3 72- LPSI Pump A                    supports        0876-41          VT-3    3 75- LPSI Pump B                    supports        0876-42          VT-3    3    3      2 78- CS Pump A                      supports        0876-43          VT-3    3 81- CS Pump B                      supports        0876-44          VT-3    3    3      3 116- HPSI Pump A                  supports        0776-16          VT-3    4    2      1 117- HPSI Pump B                  supports        0776-17          VT-3    4    2      2 F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS
            *F-A; C running percent          -              -                -  4**    1      1    50    **4 Total, 2 REQ'D 1      2    100  Multiple Items 41- Steam Generator 1              snubbers          212            VT-3    2    1      1 1      2 42- Steam Generator 2              snubbers          211            VT-3    2 3INT-ISI-2 Rev. 4                                             68 of 210


SECTION 6.0 ASME CLASS 3 EXAMINATION  
SECTION 6.0 ASME CLASS 3 EXAMINATION  
Line 303: Line 442:
==SUMMARY==
==SUMMARY==


3INT-ISI-2 Rev. 4 69 of 210 INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components   F-A       Class 3 Supports 3INT-ISI-2 Rev. 4 70 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-A; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES Pressure Vessels
3INT-ISI-2 Rev. 4 69 of 210
 
INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 3INT-ISI-2 Rev. 4                         70 of 210
 
ASME                                                   DESCRIPTION, NDE  TOTAL  EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                         INSPECTION              REMARKS METHOD ITEMS AMOUNT               %
NO                                                        NO                                  PERIOD EXAM CATEGORY D-A; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES Pressure Vessels
* D1.10 Welded Attachments
* D1.10 Welded Attachments
*D1.10; running percent---22**3133
            *D1.10; running percent           -             -                 - 22**   3        1      33    **10 req'd due to 3        2      66    multiple comp 4        3      100 DF System                         attachments     DFA-T02          VT-1    2    2        1 DFB-T02 DG System                         attachments     DGA-E04            VT-1    8    1        1 DGA-E05                         2        2 DGB-E04 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System                         attachments     ECA-E-1          VT-1    4    2        3 ECA-T-1 ECB-E-1 ECB-T-1 EW System                         attachments     EWA-E01            VT-1    4    1        1 EWA-T01                         1        3 EWB-E01 EWB-T01 PC System                         attachments     PCA-E1            VT-1  2      1        2 PCB-E1 SI System                         attachments     SIA-E01          VT-1  2      1        3 SIB-E01 3INT-ISI-2 Rev. 4                                           71 of 210
**10 req'd due to 3266 multiple comp43100  DF System attachments DFA-T02VT-1221 DFB-T02   DG System attachments DGA-E04VT-1811 DGA-E05 22 DGB-E04 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-1423 ECA-T-1 ECB-E-1 ECB-T-1 EW System attachments EWA-E01VT-1411 EWA-T01 13 EWB-E01 EWB-T01 PC System attachments PCA-E1VT-1212 PCB-E1 SI System attachments SIA-E01VT-1213 SIB-E01 3INT-ISI-2 Rev. 4 71 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS Piping D1.20 Welded Attachments
 
*D1.20; running percent---24311141129 11313 AF System attachments pipingVT-1911CT SystemattachmentspipingVT-1311 DG System attachments pipingVT-11423 EC System attachmentspipingVT-11413 EW System attachmentspipingVT-13741 22 NC System attachmentspipingVT-11921 13 PC System attachmentspipingVT-11311SG SystemattachmentspipingVT-1311 12SI SystemattachmentspipingVT-1211 SP SystemattachmentspipingVT-112982 73 3INT-ISI-2 Rev. 4 72 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY D-B; ALL PRESSURE RETAINING COMPONENTS D2.10Pressure retaining componentsClass 3IWD-5221VT-2****
ASME                                               DESCRIPTION, NDE  TOTAL  EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                           INSPECTION        REMARKS METHOD ITEMS AMOUNT               %
* Note Pressure Test Program EXAM CATEGORY F-A; SUPPORTS F1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
NO                                                      NO                                  PERIOD Piping D1.20 Welded Attachments
*F-A; B running percen t---3191615112817313 AF System supports pipingVT-318 21 12 43CT SystemsupportspipingVT-3311 DG System supports pipingVT-33023 EC System supportspipingVT-31623 EW System supportspipingVT-36761 22 NC System supportspipingVT-33541 23 PC System supportspipingVT-31711 SG System supportspipingVT-3411 12 SI System supportspipingVT-3411 SP System supportspipingVT-312572 73 3INT-ISI-2 Rev. 4 73 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.30CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
            *D1.20; running percent         -             -                 -   243  11        1        4 11        2        9 11        3      13 AF System                       attachments       piping            VT-1    9    1        1 CT System                      attachments      piping            VT-1    3    1        1 DG System                       attachments       piping            VT-1    14    2        3 EC System                       attachments      piping            VT-1    14    1        3 EW System                       attachments      piping            VT-1    37    4        1 2        2 NC System                       attachments      piping            VT-1    19    2        1 1        3 PC System                       attachments      piping            VT-1    13    1        1 SG System                      attachments        piping            VT-1    3    1        1 1        2 SI System                      attachments        piping            VT-1    2    1        1 SP System                      attachments        piping            VT-1  129    8        2 7        3 3INT-ISI-2 Rev. 4                                   72 of 210
*F-A; C running percent---57711252214328 AF System supports pipingVT-310 11 12 DG System supports pipingVT-3413 EC System supportspipingVT-3213 EW System supportspipingVT-31021 NC System supportspipingVT-3111 PC System supportspipingVT-31321 23 SG System supportspipingVT-3722 SI System supportspipingVT-3112 SP System supportspipingVT-3911 12 3INT-ISI-2 Rev. 4 74 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKSF1.40SUPPORTS OTHER THAN PIPING SUPPORTS
 
*F-A; B running percent---223130**10 req'd due to 3260 multiple comp43100DF Systemsupports DFA-T02VT-3211 DFB-T02DG Systemsupports DGA-E04VT-3811 DGB-E04 12 DGA-E05 13 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1VT-3411 ECB-E-1 12 ECA-T-1 ECB-T-1 EW System attachments EWA-E01VT-3423 EWB-E01 EWA-T01 EWB-T01 PC System attachments PCA-E1VT-3212 PCB-E1SI Systemattachments SIA-E01VT-3213 SIB-E01 3INT-ISI-2 Rev. 4 75 of 210  
ASME                                                 DESCRIPTION, NDE  TOTAL  EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                           INSPECTION                REMARKS METHOD ITEMS AMOUNT               %
NO                                                        NO                                  PERIOD EXAM CATEGORY D-B; ALL PRESSURE RETAINING COMPONENTS D2.10 Pressure retaining components      Class 3        IWD-5221            VT-2     *   *       *       *
* Note Pressure Test Program EXAM CATEGORY F-A; SUPPORTS F1.30 CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
            *F-A; B running percent          -               -                 -   319  16        1        5 11        2        8 17        3      13 AF System                         supports         piping            VT-3    18    2        1 1        2 4        3 CT System                          supports        piping            VT-3    3    1        1 DG System                         supports         piping            VT-3    30    2        3 EC System                         supports        piping            VT-3  16    2        3 EW System                         supports        piping            VT-3  67    6        1 2        2 NC System                         supports        piping            VT-3  35    4        1 2        3 PC System                         supports        piping            VT-3  17    1        1 SG System                         supports        piping            VT-3    4    1        1 1        2 SI System                         supports        piping            VT-3    4    1        1 SP System                         supports        piping            VT-3  125    7        2 7        3 3INT-ISI-2 Rev. 4                                           73 of 210
 
ASME                                                 DESCRIPTION, NDE  TOTAL  EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                           INSPECTION        REMARKS METHOD ITEMS AMOUNT               %
NO                                                      NO                                  PERIOD F1.30 CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
            *F-A; C running percent       -               -                 -   57    7        1      12 5        2      21 4        3      28 AF System                         supports         piping            VT-3  10    1        1 1        2 DG System                         supports         piping            VT-3    4    1        3 EC System                         supports        piping            VT-3    2    1        3 EW System                         supports        piping            VT-3  10    2        1 NC System                         supports        piping            VT-3    1    1        1 PC System                         supports        piping            VT-3  13    2        1 2        3 SG System                         supports        piping            VT-3    7    2        2 SI System                         supports        piping            VT-3    1    1        2 SP System                         supports        piping            VT-3    9    1        1 1        2 3INT-ISI-2 Rev. 4                                   74 of 210
 
ASME                                                 DESCRIPTION, NDE  TOTAL  EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                         INSPECTION              REMARKS METHOD ITEMS AMOUNT               %
NO                                                      NO                                  PERIOD F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS
            *F-A; B running percent         -             -                 -   22    3        1      30    **10 req'd due to 3        2      60    multiple comp 4        3      100 DF System                        supports        DFA-T02          VT-3  2      1        1 DFB-T02 DG System                        supports      DGA-E04            VT-3  8      1        1 DGB-E04                         1        2 DGA-E05                         1        3 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System                       attachments     ECA-E-1          VT-3  4      1        1 ECB-E-1                         1        2 ECA-T-1 ECB-T-1 EW System                       attachments     EWA-E01            VT-3  4      2        3 EWB-E01 EWA-T01 EWB-T01 PC System                       attachments     PCA-E1            VT-3  2      1        2 PCB-E1 SI System                      attachments      SIA-E01          VT-3  2      1        3 SIB-E01 3INT-ISI-2 Rev. 4                                           75 of 210


SECTION 7.0 AUGMENTED EXAMINATION  
SECTION 7.0 AUGMENTED EXAMINATION  
Line 317: Line 472:
==SUMMARY==
==SUMMARY==


3INT-ISI-2 Rev. 4 76 of 210 INDEX  EXAM CATEGORY  N-722-1 PWR Components Containing Alloy 600/82/182  N-729-1 PWR Reactor Vessel Upper Head  N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182  B-J  Pressure Retaining Welds in Piping  B-P  All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping  C-F-2  Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY  C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL  NA Reactor Coolant Pump Flywheel Examinations 3INT-ISI-2 Rev. 4 77 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY CC722-1; PWR COMPONENTS CONTAINING ALLOY 600/82/182 REACTOR VESSEL B15.80 RPV bottom mounted instrument penetrations1-Reactor Vessel (1-31)ICI Penetrations78173VE6161**
3INT-ISI-2 Rev. 4   76 of 210
* Required R16, R18, R20 STEAM GENERATOR B15.1353-  Cold leg instrument connectionsPenetrations224VE44******
*** Prorated over inverval per Footnote 6


of Code Case.
INDEX EXAM CATEGORY N-722-1  PWR Components Containing Alloy 600/82/182 N-729-1  PWR Reactor Vessel Upper Head N-770-1  PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J      Pressure Retaining Welds in Piping B-P      All Pressure Retaining Components C-F-1    Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2      Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2    Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA        Reactor Coolant Pump Flywheel Examinations 3INT-ISI-2 Rev. 4                                  77 of 210
4-   Cold leg instrument connectionsPenetrations225VE44******
 
PRESSURIZE R B15.1405- Heater PenetrationsPenetrations 78373VE3636****
ASME                                                        DESCRIPTION, NDE TOTAL EXAM              RUNNING ITEM        ZONE-COMPONENT OR SYSTEM      IDENTIFICATION  LINE OR SERIAL                          INSPECTION                REMARKS METHOD ITEMS AMOUNT              %
**Each RFO (5-36)B15.1805- Instrument ConnectionsInstruments78373VE77****
NO                                                              NO                                  PERIOD EXAM CATEGORY CC722-1; PWR COMPONENTS CONTAINING ALLOY 600/82/182 REACTOR VESSEL RPV bottom mounted instrument B15.80 penetrations
* Required R16, R18, 1-Reactor Vessel (1-31)            ICI Penetrations      78173              VE  61    61        *
* R20 STEAM GENERATOR
                                                                                                                      *** Prorated over inverval per Footnote 6 B15.135 3- Cold leg instrument connections  Penetrations          224              VE  4    4        ***      ***  of Code Case.
4- Cold leg instrument connections  Penetrations          225              VE  4    4        ***     ***
PRESSURIZER B15.140 5- Heater Penetrations              Penetrations        78373              VE  36    36        **       **   **Each RFO (5-36)
B15.180 5- Instrument Connections            Instruments        78373              VE    7    7        **       **
(5-37, 1 through 7)
(5-37, 1 through 7)
PIPING B15.2006- Hot Leg Instrument ConnectionsInstrumentsRCSVE2727****
PIPING B15.200 6- Hot Leg Instrument Connections    Instruments        RCS                VE  27    27      **       **
(6-101)B15.205 Cold leg instrument connections6- RCP Pressure Taps (6-100)Instrument RCPVE441256- Cold Leg Instrumentation (6-99)Instrument RCsVE126263 63100 3INT-ISI-2 Rev. 4 78 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS B15.215 Cold leg full penetration weld s23-  Safety Injection 1A (9-10)butt weldsSI-207-14"VE11********* VE in conjunction with N-770-1 VOL
(6-101)
,24-   Safety Injection 1B (11-10)butt weldsSI-223-14"VE11******prorated over inverval per Footnote 6 of 25-  Safety Injection 2A (13-10)butt weldsSI-160-14"VE11******Code Case 26-  Safety Injection 2B (15-9)butt weldsSI-179-14"VE11******27-  Pzr Spray 1A (9-11
B15.205 Cold leg instrument connections 6- RCP Pressure Taps (6-100)           Instrument         RCP              VE    4    4        1        25 6- Cold Leg Instrumentation (6-99)     Instrument         RCs              VE  12    6       2       63 6        3       100 3INT-ISI-2 Rev. 4                                                 78 of 210
)butt weldsRC-062-3"VE11******28-  Pzr Spray 1B (11-11
)butt weldsRC-017-3"VE11******32-  Drain Line Loop 1A (8-18)butt weldsRC-060-2"VE11****** 33-  Drain Line Loop 1B (10-18)butt weldsRC-058-2"VE11******34-  Drain Line Loop 2A (12-18)butt weldsRC-096-2"VE11******36-  Letdown Line (14-18)butt weldsRC-091-2"VE11******37-  Charging Line (13-11)butt weldsCH-005-3"VE11******3INT-ISI-2 Rev. 4 79 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-729-1; PWR REACTOR VESSEL UPPER HEAD REACTOR VESSEL UPPER HEAD B4.30 Head with nozzles and partial
-penetration welds of PWSCC-resistant materials 2-Closure Head CEDM Penetrations Head SurfaceN05065-CHA-01VE9797*100
*R15 (Head Replaced)
(2-89)REQUIRED R18, R212-Closure Head Vent PenetrationVent NozzleN05065-CHA-01VE11*100
*R15 (Head Replaced)
(2-88)REQUIRED R18, R21 B4.40 Nozzles and partial-penetration welds of PWSCC-resistant materials in head2-Closure Head CEDM Nozzles & J-WeldCEDM NozzleN05065-CHA-01S or Vol9797*100
* not to exceed 2020 (2-89)2-Closure Head Vent Nozzle & J-WeldVent NozzleN05065-CHA-01S or Vol11*100
* not to exceed 2020 (2-88)3INT-ISI-2 Rev. 4 80 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS CODE CASE N-770-1; PWR PRESSURE RETAINING DISSIMILAR METAL PIPING AND VESSEL NOZZLE BUTT WELDS CONTAINING ALLOY 82/182 Cracked butt weld reinforced by full structural weld overlay of Alloy 52/152 material                          INSPECTION ITEM F NOMINAL PIPE SIZE >
4 INCH NOZZLE TO SAFEEND BUTT WELDS Mitigated with FSWO During R14; 1st ISI R16 29-  Spra ybutt weldsRC-18-4"Vol61214
*Design Calc Exam 20-  Surge*butt weldsRC-028-12"Vol 1328 Freq. every 3 years.31-  Safeties (4)butt weldsRC-001-6"Vol R18, R20, R22.RC-003-6"Vol (CRAI 4348769)RC-005-6"Vol RC-007-6"Vol NPS 4 OR LARGER Mitigated with FSWO
* CIRCUMFERENTIAL WELDS During R13; 1st ISI R1520-  Pressurizer Surge Line**butt weldsRC-028-12"Vol31333
** Design Calc Frequency every 6


years, R2021-  Shutdown Cooling Loop 1butt weldsRC-051-16"Vol (CRAI 4348769) 22-  Shutdown Cooling Loop 2butt weldsRC-068-16"Vol 3INT-ISI-2 Rev. 4 81 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS Unmitigated butt weld at cold leg operating temperature INSPECTION ITEM B23-   Safety Injection 1Abutt weldsSI-207-14"VE & Vol11100 Examined R15, REQUIRED R1924-   Safety Injection 1Bbutt weldsSI-223-14"VE & Vol11100 Examined R15, REQUIRED R1925-   Safety Injection 2Abutt weldsSI-160-14"VE & Vol11100 Examined R15, REQUIRED R1926-   Safety Injection 2Bbutt weldsSI-179-14"VE & Vol11100 Examined R15, REQUIRED R1927-   Pressurizer Spray 1Abutt weldsRC-062-3"VE & Vol11100 REQUIRED R17, R2128-   Pressurizer Spray 1Bbutt weldsRC-017-3"VE & Vol11100 REQUIRED R17, R2132-   Drain Line Loop 1Abutt weldsRC-060-2"VE & Vol11100 REQUIRED R17, R2133-   Drain Line Loop 1Bbutt weldsRC-058-2"VE & Vol11100 REQUIRED R17, R2134-   Drain Line Loop 2Abutt weldsRC-096-2"VE & Vol11100 REQUIRED R17, R2136-   Letdown Linebutt weldsRC-091-2"VE & Vol11100 REQUIRED R17, R2137-   Charging Linebutt weldsCH-005-2"VE & Vol11100 REQUIRED R17, R21 EXAM CATEGORY B-P; ALL PRESSURE RETAINING COMPONENTS
ASME                                                    DESCRIPTION, NDE TOTAL EXAM              RUNNING ITEM       ZONE-COMPONENT OR SYSTEM   IDENTIFICATION LINE OR SERIAL                         INSPECTION                REMARKS METHOD ITEMS AMOUNT               %
*100% each outage UNINSULATED (SUPPORTS PRESSURE TEST PROGRAM)REACTOR VESSELB15.10CLOSURE HEAD NUTS2-  Closure Headnuts7.237" x 7.91"VT-2540**0B15.10CLOSURE STUDS2-  Closure Headstuds7.380" x 76.37"VT-25454**
NO                                                          NO                                PERIOD B15.215 Cold leg full penetration welds 23- Safety Injection 1A (9-10)    butt welds      SI-207-14           VE    1    1        ***      ***  *** VE in conjunction with N-770-1 VOL, 24- Safety Injection 1B (11-10)  butt welds      SI-223-14           VE   1    1        ***      ***  prorated over inverval per Footnote 6 of 25- Safety Injection 2A (13-10)  butt welds      SI-160-14           VE   1    1        ***      ***  Code Case 26- Safety Injection 2B (15-9)    butt welds      SI-179-14           VE   1    1        ***      ***
3INT-ISI-2 Rev. 4 82 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS PRESSURIZE RB15.10BOLTS, STUDS AND NUTS 5-  Pressurizer Manwa yStuds & Nuts1.31" x 14.5"VT-22020**
27- Pzr Spray 1A (9-11)          butt welds      RC-062-3"           VE   1    1        ***      ***
STEAM GENERATORB15.10BOLTS, STUDS AND NUTS3-  Steam Generator 1 MANWAYSStuds & Nuts1.31" x 14.5"VT-24040**
28- Pzr Spray 1B (11-11)          butt welds      RC-017-3"           VE   1    1        ***      ***
4-  Steam Generator 2 MANWAYSStuds & Nuts1.31" x 14.5"VT-24040**
32- Drain Line Loop 1A (8-18)    butt welds      RC-060-2           VE   1    1        ***      ***
33- Drain Line Loop 1B (10-18)    butt welds      RC-058-2           VE   1    1        ***      ***
34- Drain Line Loop 2A (12-18)    butt welds      RC-096-2           VE   1    1        ***      ***
36- Letdown Line (14-18)          butt welds      RC-091-2           VE   1    1        ***      ***
37- Charging Line (13-11)        butt welds      CH-005-3            VE   1    1        ***     ***
3INT-ISI-2 Rev. 4                                                 79 of 210


PIPINGB15.10BOLTS, STUDS AND NUTS31-  Pressurizer SafetiesFlange BoltingRC-001-6"VT-288**Flange BoltingRC-003-6"VT-288**
ASME                                                          DESCRIPTION, NDE    TOTAL EXAM            RUNNING ITEM     ZONE-COMPONENT OR SYSTEM             IDENTIFICATION LINE OR SERIAL                         INSPECTION                REMARKS METHOD ITEMS AMOUNT               %
Flange BoltingRC-005-6"VT-288**
NO                                                                NO                                  PERIOD CODE CASE N-729-1; PWR REACTOR VESSEL UPPER HEAD REACTOR VESSEL UPPER HEAD Head with nozzles and partial-penetration welds of PWSCC-resistant B4.30 materials 2-Closure Head CEDM Penetrations          Head Surface  N05065-CHA-01          VE      97  97
Flange BoltingRC-007-6"VT-288**37-  Charging LineFlange V435CH-005-2"VT-288**
* 100  *R15 (Head Replaced)
3INT-ISI-2 Rev. 4 83 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.20LESS THAN NPS 4 B9.21 CIRCUMFERENTIAL WELDS OTHER THAN PWR HPSI SYSTEMS 30-   Aux Pressurizer Spray**butt weldsCH-009-2"S223100
(2-89)                                                                                                            REQUIRED R18, R21 2-Closure Head Vent Penetration            Vent Nozzle  N05065-CHA-01         VE      1    1
** IEB 88-08 & IN 97-19 2 welds and base metal down stream of V431 Removed AUG B-G-1 per CRAI 4052305.PIPING WELDS >
* 100  *R15 (Head Replaced)
3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4 CIRCUMFERENTIAL WELDC5.1154-FW SG 114" x 0.938"SG-002S & Vol2*22100
(2-88)                                                                                                            REQUIRED R18, R21 Nozzles and partial-penetration welds of B4.40 PWSCC-resistant materials in head 2-Closure Head CEDM Nozzles & J-Weld      CEDM Nozzle   N05065-CHA-01      S or Vol  97  97
*Examination REQD bySG-013 IEB 79-13 & SER 83-07 (54-1 & 15; 55-1 & 15)C5.1155-FW SG 214" x 0.938"SG-005S & Vol2*23100 SG-014C5.1158Aux & Downcomer FW SG 1Butt WeldsSG-8-6"S & Vol1**12100
* 100
**Examination REQD by SG-8-8"IEB 79-13 & SER 83-07 (58-1; 59-1)C5.1159-   Aux & Downcomer FW SG 2Butt WeldsSG-11-6"S & Vol1**13100 SG-11-8"3INT-ISI-2 Rev. 4 84 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOY STEEL PIPING
* not to exceed 2020 (2-89) 2-Closure Head Vent Nozzle & J-Weld        Vent Nozzle  N05065-CHA-01      S or Vol    1    1
(*) Identifies the number of welds that are not in
* 100
* not to exceed 2020 (2-88) 3INT-ISI-2 Rev. 4                                                 80 of 210


the ASME CL 2 boundary AHE5.50PIPING WELDS >
ASME                                                         DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM    ZONE-COMPONENT OR SYSTEM            IDENTIFICATION LINE OR SERIAL                        INSPECTION                REMARKS METHOD ITEMS AMOUNT              %
3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4**100% of all intersecting longitudinal
NO                                                              NO                                PERIOD CODE CASE N-770-1; PWR PRESSURE RETAINING DISSIMILAR METAL PIPING AND VESSEL NOZZLE BUTT WELDS CONTAINING ALLOY 82/182 Cracked butt weld reinforced by full structural weld overlay of Alloy 52/152 material                  INSPECTION ITEM F NOMINAL PIPE SIZE > 4 INCH                                                                                      Mitigated with FSWO NOZZLE TO SAFEEND BUTT WELDS                                                                                    During R14; 1st ISI R16 29- Spray                                butt welds      RC-18-4            Vol  6    1        2      14    *Design Calc Exam 20- Surge*                                butt welds    RC-028-12          Vol        1        3      28    Freq. every 3 years.
31- Safeties (4)                          butt welds      RC-001-6          Vol                                R18, R20, R22.
RC-003-6          Vol                                (CRAI 4348769)
RC-005-6          Vol RC-007-6          Vol NPS 4 OR LARGER                                                                                                  Mitigated with FSWO
* CIRCUMFERENTIAL WELDS                                                                                          During R13; 1st ISI R15
                                                                                                                      ** Design Calc Frequency every 6 20- Pressurizer Surge Line**              butt welds    RC-028-12          Vol  3    1        3      33    years, R20 21- Shutdown Cooling Loop 1              butt welds    RC-051-16"          Vol                                (CRAI 4348769) 22- Shutdown Cooling Loop 2              butt welds    RC-068-16          Vol 3INT-ISI-2 Rev. 4                                                81 of 210


welds will be examined AHE5.51 CIRCUMFERENTIAL WELD**
ASME                                                    DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM    ZONE-COMPONENT OR SYSTEM      IDENTIFICATION LINE OR SERIAL                          INSPECTION              REMARKS METHOD ITEMS AMOUNT              %
Except scope in parenthesis (outside
NO                                                          NO                                PERIOD Unmitigated butt weld at cold leg operating temperature INSPECTION ITEM B Examined R15, 23- Safety Injection 1A            butt welds      SI-207-14      VE & Vol    1    1              100  REQUIRED R19 Examined R15, 24- Safety Injection 1B            butt welds      SI-223-14      VE & Vol    1    1              100  REQUIRED R19 Examined R15, 25- Safety Injection 2A            butt welds      SI-160-14      VE & Vol    1    1              100  REQUIRED R19 Examined R15, 26- Safety Injection 2B            butt welds      SI-179-14      VE & Vol    1    1              100  REQUIRED R19 27- Pressurizer Spray 1A            butt welds      RC-062-3        VE & Vol  1    1              100  REQUIRED R17, R21 28- Pressurizer Spray 1B            butt welds      RC-017-3        VE & Vol  1    1              100  REQUIRED R17, R21 32- Drain Line Loop 1A              butt welds      RC-060-2        VE & Vol  1    1              100  REQUIRED R17, R21 33- Drain Line Loop 1B              butt welds      RC-058-2        VE & Vol  1    1              100  REQUIRED R17, R21 34- Drain Line Loop 2A              butt welds      RC-096-2        VE & Vol  1    1              100  REQUIRED R17, R21 36- Letdown Line                    butt welds     RC-091-2        VE & Vol  1    1              100  REQUIRED R17, R21 37- Charging Line                  butt welds      CH-005-2        VE & Vol  1    1              100  REQUIRED R17, R21
                                                                                                                  *100% each outage UNINSULATED (SUPPORTS EXAM CATEGORY B-P; ALL PRESSURE                                                                            PRESSURE TEST RETAINING COMPONENTS                                                                                        PROGRAM)
REACTOR VESSEL B15.10 CLOSURE HEAD NUTS 2- Closure Head                        nuts      7.237 x 7.91"      VT-2    54    0      **       0 B15.10 CLOSURE STUDS 2- Closure Head                      studs      7.380 x 76.37"      VT-2    54  54      *
* 3INT-ISI-2 Rev. 4                                              82 of 210


class boundary), surface and volumetric exam to meet C-F-2  
ASME                                                DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM      ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                          INSPECTION        REMARKS METHOD ITEMS AMOUNT              %
NO                                                      NO                                PERIOD PRESSURIZER B15.10 BOLTS, STUDS AND NUTS 5- Pressurizer Manway        Studs & Nuts    1.31 x 14.5        VT-2  20  20        *
* STEAM GENERATOR B15.10 BOLTS, STUDS AND NUTS 3- Steam Generator 1 MANWAYS  Studs & Nuts    1.31 x 14.5        VT-2  40  40        *
* 4- Steam Generator 2 MANWAYS  Studs & Nuts    1.31 x 14.5        VT-2  40  40        *
* PIPING B15.10 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties    Flange Bolting    RC-001-6          VT-2    8    8        *
* Flange Bolting    RC-003-6          VT-2    8    8        *
* Flange Bolting    RC-005-6          VT-2    8    8        *
* Flange Bolting    RC-007-6          VT-2    8    8        *
* 37- Charging Line            Flange V435      CH-005-2          VT-2    8    8        *
* 3INT-ISI-2 Rev. 4                                      83 of 210


requirements.  
ASME                                                DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM      ZONE-COMPONENT OR SYSTEM  IDENTIFICATION LINE OR SERIAL                        INSPECTION                REMARKS METHOD ITEMS AMOUNT              %
NO                                                      NO                                PERIOD EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.20 LESS THAN NPS 4 CIRCUMFERENTIAL WELDS OTHER B9.21 THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray**      butt welds    CH-009-2            S    2    2        3      100  ** IEB 88-08 & IN 97-19 2 welds and base metal down stream of V431 Removed AUG B-G-1 per CRAI 4052305.
PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4
CIRCUMFERENTIAL WELD C5.11 54-FW SG 1                      14 x 0.938    SG-002        S & Vol  2*    2        2      100  *Examination REQD by SG-013                                                IEB 79-13 & SER 83-07 (54-1 & 15; 55-1 & 15)
C5.11 55-FW SG 2                      14 x 0.938    SG-005        S & Vol  2*    2        3      100 SG-014 C5.11 58- Aux & Downcomer FW SG 1      Butt Welds      SG-8-6        S & Vol  1**    1        2      100  **Examination REQD by SG-8-8                                              IEB 79-13 & SER 83-07 (58-1; 59-1)
C5.11 59- Aux & Downcomer FW SG 2      Butt Welds      SG-11-6        S & Vol  1**    1        3      100 SG-11-8 3INT-ISI-2 Rev. 4                                                84 of 210


Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI  
ASME                                                    DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM      ZONE-COMPONENT OR SYSTEM      IDENTIFICATION LINE OR SERIAL                        INSPECTION                REMARKS METHOD ITEMS AMOUNT              %
NO                                                          NO                                PERIOD
(*) Identifies the number EXAM CATEGORY C-F-2; PRESSURE                                                                              of welds that are not in RETAINING WELDS IN CARBON OR LOW                                                                          the ASME CL 2 ALLOY STEEL PIPING                                                                                        boundary PIPING WELDS > 3/8 IN NOMINAL                                                                              **100% of all WALL THICKNESS FOR PIPING >NPS                                                                            intersecting longitudinal AHE5.50 4                                                                                                          welds will be examined Except scope in parenthesis (outside class boundary), surface and volumetric exam to meet C-F-2 requirements.
Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI AHE5.51 CIRCUMFERENTIAL WELD**                                                                                    4178275)
                *category running percent                                            199  53        1      27 146      3      100 47- Main Steam SG 1 West            Butt Welds    SG-206-28      S & Vol  11(1)  12      1 SG-206-12 SG-206-6 48- Main Steam SG 1 East            Butt Welds    SG-207-28      S & Vol  11(1) 12        3 SG-207-12 SG-207-6 49- Main Steam SG 2 East            Butt Welds    SG-208-28      S & Vol  11(1) 12        3 SG-208-12 SG-208-6 50- Main Steam SG 2 West            Butt Welds    SG-209-28      S & Vol  11(1) 12        3 SG-209-12 SG-209-6 3INT-ISI-2 Rev. 4                                                  85 of 210


4178275)*category running percent19953127 1463100 47-  Main Steam SG 1 West Butt WeldsSG-206-28"S & Vol11(1)121 SG-206-12" SG-206-6"48-  Main Steam SG 1 EastButt WeldsSG-207-28"S & Vol11(1)123 SG-207-12" SG-207-6"49-  Main Steam SG 2 EastButt WeldsSG-208-28"S & Vol11(1)123 SG-208-12" SG-208-6"50-  Main Steam SG 2 WestButt WeldsSG-209-28"S & Vol11(1)123 SG-209-12" SG-209-6"3INT-ISI-2 Rev. 4 85 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS51-   Atmospheric Dump No. 1Butt WeldsSG-59-12"S & Vol27131SG-70-12"14352-   Atmospheric Dump No. 2Butt WeldsSG-84-12"S & Vol27273 SG-103-12" 53-   Steam to Aux Feedwate rButt WeldsSG-81-6"S & Vol29141SG-83-6"15356-   Feedwater SG No. 1Butt WeldsSG-201-24"S & Vol4(2)63 SG-202-24" SG-224-24"57-   Feedwater SG No. 2Butt WeldsSG-204-24"S & Vol4(2)63 SG-205-24" SG-225-24"60-   Downcomer Feedwater SG 1Butt WeldsSG-200-8"S & Vol6(8)141 SG-008-8"61-   Downcomer Feedwater SG 2Butt WeldsSG-203-8"S & Vol6(8)143 SG-11-8"66-   Blowdown SG 1Butt WeldsSG-39-6"S & Vol2(14)163 67-   Blowdown SG 2Butt WeldsSG 6"S & Vol2(10)123 AHE5.60 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING >
ASME                                                   DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM       ZONE-COMPONENT OR SYSTEM     IDENTIFICATION LINE OR SERIAL                         INSPECTION              REMARKS METHOD ITEMS AMOUNT               %
NPS 2 AND < NPS 4 AHE5.61 CIRCUMFERENTIAL**
NO                                                          NO                                PERIOD 51- Atmospheric Dump No. 1        Butt Welds      SG-59-12       S & Vol    27  13        1 SG-70-12                     14        3 52- Atmospheric Dump No. 2        Butt Welds      SG-84-12       S & Vol    27  27        3 SG-103-12 53- Steam to Aux Feedwater        Butt Welds      SG-81-6       S & Vol    29  14        1 SG-83-6                       15        3 56- Feedwater SG No. 1            Butt Welds    SG-201-24       S & Vol  4(2) 6        3 SG-202-24 SG-224-24" 57- Feedwater SG No. 2            Butt Welds    SG-204-24       S & Vol  4(2) 6        3 SG-205-24 SG-225-24" 60- Downcomer Feedwater SG 1      Butt Welds      SG-200-8       S & Vol  6(8) 14        1 SG-008-8 61- Downcomer Feedwater SG 2      Butt Welds      SG-203-8       S & Vol  6(8) 14        3 SG-11-8 66- Blowdown SG 1                  Butt Welds      SG-39-6       S & Vol  2(14) 16        3 67- Blowdown SG 2                  Butt Welds      SG 6       S & Vol  2(10) 12        3 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AHE5.60 AND < NPS 4 Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI AHE5.61 CIRCUMFERENTIAL**                                                                                        4178275)
Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI 4178275)*category running percent4111124 3INT-ISI-2 Rev. 4 86 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS303100 51-  Atmospheric Dump No. 1Butt WeldsSG-95-4"S & Vol20111 9352-  Atmospheric Dump No. 2Butt WeldsSG-100-4"S & Vol21213 AHE5.80 PIPE BRANCH CONNECTIONS OF BRANCH PIPING >
              *category running percent                                              41  11        1      24 3INT-ISI-2 Rev. 4                                               86 of 210
NPS 2 AHE5.81 CIRCUMFERENTIAL Category deleted, scope moved to C5.81. (CRAI


4178275) EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14 N A 16-Reactor Coolant Pump 1 Aflywheel1 AS&VOL443100 S OF ALL EXPOSED17 Reactor Coolant Pump 1Bflywheel1B SURFACES and UT OF 3INT-ISI-2 Rev. 4 87 of 210 ASME ITEM NO ZONE-COMPONENT OR SYSTEM IDENTIFICATION DESCRIPTION, LINE OR SERIAL NO NDE METHOD TOTAL ITEMS EXAM AMOUNT INSPECTION PERIOD RUNNING %REMARKS 18-Reactor Coolant Pump 2 Aflywheel2 A HIGH STRESS AREAS19-Reactor Coolant Pump 2Bflywheel2B 3INT-ISI-2 Rev. 4 88 of 210  
ASME                                                  DESCRIPTION, NDE  TOTAL EXAM            RUNNING ITEM      ZONE-COMPONENT OR SYSTEM    IDENTIFICATION LINE OR SERIAL                        INSPECTION              REMARKS METHOD ITEMS AMOUNT              %
NO                                                        NO                                PERIOD 30        3      100 51- Atmospheric Dump No. 1        Butt Welds      SG-95-4        S & Vol  20  11        1 9        3 52- Atmospheric Dump No. 2        Butt Welds      SG-100-4      S & Vol  21  21        3 PIPE BRANCH CONNECTIONS OF AHE5.80 BRANCH PIPING > NPS 2 Category deleted, scope moved to C5.81. (CRAI AHE5.81 CIRCUMFERENTIAL                                                                                          4178275)
EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14 NA    16-Reactor Coolant Pump 1A        flywheel          1A          S&VOL      4    4        3      100  S OF ALL EXPOSED 17 Reactor Coolant Pump 1B        flywheel          1B                                                  SURFACES and UT OF 3INT-ISI-2 Rev. 4                                               87 of 210


SECTION 8.0 REQUESTS FOR RELIEF 3INT-ISI-2 Rev. 4 89 of 210 RELIEF REQUESTS INDEX NUMBER DESCRIPTION
ASME                                              DESCRIPTION, NDE TOTAL EXAM              RUNNING ITEM    ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL                        INSPECTION              REMARKS METHOD ITEMS AMOUNT              %
: 31.                Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles 34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle. NRC accepted as documented by SER attached to Letter dated September 20, 2006.
NO                                                    NO                                PERIOD 18-Reactor Coolant Pump 2A      flywheel          2A                                                  HIGH STRESS AREAS 19-Reactor Coolant Pump 2B      flywheel          2B 3INT-ISI-2 Rev. 4                                               88 of 210
: 35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle. 36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements  NRC accepted as documented by SER attached to Letter dated June 21, 2007 37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique. NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2 nd Interval 39. Safety Injection Tank alternative repair method.
Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008 40. Extended Reactor Vessel Examinations to meet the PWROG program  Submitted by APS letter
: 41. Request to utilize Appendix 1 of Code Case N-729-1. Submitted by APS letter 42. Request to utilize Leak Path Assessments N-729-1 previously qualified  Submitted by APS letter 43. Included for reference to document the Closeout of U3 2 nd Interval  Submitted by APS letter
: 44. Extended Reactor Vessel Examinations  Submitted by APS letter  45. Included for reference to document the Closeout of U2 RPV 2 nd Interval 46. Included for reference to document the Closeout of U1 2 nd Interval 47. Included for reference to document the Closeout of U3 RPV 2 nd Interval 48. Request for Relief to use UT in Lieu of RT  49. Request to use Alternate Inspection method for Reactor Vessel Leak-off line 3INT-ISI-2 Rev. 4 90 of 210  


SECTION 9.0 ISI BOUNDARY DRAWINGS 3INT-ISI-2 Rev. 4 91 of 210 BOUNDARY DRAWING INDEX Drawing No.      Drawing Title    Code Class 02-M-AFP-001  Auxiliary - Feedwater System  2 & 3 02-M-CHP-001  Chemical and Volume Control System  1 & 2 02-M-CHP-002  Chemical and Volume Control System  2 & 3 02-M-CHP-003  Chemical and Volume Control System  2 02-M-CLP-001  Containment Integrated and Local Leak Rate Test  2 02-M-CPP-001  Containment Purge System  2 02-M-CTP-001  Condensate Purge System    2 02-M-DFP-001  Diesel Fuel Oil & Transfer System  3 02-M-DGP-001  Diesel Generator System    3 02-M-DWP-002  Demineralized Water System  2 02-M-ECP-001  Essential Chilled Water System  3 02-M-EWP-001  Essential Cooling Water System  3 02-M-FPP-006  Fire Protection System    2 02-M-GAP-001  Service Gas Supply System (N 2 and H 2)  2 & 3 02-N-GRP-001  Gaseous Radwaste System    2 02-M-HCP-001  HVAC Containment Building  2 02-M-HPP-001  Containment Hydrogen Control  2 02-M-IAP-002  Instrument and Service Air System  2 02-M-IAP-003  Instrument and Service Air System  2 02-M-NCP-002  Nuclear Cooling Water System  3 02-M-NCP-003  Nuclear Cooling Water System  2 02-M-PCP-001  Fuel Pool Cooling & Cleanup System  2 & 3 02-M-RCP-001  Reactor Coolant System    1 & 2 02-M-RCP-002  Reactor Coolant System    1 & 2 02-M-RDP-001  Radioactive Waste Drain System  2 02-M-SGP-001  Main Steam System    2 & 3 02-M-SGP-002  Main Steam System    2 02-M-SIP-001  Safety Injection and Shutdown Cooling System 2 02-M-SIP-002  Safety Injection and Shutdown Cooling System 1 & 2 02-M-SIP-003  Safety Injection and Shutdown Cooling System 2 02-M-SPP-001  Essential Spray Pond System  3 02-M-SPP-002  Essential Spray Pond System  3 02-N-SSP-001  Nuclear Sampling System    2 02-M-WCP-001  Normal Chilled Water System  2 13-M-ZZP-001  Symbols and Legend    N/A 13-M-ZZP-002  Symbols and Legend    N/A 3INT-ISI-2 Rev. 4 92 of 210  
SECTION 8.0 REQUESTS FOR RELIEF 3INT-ISI-2 Rev. 4 89 of 210


SECTION 10.0 ZONE DRAWINGS 3INT-ISI-2 Rev. 4 93 of 210 ZONE DRAWING INDEX Drawing No. Drawing Title        Code Class Zone 1  Reactor Vessel 1 Zone 2  Closure Head 1 Zone 3  Steam Generator 1 1 Zone 4  Steam Generator 2 1 Zone 5  Pressurizer  1 Zone 6  RCS Primary Piping 1 Zone 16  Reactor Coolant Pump 1A 1 Zone 17  Reactor Coolant Pump 1B 1 Zone 18  Reactor Coolant Pump 2A 1 Zone 19  Reactor Coolant Pump 2B 1 Zone 20  Pressurizer Surge Line 1 Zone 21  Shutdown Cooling Loop 1 1 Zone 22  Shutdown Cooling Loop 2 1 Zone 23  Safety Injection 1A 1 Zone 24  Safety Injection 1B 1 Zone 25  Safety Injection 2A 1 Zone 26  Safety Injection 2B 1 Zone 27  Pressurizer Spray 1A 1 Zone 28  Pressurizer Spray 1B 1 Zone 29  Combined Pressurizer Spray 1 Zone 30  Aux. Pressurizer Spray 1 Zone 31  Pressurizer Safeties 1 Zone 32  Drain Line 1A 1 Zone 33  Drain Line 1B 1 Zone 34  Drain Line 2A 1 Zone 35  Drain Line 2B 1 Zone 36 Letdown Line 1 Zone 37 Charging Line 1 Zone 38 Drain Line Loop 1 1 Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42  Steam Generator 2 2 Zone 43  Main Steam SG1 East 2 Zone 44  Main Steam SG1 West 2 Zone 45  Main Steam SG2 East 2 Zone 46  Main Steam SG2 West 2 Zone 47  Main Steam SG1 West 2 Zone 48  Main Steam SG1 East 2 Zone 49  Main Steam SG2 East 2 Zone 50  Main Steam SG2 West 2 Zone 51  Atmospheric Dump No. 1 2 Zone 52  Atmospheric Dump No. 2 2 Zone 53  Steam to Aux Feedwater System 2 Zone 54  Feedwater SG No. 1 2 Zone 55  Feedwater SG No. 2 2 Zone 56  Feedwater SG No. 1 2 Zone 57  Feedwater SG No. 2 2 Zone 58  Aux & Downcomer Feedwater SG 1 2 Zone 59  Aux & Downcomer Feedwater SG 2 2 Zone 60  Downcomer Feedwater SG 1 2 Zone 61  Downcomer Feedwater SG 2 2 Zone 62  Aux Feedwater SG 1 2 Zone 63  Aux Feedwater SG 2 2 3INT-ISI-2 Rev. 4 94 of 210 ZONE DRAWING INDEX (Continued)
RELIEF REQUESTS INDEX NUMBER                          DESCRIPTION
Drawing No. Drawing Title  Code Class Zone 64  Blowdown SG 1  2 Zone 65  Blowdown SG 2  2 Zone 66  Blowdown SG 1  2 Zone 67  Blowdown SG 2  2 Zone 68  Regenerative Heat Exchanger  2 Zone 69  Letdown Heat Exchanger  2 Zone 70  LPSI Pump Room A Suction  2 Zone 71  LPSI Pump Room A Discharge  2 Zone 72  LPSI Pump A  2 Zone 73  LPSI Pump Room B Suction  2 Zone 74  LPSI Pump Room B Discharge  2 Zone 75  LPSI Pump B  2 Zone 76  Containment Spray Pump Room A Suction 2 Zone 77  Containment Spray Pump Room A Discharge 2 Zone 78  Containment Spray Pump A  2 Zone 79  Containment Spray Pump Room B Suction 2 Zone 80  Containment Spray Pump Room B Discharge 2  Zone 81  Containment Spray Pump B  2 Zone 82  Shutdown Cooling Heat Exchange Room A 2 Zone 83  Shutdown Cooling Heat Exchange Room A 2 Zone 84  Shutdown Cooling Heat Exchanger A  2 Zone 85  Shutdown Cooling Heat Exchanger Room B 2 Zone 86  Shutdown Cooling Heat Exchanger Room B 2 Zone 87  Shutdown Cooling Heat Exchanger B  2 Zone 88  East Wrap  2 Zone 89  East Wrap  2 Zone 90  East Wrap  2 Zone 91  West Wrap  2 Zone 92  West Wrap  2 Zone 93  West Wrap  2 Zone 94  A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95  B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96  Containment LPSI Header to Loop 1A  2 Zone 97  Containment LPSI Header to Loop 1B  2 Zone 98  Containment LPSI Header to Loop 2A  2 Zone 99  Containment LPSI Header to Loop 2B  2 Zone 100  Containment LPSI Train A Suction  2 Zone 101  Containment LPSI Train B Suction  2 Zone 102  SI Pumps Train "A" Suction  2 Zone 103  Refueling Water Suction Train "A"  2 Zone 104  SI Pumps Train "B" Suction  2 Zone 105  Refueling Water Suction Train "B"  2 Zone 106  HPSI Pump Room "A" Discharge  2 Zone 107  HPSI Pump Room "B" Discharge  2 Zone 108  HPSI Discharge 88' Pipe Chase  2 Zone 109  HPSI Discharge 88' Pipe Chase  2 Zone 110  HPSI Discharge West Wrap  2 Zone 111  HPSI Discharge West Wrap  2 Zone 112  HPSI Discharge East Wrap  2 Zone 113  HPSI Discharge East Wrap  2 Zone 114  Containment HPSI Header Loop 1A & 1B 2 Zone 115  Containment HPSI Header Loop 2A & 2B 2 Zone 116  HPSI Pump "A"  2 Zone 117  HPSI Pump "B"  2 Zone 118  HPSI Long Term  2 Zone 119  HPSI Long Term  2 Zone 120  Containment Spray A  2 Zone 121  Containment Spray B  2 3INT-ISI-2 Rev. 4 95 of 210 UNIT 2 6 1/29 1/16SUPPORT COLUMNS INLET OUTLET100% LIGAMENTS54 STUD HOLES
: 31. Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles
: 34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle.
NRC accepted as documented by SER attached to Letter dated September 20, 2006.
: 35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle.
: 36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007
: 37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique.
NRC accepted as documented by SER attached to Letter dated June 21, 2007 38   Included for reference to document the Close out of U2 2nd Interval
: 39. Safety Injection Tank alternative repair method.
Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008
: 40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter
: 41. Request to utilize Appendix 1 of Code Case N-729-1.
Submitted by APS letter
: 42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter
: 43. Included for reference to document the Closeout of U3 2nd Interval Submitted by APS letter
: 44. Extended Reactor Vessel Examinations Submitted by APS letter
: 45. Included for reference to document the Closeout of U2 RPV 2nd Interval
: 46. Included for reference to document the Closeout of U1 2nd Interval
: 47. Included for reference to document the Closeout of U3 RPV 2nd Interval
: 48. Request for Relief to use UT in Lieu of RT
: 49. Request to use Alternate Inspection method for Reactor Vessel Leak-off line 3INT-ISI-2 Rev. 4                                       90 of 210


COUNTED CLOCKWISE
SECTION 9.0 ISI BOUNDARY DRAWINGS 3INT-ISI-2 Rev. 4 91 of 210


FROM 0&deg; 11 1/4182 1/4SHEAR KEYS40 AT 1A B41 AT 1B B42 AT 2A B43 AT 2B B 0&deg; PLANT NORTH 180&deg; 270&deg; 90&deg; 1-19 0&deg; 180&deg; 270&deg; 90&deg; SHELL SEGMENT CROSS SECTION -LONG SEAMS-REFERENCE DWG:
BOUNDARY DRAWING INDEX Drawing No.                  Drawing Title                      Code Class 02-M-AFP-001    Auxiliary - Feedwater System                    2&3 02-M-CHP-001    Chemical and Volume Control System              1&2 02-M-CHP-002    Chemical and Volume Control System              2&3 02-M-CHP-003    Chemical and Volume Control System              2 02-M-CLP-001    Containment Integrated and Local Leak Rate Test 2 02-M-CPP-001    Containment Purge System                        2 02-M-CTP-001    Condensate Purge System                        2 02-M-DFP-001    Diesel Fuel Oil & Transfer System              3 02-M-DGP-001    Diesel Generator System                        3 02-M-DWP-002    Demineralized Water System                      2 02-M-ECP-001    Essential Chilled Water System                  3 02-M-EWP-001    Essential Cooling Water System                  3 02-M-FPP-006    Fire Protection System                          2 02-M-GAP-001    Service Gas Supply System (N2 and H2)          2&3 02-N-GRP-001    Gaseous Radwaste System                        2 02-M-HCP-001    HVAC Containment Building                      2 02-M-HPP-001    Containment Hydrogen Control                    2 02-M-IAP-002    Instrument and Service Air System              2 02-M-IAP-003    Instrument and Service Air System              2 02-M-NCP-002    Nuclear Cooling Water System                    3 02-M-NCP-003    Nuclear Cooling Water System                    2 02-M-PCP-001    Fuel Pool Cooling & Cleanup System              2&3 02-M-RCP-001    Reactor Coolant System                          1&2 02-M-RCP-002    Reactor Coolant System                          1&2 02-M-RDP-001    Radioactive Waste Drain System                  2 02-M-SGP-001    Main Steam System                              2&3 02-M-SGP-002    Main Steam System                              2 02-M-SIP-001    Safety Injection and Shutdown Cooling System    2 02-M-SIP-002    Safety Injection and Shutdown Cooling System    1&2 02-M-SIP-003    Safety Injection and Shutdown Cooling System    2 02-M-SPP-001    Essential Spray Pond System                    3 02-M-SPP-002    Essential Spray Pond System                    3 02-N-SSP-001    Nuclear Sampling System                        2 02-M-WCP-001    Normal Chilled Water System                    2 13-M-ZZP-001    Symbols and Legend                              N/A 13-M-ZZP-002    Symbols and Legend                              N/A 3INT-ISI-2 Rev. 4                                92 of 210
N001-3.01-15 AND 17 N001-3.01-41 AND 61


N001-3.01-72 NOTES:TAG NO. SERIAL NO.
SECTION 10.0 ZONE DRAWINGS 3INT-ISI-2 Rev. 4 93 of 210


N.B NO.2MRCEX01 79173 (C-E)
ZONE DRAWING INDEX Drawing No. Drawing Title                    Code Class Zone 1      Reactor Vessel                        1 Zone 2      Closure Head                          1 Zone 3      Steam Generator 1                      1 Zone 4      Steam Generator 2                      1 Zone 5      Pressurizer                            1 Zone 6      RCS Primary Piping                    1 Zone 16    Reactor Coolant Pump 1A                1 Zone 17    Reactor Coolant Pump 1B                1 Zone 18    Reactor Coolant Pump 2A                1 Zone 19    Reactor Coolant Pump 2B                1 Zone 20    Pressurizer Surge Line                1 Zone 21    Shutdown Cooling Loop 1                1 Zone 22    Shutdown Cooling Loop 2                1 Zone 23    Safety Injection 1A                    1 Zone 24    Safety Injection 1B                    1 Zone 25    Safety Injection 2A                    1 Zone 26    Safety Injection 2B                    1 Zone 27    Pressurizer Spray 1A                  1 Zone 28    Pressurizer Spray 1B                  1 Zone 29    Combined Pressurizer Spray            1 Zone 30    Aux. Pressurizer Spray                1 Zone 31    Pressurizer Safeties                  1 Zone 32    Drain Line 1A                          1 Zone 33    Drain Line 1B                          1 Zone 34    Drain Line 2A                          1 Zone 35    Drain Line 2B                          1 Zone 36    Letdown Line                          1 Zone 37    Charging Line                          1 Zone 38    Drain Line Loop 1                      1 Zone 39    HPSI Long Term Recirc 1                1 Zone 40    HPSI Long Term Recirc 2                1 Zone 41    Steam Generator 1                      2 Zone 42    Steam Generator 2                      2 Zone 43    Main Steam SG1 East                    2 Zone 44    Main Steam SG1 West                    2 Zone 45    Main Steam SG2 East                    2 Zone 46    Main Steam SG2 West                    2 Zone 47    Main Steam SG1 West                    2 Zone 48    Main Steam SG1 East                    2 Zone 49    Main Steam SG2 East                    2 Zone 50    Main Steam SG2 West                    2 Zone 51    Atmospheric Dump No. 1                2 Zone 52    Atmospheric Dump No. 2                2 Zone 53    Steam to Aux Feedwater System          2 Zone 54    Feedwater SG No. 1                    2 Zone 55    Feedwater SG No. 2                    2 Zone 56    Feedwater SG No. 1                    2 Zone 57    Feedwater SG No. 2                    2 Zone 58    Aux & Downcomer Feedwater SG 1        2 Zone 59    Aux & Downcomer Feedwater SG 2        2 Zone 60    Downcomer Feedwater SG 1              2 Zone 61    Downcomer Feedwater SG 2              2 Zone 62    Aux Feedwater SG 1                    2 Zone 63    Aux Feedwater SG 2                    2 3INT-ISI-2 Rev. 4            94 of 210


22513 ZONE 1 REACTOR VESSEL 1-11-151-18 1-161-11 1-17 1-20 1-141-7 1-5 1-3 1-9 1-10 1-13 1-21-6 1-12 1-8 1-4ICI Penetrations 1 thru 61 1-31 1-30 RX INTERIOR RX INTERIOR RX INTERIOR3INT-ISI-2 Rev. 4 96 of 210 UNIT 2 83 91 75 67 86 66 74908297 81 73 89 72 80 96 85 95 92 79 71 88 70 78 94 84 93 77 69 87 68 76 7.388.611.576.37NOTES:1) Full ITEM ID include -CEDM or RVLMS NO2) TAG NO. 2MRCEX01 SERIAL NO. N05065-CHA-01 (Doosan)
ZONE DRAWING INDEX (Continued)
N.B. NO. 1685
Drawing No. Drawing Title                            Code Class Zone 64    Blowdown SG 1                                   2 Zone 65    Blowdown SG 2                                  2 Zone 66    Blowdown SG 1                                   2 Zone 67    Blowdown SG 2                                   2 Zone 68    Regenerative Heat Exchanger                    2 Zone 69    Letdown Heat Exchanger                          2 Zone 70     LPSI Pump Room A Suction                        2 Zone 71     LPSI Pump Room A Discharge                      2 Zone 72    LPSI Pump A                                    2 Zone 73     LPSI Pump Room B Suction                        2 Zone 74    LPSI Pump Room B Discharge                      2 Zone 75    LPSI Pump B                                    2 Zone 76    Containment Spray Pump Room A Suction          2 Zone 77    Containment Spray Pump Room A Discharge        2 Zone 78    Containment Spray Pump A                        2 Zone 79    Containment Spray Pump Room B Suction          2 Zone 80    Containment Spray Pump Room B Discharge        2 Zone 81     Containment Spray Pump B                        2 Zone 82     Shutdown Cooling Heat Exchange Room A          2 Zone 83    Shutdown Cooling Heat Exchange Room A          2 Zone 84     Shutdown Cooling Heat Exchanger A              2 Zone 85     Shutdown Cooling Heat Exchanger Room B          2 Zone 86    Shutdown Cooling Heat Exchanger Room B          2 Zone 87     Shutdown Cooling Heat Exchanger B              2 Zone 88     East Wrap                                      2 Zone 89    East Wrap                                      2 Zone 90    East Wrap                                      2 Zone 91    West Wrap                                      2 Zone 92    West Wrap                                      2 Zone 93    West Wrap                                      2 Zone 94    A Train Misc. Pipe Chases & 88' Pipe Tunnel    2 Zone 95    B Train Misc. Pipe Chases & 88' Pipe Tunnel    2 Zone 96    Containment LPSI Header to Loop 1A              2 Zone 97    Containment LPSI Header to Loop 1B              2 Zone 98    Containment LPSI Header to Loop 2A              2 Zone 99    Containment LPSI Header to Loop 2B              2 Zone 100    Containment LPSI Train A Suction                2 Zone 101    Containment LPSI Train B Suction                2 Zone 102    SI Pumps Train A Suction                      2 Zone 103    Refueling Water Suction Train A              2 Zone 104    SI Pumps Train B Suction                      2 Zone 105    Refueling Water Suction Train B               2 Zone 106    HPSI Pump Room A Discharge                    2 Zone 107   HPSI Pump Room B Discharge                    2 Zone 108    HPSI Discharge 88 Pipe Chase                  2 Zone 109    HPSI Discharge 88 Pipe Chase                  2 Zone 110    HPSI Discharge West Wrap                        2 Zone 111    HPSI Discharge West Wrap                        2 Zone 112   HPSI Discharge East Wrap                        2 Zone 113    HPSI Discharge East Wrap                        2 Zone 114    Containment HPSI Header Loop 1A & 1B            2 Zone 115    Containment HPSI Header Loop 2A & 2B            2 Zone 116    HPSI Pump A                                  2 Zone 117    HPSI Pump B                                  2 Zone 118    HPSI Long Term                                  2 Zone 119    HPSI Long Term                                  2 Zone 120    Containment Spray A                            2 Zone 121    Containment Spray B                             2 3INT-ISI-2 Rev. 4                       95 of 210
: 3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP REFERENCE DWGS:13-MN-740 (Replaced RV HEAD SPEC)R15 WO 3377051WASHERS CLOSURE HEAD STUDS270&deg;  90&deg;  0&deg;  180&deg;CLOSURE HEAD TOP VIEWSTUD LOCATIONS 1 THRU 54 CW FROM 0&deg;#1 THRU #54 ZONE 2 CLOSURE HEAD      NOTE 3 RVLMS LOCATED AT 92 & 96UT Baseline Completed on 2-61 2-602-58 2-71 2-70 2-59VENT LINE2-881 THRU 18 19 THRU 36 37 THRU 54 1 THRU 18 19 THRU 36 37 THRU 542-61 at CEDM locations:54, 59, 65, 69, 71, 73, 7779, 81, 82, 84, 85, 87, 88, 89    NUTS 1 THRU 1819 THRU 3637 THRU 543INT-ISI-2 Rev. 4 97 of 210 UNIT 2 ZONE 3 STEAM GENERATOR #1 315&deg;14.50 2.75 6.37.87.56 1.310 MANWAY STUDS (20 EA)LOOKING DOWN  90&deg;  180&deg;  0&deg;  45&deg;0&deg; MANWAYSTUDS & NUTSNOTE 1-112&deg; MANWAYSTUDS & NUTS-NOTE 1-CHANNEL HEAD CROSS SECTION NOTES: 1) Stud Location is #1 TDC Going CW to #20.
Serial NO. 212 REFERENCE DWGS:MN725-A16, A17, A19 and A20
: 2) Tag NO 2MRCEE01AMN725-A31, A32, A36, A52 and A72        N. B. NO. 161 1402531279.3TUBESHEETSKIRT  B   315&deg; 45&deg;107 106 101102 105104 100 6.7202.13717.34.63MN725-A243 and A390 326 3243INT-ISI-2 Rev. 4 98 of 210 UNIT 2 ZONE 4 STEAM GENERATOR #2 315&deg;14.50 2.75 6.37.87.56 1.310MANWAY STUDS (20 EA)LOOKING DOWN  90&deg;  180&deg;  0&deg;  45&deg;0&deg; MANWAYSTUDS & NUTSNOTE 1-112&deg; MANWAYSTUDS & NUTS-NOTE 1-CHANNEL HEAD CROSS SECTION NOTES:1) Stud Location is #1 TDC Going CW to #20.          Serial NO. 211 REFERENCE DWGS:MN725-A16, A17, A19 and A20
: 2) Tag NO 2MRCEE01BMN725-A31, A32, A36, A52 and A72        N. B. NO. 160 2531279.3TUBESHEET  315&deg; 45&deg;107 106 101 102 105104100 6.7202.13717.3140SKIRT  B4.63MN725-A243 and A390 426 4243INT-ISI-2 Rev. 4 99 of 210 UNIT 2 ZONE 5 PRESSURIZERNOTES:1) STUD LOCATION IS #1 TDC    GOING CW TO #20


SERIAL NO. 79373 (C-E)REFERENCE DWGS:N001-6.04-6, 31 AND 902) TAG NO 2MRCEX02      N.B. NO. 22252 14.502.756.37.87.56 1.310MANWAY STUDS  90&deg;   270&deg;   0&deg;STUDS & NUTSNOTE 1-   90&deg;   270&deg;  0&deg;96 1/45ID UPPER SHELL LOWER SHELL  90&deg;   270&deg;   0&deg;MANWAYTOP VIEWSKIRT  B 48.7ID(TYP)4ZONE 20 ZONE 29368.5510 57 514 511 513 512 56 54 53 51 540 59 52 55 58 5213INT-ISI-2 Rev. 4 100 of 210 UNIT 2 12-1012-1912-1312-16 ZONE 6 RCS PRIMARY PIPINGNOTES:REFERENCE DWGS:**13-P-ZCG-103N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 1001) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY)2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY)11-9 11-8 11-4 17-111-1 11-7 1-281-29 13-7 13-4 13-8 13-9 13-118-1RCP 2A ZONE 18 RCP 1B ZONE 17 REACTORVESSEL ZONE 1 SG 2 ZONE 4SG 1 ZONE 3 RCP 1A ZONE 16 RCP 2B ZONE 199-9 9-8 9-4 16-19-1 9-7 1-321-31 15-7 15-415-8 15-119-1 1-307-7 7-8 7-4 7-1RC-631-27 6-7 6-9 6-46-1 6-818-212-112-4 12-17 12-717-2 10-110-4 10-17 10-716-2 8-1 8-4 8-17 8-7 19-2 14-114-414-17 14-7 1A1B2A 2B RC-32RC-79 RC-31RC-34RC-93 RC-30 RC-33 RC-84 RC-733) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGEMARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.10-13 10-1610-19 10-10 4-1033-103 8-108-138-16 8-19 14-1014-19 14-1314-16    5) FOR REPLACEMENT WELDS,  PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS  JOINED TO THE REPLACEMENT WELD.
180&deg; 1-18 1-19                                                                NOTES:
MN725-A343 and A383  Cold Leg Instrument Nozzles 6-99 RCP Pressure Taps 6-100 Hot Leg Instrument Nozzles (27) 6-101** Note Reference Drawings for Locations3INT-ISI-2 Rev. 4 101 of 210 UNIT 2 ZONE 16 REACTOR COOLANT PUMP 1A NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418    DISCHARGE C  2) TAG NO. 2MRCEP01A L    SERIAL NO. 1110-1A (C-E)    N.B. NO. 23457N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)
1-17                                                                                              TAG NO.      2MRCEX01 SERIAL NO. 79173 (C-E)
C16-17  AND  16-1816-31 SEAL HOUSING      STUDS & NUTS- NOTE 116-32 FLANGE STUDS &      16-33 NUTS- NOTE 116-12 THRU 16-15
N.B NO.     22513 1-1 90&deg;                                                       270&deg; 1-12 1-8 180&deg; 1-4 1-11 100% LIGAMENTS                                                                              1-7 54 STUD HOLES                                                    1-20 COUNTED CLOCKWISE                1-16                  1-15                              1-3 FROM 0&deg; 1-30 0&deg;   PLANT NORTH 90&deg;                       270&deg; 1-14 1-13 3INT-ISI-2 Rev. 4 0&deg;            1-9 1-5 SHELL SEGMENT 182 1/4                                          CROSS SECTION 11 1/4
                                                                                                                          -LONG SEAMS-OUTLET                                                              INLET REFERENCE DWG:
N001-3.01-15 AND 17 N001-3.01-41 AND 61 N001-3.01-72 1-10 SUPPORT COLUMNS  RX INTERIOR 40 AT 1A B    RX INTERIOR 1-6                                            41 AT 1B B    RX INTERIOR 9 1/16                         42 AT 2A B 43 AT 2B B UNIT 2            ZONE 1 SHEAR                  1-2 KEYS 96 of 210 ICI Penetrations 1 thru 61                                                                                                          REACTOR VESSEL 1-31 6 1/2


CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)
NOTES:
B UPPER HORIZONTAL SUPPORTS (2)
: 1) Full ITEM ID include -CEDM or RVLMS NO
B16-19 AND  16-20MOTOR SUPPORTSTAND163 16416-21 AND  16-22 NUTS & RINGS16-30FLANGE SURFACE 16-34CASING INTERNAL SURFACE B3INT-ISI-2 Rev. 4 102 of 210 UNIT 2 ZONE 17 REACTOR COOLANT PUMP 1B NOTES:1) STUD LOCATIONS CW FROM REFERENCE DWGS:N001-6.02-418    DISCHARGE C  2) TAG NO. 2MRCEP01B L    SERIAL NO. 1110-1B (C-E)     N.B. NO. 23458N001-6.02-420 THRU 423N001-6.02-107 & 1088.271.1SEAL HOUSING STUDS FLANGE STUDS 32.876.936.897.284.5284.33SNUBBER (2)
: 2) TAG NO. 2MRCEX01 SERIAL NO. N05065-CHA-01 (Doosan)
C17-31 SEAL HOUSING      STUDS & NUTS- NOTE 117-32 FLANGE STUDS &     17-33 NUTS- NOTE 1 CW FROM DISCNOZZLE COLUMNSUPPORTS(4)LOWER HORIZONTALSUPPORTS (2)
N.B. NO. 1685 2-71        NOTE 3                                    2-61                                                                  3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP 2-70 REFERENCE DWGS:
BMOTOR SUPPORTSTAND17-12 THRU 17-1517-17  AND  17-18UPPER HORIZONTAL
2-60                                                                  13-MN-740 (Replaced RV HEAD SPEC)
RVLMS                                                                                                                                R15 WO 3377051 LOCATED                          2-59 AT 92 & 96 2-58                        UT Baseline Completed on 2-61 at CEDM locations:
2-88                                                    54, 59, 65, 69, 71, 73, 77 79, 81, 82, 84, 85, 87, 88, 89 VENT LINE NUTS 1 THRU 18 19 THRU 36 37 THRU 54 CLOSURE HEAD 7.38                STUDS 8.6
                                                                                                                                          #1 THRU #54 1 THRU 18 19 THRU 36                  WASHERS 180&deg;                                                                            37 THRU 54                1 THRU 18 3INT-ISI-2 Rev. 4 19 THRU 36 76.37                              37 THRU 54 93    84    94 77                  78 69                    70 87                              88 68                              71 76                                  79 92                                      95 90&deg;          83                                        85          270&deg; 91                                      96 75                                  80 67                              72 86 66                      73 89 74                    81 90    82    97 11.5 STUD LOCATIONS 1 THRU 54                                                                                            UNIT 2            ZONE 2 0&deg;    CW FROM 0&deg; CLOSURE HEAD 97 of 210                                      TOP VIEW                                                                                                            CLOSURE HEAD


SUPPORTS (2)
112&deg; MANWAY STUDS & NUTS                      NOTES:
B17-19 AND  17-2017-21 AND  17
90&deg;      326
                                                                              -NOTE 1-                          1) Stud Location is #1 TDC Going CW to #20.
45&deg;
: 2) Tag NO 2MRCEE01A Serial NO. 212 0&deg; MANWAY N. B. NO. 161 STUDS & NUTS NOTE 1- 324 REFERENCE DWGS:
MN725-A16, A17, A19 and A20 0&deg;                                                              180&deg;                MN725-A31, A32, A36, A52 and A72 MN725-A243 and A390 315&deg; LOOKING DOWN
                                                                                                                .87 TUBESHEET 202.1 3INT-ISI-2 Rev. 4 107                                      25          37 6.37 106 315&deg; 102                                                        100 31 6.7 45&deg;101                                                                                      14.50 105                                                      1.310 27 9.3                                    2.75 104        17.3                  140 SKIRT B 4.63
                                                                                                                .56 CHANNEL HEAD CROSS SECTION                                  MANWAY STUDS (20 EA)
UNIT 2            ZONE 3 98 of 210 STEAM GENERATOR #1
 
112&deg; MANWAY STUDS & NUTS                                NOTES:
90&deg;      426
                                                                                -NOTE 1-                                    1) Stud Location is #1 TDC Going CW to #20.
45&deg;
: 2) Tag NO 2MRCEE01B Serial
N.B. No. 547 Reference Drawings:
N.B. No. 547 Reference Drawings:
N001-7.03-1 N001-7.03-48 thru 501110 WW TOP LONG SEAMSNEAR & FAR SIDE 8 SCH 160 PIPEAND FITTINGSINLETOUTLETVIEW FACING HEAT EXCHANGERLOOKING PLANT SOUTH 68-468-3 68-768-868-5 68-6 68-268-968-1 B B3INT-ISI-2 Rev. 4 154 of 210 UNIT 2 ZONE 69 LETDOWN HEAT EXCHANGER NOTES: Tag No. 2MCHNE02 Serial No. N2373 (Richmond Engr)
N001-7.03-1 N001-7.03-48 thru 50 W                  W 11 B                10 B 68-4                                                    68-2        68-1 68-3 INLET TOP VIEW FACING HEAT EXCHANGER 3INT-ISI-2 Rev. 4 68-5 LONG SEAMS                                                                OUTLET NEAR & FAR SIDE 68-7 68-6                8 SCH 160 PIPE                      68-8        68-9 AND FITTINGS LOOKING PLANT SOUTH UNIT 2          ZONE 68 154 of 210                                                                                            REGENERATIVE HEAT EXCHANGER
N.B. No. 77334 Reference Drawings:
 
N001-7.03-26 N001-7.03-27
Tubesheet  NOTES:
Tag No. 2MCHNE02 Serial No. N2373 (Richmond Engr)
N.B. No. 77334 32 Studs 1 x 9 3/4                                      Reference Drawings:
3/4                    N001-7.03-26 Channelhead Cross Section        N001-7.03-27 N001-7.03-28 N001-7.03-29 69-1 69-2 3INT-ISI-2 Rev. 4 UNIT 2  ZONE 69 155 of 210                                                                                    LETDOWN HEAT EXCHANGER
 
EL. 47 10                                SI-67 W
B                                                                    LINE #              DIA X SCH      FROM      TO ZONE 76                                H-4 SI-67          16 X 0.312  70-103 70-109 70-109 SI-241              18 X 0.312    70-44  70-47 SI-307              14 X 0.312    70-63  70-69 70-107                                70-50 SI-307              20 X 0.375    70-49  70-61 70-52 SI-307 W 70-106                                                                        B H-16 70-104 REFERENCE DRAWINGS 70-53                        02-P-SIF-201 70-49 SI-A-067-GCBC-16 V-201 70-55 70-47 W
SI-241 B
ZONE 102                                                                    H-20 3INT-ISI-2 Rev. 4                                                                                                                                                                        70-56 SI-A-241-GCBC-18 70-103                                                                                                                                                  EL. 41 10 SI-A-307-GCBC-20 70-60                                                      70-58 70-61 70-46 LPSI PUMP A 70-44                                SUCTION    70-65                                                  70-59 ZONE 94 70-69 SI-A-307-GCBC-14 UNIT 2            ZONE 70 70-64      70-63 156 of 210                                                                                                                                                                            LPSI PUMP ROOM 70-68 A SUCTION 70-66
 
74-52                                      ZONE 83                                                                                LINE #              DIA X SCH      FROM      TO 74-54 SI-A-087-FCBA-10                                                      SI-78        10 X 0.365        72-29    72-32 ZONE 76 SI-87            8 X 0.322      72-5    72-6 B                                                                                                                      SI-87        10 X 0.365        72-8    72-57 SI-87 H-3 74-57 EL 62-9 74-51                                              74-55 SI-78  B 74-49                                                        72-32 H-3 REFERENCE DRAWINGS 02-P-SIF-207 W                                          EL 62-9 74-48 72-30                                        SI-A-078-FCBA-10 74-46                                                                        SI-78  C H-1 SI-87      74-45A                                              72-29 H-2    B 74-45                                                      V-435 W                                                                                  72-21 SI-A-087-FCBA-10 3INT-ISI-2 Rev. 4 72-27 HV-306                                                                            72-20 72-18 72-26                                                                            LPSI            72-5 PUMP A 72-24                                                                  DISCHARGE                      72-6 72-23                                                                                                      72-8 B
SI-87 72-9 H-1                V-434 72-15                                      EL 46-9 W
72-17 TOG EL.
51-6 72-11 UNIT 2              ZONE 71 72-14                  W SI-87  B 157 of 210                                                                                                                                                                                    LPSI PUMP ROOM A 72-12      H-11                            DISCHARGE
 
W          B                                                  NOTES:
72-3C
: 1) TAG NUMBER: 2MSIAP01
: 2) SERIAL NUMBER: 0876-40 INGERSOL RAND W                                              W 72-3B B                              72-3A B    WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 71                                  REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 SUCTION ZONE 70                                          UNIT 2        ZONE 72 158 of 210 LPSI PUMP A
 
LINE #          DIA X SCH          FROM        TO                REFERENCE DRAWINGS 02-P-SIF-202 SI-308          14 X 0.312        71-63      71-69 SI-308          20 X 0.375        71-49      71-61 SI-194          18 X 0.312        71-44      71-47 SI-34          16 X 0.312      71-105 71-111 V-200 71-108 ZONE 104 SI-34 W                                                                                                          LPSI ZONE 79                                          B          71-49                                                                                        PUMP B H-4                                                                                                              SUCTION 71-110 SI-B-308-GCBC-14 71-69 ZONE 95 SI-B-034-GCBC-16 71-68 71-107              71-111 71-50 71-105 3INT-ISI-2 Rev. 4                                                                                                                                71-44                                                71-66 71-46 71-52 71-65 SI-B-194-GCBC-18 SI-308 B                                                                                                                                    71-64 H-12 71-47 71-63 71-59 71-61 SI-308 B
71-53                                                                                  71-60 H-13 W                          71-55 SI-B-308-GCBC-20              71-56                      71-58                                            UNIT 2              ZONE 73 159 of 210                                                                                                C/L EL. 41 10                                                            LPSI PUMP ROOM B SUCTION
 
ZONE 86 LINE #      DIA X SCH      FROM    TO 75-48                                                                                                                  SI-129      8 X 0.322    73-5    73-6 SI-129 SI-129      10 X 0.365  73-8    75-51 H-6      C 75-46                                                                                                                                  SI-123      10 X 0.365  73-27  73-30 75-51 EL 62-9 75-49 75-45            EL 62-9                                                                                                                      REFERENCE DRAWINGS 73-30 02-P-SIF-208 ZONE 79 75-43 SI-B-123-FCBA-10 75-42                              73-28 75-40                                                        73-27 SI-129  W B
H-4 SI-129 B  75-39 H-5                                                                        V-447 73-25 3INT-ISI-2 Rev. 4 W
HV-307                                                                              73-19 73-24                                                                          SI-B-129-FCBA-10 73-22 73-17 73-21                                                                              73-15 73-14 SI-129 SI-129        H-1    B            V-446 73-12 SI-129      H-2    C H-3                                                                                  73-85 W            C 73-5                73-6 73-11 LPSI                                                                                                      UNIT 2            ZONE 74 PUMP B                                                        EL 46-9 DISCHARGE 160 of 210                                                                                                                                                                      LPSI PUMP ROOM B 73-8            73-9 DISCHARGE
 
W          B                                                  NOTES:
73-3C                                                      1) TAG NUMBER: 2MSIBP01
: 2) SERIAL NUMBER: 0876-41 INGERSOL RAND W                                              W 73-3B B                              73-3A B    WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 74                                    REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 SUCTION ZONE 73                                            UNIT 2        ZONE 75 161 of 210 LPSI PUMP B
 
80-20                                                      ZONE 82 V-184                        EL. 70 80-19 70-113          72-35 SI-A-067-GCBC-14 SI-A-078-FCBA-10 70-114 72-33 B  SI-67 80-18                                                                        B    SI-67      H-1  70-111 ZONE 71 B  SI-67      H-2 W                    70-110 EL. 47 10                                                                          H-3 80-10                          80-9                                                                            ZONE 70 80-17 80-16 V-157 REFERENCE DRAWINGS 80-11            SI-A-009-GCBC-18                                          80-8                                    02-P-SIF-201 EL. 41 10                    02-P-SIF-207 80-12 80-13 3INT-ISI-2 Rev. 4 80-7 LINE #        DIA X SCH      FROM    TO ZONE 102                                                                                                                                                                SI-067        16 X 0.312    70-110 70-111 B      W                                          SI-067        14 X 0.312    70-113 80-16 CONTAINMENT SPRAY PUMP A                                                                      SI-9                                              SI-009        14 X 0.312    80-1  80-4 SUCTION H-4 SI-009        18 X 0.312    80-5  80-13 80-6                                                                        SI-078        10 X 0.365    72-33  72-35 80-1                                                80-5 80-4 80-2 80-3                                                                                                                          UNIT 2            ZONE 76 162 of 210                                                                                                                                                                              CONTAINMENT SPRAY PUMP ROOM A SUCTION
 
ZONE 83 EL 70                                                  EL 58-6 LINE #            DIA X SCH        FROM          TO 82-33 SI-079            8 X 0.322          82-1A      -
82-35                                                                                                                    SI-079            10 X 0.365          82-1    82-27 82-32 SI-082            10 X 0.365          82-31    82-35 82-13                                        82-34                                      B                                                          REFERENCE DRAWINGS SI-82 EL 53-6                                                                                                                W 02-P-SIF-207 H-2 82-14 82-12 V-485                                SI-A-082-FCBA-10 TOG EL 51-6 82-15 82-31 W
SI-79 B                                                                                                                                        W 82-10                                  H-4                                                                                                                                      SI-79 82-23                                  B 82-16                                                                                                                        H-6 82-9                                  82-11                                                                HV-684 82-17                                                                    82-22 82-8 82-29                                                82-18 82-7                                                                                                                                                82-19 82-24 3INT-ISI-2 Rev. 4                                    82-28                          W SI-79      SI-79        SI-79 82-6                              H-1            H-2      H-3                                    SI-A-079-FCBA-10                                                                    82-21 B            C          B B                                                                      82-25 82-5                              82-4                                                                                              SI-79 W  H-5        82-20                                                      W CONTAINMENT SI-79 SPRAY PUMP A                            ZONE 82                                                                                            B DISCHARGE                                                                                                                          H-7 SI-A-079-FCBA-10 82-1A 82-1                                    EL 70                                                              SI-79 82-3                                                                                                                                                                      B 82-2                                                                                                                          H-8 SI-79 C
H-9 82-27                                                                                    UNIT 2                  ZONE 77 82-26 163 of 210                                                                                                                                                                                                      CONTAINMENT SPRAY PUMP ROOM A DISCHARGE
 
NOTES:
W          B                                                  1) TAG NUMBER: 2MSIAP03 80-3C
: 2) SERIAL NUMBER: 0876-42 INGERSOL RAND W                                              W 80-3B B                              80-3A B    WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 77                                  REFERENCE DRAWINGS N001-11.01-36 SUCTION ZONE 76                                            UNIT 2        ZONE 78 164 of 210 CONTAINMENT SPRAY PUMP A
 
EL 47-10                          LINE #        DIA X SCH        FROM    TO 81-17 SI-033        14 X 0.312      81-1  81-4 81-16 SI-033        18 X 0.312      81-5  81-12 SI-34 C                                                                                              SI-034        14 X 0.312    81-15 71-101 H-6 SI-034        16 X 0.312    71-103 71-104 SI-123        10 X 0.365    73-31  73-33 SI-B-034-GCBC-14 REFERENCE DRAWINGS ZONE 85                                                                                                  ZONE 104    02-P-SIF-202 EL 41-10                  02-P-SIF-208 EL 70 81-18 SI-B-123-FCBA-10                                    V-158 73-33                                                                                                                        CONTAINMENT SPRAY PUMP B 81-19                                                                                            81-15                                                        SUCTION 73-31 71-104                                                                                                                        81-1 V-185                                                                                                                            SI-B-033-GCBC-14 3INT-ISI-2 Rev. 4 81-12 71-100                                              ZONE 74 71-101                                                                          81-11 71-103                                                              81-10 ZONE 73                                                                W 81-2 SI-34                                                                                        SI-33 B                                                                                                B 81-9                                                  H-4 H-1 SI-B-034-GCBC-16                                                                                                                    81-3 SI-34 B                                                                                                                            81-4 H-3                                    SI-B-033-GCBC-18 81-5 81-6 81-8                            81-7 UNIT 2            ZONE 79 165 of 210                                                                                                                                                                    CONTAINMENT SPRAY PUMP ROOM B SUCTION
 
ZONE 86                                                        LINE #              DIA X SCH            FROM    TO SI-119            8 X 0.322          83-1A      -
SI-147 SI-119          10 X 0.365            83-1  83-26 EL 70                                            C H-1                         SI-147          10 X 0.365          83-30  83-34 83-32 REFERENCE DRAWINGS EL 53-6                                                                                                                                                                            02-P-SIF-208 83-34 83-31                            EL 58-6 ZONE 85 83-12 83-33 83-13                                                  83-60 83-11 SI-B-147-FCBA-10                                                                                                    EL 70 83-14 SI-B-119-FCBA-10 TOG EL 51 6                                                                            83-30 V-484                                                                                                                                                          SI-119 83-16                                                                                        B H-9 83-17                                                                      SI-119 SI-119                                                                                      HV-689 83-22                                                        C          83-26 83-15                                                                                                  SI-119 W                H-8 B
3INT-ISI-2 Rev. 4 H-4                                                                                                          W                      H-6 C              SI-119 83-5                                                          SI-119                                                          C H-7 B
83-6                                                                      H-5 83-25 83-7                                                            83-18 C                                                                                83-21 SI-119 83-8                                                H-1                                            83-4                                                                                83-24 SI-119    B                                                                  83-20 83-10                                                                                                                                                                                      EL 63-0 H-2                                                                83-19          83-23 W                                        W SI-119 B                                                                            83-3 H-3 CONTAINMENT SI-B-119-FCBA-10 83-9                        SPRAY PUMP B DISCHARGE EL 49-2                                                                                                        83-2                                                            UNIT 2                      ZONE 80 83-1A                                83-1 166 of 210                                                                                                                                                                                             CONTAINMENT SPRAY PUMP ROOM B DISCHARGE
 
W                                                              NOTES:
B 81-3C                                                      1) TAG NUMBER: 2MSIBP03
: 2) SERIAL NUMBER: 0876-43 INGERSOL RAND W                                              W 81-3B B                              81-3A B    WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 80                                  REFERENCE DRAWINGS N001-11.01-36 SUCTION ZONE 79                                          UNIT 2         ZONE 81 167 of 210 CONTAINMENT SPRAY PUMP B
 
LINE #        DIA X SCH        FROM        TO SI-078        10 X 0.365      72-36      72-48 SI-078        20 X 0.500      72-49      72-52 SI-079        10 X 0.365      82-28      72-61 82-29 REFERENCE DRAWINGS 82-28                                                                                                        02-P-SIF-207 82-30 B
W                                                72-54        72-58 SI-79                                                                                                  72-60 H-10                                                        SI-A-079-FCBA-10 72-50 HV-678 72-52 72-38                                                                                                                                                                  CS/SS ZONE 77 72-55                        72-57 B                                                                                                                                            72-61 W                          72-39 SI-78 72-47                                                              72-49B H-4 72-45 SDCHX A 72-41                                                                                                                                INLET 72-36 3INT-ISI-2 Rev. 4 NOZZLE 72-48 HV-685                                                                                                                          SI-A-078-FCBA-20 ZONE 76                        72-42                            72-44                                                      72-49A SI-A-078-FCBA-10                                                                                    SI-78  C H-5  W 72-49 UNIT 2              ZONE 82 168 of 210                                                                                                                                                                      SHUTDOWN COOLING HEAT EXCHANGER ROOM A
 
LINE #                DIA X SCH              FROM              TO SI-070                20 X 0.500              74-1        74-19                                                                                                              W B
REFERENCE DRAWINGS                                              SI-070                16 X 0.375          74-21          74-25                                                                                                      SI-82 ZONE 94 02-P-PCF-201                                                                                                                                                                                                                        H-1          82-37 02-P-SIF-203                                                SI-070                20 X 0.500          74-27          74-27                                                                                            82-38 02-P-SIF-207                                                                                                                                                                    B SI-89 SI-082                10 X 0.365          82-36          82-38                                                                                      HV-688 H-5 SI-087                10 X 0.365          74-58          74-74                                                                                                                            82-36 74-84 82-44 SI-089                10 X 0.365          74-77          82-44                74-83 W                                                                                                                                  82-43 SI-87                                                                                                            B      W SI-089                10 X 0.365          82-39          82-40                74-81                      HV-687 H-8    C                                                                                                        SI-89                        82-41 SI-090                14 X 0.375          74-105 74-118                                    H-2 SI-87                                                                                                                            74-87 H-7    B          SI-131                6 X 0.280          74-97 74-100                                                                                                      82-39                ZONE 77 74-70                                                                                                                                                                                      82-40 SI-87                                                                                                                                                                                          SI-A-082-FCBA-10 A    SI-87                                                                                                                      82-42 74-71                    H-6                                          74-66                                                                                          B SI-89 C                        H-5                                    74-64 74-67                                                                                                                          H-1      W                                            74-7 74-73                                                                                                    74-63                                                                                              74-9 74-69 74-80 SI-87  C 74-61                    74-60              74-86                                              74-10 H-9 SI-89 74-78                                  B                                          74-6 74-118                                                        74-58                                        H-3 74-112                                                                                                                                                                      74-12 SI-A-089-FCBA-10                                                                                74-4 74-114 W
W                                                                                SI-87                                                                    74-157 3INT-ISI-2 Rev. 4 SI-A-087-FCBA-10                      SI-90  C                                                    V-458    B                                        V-460          74-77 H-4                                                                                                                              74-3 H-2                                                                                                                                                                                        SDCHX A ZONE 71                                                                                  OUTLET 74-100                                    74-13                                                          NOZZLE 74-115                          74-111 ZONE 94                                                                                                      SI-E-131-FCBA-6 74-108 74-117                  74-109                                                                                                                                              W W              74-106                                                                                                                            SI-70 SI-90                                                                                                                                    W                H-6 B
74-74                      B              SI-90    B                74-99                                                                          SI-70                                              74-1 H-1                                                                                                                                          B            SI-70 CS/SS H-4                                                                                HV-686              H-1 HV-657                                    74-98 H-7 W    B                                                                                                            74-97                                                    74-76                                        C SI-70    74-75                                                                                                                                    74-15 H-3        74-27                                                SI-A-090-FCBA-14 74-25                                                                                                                  74-96 74-22        74-105 74-24                                                                                                B    W SI-70 74-21                                                                              SI-A-070-FCBA-20 H-2                                                                              UNIT 2                          ZONE 83 74-19                                              74-104A 74-18 74-16 169 of 210                                                                                                                                                                                                                          SHUTDOWN COOLING HEAT EXCHANGER ROOM A
 
NOTES:
: 1)    TAG NUMBER: 2MSIAE01
: 2)  SERIAL NUMBER: S-18343 TUBE SHEET              (ENGR & FABRICATORS) 1/8 CLAD            1-7/16                                                    3) NATIONAL BOARD NUMBER 1710
: 4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
64 STUDS 1.5 X 17 REFERENCE DRAWINGS:
N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 74-121 75-122 DETAIL 74-123 3INT-ISI-2 Rev. 4 74-124 30 deg.
Inconel Weld SA-105 30 deg.
Clad 74-122        INLET NOZZLE - ZONE 82                                      UNIT 2                ZONE 84 74-121        OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83 170 of 210                                                                                                    SHUTDOWN COOLING HEAT EXCHANGER A
 
EL 75 73-36 73-34 B            W                                                                        EL 80-2          73-45 C  SI-123          SI-123                                        73-37                                                                        B SI-123      W H-1            H-2 EL 75                                                                                                                                                    H-5 W
73-39  SI-123 83-28                                                                                                B                                                    SI-B-123-FCBA-10 T OF EL 70                                                        H-8 83-29                                  HV-694                                                                                                        73-45A 83-27                                                                                  EL 80-2 73-43 73-40                                                                73-46 ZONE 79 HV-679                                                                            73-42 73-60 W                                                                                                                                                                      73-48 T OF EL 70                                                            SI-119  B SI-119  B                                                W                                                                                                            73-47 H-13                        73-62 H-10 73-56                                                                                        73-63 ZONE 80        SI-119  C H-11 SI-119 B                                                SI-123 SI-B-119-FCBA-10                                                                                                                        B 73-59                    W                                              H-6 73-57                                      H-14 SI-123 3INT-ISI-2 Rev. 4 B
H-7 73-64 73-49    SI-B-123-FCBA-20 SDCHX B                    73-54 INLET                    CS/SS NOZZLE                                                73-51 73-52 REFERENCE DRAWINGS 02-P-SIF-208 LINE #        DIA X SCH              FROM            TO                                                                                                        UNIT 2                        ZONE 85 SI-119        10 X 0.365          83-27        73-63 171 of 210                                                                                                                                                                        SHUTDOWN COOLING HEAT SI-123        10 X 0.365          73-34        73-46                                                                                                      EXCHANGER ROOM B SI-123        20 X 0.500          73-48        73-54
 
LINE #                            DIA X SCH          FROM          TO SI-072                            20 X 0.500          75-1      75-17 SI-072                            16 X 0.375          75-19    75-23 SI-072                            20 X 0.500          75-25    75-26 SI-129                            10 X 0.365          75-53    75-61 SI-131                            6 X 0.280          75-81    75-84 75-58            SI-B-129-FCBA-10 SI-134                            10 X 0.365          75-62    75-72                                        C              ZONE 95                      75-60 SI-72 C      B H-6                                    75-61 SI-134                            10 X 0.365          83-38    83-43                                                                                                                                                  SI-129  SI-129 W
B    SI-72                                                                                                H-10    H-11 SI-135                            14 X 0.375          75-87 75-100                                          W                                                                                                                                    C H-5 75-25                                                      SI-129 SI-147                            10 X 0.365          83-35    83-37                                                                                      75-26 75-96                                75-23                                                    H-12 SI-B-135-FCBA-14 C                                                                  75-22 C
ZONE 95                                                  W SI-135          SI-135                                                          HV-658 H-2            H-3                                                                  75-20 W                            75-94 B SI-135                      75-97                                                                75-19 75-68                75-66                                                        75-94A SI-B-134-FCBA-10 H-1                                                                                                                                        75-56 75-93                                                    75-17 W
C SI-134                                      75-65                                        75-91 75-99          75-90                          75-16 H-8 75-100 75-88                          75-14 75-69                                                                                                                                                                                75-55 83-43                                                                                            V-455 3INT-ISI-2 Rev. 4                                                                  75-71                      75-63                                                75-82      75-87 75-72 SI-134                                                                SI-E-131-FCBA-6                              C                                    SI-129 W 83-41                                    C                                                                                                                                                H-7    C H-1                                                                        75-81                            SI-72                    75-54 83-42                                                                                                                                                                H-3 SI-134                                                      75-83                                                                                        SI-129 C                                                                                                                                                        C H-2                                                    75-84                                    75-13                                                  H-8 83-39                                                                                      V-464 B                                                        HV-695                                                                                                                                              75-53 SI-134                                                                                      75-12                                                          SI-129 SI-147    83-37                                                                    C                                                                                                                                                        B 83-40                            H-3                              75-9                                                                                                                  H-9 H-2                                                              W                                                                                              75-11A SI-134                                                                                                                                                        SI-129 SI-134 B                                                                                                                                                    H-13 B
W      H-5          SI-B-134-FCBA-10                                                                    W H-7                                                                                              75-11    SI-72                                                                      W 83-36                                83-38              C    SI-134                  75-62                                                                          B B                                                                                  H-12 HV-693                                  H-6 83-35                                                                                                                                            HV-696                                                            ZONE 74 SI-B-147-FCBA-10        SI-B-072-FCBA-20                                                                          C 75-8            SI-72 W
75-4                                                                                          H-4 REFERENCE DRAWINGS                                      UNIT 2                        ZONE 86 75-7                  W                                02-P-PCF-201 75-2                              75-1        75-5                        SI-72                                    02-P-SIF-204 172 of 210                                                                                                                            B                                                                              SHUTDOWN COOLING HEAT ZONE 80                                                                                            H-1                                      02-P-SIF-208 SDCHX B OULLET                                  SI-72 EXCHANGER ROOM B NOZZLE                                  H-2    C
 
NOTES:
: 1)    TAG NUMBER: 2MSIBE01
: 2)  SERIAL NUMBER: S-18344 TUBE SHEET              (ENGR & FABRICATORS) 1/8 CLAD          1-7/16                                                    3) NATIONAL BOARD NUMBER 1711
: 4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
64 STUDS 1.5 X 17 REFERENCE DRAWINGS:
N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 75-76 75-77 DETAIL 75-78 3INT-ISI-2 Rev. 4 75-79 30 deg.
Inconel Weld SA-105 30 deg.
Clad 75-77        INLET NOZZLE - ZONE 85                                      UNIT 2                ZONE 87 75-76        OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86 173 of 210                                                                                                    SHUTDOWN COOLING HEAT EXCHANGER B
 
LINE #    DIA X SCH        FROM            TO REFERENCE DRAWINGS SI-072  12 X 0.375          78-2      78-11                                                                                                  02-P-SIF-208 SI-072  12 X 1.125      78-13        78-14                                        78-21 17                        78-20 SI-072  20 X 0.500      75-35        75-38 SI-073  12 X 0.375          79-1      79-11              ZONE 98 78-19 SI-073  12 X 1.125      79-13        79-14 SI-155  12 X 1.125      78-16        78-21                      78-18 SI-E-155-CCBA-12 SI-172  10 X 0.365      78-10C 78-10D                              78-17 ZONE 99                                                                                                                                      UV-615 SI-174  12 X 1.125      79-16        79-21                            78-16                                                                                  C W    C      C 78-14                        SI-72    SI-72        SI-72 18                                                                                                                                            78-13                    H-20    H-21        H-22 78-11                                          78-10B                B 79-21                                                                                                                                                    78-10A          SI-72 SI-E-172-FCBA-10      78-10C                                                            W 78-3                                                                                                H-19 79-20                                                                                78-2 78-10J                                                      78-9J 78-5 78-10K 79-19                                                                                                                                                                78-9G 75-38 78-6                                                SI-72 3INT-ISI-2 Rev. 4 w                                        C                                        78-10D H-18 SI-72 H-13 B                                                                                    HV-690 SI-72 75-37 78-7                                    B H-14                                                    75-36                            ZONE 89 SI-72 C                                        B              79-1 H-11 SI-E-174-CCBA-12                                            SI-72            78-8 H-15                                                                                                                            SI-B-072-FCBA-20 79-6                          75-35 78-9F                                                                                                              ZONE 95 78-9          79-7                          SI-73 78-9K                                                                                  H-1      C C
SI-72    SI-72    C H-17      H-16                                                                                79-8 79-18              UV-625                                                                                                                                UNIT 2                    ZONE 88 78-9C 79-11                                79-10 174 of 210                                                                                                                                                  B          C SI-73      SI-73 W                                    EAST WRAP 79-17    79-16                            79-14            SI-B-073-FCBA-12        79-13            H-2        H-3
 
REFERENCE DRAWINGS 02-P-SIF-202 02-P-SIF-208 71-1        71-2 ZONE 101                                                                    UV-656 71-4 26 71-208 SI-194  C                                                            71-7        71-8            SI-B-194-GCBC-16 H-23 71-70 71-5 71-10 B
TOG                                                                                                                                B    SI-194 87-3                                                                                                    71-13              W w
SI-194                                                            71-210            SI-194 H-13 B                  71-11 H-14                                                                  71-14      H-12 SI-E-173-GCBC-16 71-16 71-90                                          SI-B-194-GCBC-18 SI-B-038-GCBC-12 71-71 71-18 71-91 3INT-ISI-2 Rev. 4                                71-73 71-93 ZONE 95 V-442 71-75 71-94 71-76                      ZONE 88 71-78                                                              71-88 LINE #      DIA X SCH              FROM            TO HV-690 71-87A SI-38      12 X 0.250            71-90      71-94                                                        B 71-79                                  W SI-173      16 X 0.312            71-70      71-71                                                      SI-173 H-1 SI-173      10 X 0.250            71-73      71-87A                                                                                          71-85 71-81                                                                                                            UNIT 2              ZONE 89 SI-173      10 X 0.365            71-88            -
SI-194      16 X 0.312              71-1      71-11                              71-82 71-84 175 of 210 EAST WRAP SI-194      18 X 0.312            71-13      71-18
 
90-46                                                                                                              LINE #    DIA X SCH          FROM    TO 90-45                                                                            SI-030  24 X 0.375        85-6    85-8 ZONE 121 22                                                                                                                      SI-134  10 X 0.365        83-53  83-57 90-44 B                                                                                                      SI-134    8 X 0.322        83-58  83-59 SI-130                                                                                                    SI-308  24 X 0.562        85-9    85-11 H-2                            SI-B-130-GCBC-10 SI-130    10 X 0.365        90-42  90-46 SI-130    8 X 0.322        90-40  90-41 90-43 83-59          B                                  83-53 SI-134 W                EL 95 H-9 90-42 90-41 SI-B-134-FCBA-10 90-40 83-57 UV-671 83-54 ZONE 95 83-58 83-55 B
SI-134 3INT-ISI-2 Rev. 4 H-10 83-56 ZONE 101                        85-6 24                                UV-676 90-50 SI-B-030-HCBA-24                                          85-9 REFERENCE DRAWINGS 90-51                                                                                                                                  02-P-SIF-202 V-206                                                                      02-P-SIF-208 SI-B-308-GCBC-24 85-11 UNIT 2              ZONE 90 176 of 210 EAST WRAP ZONE 104                        EL 73-7
 
LINE #          DIA X SCH          FROM            TO SI-070        20 X 0.500        74-42          74-44                                                            77-21 SI-070        12 X 0.375          76-2          76-11                                                  77-20                    20 76-21                            ZONE 96 19                                    SI-070        12 X 1.125        76-13          76-14 ZONE 97 SI-071        12 X 0.375        74-103 77-11                                                  77-19 SI-E-202-CCBA-12                    SI-071        12 X 1.125        77-13          77-14 76-20                                              SI-071        10 X 0.365        77-10C 77-10D SI-202        12 X 1.125        76-16          76-21                                                                          TOG 76-19                                                                                                                                          77-18                                  EL 87-3 76-3 SI-220        12 X 1.125        77-16          77-21 TOG                                                                                                                              SI-E-220-CCBA-12 EL 87-3                            76-5 77-17 76-2 W
76-18                                                                                              SI-70                                  UV-645                                      77-16 76-6                              74-44                                  B 76-17                                                                                            H-12 W                          B SI-71                                77-14 76-16        SI-70    C                                                                                                            C 74-102                    B                    H-3                                77-13 UV-635        H-16                                                                                SI-70 76-7                                                                        77-10B                                      77-11 SI-70                                                                                H-10 B
76-13      H-14                        TOG                                                              77-10A                                          77-10C 74-103 3INT-ISI-2 Rev. 4 EL 87-3 76-14                                76-11                                                                                                                                              77-10D 74-104 W
HV-691 B                                          SI-70 B
SI-70                                        H-11 77-7                                                                                        ZONE 92 H-13 TOG                                              74-43 EL 87-3 SI-A-070-FCBA-12                                                                                                      74-42 77-8          77-10                SI-71 76-8                                                                                  W B                            ZONE 94          SI-A-070-FCBA-20 76-10                                                                            H-2            SI-70 SI-A-071-FCBA-12                                                          B H-9 REFERENCE DRAWINGS SI-70 02-P-SIF-207                                                                                                                                            C H-15 UNIT 2                    ZONE 91 177 of 210 WEST WRAP
 
70-1 ZONE 100                              70-1A 27                                                                              REFERENCE DRAWINGS 70-1B 02-P-SIF-201 70-97                                                70-2 02-P-SIF-207 70-98                                                  70-4                EL. 84-3 V-256                                        70-95 EL 87-3              70-91                                70-89 EL 87-3 70-88 70-5 70-92                                                                                70-86 70-94 70-7 w
SI-239 C                                                      SI-A-241-GCBC-16 H-1 SI-A-002-GCBC-12 70-70 70-74                                                                        70-8      SI-241 H-15 C
70-71 70-76                                          70-73                                              SI-241 H-14    B SI-239 SI-E-239-GCBC-10                                      C                          70-10                                                                                                          SI-241 H-2 B
H-11 3INT-ISI-2 Rev. 4 70-11                                  70-13 70-20                SI-241 ZONE 91                                                                                                                                                                                                                          H-9 B
70-77                                                                                                            70-85 70-83                                                                                                                                                                                            W UV-655            70-14 70-17 70-79 HV-691                                                                                                                                                                                        70-22 70-16 70-82A                          70-80 70-16A                    70-19                EL 70 w
SI-239                                                                                                          SI-241 C                                                                                                                B H-3                                                                                                            H-21                  EL 78-9 ZONE 94 W SI-241 H-12 B
LINE #        DIA X SCH        FROM        TO SI-002      12 X 0.250      70-85      70-98 UNIT 2                        ZONE 92 SI-239      10 X 0.250      70-70 70-82A 178 of 210                                                                        SI-239      10 X 0.365      70-83        -
WEST WRAP SI-241      16 X 0.312        70-1      70-14 SI-241      18 X 0.312      70-16      70-22
 
93-43                                                                                                  LINE #        DIA X SCH      FROM      TO ZONE 120                        93-41                                                                                            SI-089        8 X 0.322    82-66  82-67 21 SI-089        10 X 0.365    82-55  82-65 UV-672 SI-007        24 X 0.375    84-6    84-8 82-67                                                          SI-307        24 X 0.562    84-9    84-11 93-42 93-40                                          82-65                                            SI-088        10 X 0.365    93-42  93-43 SI-A-088-GCBC-10 82-66                                                                          SI-088        8 X 0.322    93-40  93-41 82-64 EL 89-9                                                    REFERENCE DRAWINGS C                        82-63                                                          02-P-SIF-201 SI-89 02-P-SIF-207 SI-A-089-FCBA-10 H-12 TOG EL 87-3                              82-55          B SI-89 82-56                                        H-11 W B SI-89 H-13 EL 92-6 3INT-ISI-2 Rev. 4                                                                                                                                            TOG        B 82-62                                                    EL 87-3 SI-89 H-10 ZONE 94 82-57 ZONE 100                    84-6                                                    82-61    82-60 23                          SI-A-007-HCBA-24                                                      82-58 82-59                                    EL 84-8 93-50 93-51                                  84-9 SI-A-307-GCBC-24 UV-674 84-11 UNIT 2            ZONE 93 V-205 179 of 210 WEST WRAP ZONE 102                      EL 73-7
 
ZONE 91                                                                      EL 90-2 74-41 EL 92-6                                                                                            W      B ZONE 92                                                                      82-54                                                                                    74-34                      74-32 ZONE 93                                                                                                    SI-70 H-8 82-53                          74-40 EL 64 B
70-23                                                                                                      74-38 SI-89 SI-241                                H-9 B                                  W                    82-52                                                                                                    W B H-17                                                                                                        74-37                                                              SI-70 H-5 74-35 SI-241                                                            SI-A-089-GCBC-10 H-8 B
70-24 SI-A-070-FCBA-20 SI-241                                                                                82-47 B                                                82-48                                                                                                74-31 H-7 70-25                                                                  82-49 SI-241                                                                                                                                                                    B B                                                                    C H-6                                    82-51 SI-89                                          82-46                                    SI-70 70-27 H-7                                                                                      H-4 EL 89-4                                              W 82-50      B                                    B 70-28                                                                                                                                                                74-30 SI-89 W                          SI-89 H-8                              H-6                                      82-45 70-30 3INT-ISI-2 Rev. 4 EL 88 SI-241 74-28 B                                                                ZONE 83 EL 72 H-5    W SI-A-241-GCBC-18                                                                                EL 41-10                                                                          ZONE 83 SI-241 B
B      70-37                              SI-241 H-4 70-31                                            W                                              H-3              B W                                          ZONE 70 SI-241 H-2    W 70-33 70-39 70-40 70-34 70-36                                                                  70-43 70-41 UNIT 2                ZONE 94 LINE #        DIA X SCH                  FROM          TO 180 of 210 SI-070      20 X 0.500              74-28      74-41                                                                                                                    A TRAIN MISC. PIPE CHASES REFERENCE DRAWINGS; SI-089      10 X 0.365              82-45      82-54          02-P-SIF-201                                                                                                AND 88 PIPE TUNNEL 02-P-SIF-207 SI-241      18 X 0.312              70-23      70-43
 
C      B SI-72  SI-72 ZONE 89                                                                                                                                                          H-8    H-10 71-19                              EL 95                                                EL 92-6 B                                              71-20                                                                                ZONE 88 EL 89-9                  ZONE 90                              83-52 W SI-194 75-33 H-11                                              71-22 B
71-25                                                      SI-194                                                      83-51                    C 71-23                  H-9                                                                              SI-72 75-31 H-9                                    SI-72  C 71-26                                                                                                                                    W H-7 B            B                      SI-B-134-FCBA-10 W
SI-194    SI-194 75-30 H-10        H-15 71-27                                                                                  83-50                                                                                    75-29 71-29                                                                                                                                                                            75-27 SI-B-194-GCBC-18                                                                  83-48 71-30                                                                                  83-49      B 71-32                                                                                          83-47 SI-134 SI-B-072-FCBA-20 W                                                  H-11                                                                                        EL 72 SI-194                                                  W                  B B                                                                                  EL 92-1 H-8                                                                    SI-134                                                                    ZONE 86 B
SI-194                                                                                                  H-12                  83-46 W
H-7 71-33 W
3INT-ISI-2 Rev. 4 W    B            B                          SI-194 SI-194      SI-194 H-6 C                                                                      83-45 83-44 H-4        H-21 71-34 B
SI-134                                                  REFERENCE DRAWINGS; H-4                                                          02-P-SIF-202 71-37                                                                                                                                                                02-P-SIF-208 71-36 EL 88 71-40                                                                ZONE 86 71-39 B
SI-194 B    W                                71-41 H-5 SI-194 H-2                                          EL 41-10 71-43                                                                                            UNIT 2                    ZONE 95 LINE #            DIA X SCH          FROM      TO ZONE 73 181 of 210 SI-072            20 X 0.500        75-27    75-33                  B TRAIN MISC. PIPE CHASES SI-134            10 X 0.365        83-44    83-52                      AND 88 PIPE TUNNEL SI-194            18 X 0.312        71-19    71-43
 
76-38                    A                B ZONE 23                          76-47 SI-202 H-7 76-37 V-542 76-46 B                                  76-36 SI-202 H-6 76-45 76-35 76-34 76-44 EL 89-9 76-43                                                                              B 76-33                                      76-32    B      SI-202 B                                        SI-202 H-16 SI-E-202-CCBA-12 B                            FL EL 100                SI-202                                      H-1 W C                                                                                    B SI-202  SI-202                                                      H-3                                                        B SI-202 SI-202 H-17    H-12                                                                              B                                        H-18 H-4                                                            ZONE 114 SI-202 H-2            76-31 76-42 76-30 B SI-202                  76-29 76-40                                76-41                                                    H-15                      76-28 3INT-ISI-2 Rev. 4                                                                                                                                                    76-79                              76-25 76-39                                                                                                                                              76-27                        76-24 SI-E-202-CCBA-12 V-134 76-23 76-22 19 ZONE 91 REFERENCE DRAWINGS 02-P-SIF-103 A
LINE #            DIA X SCH                  FROM        TO                                                UNIT 2        ZONE 96 SI-202            12 X 1.125                76-22      76-25 182 of 210                                                                                                                                                                                CONTAINMENT SI-202            12 X 1.312                76-27      76-47                                            LPSI HEADER TO LOOP 1A
 
77-46D B                        ZONE 24 77-46 SI-220  77-47 77-46C 77-45                                                                              H-1 BSI-220                  77-44 77-43                                                                                                                V-543 H-27 B                                  77-46E B                                                                                                                                77-46G SI-220                                                        SI-220                          77-46B B                                              77-46F H-5                                                    W    H-23 SI-220    77-46A A                                                                                                                      H-24 77-42 SI-E-220-CCBA-12 B
77-38                                SI-220 B                              77-41 H-10 SI-220                                        B 77-40 77-37                                          H-12                                    W SI-220 B                                                                  H-7        B 77-36 SI-220                                                                            SI-220 H-13                                                                                H-8                                  77-39 77-35 77-34 77-52 77-33 77-32 3INT-ISI-2 Rev. 4                                                                                                                  77-38A B            B B                                                77-29                                            SI-220    SI-220 SI-220                                                77-28                                            H-9      H-19 H-15        77-31                                                                                W                                                        LINE #            DIA X SCH        FROM        TO 77-28A A
EL 89-9                                                                                                                                        SI-220        12 X 1.125          77-22      77-25 77-28D 77-30                                                                                                                                SI-220        12 X 1.312          77-27      77-47 77-28C ZONE 114 B
B  SI-220 SI-220 H-17                                  77-28B H-18 SI-220                                                                                                                            REFERENCE DRAWINGS B                      SI-E-220-CCBA-12 H-20                                            77-83                                                                                  02-P-SIF-103 77-25 77-24 77-27 V-144          77-23 UNIT 2                  ZONE 97 77-22 183 of 210                                                                                                                                                                                                CONTAINMENT ZONE 91                20                LPSI HEADER TO LOOP 1B
 
LINE #          DIA X SCH          FROM        TO SI-155      12 X 1.125            78-22    78-25 SI-155      12 X 1.312            78-27    78-47                                                                                          EL 89-9 78-23 78-24 78-22    17 78-39              78-38 78-33 78-32                                      78-25 78-34                                                                                                ZONE 88 78-27 B    W SI-155 V-114 H-7                                  FL EL                            ZONE 115 100 78-40                                                                          78-35 78-78 78-28 78-41 3INT-ISI-2 Rev. 4                                                            78-37                                                                    78-29 78-31 78-36                                        B SI-155 SI-E-155-CCBA-12                                                                          78-30 H-2 ZONE 25 78-42 REFERENCE DRAWINGS 78-47 02-P-SIF-136 78-46 V-540                                                                            78-43 B
W SI-155                                        B H-5                                        SI-155 78-45                      78-44    H-6 UNIT 2            ZONE 98 184 of 210                                                                                                                                                                            CONTAINMENT LPSI HEADER TO LOOP 2A
 
LINE #                      DIA X SCH        FROM      TO SI-174                    12 X 1.125    79-23    79-25 SI-174                    12 X 1.312    79-27    79-47 C
SI-174    79-37 H-10 79-36 B        W  B W
SI-174    SI-174 H-13          H-8 SI-E-174-CCBA-12 79-38 79-45                      79-44 W                                    SI-174 B
V-541                                              SI-174                                                    H-12 B  SI-174 H-4                  C H-5 79-46                                                79-41                                                        79-35              ZONE 115 79-47                                                                                                              79-39 79-34 79-43                                                                        79-40 3INT-ISI-2 Rev. 4 79-42 B                                                                    79-70 SI-174    EL 93-5 79-27                          79-25 H-11 ZONE 26 V-124                  18 79-23 ZONE 88 REFERENCE DRAWINGS 02-P-SIF-136 UNIT 2                  ZONE 99 185 of 210                                                                                                                                                                              CONTAINMENT LPSI HEADER TO LOOP 2B
 
LINE #            DIA X SCH      FROM        TO SI-007            24 X 0.375      84-2    84-3            REFERENCE DRAWINGS 02-P-SIF-105 SI-241            16 X 0.312    70-116 70-119                    02-P-SIF-151                            PSV-179 SI-241            16 X 1.594    70-120 70-121                  13-P-ZCG-112 SI-369            10 X 0.250    70-122 70-132 SI-369            6 X 0.280    70-134        -
70-134 70-132 ZONE 21 70-123 70-121 SI-A-369-GCBC-10                      70-125 SI-A-241-GCBC-16 V-653                                                                                                                  W    B SI-369 C
SI-241                                                        H-1 70-120 H-19 70-122 70-119 3INT-ISI-2 Rev. 4 70-131 70-117 70-129 84-2                                                                                                  70-126 70-116 SI-A-007-HCBA-24 27 ZONE          70-128 92 V-673 84-3 W    B 84-5 23 ZONE                            UNIT 2            ZONE 100 93 186 of 210                                                                                                                                                    CONTAINMENT LPSI TRAIN A SUCTION
 
ZONE                                71-123 22 71-122 UV-654                                                                                  85-2 SI-194                                71-121 H-22 B
SI-A-030-HCBA-24 71-119                                                  V-675 B
W SI-194 85-3 H-16 W    B 85-5 24 ZONE SI-A-194-GCBC-16 90 71-118 71-116 71-115 SI-194                                        71-113 PSV-189                                                      C SI-A-368-GCBC-10                      H-26 3INT-ISI-2 Rev. 4 71-112 71-130 71-124 LINE #        DIA X SCH      FROM      TO 71-125                  26        ZONE 71-148                                                                                                                SI-030      24 X 0.375        85-2  85-3 71-145                                                                                71-127                                      89 71-149                                                                        SI-194      16 X 0.312    71-112 71-121 71-143                                                                  71-151                                                                SI-194      16 X 1.594    71-122 71-123 SI-368      10 X 0.250    70-124 71-143 W
71-131 B        71-134 SI-368        6 X 0.280    71-145        -
SI-368    71-136 H-2                                                              71-133 71-137 REFERENCE DRAWINGS 02-P-SIF-105                              UNIT 2              ZONE 101 71-139                                                                          02-P-SIF-151 71-142                                                                                                      13-P-ZCG-112 187 of 210 71-140                                                                                                                                      CONTAINMENT LPSI TRAIN B SUCTION
 
LINE#            DIA/SCH                FROM                  TO SI-307          24" x 0.562"          84-12              84-37 SI-307          20" x 0.375"          84-39              84-46                                    SI-008-H002 REMOVED PER CONT. ON SI-9            18" x 0.312"          80-14              84-87                                    EDC 94-00466 ZONE 93                    84-12 WEST WRAP SI-8            10" x 0.250"          84-51              84-84 V-205 EL72' 84-14 REFERENCE DWG'S 02-P-SIF-201                                                                84-69                  84-74 84-67                                            84-82 84-16                                                                        B        W                                                84-72 SI-008 H3                  84-65                                                    84-80 V-470 BW SI-307                                                                  B  SI-008                                                                  84-79 H15                                                                        H4 84-63 84-71 84-75                84-84 SI-A-307-GCBC-24"                                SI-A-008-GCBC-10" 84-61                    B                    BSI-008 W                              84-77 84-55                              SI-008                      H5                                            HPSI W
PUMP #1 84-18                                                                                          H1                                                                    ZONE 116 84-59                              CONT. ON 84-53                                                                                    ZONE 76 84-57                                          CSP SUCTION B                                                                    CONT. ON 80-14 3INT-ISI-2 Rev. 4 SI-009                                                              ZONE 70 W
H5                                                                LPSI "A" BW                                                                                                          V-157                          SUCTION SI-307                                                                        V-105 H2                                      SI-A-009-GCBC-18"                                          80-15 84-50                                            V-201 84-20 SI-009 B
84-24                                                                                                W B                            84-48                                      H2 84-51                                                                                B SI-307                                                        SI-009                  HV-683 84-86                                                                                  84-46 H6 H1    W 84-22          W                                                84-87                                                                84-43 84-44 SI-307 H3 84-28                                                                SI-A-307-GCBC-20"                            B 84-26                                                                  84-35                                                        SI-307 B                                                    B SI-307          84-41                            W 84-29                    84-33                                                                                    H10 H8 W SI-307 84-31        H7        84-34 SI-307                    84-37 W    H5                                        84-39                                    UNIT 2                    ZONE 102 B        CONT. ON                                        84-85 ZONE 103 RWT SUCTION 188 of 210                                                                                                                                                                              SAFETY INJECTION PUMPS A TRAIN SUCTION
 
CH-A-142-HCBA-20" 86-33 86-35                                                  86-31 ESSENTIAL              88' PIPE TUNNEL            AUX BLDG W 86-59                                                                  B                                  88' PIPE CHASE CH-142 REFUELING                                                                          W B        H8 WATER                                                                                CH-142 86-29 TANK                                                                                  H20 CH-142  B 86-57                          86-37                                                                          H4 B                      70 CONT ON CH-142                                          ZONE 102 H6  W                                        SI PUMP SUCT.
86-60 86-39                                            86-27                          86-1 CH-A-142-HCBA-20"                                                                          86-3                                      CH-142 B 86-55                                                                                              H2    W 86-5 86-5                    CH-142 B
CH-142 B                                                86-41 H22                                                                                                H3 86-25 B                  86-43                                    V-306 CH-142                                                                                        86-23 H13 86-7                        BCH-142 B                                                                        W H1 CH-142                                              86- 8 3INT-ISI-2 Rev. 4 H14  W                    86-45                                                                                      86-20 86-21 86-53 86-62                                                          HV531 86-10                                                                      86-16 86-47 BCH-424                                86-18                          W W                                                                CH-424 H1                                                                    B 86-51                                                                                                W                                        H6 86-49                                                                              CH-424 CH-A-424-GCBC-20" B              H2                                      El. 51 6" CH-424 H3 B
86-14 86-12 Reference DWG'S.
LINE#      DIA/SCH          FROM                TO                                                                                            UNIT 2                  ZONE 103 02-P-SIF-201 02-P-ZYA-925 CH- 424 189 of 210                  20" x 0.375"        86-1              86-20                                                                                      REFUELING WATER SUCTION CH- 142                    20" x 0.375"        86-21              86-59                                                                                              A TRAIN
 
V-327                                                                      LINE#              DIA/SCH                FROM              TO 104-5 CONT. ON            85-12                                                                                                  SI-308                24" x 0.562"        85-12              85-37 ZONE 90                                                        CH-B-150-GCBC-3 EAST WRAP                                                                                                                  SI-308                20" x 0.375"        85-38              85-49 85-14                  104-4 85-16                                                                                            SI-33                18" x 0.312"        85-50              81-13 104-3 104-2                                                                                      SI-31                10" x 0.250"        85-59              85-80 104-1 V-206                            T.O.G. EL. 70'6" CH-150                3 X 0.216          104-1              104-5 B SI-308 W      H1                85-18 REFERENCE DWG'S B SI-308                      B SI-308                                                        C                                                    02-P-SIF -202 H4                H2    W                                                  SI-308                                                  02-P-CHF-206 H15    W 85-20 85-26          85-28          85-29 85-31                                                  CONT. ON ZONE 105 RWT SUCT.
85-22                                                                                                              85-36          B SI-308 BSI-308 W  B                                                                                                      85-33                          H8        H9 85-34                    W SI-308        85-24 H3 85-37 85-59 85-38 85-50 BSI-308 SI-B-033-GCBC-18" 85-61                                                W      H5                                              85-40 85-63                                                                                            SI-B-308-GCBC-24" 85-65                        SI-31 3INT-ISI-2 Rev. 4 B                            85-52                            SI-B-308-GCBC-20" W    B                                H1 SI-31                                                                85-54 H4 B                                  85-56 85-67 SI-31    W                                                                                                                85-42 H5 B  W                        85-58 85-74                                                                                                      85-44 SI-033                                                    85-46 85-69                                            85-75 H3                      V-104 81-14              B                                          HV-692 85-71                                                                                            SI-308 85-72                  85-77                          81-13                      H11                            85-47 V-402                                                                                          W V-158                                            85-49 85-78 CONT. ON                                                        V-200 ZONE 79 SI-B-031-GCBC-10"                    CONT. SPRAY                          CONT. ON PUMP "B" SUCT.                        ZONE 73 LPSI PUMP                      UNIT 2                    ZONE 104 "B" SUCT.
85-80 190 of 210                                                                                                                                                                      SAFETY INJECTION PUMPS B TRAIN SUCTION HPSI PUMP #2 ZONE 117
 
B W      87-37 87-39        CH-149 ESSENTIAL AUX. BLDG.                                                                  H8 PIPE TUNNEL  88'                                          87-41      CH-149 B                            87-35 H9 87-43 87-82 W
W                                                    87-78 CH-149  B 87-45        H13 EL. 88' REFUELING                                                                                                                              87-80 BCH-149 WATER TANK                                                                                                                    B H21                    CH-149        CH-149B 87-47 H12          H10  W 87-88                                                            W 87-84 87-49                                                                                                B CH-149 W 87-86 H7 87-31 87-51 CH-149 B H14 W          87-27                                               87-33 87-75 87-29 CH-149 B                                        B CH-B-149-HCBA-20"                              87-53                                    H4                                    CH-149 H6 CH-149 B
W 70' H5 CH-B-149-HCBA-20" 87-73                                                                                                          87-25                B        W CH-149 W
B H2 CH-149 W  B                              87-55 3INT-ISI-2 Rev. 4 H25                                                                                    B CH-149              B CH-149                                                                                                        CH-149 H3              W W B                                                                                87-23                                  H1 H26                            87-57 CH-149 H27                                                                                  87-21                                87-76 87-59                                      B 87-71                                                                                          V-305      CH-425                                                  HV530 87-61                87-5                        W H1 87-63                                                                          87-19                          87-16 87-10 W
87-65                  87-3                                                                      87-18 BCH-425 87-69            87-67                                                                                                                                            H6 87-8 87-7                                                                            EL 51'6" 87-1                                                                                87-12 Reference DWG'S.
87-14 02-P-SIF-202                                                                        CH-B-425-GCBC-20" SI-PUMP 02-P-ZYA-925                                          SUCTION CONT. ON                                                                  UNIT 2                ZONE 105 ZONE 104 191 of 210 LINE#    DIA/SCH          FROM          TO                                                                                                                REFUELING WATER SUCTION B TRAIN CH-425                  20" x 0.375"    87-1        87-18 CH-149                  20" x 0.375"    87-19        87-75
 
LINE #                          DIA X SCH                    FROM          TO SI-099                          4 X 0.337                  106-1        106-6                                                                      B                    A SI-100                      SI-100        106-10                        106-11 SI-100                          4 X 0.438                  106-7      106-44                              ZONE 108                                    W H-2                      H-3                                                    106-12            V-476 SI-100                          4 X 0.438                106-24      106-28                                                EL 88 SI-105                          2 X 0.344                106-49      106-72                                                                  106-33        106-9 106-13 B                                            106-32        106-8 SI-105                          2 X 0.344                106-63      106-68 W SI-100 SI-106                          3 X 0.438                106-45      106-48                                                                  106-31                                          V-404 H-11                                                                B                                                                                      SI-A-100-CCBA-4 106-30              SI-100 B                        106-34                                          106-26                                        106-7 H-34 W W SI-100                                          106-44                  106-27                                                                                                              106-14 106-6 B
H-4                                          W SI-100                106-28                                        106-5      106-49 W SI-100 H-10    B W
B            H-16                                                                                                                                                      106-50 SI-100                                                                                                                                                                                106-51 B                                                              B                              B SI-100 W                                                                    SI-100                    W                                                                                                                SI-A-105-CCBB-2 H-15                                                                                  H-1                                                                                                                                      EL 48-10 SI-100                                                      W                                                                                          106-25 H-9                                                                                                          106-4 H-36                                                                                                                  106-29 106-43                                                                                                        A 106-15 POINT A 106-23                                                                                    CONTINUED 106-36                                                                  EL 51-6                                                                                                W                                    THIS DRAWING 106-22                                                      SI-100  B 106-37                                  106-35                                                                                                    106-21 B                                                                                          C                  H-5 HV-698                                                                        SI-99 W SI-100                                                      ZONE 118 W SI-99 106-24 106-38                                                                                                                                                                                              H-1        W H-8                                                                                    H-2                                    C B                                                                                                    EL 46-3              HV-604                                                                                                              106-16 W SI-100                                                      C        106-42 H-6                C                                                                                                                                                                                            106-20                      106-17 106-48                                              106-3 106-41 B
SI-100 SI-106                                        106-2 H-7                                                                                                                                                                                                                        106-18 SI-A-100-CCBA-4                                  W        H-1 POINT A                                106-39 3INT-ISI-2 Rev. 4 CONTINUED THIS DRAWING                                                                          106-40 B                                                                                                                                                              SI-A-106-CCBA-3 A
106-54 SI-105                                                                                                                                                                          SI-A-99-CCBB-4 106-63                                                                                                                        106-47                                          EL 41-2 H-J W                                                                                                                                                                                                                                      106-45 106-52                                                                                                                                                                                                            106-46 106-53                                                106-64                                                                                                                      106-1                              106-19 V-218 106-55      106-56 106-57                                                106-65                                                                                                        HPSI A 106-58                                                      106-66                                                                                                  PUMP EL 41-2 B SI-105 106-67 H-D    W                                        SI-A-105-CCBB-2 106-59 B
W SI-105                                                                  106-68 H-C      106-60 SW                                                                          V424                                        REFERENCE DRAWINGS 106-61                                                                                                                                                                  UNIT 2                  ZONE 106 SW                                                                              B 106-62                                                        SI-105 02-P-SIF-203 106-69                                                      W 192 of 210                                                                                                                                    H-B                                                                                                HPSI PUMP ROOM A 106-70                                                                                    NOTE:
106-71                                          UV-666                    SW = SOCKET WELD                                                DISCHARGE 106-72 SW
 
LINE #                            DIA X SCH              FROM              TO SI-107                            4 X 0.337            107-1        107-41 SI-107                            4 X 0.337            107-23        107-27 W
SI-107                            3 X 0.438            107-68        107-71 W          B SI-107 107-35 SI-112                            2 X 0.344            107-42        107-65                                                                                  B SI-107        H-11                                    107-36 SI-112                            2 X 0.344            107-56        107-60                                                                      W H-10                                                  107-37 B      SI-107                                                                                        ZONE 109 SI-112                            2 X 0.344            107-66        107-67 H-9                                                                          C SI-107 W
SI-107                                                                                                H-12 REFERENCE DRAWINGS                                                                                      B              107-34                                                          C H-8                                                                        SI-107        W 02-P-SIF-204                                                                                                                                                                  W                                                          EL 51-6 W                                                                                                      H-1 SI-107 C 107-33                                                                V405 B  SI-107                                                                                                        H-2        107-3 NOTE:                                                                W                                                                                                              107-4 H-7                                                              107-7                                                                              107-38 A  SI-107 SW = SOCKET WELD                                                B  SI-107                                                                                                        107-5 H-3          107-8 H-6                                                                                                                                                107-2                          EL 46-3 107-32                                                        107-9 107-6            107-42 EL 46-9                                                EL 48-10                                                        107-43                                                            107-39 107-10                                          V-478          107-44                                                    107-40 107-31                                                                                                                                                          107-41 107-25                                                  107-12        107-45 SI-B-107-CCBB-4                                                                    107-11 107-26                                                                107-46                                  SI-B-107-CCBB-4 HV-609 B SI-107                                                          107-47 B SI-107                                                                107-24                                          107-48 ZONE              H-46 107-30                  H-5                                                                          107-13                                            W          107-1 POINT A                                                                              119          W CONTINUED                                                                                                                                                                                        SI-112 THIS DRAWING                                                                                                                                        107-14 EL 41-2                                                                                                                                                  B A                                                                                                                                                                                              H-D 107-15 3INT-ISI-2 Rev. 4 107-49                      107-56 W              107-29                                                                        W SI-107                                                                                HPSI B SI-112                                                            107-71 B                                                                                                H-4                                                                                  PUMP EL 44 B
H-G 107-23 107-50                                            107-57        V-219 107-27 A  POINT A        SI-B-112-CCBB-2 107-16                        CONTINUED THIS DRAWING 107-51                                                                                                                                              HV-699 107-58                                      107-28                                                                              EL 47-3 EL 41-2 107-59                                                                                            107-20                            107-70 107-60                                                                                  107-22 107-52                                                                              SI-B-112-CCBB-2                                                                    107-68                              SI-B-107-CCBA-3 107-21 B SI-112 V400 107-69 W                                                                            V426                                                                            107-19 H-C        107-53                                                                                                                                                                                      107-17 SW                                                                                                                                      W    SI-107 107-54                                                                      107-67 SW                                                                                                                                    H-48 107-55                                                              107-66                                              B              107-18 107-61                                                            107-64                                                                                                          UNIT 2                      ZONE 107 107-62                                                        UV667 193 of 210                                                        B SI-112                                                                                                                                                                    HPSI PUMP ROOM B 107-63 H-H                                                                                                                                                                        DISCHARGE 107-65 SW
 
LINE #                          DIA X SCH                FROM            TO SI-100                          4 X 0.438              108-1            108-34 SI-118                        2 X 0.344              108-35          108-45                                                                                              REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204                                                        CHARGING 02-P-CHF-207                                                          PUMP A V508 B
B                                                          W SI-118 W
108-30    SI-100                                                          H-R W                                                                                                            108-45 H-21 B SI-100 H-18                      108-31 ZONE 112 EL. 93 10                              B 108-32                                  W SI-118 H-N 108-25                                                                                                                  108-44 108-34                                            EL. 922 108-24            108-29                                                              108-43 108-33                                                            B 108-22    108-23                                                                                                                        SI-118 108-26 C                                                  W SI-A-100-CCBA-4                                                                                                                                                        H-P W    B    SI-100 108-21 SI-100 H-20 108-20                                                        108-28 108-17                                                                                            H-19 EL. 92                                                                                    108-27 108-41 108-16                                        B 108-35                                                108-37 W SI-100 108-15                                                                          108-36                              EL. 922 3INT-ISI-2 Rev. 4 H-26 SI-118 B                                  108-39 W SI-100 B                                                                        H-A                                                                                          108-42 H-29 108-6                                                                                                                        C 108-7                                                                                                      SI-118                                                                                      SI-E-118-CCBA-2 ZONE 111                            108-8 108-1                                                                                                                          H-S                                                                      108-40 SI-118    B 108-2                                            B                                                                                      108-38 W                                                                                                                                      H-H      W SI-100                                108-19 B SI-100                                                                108-18                                                                  EL. 89 H-35                                    H-13      108-14                                                                                                              B W                                                                                                                                                                  SI-118 108-9                                                                                                        H-E 108-3                              108-13    B SI-100                        SI-A-100-CCBA-4 H-12 B        108-5 W                      W                              108-10 SI-100 H-32              108-12 EL. 89 4 108-4                                                      108-11                                                                                                                              UNIT 2                      ZONE 108 B SI-100 W      H-31 194 of 210                                                                                                                                                                                                                            HPSI DISCHARGE 88 PIPE CHASE ZONE 106
 
LINE #                      DIA X SCH            FROM              TO SI-107                      4 X 0.337            109-1            109-43 REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204 B
W SI-107 ZONE 113                H-21                  EL. 93 10 109-23 109-22 B
109-21 SI-107    109-24 H-25                                    109-19 109-18 109-20 109-17          SI-107 C
109-33        B        109-30                                109-25 H-19 SI-107                                          109-26                                                    SI-107C                                109-7 109-34                                                                                              109-14 W  H-34                                          109-27                                                      H-20 109-6 109-36                                                              SI-107  B                                                        109-11 109-43                                                                                                                                                                                                    109-8 H-26    W ZONE 110                                                                                                                                      109-16              109-13 109-37                                                                                                                                            109-10 EL. 92 2 109-28                        109-15            109-12                              B 109-35                                                            EL. 89 4                                                        SI-107 109-32                                    109-29 H-47                  109-5 EL. 91                                                        SI-B-107-CCBB-4 109-9                            B W 3INT-ISI-2 Rev. 4 C        109-42                                                                                                                                                                                          SI-107 EL. 88 6                                          SI-107 SI-107                                                                                      109-31                                                                                                      W  H-16 B                                                                                                                                                                    H-15 H-37 W SI-107 B
109-41 H-35                                                                                                                                                                  109-4 B                                                                                                                                                109-2 EL. 89 4            W                                                                                                                                                                                      109-3 SI-107                                                                                                                                          109-1 109-40      H-36 SI-B-107-CCBB-4                                                                                                                                                      SI-107 SI-107      H-14 EL. 51 8                                                    B H-13          W FROM                                          B HPSI B 40                              W ZONE 107 UNIT 2                        ZONE 109 195 of 210                                                                                                                                                                                                      HPSI DISCHARGE 88 PIPE CHASE
 
LINE #        DIA X SCH        FROM      TO SI-103        2 X 0.344      110-40  110-52 SI-107        2 X 0.344      110-53  110-59 SI-107        4 X 0.337      110-1  110-10 SI-110        2 X 0.344      110-11  110-17 SI-218        2 X 0.344      110-18  110-22 REFERENCE DRAWINGS                                                                  SI-218        3 X 0.438      110-38  110-39 110-39                      ZONE 114 15                                                                                                                                                    SI-218        4 X 0.438      110-23  110-37 110-38 02-P-SIF-203 SI-236        2 X 0.344      110-60  110-64 110-37                                                            B    W SI-E-218-CCBA-3                SI-236 EL. 93 5 SI-E-218-CCBA-4                        H-B 110-36                                                                                  SI-E-236-CCBA-2                                                                  B 110-35            110-61                                                                                                          SI-103 W B                                                                                              EL. 86 9                                110-48 SI-218                                                                    110-60                                                                                    H-D W                                      110-34    110-62 H-1                                                                          110-59 EL. 88 6 110-63                                                      110-64 110-33                                                                                                                                                                                  UV637 SI-E-218-CCBA-2                                                    ZONE 111 110-32                                                                                                                                              110-49                                          110-46 UV646 SI-218 B                                        110-65                                                  110-57 H-2                                                                            B                                                          110-50 110-19        SI-218                                                        110-56                                                110-47                              110-44 110-66 SI-107                                                                    B SI-218  C                                          H-B                                                                                        SI-103 110-20                    B                    H-A                                                                                                  B                  110-43 H-3                                                                                        110-58                                              H-B SI-103 110-21                                                      B SI-103            EL. 88 6 110-31                                                                UV636                                                                                                              H-E 3INT-ISI-2 Rev. 4  110-30                                                                                            H-A                  110-55 110-29                                                                              110-15                          110-54                                                                110-45                      110-42 110-52                                                                                                                                            110-51 110-18                          110-14 110-28                                                                                                                  SI-B-107-CCBB-2                                                                            110-41 110-13 110-17 SI-110 B                                                                                SI-A-103-CCBA-2 110-12                                                      B H-A SI-107 W 110-22          110-16                                                              H-42                                                                              110-40 110-24                                                                                    EL. 85 9/16 110-23                                                                                                                                                  ZONE 111 110-25                                                                                                          SI-107 C H-43      110-2        110-1            B SI-B-110-CCBB-2                                                                                                            SI-107      W 110-6                    SI-107 C H-39 110-11                      110-53                                  H-44 110-10                                        110-5 110-9                                    SI-107  B                                                                          UNIT 2                ZONE 110 W
H-45 110-8          EL. 85                                                                  ZONE 109 196 of 210                                                                                                                            110-7                                                                                        HPSI DISCHARGE SI-107 C 110-4 WEST WRAP 110-3      H-41 SI-B-107-CCBB-4
 
LINE #          DIA X SCH      FROM TO 111-41                                                                                                                                          SI-100          2 X 0.344    111-9 111-25 ZONE 114                                                                                                                SI-100          4 X 0.438    111-1 111-8 111-40 111-39                        16                                                                                                                                    SI-236          3 X 0.438    111-40 111-41 SI-236          4 X 0.438    111-26 111-39 EL. 93 5 SI-E-236-CCBA-3 111-38                            111-37 B                    111-36 SI-236 W
H-1                                                                                REFERENCE DRAWINGS 111-35                                                      02-P-SIF-203 SI-236  C H-2 111-34 SI-236  B                              SI-E-236-CCBA-4 H-3 SI-100  B 111-33 111-21        H-A 111-32 111-31                                      111-20 111-30                                                                111-19 UV647 111-29                          111-22 SI-100  B 111-23                                            H-B ZONE 110                                                        111-17 111-28                                                      111-42                          111-16 111-24        111-18                                                                      B W SI-100 3INT-ISI-2 Rev. 4 EL. 88 6 111-27                                                          111-15                                                                      H-37 111-26                                                                                                    EL. 85    111-5 111-25          EL. 85 111-14              111-6 SI-A-100-CCBA-4 ZONE 110 111-2      111-1 B
111-9                                                                  SI-100 W 111-13 H-30 111-7 111-12                                      111-8 111-4      111-3            ZONE 108 111-11          111-10          SI-A-100-CCBA-2 UNIT 2                ZONE 111 197 of 210                                                                                                                                                                                                    HPSI DISCHARGE WEST WRAP
 
LINE #    DIA X SCH      FROM      TO SI-100    4 X 0.438      112-1    112-6 SI-101    2 X 0.344      112-7  112-20 SI-102    2 X 0.344    112-21  112-32 ZONE 113                                SI-176    4 X 0.438    112-33  112-44 112-20                                                            SI-176    3 X 0.438    112-45  112-46 ZONE 115 SI-A-101-CCBA-2 14      112-46      SI-E-176-CCBA-3                                                                                                        B B                                                                SI-101 SI-101                                      112-16 112-45                                                                                                              H-D H-A                                        112-17 B                                                                                            B            112-18                  UV-617 112-44                                                          SI-101 W SI-176                                                                                    W H-3                                                                                              H-C EL 93-5 112-13 112-42                        112-43                                                                    112-19                                                  112-12 112-41                        SI-E-176-CCBA-4                                                                                    112-15 112-14 112-40                                                                                                                                                            EL 88-9 B                                  112-11 112-39                        SI-176 B 112-35                                                                                                  SI-101 H-1                              112-29                                                                                            112-10 112-30                                                                  H-B SI-176 B        112-36 UV-627 H-2                                      ZONE 113 112-26 112-38 112-31                                                        112-25 112-34 112-24 112-37 112-33 3INT-ISI-2 Rev. 4 112-27                            112-23 112-32 112-28        SI-102 B SI-A-102-CCBA-2            W SI-102 H-A                    H-B B                                                        112-22 112-9 112-8                                          EL 92-6 112-7                              112-21                            112-1 112-6                            112-2 112-5 SI-100 B W
H-17                                                        ZONE 108 112-4                        112-3 REFERENCE DRAWINGS SI-A-100-CCBA-4 02-P-SIF-204 UNIT 2              ZONE 112 198 of 210 HPSI DISCHARGE EAST WRAP
 
LINE #                  DIA X SCH        FROM          TO SI-108                  2 X 0.344      113-7        113-15 SI-107                  4 X 0.337      113-1        113-6                                  REFERENCE DRAWINGS SI-109                  2 X 0.344      113-21        113-27                                                                                                                                                    B SI-157                  4 X 0.438      113-33        113-49                                      02-P-SIF-204                                                                                113-48                W SI-157 SI-157                  3 X 0.438      113-50        113-51                                                                                                          113-49 H-6 SI-157                  2 X 0.344      113-16        113-20                                                                                                    113-50 SI-176                  2 X 0.344      113-28        113-32                                                                                                                                                113-47 113-51 113-46 ZONE 115              13                                        113-45 B
POINT A                                                                                              SI-157                      113-44 CONTINUED THIS DRAWING                                                                                            H-5 SI-E-157-CCBA-4                    A                                                                                                                                SI-157C 113-16              UV-616                                                                                          H-4 B    113-36                                                                                                                  113-43 113-17 SI-157                                                                113-15                                                    113-42 113-35 H-1 113-18 113-41 113-19 113-34                                                                                113-13                                                                                113-38 113-20                                                                                                    113-40 113-12 113-39 ZONE 112                                                        B SI-157                                                                                                            EL 86 113-33 W    H-A                                                                                      113-37 W    B        SI-E-157-CCBA-2 SI-176                                                    BSI-108                      EL 88-9                                                  SI-157B H-A                                                          H-A                        113-11                                                      H-9 113-29                                                                                113-14                                                                                            A UV-626                                                                                                                                              POINT A 113-30                                                                                                    113-10                                          SI-E-157-CCBA-4            CONTINUED B                                                                                                                          THIS DRAWING 3INT-ISI-2 Rev. 4                                                                SI-109                                                        SI-B-108-CCBB-2 H-A 113-31            113-28 113-25 113-27                                    113-24 113-26                                113-23 113-22 113-32        SI-E-176-CCBA-2 113-1    BW ZONE 112                                                                                                EL 92-6                    SI-107 SI-B-109-CCBB-2                              H-22 113-9 113-21            113-2 113-8 113-7 ZONE 109 113-6 113-5                B                                                                                        UNIT 2                    ZONE 113 SI-107                                        SI-B-107-CCBB-4 H-24 199 of 210 HPSI DISCHARGE 113-3                                                        EAST WRAP 113-4 EL 84-6
 
LINE #                        DIA X SCH          FROM        TO SI-218                        3 X 0.438        114-1      114-11 SI-236                        3 X 0.438        114-12      114-23 REFERENCE DRAWINGS 02-P-SIF-103 114-20                  114-19 EL 93-5 114-8 114-9 SI-E-236-CCBA-3 114-18 114-7                                                          B SI-E-218-CCBA-3                                                                                                          SI-236        114-17 B SI-218              114-6                        114-21                              H-5 H5 114-16 114-5                    EL 93-5 114-4                114-22 114-15 114-14 EL 93-5 3INT-ISI-2 Rev. 4            114-11                                                                                                      V-143 114-13 ZONE 96                            114-3                            114-23 114-12 V-133 114-2                                        ZONE 97                            16 114-1 ZONE 111 15 ZONE 110 UNIT 2        ZONE 114 200 of 210 CONTAINMENT HPSI HEADER LOOP 1A & 1B
 
LINE #                  DIA X SCH          FROM        TO SI-157                  3 X 0.438        115-1      115-12 SI-176                    3 X 0.438        115-13      115-22 REFERENCE DRAWINGS 02-P-SIF-136 ZONE 113 13 115-1 115-14            115-13 EL 93-5 SI-E-157-CCBA-3 14 115-15        ZONE 112 115-17 EL 93-5              115-2                                                                                        115-16 115-3 115-4 B SI-176 115-5 V-123          H-4 B                                        115-21 115-6                      SI-157 V-113                                H-11                                                                                              115-18 EL 89-9 3INT-ISI-2 Rev. 4 115-7                                                                                                                                  115-19 115-20 115-8 SI-E-176-CCBA-3 EL 91-4 115-9 115-12                                              115-22 115-10                  115-11        ZONE 98                              ZONE 99 UNIT 2          ZONE 115 201 of 210 CONTAINMENT HPSI HEADER LOOP 2A & 2B
 
W N        W                                                    B          1) TAG NUMBER: 2MSIAP02 B                                    116-1B 116-1A
: 2) SERIAL NUMBER: INGERSOL RAND S/N 0776-16
: 3) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 W
W                                        B B                              116-1C 116-1D DISCHARGE ZONE 102 ZONE 106 3INT-ISI-2 Rev. 4                                                                  SUCTION DISCHARGE                        116-1  116-2 HEAD STUDS UNIT 2          ZONE 116 202 of 210 HPSI PUMP A
 
W N        W                                                    B B                                    117-1B                1) TAG NUMBER: 2MSIBP02 117-1A
: 2) SERIAL NUMBER: INGERSOL RAND S/N 0776-17
: 3) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 W
W                                        B B                              117-1C 117-1D DISCHARGE ZONE 104 ZONE 107 3INT-ISI-2 Rev. 4                                                                  SUCTION DISCHARGE                        117-1  117-2 HEAD STUDS UNIT 2            ZONE 117 203 of 210 HPSI PUMP B
 
LINE #        DIA X SCH                  FROM            TO SI-106        3 X 0.438                  118-1        118-49 118-48                        118-47        118-46 B
118-27                                        SI-106                                                                                  118-49                                                                                                REFERENCE DRAWINGS W                      B    W                                    ZONE 39 H-18                                                                                                                                118-45 118-28                                              SI-106                                                                                                                                                                                  02-P-SIF-203 W                          V-523                                          118-44 H-23                            118-19 B                                                              77                                                                                02-P-SIF-105 SI-106 118-43 BW 118-20                                    H-14    SI-106 118-42 H-13 A
POINT A CONTINUED THIS DRAWING          118-26                                                                                                                                                                118-41 SI-A-106-CCBA-3 118-40                                      B 118-25                                                                                                                          HV-321                                                          118-33        SI-106 118-18                                                                                                                                      H-26 B  SI-106 EL 92 6                                                                      EL 85 118-17                                                                                                                        W    H-21              B BSI-106                                                        SI-106 118-21                                                                                                                                                                            POINT A 118-34                          H-25        A    CONTINUED BSI-106    H-22                                                                      THIS DRAWING 118-22 118-24                                                                                                                                    H-24                              118-35                                                    118-29 118-39 BSI-106          B                                                                                                                                                                                      SI-106 W 118-23 SI-106                    B W      H-16                                                                                                            118-38                                                                              H-20        B H-15            SI-106                      W    B W                      H-12                          SI-106                                            118-37                                118-36 118-32                                    118-30 W
H-3 118-16                                                                                                                                    118-31                                  C SI-106 B                                  118-5 3INT-ISI-2 Rev. 4                                                                                            SI-106                                                                                                                                                                    H-19 H-11 W                                              118-4 W                      118-6                                          118-3 B                                                                                W    B W    B        SI-106                                                                118-2 SI-106 SI-106          H-4                                            W B H-2 H-5                                                            SI-106 B                                                                                      H-10 W
SI-106        118-7                                                                                                                        HV-604 118-15 H-6                                                                                                      118-1 ZONE 106 118-8                                                                      EL 51-6 118-9 B SI-106 W
118-10                                                                          H-9 EL 46-3 SI-106 B                                                            118-14                                                                                                                      UNIT 2                              ZONE 118 W
H-7 204 of 210                                                      C                                                                      118-13                                                                                                HPSI A LONG TERM SI-106 H-8                                                                        SI-A-106-CCBA-3                                                                                            RECIRCULATION 118-11                                            118-12
 
LINE #            DIA X SCH                  FROM      TO SI-114            3 X 0.438                119-1 119-52 119-27                    W          B                                                        SI-319            2 X 0.344                119-53 119-57 119-28                                                          SI-114 B                                                                                                  H-13 B      SI-114                              119-29                                                                        B SI-114                            C SI-114 H-26 SI-B-114-CCBA-3                                                                                                        SI-319 H-21                                                                                                              H-12                      C                                                          V-509 119-25          SI-319 H-B 119-39                                                                            119-26                                  119-57        H-A                                                      119-53 A                    119-38                                                                          119-24 W    B POINT A                                                                                                                                                                119-56 CONTINUED THIS DRAWING                                              SI-114                                          119-23                                                                                                                        B SI-E-319-CCBA-2                              SI-319 H-17                        EL 87-3 H-J EL 87-3                                                                      119-22 119-33 119-21                                                                                    119-54 119-37                                                        119-32 B                119-20                                                                                SI-319  B 119-36                                                                                                        SI-114 H-G 119-30                          H-27 119-35 SI-114    B                                                                    119-19 B
119-34                H-15                            EL 85-4                        SI-114 SI-114    C                                    W EL 92-6 119-31                              H-10                                                          119-55 H-16 B SI-114            119-18 W                                                                                        119-47 H-9                            119-17 W                                                                                                              V-533            119-48 B                                                                                                                                                      119-46 W            SI-114    119-8                                119-16                                                                  119-50    119-49 B
H-7                                                                                                                                                                SI-B-114-CCBA-3 W        SI-114                                            119-9 119-15                                        ZONE 40                          67 B                                                                                                                                                                                119-45 H-6                                                119-10 SI-114 119-52 3INT-ISI-2 Rev. 4 W      B            H-5                                                                                                                                                                                  119-44 EL 51-6                      119-51 SI-114        119-7 C
SI-114                                                                                        HV331 W                    H-4 B                                                                                                                                          H-8                                                119-43                    119-41 W                B    SI-114      119-6                                                                                                                                  119-11 H-3                                                                                                                                                                                              EL 88                                            A SI-114                                                                                  SI-B-114-CCBA-3                                                                      EL 46-3 119-42                                      POINT A H-2                                                                                                                                                                                                                                                              CONTINUED W    B                        THIS DRAWING 119-12                                                                          119-40 SI-114 119-5 119-14                                                                                                      H-22 EL 46-8                                                                                                                                                                119-13 119-4 B
W SI-114 H-1 119-3                                                                                                                                                                                                                UNIT 2                            ZONE 119 119-2                                                                                                                                                            REFERENCE DRAWINGS HV-609 205 of 210 02-P-SIF-105                                HPSI B LONG TERM 02-P-SIF-204                                RECIRCULATION 02-P-CHF-207 119-1                                  ZONE 107
 
LINE #              DIA X SCH      FROM      TO SI-088            10 X 0.250    120-1 120-19 EL 116-4 120-18 120-17 EL 112 120-19 120-16 120-15 C      120-14 SI-88 H-2 120-13 SI-A-088-GCBC-10                              EL 95-5 120-1 3INT-ISI-2 Rev. 4 120-2 EL 89-9                                                    120-11 EL 91-5 120-12 120-10 21        120-3 120-6                                      120-9 120-4 V-164 CONT ZONE 93                        120-5 120-7 120-8 UNIT 2  ZONE 120 206 of 210                                                                                                                                            CONTAINMENT REFERENCE DRAWINGS 13-P-ZCG-105 SPRAY A
 
LINE #              DIA X SCH      FROM  TO SI-130            10 X 0.250  121-1 121-21 EL 116-4 121-19                          121-21 EL 112 121-18 121-20 121-17 SI-A-130-GCBC-10 121-16 C    W SI-130 H-7 C          121-3 3INT-ISI-2 Rev. 4                                                                                    SI-130                        EL 93-5  121-2 H-3 121-13 121-15 121-12                                                    22 EL 95-5 121-1 121-4                        CONT ZONE 90 121-14 V-165                        121-5 121-6 121-11                                                121-07 121-08 EL 90-5 121-9 121-10 UNIT 2      ZONE 121 207 of 210                                                                                                                                                              CONTAINMENT REFERENCE DRAWINGS 13-P-ZCG-105 SPRAY B


N001-7.03-28 N001-7.03-29 TubesheetChannelheadCross Section 32 Studs 1 x 9 3/4 3/469-1 69-23INT-ISI-2 Rev. 4 155 of 210 UNIT 2 ZONE 70 LPSI PUMP ROOM A SUCTION REFERENCE DRAWINGS02-P-SIF-201SI-241 H-20 V-201 SI-307H-16 SI-67 H-4 70-56 70-58 70-59 70-60 70-6170-63 70-64 70-66 70-65 70-68 70-69 70-4670-44 70-47 70-55 70-53 70-103 70-52 70-5070-4970-10470-106 70-107 70-109 ZONE 76EL. 47 10 EL. 41 10 LPSIPUMP A SUCTION ZONE 94SI-A-307-GCBC-20SI-A-307-GCBC-14SI-A-067-GCBC-16LINE #DIA X SCHFROMTO SI-67SI-241SI-307SI-307 16 X 0.312 18 X 0.312 14 X 0.312 20 X 0.37570-10370-4470-6370-49 70-10970-4770-6970-61SI-A-241-GCBC-18ZONE 102 W W W B B B3INT-ISI-2 Rev. 4 156 of 210 UNIT 2 ZONE 71 LPSI PUMP ROOM AREFERENCE DRAWINGS02-P-SIF-207 V-435SI-87H-3ZONE 76SI-A-087-FCBA-10LINE #DIA X SCHFROMTO SI-78 SI-87 SI-87 10 X 0.365 8 X 0.322 10 X 0.36572-29 72-5 72-872-3272-672-5772-32 72-3074-4572-2972-2772-2672-2372-2472-2172-2072-18 72-1572-1772-1472-1272-11 72-9 72-8 72-6 72-574-5274-5474-45A74-5174-4974-4874-46 74-5774-55 ZONE 83 V-434 HV-306SI-87 H-2SI-78H-1SI-87 H-1 SI-87 H-11SI-A-078-FCBA-10SI-A-087-FCBA-10LPSIPUMP ADISCHARGEEL 46-9TOG EL.51-6EL 62-9EL 62-9W DISCHARGE SI-78 H-3 W W W B B C B B B3INT-ISI-2 Rev. 4 157 of 210 UNIT 2 ZONE 72 LPSI PUMP A REFERENCE DRAWINGSN001-11.01-3672-3A W 72-3C W 72-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
SECTION 11.0 Terms and Definitions 3INT-ISI-2 Rev. 4  208 of 210
DISCHARGEZONE 71 SUCTIONZONE 70N001-11.01-50 NOTES:1) TAG NUMBER: 2MSIAP012) SERIAL NUMBER: 0876-40 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 158 of 210 UNIT 2 ZONE 73 LPSI PUMP ROOM B SUCTION REFERENCE DRAWINGS 02-P-SIF-202 V-200C/L EL. 41 10LPSIPUMP B SUCTIONSI-B-308-GCBC-20LINE #DIA X SCHFROMTOSI-308SI-308SI-194 SI-34 14 X 0.312 20 X 0.375 18 X 0.312 16 X 0.31271-6371-4971-44 71-105 71-69 71-61 71-4771-111SI-308 H-12 SI-308 H-1371-50 71-10571-10771-49 71-108 71-11071-4671-44 71-5271-111 71-4771-53 71-55 71-5671-5871-59 71-60 71-6171-64 71-65 71-63 71-66 71-6871-69SI-B-308-GCBC-14SI-B-194-GCBC-18 SI-34 H-4SI-B-034-GCBC-16 ZONE 95 ZONE 79 ZONE 104 W W B B B3INT-ISI-2 Rev. 4 159 of 210 UNIT 2 ZONE 74 LPSI PUMP ROOM BREFERENCE DRAWINGS02-P-SIF-208 V-447LINE #DIA X SCHFROMTOSI-129SI-129SI-123 8 X 0.322 10 X 0.365 10 X 0.365 73-5 73-873-2773-675-5173-30 73-28 75-39 73-27 73-25 73-24 73-21 73-22 73-19 73-17 73-15 73-1273-14 75-48 75-4075-51 75-49 ZONE 86 V-446 HV-307 SI-129 H-5 SI-129H-6SI-129 H-1SI-B-123-FCBA-10SI-B-129-FCBA-10 LPSI PUMP B DISCHARGE EL 46-9EL 62-9SI-129 H-4 73-9 73-8EL 62-9ZONE 79 75-46 75-45 75-43 75-42 73-673-5SI-129 H-2 SI-129H-3 73-30 DISCHARGE 73-8573-11 W W W B C C B B C3INT-ISI-2 Rev. 4 160 of 210 UNIT 2 ZONE 75 LPSI PUMP B REFERENCE DRAWINGSN001-11.01-3673-3A W 73-3C W 73-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 74 SUCTIONZONE 73N001-11.01-50 NOTES:1) TAG NUMBER: 2MSIBP012) SERIAL NUMBER: 0876-41 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 161 of 210 UNIT 2 ZONE 76 CONTAINMENT SPRAY PUMP ROOM A SUCTION REFERENCE DRAWINGS 02-P-SIF-201 V-157SI-9 H-4EL. 41 10 CONTAINMENTSPRAY PUMP A SUCTIONLINE #DIA X SCHFROMTOSI-067SI-067SI-009SI-009 16 X 0.312 14 X 0.312 14 X 0.312 18 X 0.31270-11070-113 80-1 80-570-11180-1680-480-13 02-P-SIF-207 V-18470-111 72-35 72-33 70-11470-110 70-113 80-19 80-18 80-1780-1680-1080-2080-980-11 80-8 80-7 80-2 80-1SI-67 H-3 SI-67 H-2SI-67 H-1 ZONE 70 ZONE 71 ZONE 82 EL. 70EL. 47 10SI-A-009-GCBC-18SI-A-078-FCBA-10SI-07810 X 0.36572-3372-35SI-A-067-GCBC-14 W80-1380-12 80-6 80-5 80-4 80-3ZONE 102 W B B B B3INT-ISI-2 Rev. 4 162 of 210 UNIT 2 ZONE 77 CONTAINMENT SPRAY PUMP ROOM A DISCHARGE REFERENCE DRAWINGS 02-P-SIF-207LINE #DIA X SCHFROMTOSI-079SI-079SI-082 8 X 0.322 10 X 0.365 10 X 0.365 82-1A 82-182-31-82-2782-35 HV-684SI-A-082-FCBA-10 V-485 82-27 82-2482-22 82-20 82-2182-1982-18 82-1782-13 82-682-2382-31 82-16 82-12 82-1482-11 82-10 82-582-9 82-8 82-7 82-4 82-3SI-79 H-9 SI-79 H-5SI-79 H-8 SI-79 H-6 SI-79 H-7SI-79 H-3SI-79 H-2 SI-79 H-1SI-79 H-4SI-A-079-FCBA-10SI-A-079-FCBA-10SI-82 H-282-33 82-34 82-32 82-35CONTAINMENTSPRAY PUMP ADISCHARGE ZONE 82 ZONE 83TOGEL 51-6EL 70W EL 70EL 53-6EL 58-682-15 82-1A 82-1 82-2 82-2682-2582-28 82-29 W W W W W B B C B B B B B B C3INT-ISI-2 Rev. 4 163 of 210 UNIT 2 ZONE 78 CONTAINMENT SPRAY PUMP A REFERENCE DRAWINGSN001-11.01-3680-3A W 80-3C W 80-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 77 SUCTIONZONE 76 NOTES:1) TAG NUMBER: 2MSIAP032) SERIAL NUMBER: 0876-42 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 164 of 210 UNIT 2 ZONE 79 CONTAINMENT SPRAY PUMP ROOM B SUCTION REFERENCE DRAWINGS 02-P-SIF-202 V-185CONTAINMENTSPRAY PUMP B SUCTIONLINE #DIA X SCHFROMTOSI-033SI-033SI-034SI-034 14 X 0.312 18 X 0.312 14 X 0.312 16 X 0.312 81-1 81-581-1571-10381-4 81-12 71-101 71-104 02-P-SIF-208 71-104SI-B-033-GCBC-18SI-12310 X 0.36573-3173-33 V-158 73-3381-19 81-1881-17 81-16 81-981-8 81-15 81-3 81-171-103 71-10171-10073-31SI-33 H-4SI-34H-3SI-34H-1 SI-34 H-6SI-B-034-GCBC-14SI-B-033-GCBC-14SI-B-034-GCBC-16SI-B-123-FCBA-10 ZONE 73ZONE 74 ZONE 85 EL 70EL 41-10EL 47-10 81-5 81-281-481-6 81-7 81-1281-1081-11 ZONE 104 W B B B C3INT-ISI-2 Rev. 4 165 of 210 UNIT 2 ZONE 80 CONTAINMENT SPRAY PUMP ROOM B DISCHARGE REFERENCE DRAWINGS 02-P-SIF-208LINE #DIA X SCHFROMTOSI-119SI-119SI-147 8 X 0.322 10 X 0.365 10 X 0.365 83-1A 83-183-30-83-26 83-34 V-484SI-119 H-7SI-B-119-FCBA-10 HV-689SI-B-147-FCBA-10SI-B-119-FCBA-10 83-183-1183-2 83-1A 83-3 83-5 83-12 83-4 83-6 83-7 83-1383-9 83-14 83-34 83-3283-8 83-10 83-3383-31 83-15 83-30 83-16 83-18 83-1783-19 83-2083-2283-2383-2483-2583-26CONTAINMENTSPRAY PUMP BDISCHARGE ZONE 86 ZONE 85 EL 58-6TOG EL 51 6EL 70EL 7083-21EL 63-0EL 53-6EL 49-2SI-119 H-9SI-119 H-8 SI-119 H-6 SI-119H-2 SI-119 H-1 SI-119H-3 SI-119 H-4 SI-119 H-5 WSI-147 H-183-60 W W W B B C C C B B C B C3INT-ISI-2 Rev. 4 166 of 210 UNIT 2 ZONE 81 CONTAINMENT SPRAY PUMP B REFERENCE DRAWINGSN001-11.01-3681-3A W 81-3C W 81-3B WVIEW LOOKING DOWNWELDED SUPPORT FEETAND SUPPORT COLUMNSTWENTY-FOUR 2 DIAMETER STUDS(21 @ 9.5 LONG AND 3 @ 8.88 LONG)
DISCHARGEZONE 80 SUCTIONZONE 79 NOTES:1) TAG NUMBER: 2MSIBP032) SERIAL NUMBER: 0876-43 INGERSOL RAND B B B3INT-ISI-2 Rev. 4 167 of 210 UNIT 2 ZONE 82 SHUTDOWN COOLING HEAT EXCHANGER ROOM AREFERENCE DRAWINGS 02-P-SIF-207 HV-685LINE #DIA X SCHFROMTOSI-078SI-078SI-079 10 X 0.365 20 X 0.500 10 X 0.36572-3672-4982-28 72-48 72-52 72-61 HV-678SI-A-078-FCBA-20SI-78 H-5 72-52 72-4972-49A72-4872-4772-4572-44 72-42 72-41 72-3972-38 72-3672-5072-49B72-6072-61 72-5872-5772-55 72-5482-3082-2982-28SI-79 H-10 CS/SSSI-A-078-FCBA-10SI-A-079-FCBA-10 ZONE 77 ZONE 76 SDCHX A INLETNOZZLESI-78 H-4 W W W B B C3INT-ISI-2 Rev. 4 168 of 210 UNIT 2 ZONE 83 SHUTDOWN COOLING HEAT EXCHANGER ROOM AREFERENCE DRAWINGS 02-P-PCF-201LINE #DIA X SCHFROMTOSI-070SI-070SI-070 20 X 0.500 16 X 0.375 20 X 0.500 74-174-2174-27 74-19 74-25 74-27 V-458SI-89 H-574-98SI-A-090-FCBA-14 02-P-SIF-203 02-P-SIF-207SI-082SI-087SI-089 10 X 0.365 10 X 0.365 10 X 0.36582-3674-5874-77 82-38 74-74 82-44SI-08910 X 0.36582-3982-40SDCHX A OUTLET NOZZLEZONE 77ZONE 94 ZONE 94ZONE 71SI-89 H-3SI-87H-4SI-87 H-5SI-87H-8SI-87H-7SI-87H-6SI-87 H-9SI-82 H-1SI-89 H-2SI-89H-1 WSI-90 H-1 W SI-90 H-2SI-90H-4SI-70 H-6SI-70 H-7 SI-70 H-2SI-70 H-3 WSI-70H-1 W74-2774-7574-2574-2474-2274-1974-104A74-2174-1874-1674-1574-9674-1374-1074-7674-1274-974-774-674-474-374-174-9774-5874-6374-6174-6774-11874-11774-11274-11474-11574-10974-11174-10874-10674-10574-6474-6074-6674-6974-7074-7174-7374-7482-3982-4282-3682-3882-3774-7774-10074-9974-8674-8074-7874-8374-8474-8182-4382-4482-4182-4074-87 HV-657 HV-687 HV-686 HV-688 V-460SI-A-070-FCBA-20SI-A-087-FCBA-10 SI-E-131-FCBA-6SI-A-089-FCBA-10SI-A-082-FCBA-10 CS/SSSI-09014 X 0.37574-10574-118SI-131 6 X 0.28074-9774-10074-157 W W W W W W W B B A B B C B B C B B C B B C B B C B3INT-ISI-2 Rev. 4 169 of 210 UNIT 2 ZONE 84 SHUTDOWN COOLING HEAT EXCHANGER A 74-121 74-122 74-12474-123INLET NOZZLE - ZONE 82OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83NOTES:1)    TAG NUMBER: 2MSIAE012)    SERIAL NUMBER: S-18343        (ENGR & FABRICATORS)3)  NATIONAL BOARD NUMBER 17104)   ZERO DEGREE FOR GIRTH WELDS      IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-25 30 deg.30 deg.Inconel Weld SA-105 Clad 74-121 75-122DETAILN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 173INT-ISI-2 Rev. 4 170 of 210 UNIT 2 ZONE 85REFERENCE DRAWINGS 02-P-SIF-208 HV-694LINE #DIA X SCHFROMTOSI-119SI-123SI-123 10 X 0.365 10 X 0.365 20 X 0.50083-2773-3473-48 73-63 73-46 73-54 HV-679SI-119 H-14SI-B-123-FCBA-10SI-119H-13SI-119 H-11SI-119 H-10 SI-123 H-2SI-123 H-8SI-123 H-5SI-123 H-6SI-123 H-7 73-62 73-63 73-60 73-5973-57 73-56 83-2983-2873-34 83-2773-36 73-37 73-4073-39 73-42 73-45 73-45A 73-43 73-46 73-48 73-4773-64 73-49 73-51 73-52SI-B-123-FCBA-20SI-B-119-FCBA-1073-54 CS/SSZONE 80 ZONE 79SDCHX BINLET NOZZLET OF EL 70T OF EL 70 EL 75EL 75EL 80-2EL 80-2SHUTDOWN COOLING HEAT EXCHANGER ROOM BSI-123 H-1 W W W W W W B B B B C B B C B B3INT-ISI-2 Rev. 4 171 of 210 UNIT 2 ZONE 86 SHUTDOWN COOLING HEATREFERENCE DRAWINGS 02-P-PCF-201LINE #DIA X SCHFROMTOSI-072SI-072SI-072 20 X 0.500 16 X 0.375 20 X 0.500 75-175-1975-25 75-17 75-23 75-26 HV-696SI-B-147-FCBA-10SI-129SI-131SI-134 10 X 0.365 6 X 0.280 10 X 0.36575-5375-8175-62 75-61 75-84 75-72SI-134SI-135 10 X 0.365 14 X 0.37583-3875-87 83-43 75-100SI-72 H-3SI-72 H-4SI-72 H-2SI-72 H-1 WSI-72 H-12 W SI-72 H-5 SI-72 H-6 SI-147 H-2SI-134 H-8SI-134 H-3SI-134 H-2SI-134 H-1 SI-134H-6 SI-134 H-5 SI-134 H-7SI-135 H-1SI-135 H-3 SI-135 H-2SI-129 H-11SI-129 H-10 SI-129 H-12 SI-129H-9 SI-129H-8 SI-129H-7 SI-129H-1375-5875-6075-1475-2675-2575-2375-9075-5575-2275-2075-8875-1975-9175-9975-5675-1775-1675-8775-9675-10075-1375-9375-8175-8275-1275-8375-11A75-1175-875-9775-8475-975-7275-7175-6975-6875-775-6675-6575-6375-575-6275-275-475-175-5483-3675-5375-6175-9483-3783-3883-3983-4283-4383-3583-4083-41 ZONE 80 SDCHX BOULLETNOZZLE ZONE 74 ZONE 95ZONE 95SI-B-129-FCBA-10SI-B-135-FCBA-14SI-B-072-FCBA-20 HV-695 HV-693 V-464 V-455 HV-658SI-B-134-FCBA-1002-P-SIF-20402-P-SIF-208 EXCHANGER ROOM B75-94ASI-14710 X 0.36583-3583-37SI-E-131-FCBA-6 W W W W W W W W W W B B C B C B C C B C B B C C C C C C C C B C B B CSI-B-134-FCBA-103INT-ISI-2 Rev. 4 172 of 210 UNIT 2 ZONE 87 SHUTDOWN COOLING HEAT EXCHANGER B75-7675-7775-79 75-78INLET NOZZLE - ZONE 85OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86NOTES:1)    TAG NUMBER: 2MSIBE012)    SERIAL NUMBER: S-18344        (ENGR & FABRICATORS)
REFERENCE DRAWINGS:N001-7.03-020 N001-7.03-253)  NATIONAL BOARD NUMBER 17114)  ZERO DEGREE FOR GIRTH WELDS      IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.
30 deg.30 deg.Inconel Weld SA-105 Clad 75-76 75-77DETAILN001-11.01-209 TUBE SHEETCHANNEL HEAD CROSS SECTION 1/8 CLAD 1-7/1664 STUDS1.5 X 173INT-ISI-2 Rev. 4 173 of 210 UNIT 2 ZONE 88 EAST WRAPREFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-072 SI-072 SI-072 12 X 0.375 12 X 1.125 20 X 0.50078-2 78-13 75-3578-1178-1475-38SI-E-174-CCBA-12 SI-073 SI-073 SI-155 12 X 0.375 12 X 1.125 12 X 1.12579-1 79-13 78-1679-1179-1478-21 SI-172 SI-174 10 X 0.365 12 X 1.12578-10C 79-16 78-10D79-21 02-P-SIF-208 17 1879-179-779-679-879-1079-1379-1179-1479-1679-1779-1879-1979-2079-2175-3875-3675-3775-3578-1178-10K78-10J78-1378-10C78-2078-10B78-1978-10A78-9J78-878-2178-1878-1778-10D78-1678-9G78-9F78-778-1478-9K78-9C78-678-978-578-378-2 ZONE 89 ZONE 98ZONE 99 SI-73 H-1SI-72 H-16SI-72 H-17SI-72 H-15SI-72 H-11SI-72 H-14SI-72 H-13 SI-72 H-18SI-72H-22SI-72 H-21 SI-72 H-20 w SI-73 H-3 SI-73 H-2 UV-615 HV-690 UV-625SI-B-073-FCBA-12SI-B-072-FCBA-20SI-E-155-CCBA-12SI-E-172-FCBA-10SI-72H-19ZONE 95 W W W C C B B C B B C C C C B C C3INT-ISI-2 Rev. 4 174 of 210 UNIT 2 ZONE 89 EAST WRAPREFERENCE DRAWINGS02-P-SIF-202 SI-173 H-1 w HV-690SI-E-173-GCBC-16 2602-P-SIF-208 SI-194 H-13 SI-194H-12SI-194 H-14SI-194 H-2371-8171-8471-8571-87A71-9471-771-7171-9371-7371-7571-9171-7871-9071-1871-7071-7671-7971-8271-1671-8871-571-1471-1171-871-471-271-1ZONE 88TOG87-3SI-B-038-GCBC-12SI-B-194-GCBC-18SI-B-194-GCBC-16 ZONE 101 ZONE 95 UV-656 V-442LINE #DIA X SCHFROMTOSI-38 SI-173 SI-173 12 X 0.250 16 X 0.312 10 X 0.250 71-90 71-70 71-7371-9471-7171-87A SI-173 SI-194 10 X 0.365 16 X 0.312 71-8871-1    11SI-19418 X 0.31271-1371-1871-21071-1371-1071-208 W W B B B B C3INT-ISI-2 Rev. 4 175 of 210 UNIT 2 ZONE 90 EAST WRAP REFERENCE DRAWINGS 02-P-SIF-202 24 02-P-SIF-208 ZONE 101 V-206UV-67685-1185-985-690-51SI-B-308-GCBC-24SI-B-030-HCBA-24EL 73-7ZONE 104LINE #DIA X SCHFROMTO SI-030 SI-134 SI-13424 X 0.37510 X 0.3658 X 0.32285-6 83-53 83-58 85-8 83-57 83-59SI-30824 X 0.56285-985-11 SI-134 H-10 UV-671 ZONE 95 SI-134H-983-5983-5383-5483-5883-5583-5683-57SI-B-134-FCBA-10EL 95W 22 ZONE 121SI-B-130-GCBC-1090-4190-4290-4390-4490-4590-4690-40SI-130 H-2SI-13010 X 0.36590-4290-46SI-1308 X 0.32290-4090-41 B B B90-503INT-ISI-2 Rev. 4 176 of 210 UNIT 2REFERENCE DRAWINGS 02-P-SIF-207 UV-645LINE #DIA X SCHFROMTOSI-070SI-070SI-070SI-07120 X 0.50012 X 0.37512 X 1.12512 X 0.375 74-42 76-2 76-1374-10374-4476-1176-1477-11SI-71 H-3SI-A-070-FCBA-12SI-07112 X 1.12577-1377-14SI-07110 X 0.36577-10C77-10DSI-20212 X 1.12576-1676-21 SI-22012 X 1.12577-1677-21 UV-635 HV-69176-1176-2 76-3 76-5 76-6 76-7 76-876-1376-1076-1476-1676-1776-1876-1976-2076-21SI-E-202-CCBA-12SI-A-071-FCBA-12SI-E-220-CCBA-12SI-A-070-FCBA-2074-4277-7 74-43 74-10374-104 74-102 77-8 77-16 77-13 77-1177-2177-10C 77-20 77-10D 77-19 77-10B77-1877-10A 77-14 77-10 77-17 SI-70 H-10SI-71 H-2SI-70 H-13SI-70 H-11 W SI-70 H-16 WSI-70 H-14SI-70 H-9 W SI-70 H-15 74-44ZONE 94 ZONE 97 ZONE 96TOGEL 87-3TOGEL 87-3TOGEL 87-3TOGEL 87-3ZONE 92SI-70 H-12 W 19 20 ZONE 91WEST WRAP B B B B C C B B B C B3INT-ISI-2 Rev. 4 177 of 210 UNIT 2 ZONE 92 WEST WRAP REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-002 SI-239 SI-23912 X 0.25010 X 0.25010 X 0.365 70-85 70-70 70-8370-98 70-82A-SI-241 SI-24116 X 0.31218 X 0.31270-1 70-1670-1470-22 02-P-SIF-201 2770-97 SI-239 H-1SI-241 H-12SI-241 H-21 wHV-691SI-A-002-GCBC-12 02-P-SIF-20770-9570-9470-8970-9270-8870-8670-1370-9170-2070-1970-1470-1770-1170-1070-7370-2270-8570-16A70-870-1670-770-7070-7770-570-7170-7470-7970-7670-8070-82A70-8370-470-270-9870-1B70-1A70-1 SI-239 H-2SI-239 H-3 wSI-241 H-14SI-241 H-15 SI-241 H-11 SI-241H-9EL. 84-3EL 78-9EL 87-3EL 87-3ZONE 100ZONE 94UV-655 V-256EL 70SI-E-239-GCBC-10SI-A-241-GCBC-16 ZONE 91 W W C B C B B C B B C3INT-ISI-2 Rev. 4 178 of 210 UNIT 2 ZONE 93 WEST WRAP 23 ZONE 100V-205 UV-67484-1184-984-693-51SI-A-307-GCBC-24EL 73-7SI-A-007-HCBA-24 ZONE 102REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-207LINE #DIA X SCHFROMTOSI-089SI-089SI-007 8 X 0.322 10 X 0.365 24 X 0.37582-6682-55 84-682-6782-6584-8SI-30724 X 0.56284-984-11 UV-672ZONE 94SI-89 H-1182-5582-5682-5782-5882-5982-6182-6282-6082-6382-6482-6582-6682-67SI-89H-10 SI-89 H-13SI-89H-12 WEL 92-6EL 84-8TOGEL 87-3TOGEL 87-3SI-A-089-FCBA-10 21ZONE 12093-4393-4193-4093-42SI-A-088-GCBC-10SI-08810 X 0.36593-4293-43SI-0888 X 0.32293-4093-41 B C B BEL 89-993-503INT-ISI-2 Rev. 4 179 of 210 UNIT 2 ZONE 94 A TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNELREFERENCE DRAWINGS; 02-P-SIF-201 02-P-SIF-207LINE #DIA X SCHFROMTO SI-070 SI-089 SI-24120 X 0.50010 X 0.36518 X 0.312 74-28 82-45 70-2374-4182-5470-43 SI-89 H-7SI-A-241-GCBC-18SI-70H-8 W82-4582-4682-4982-4782-4882-5082-5182-5282-5382-54SI-89 H-8SI-89 H-9SI-89H-670-3470-3370-3070-3170-2870-2570-2770-2470-2370-4070-4170-4370-3670-3770-39SI-241 H-8 SI-241H-17SI-241 H-7 SI-241 H-4SI-241 H-3SI-241 H-2SI-241 H-5SI-241 H-674-3074-2874-3174-3274-3474-3574-3774-3874-40SI-70 H-5 W SI-70 H-474-41SI-A-089-GCBC-10SI-A-070-FCBA-20EL 72EL 89-4EL 92-6EL 64EL 41-10EL 90-2ZONE 83ZONE 91 ZONE 93ZONE 92 ZONE 70EL 88ZONE 83 W W W W W W W B B B B B B B B C B B B B B B3INT-ISI-2 Rev. 4 180 of 210 UNIT 2 ZONE 95 B TRAIN MISC. PIPE CHASES AND 88 PIPE TUNNELREFERENCE DRAWINGS; 02-P-SIF-202 02-P-SIF-208LINE #DIA X SCHFROMTOSI-072SI-134SI-194 20 X 0.500 10 X 0.365 18 X 0.31275-2783-4471-19 75-33 83-52 71-43 SI-194 H-6 WSI-134 H-12SI-B-134-FCBA-1071-4071-3971-3771-3671-2671-3471-4371-3371-3271-2571-4171-3071-2971-2371-2771-2271-2071-19 SI-194 H-7 SI-194H-2 SI-194 H-8SI-194 H-15SI-194 H-4 SI-194 H-10SI-194 H-21 SI-194 H-9 SI-194 H-11SI-194 H-583-4783-4483-4583-4683-4983-4883-5083-5183-52 SI-134H-1175-3375-3175-3075-2975-27SI-72H-8SI-72 H-10SI-72H-9SI-72 H-7EL 92-6ZONE 88EL 72ZONE 86EL 88ZONE 86 ZONE 90EL 95EL 92-1ZONE 73EL 41-10EL 89-9ZONE 89SI-B-072-FCBA-20SI-B-194-GCBC-18 SI-134H-4 W W W W W W W W B B C B B C B B B B B B B B B B C C3INT-ISI-2 Rev. 4 181 of 210 UNIT 2 ZONE 96CONTAINMENT LPSI HEADER TO LOOP 1A V-542 ZONE 91LINE #DIA X SCHFROMTO SI-202 SI-20212 X 1.12512 X 1.312 76-22 76-2776-2576-4776-25SI-202 H-17 SI-202 H-12 WSI-E-202-CCBA-12 19REFERENCE DRAWINGS 02-P-SIF-103 A A SI-202 H-7 SI-202H-676-2876-3976-4076-4176-4276-4476-4376-4576-4676-47SI-202 H-18 SI-202 H-2 SI-202H-3 SI-202 H-4SI-202 H-16SI-202 H-176-3076-3176-2776-3276-3476-2976-3576-3776-3376-3876-3676-2376-2276-24SI-E-202-CCBA-12 ZONE 23FL EL 100EL 89-9V-134ZONE 11476-79SI-202 H-15 B C B B B B B B B B B3INT-ISI-2 Rev. 4 182 of 210 UNIT 2 ZONE 97CONTAINMENT LPSI HEADER TO LOOP 1B V-144 ZONE 91LINE #DIA X SCHFROMTOSI-220SI-220 12 X 1.125 12 X 1.31277-2277-27 77-25 77-47SI-E-220-CCBA-12REFERENCE DRAWINGS 02-P-SIF-103 A77-28C 20 A ZONE 24EL 89-9SI-220 H-18 SI-220 H-15SI-220 H-20 SI-220 H-17 SI-220 H-13SI-220 H-12SI-220 H-1077-28B77-3877-3977-3177-3477-3077-2877-28A77-2977-28D77-3777-3577-3677-3277-3377-4077-5277-2377-2277-38A77-2577-2477-2777-4677-4577-46B77-46A77-4277-4177-4477-4377-4777-46F77-46D77-46C77-46G77-46ESI-220 H-24 SI-220 H-8SI-220 H-7SI-220 H-23SI-220 H-5SI-220 H-27SI-220 H-9 SI-220H-19 V-543SI-E-220-CCBA-12 SI-220 H-1ZONE 11477-83 W W W B B B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 183 of 210 UNIT 2 ZONE 98CONTAINMENT LPSI HEADER TO LOOP 2AV-114 ZONE 88LINE #DIA X SCHFROMTO SI-155 SI-15512 X 1.12512 X 1.312 78-22 78-2778-2578-47SI-E-155-CCBA-12REFERENCE DRAWINGS02-P-SIF-13678-32 17SI-155 H-7 SI-155H-2SI-155 H-6 SI-155 H-578-3378-3578-3478-3878-3978-3778-4278-3678-4078-4178-4478-4378-4578-4678-4778-3078-2978-2878-2578-2778-2478-2378-2278-31 ZONE 25V-540 FL EL100EL 89-9ZONE 11578-78 W W B B B B3INT-ISI-2 Rev. 4 184 of 210 UNIT 2 ZONE 99CONTAINMENT LPSI HEADER TO LOOP 2B ZONE 88LINE #DIA X SCHFROMTO SI-174 SI-17412 X 1.12512 X 1.312 79-23 79-2779-2579-47REFERENCE DRAWINGS 02-P-SIF-136 18SI-174 H-12V-541 ZONE 26SI-174 H-11 SI-174 H-5SI-174 H-4SI-174H-10 SI-174 H-13 SI-174 H-8 W79-2379-2579-4179-2779-3579-3479-3679-3779-4279-3879-3979-4079-4479-4379-4579-4679-47 V-124EL 93-5SI-E-174-CCBA-12ZONE 11579-70 W W B C B B C B B3INT-ISI-2 Rev. 4 185 of 210 UNIT 2 ZONE 100CONTAINMENT LPSI TRAIN A SUCTION ZONELINE #DIA X SCHFROMTO SI-007 SI-24124 X 0.37516 X 0.31284-270-116 84-370-119 27V-673SI-241H-1984-5 W84-3SI-A-007-HCBA-24 23 SI-369H-1 W84-270-13470-13270-13170-12870-12270-12970-12670-12570-11770-12370-119 70-12070-121 V-653PSV-17970-116 92ZONE 93SI-A-241-GCBC-16SI-A-369-GCBC-10SI-24116 X 1.59470-12070-121SI-36910 X 0.25070-12270-132 SI-3696 X 0.28070-134-REFERENCE DRAWINGS 02-P-SIF-105 02-P-SIF-15113-P-ZCG-112 ZONE 21 B B C3INT-ISI-2 Rev. 4 186 of 210 UNIT 2 ZONE 101CONTAINMENT LPSI TRAIN B SUCTIONLINE #DIA X SCHFROMTO SI-030 SI-19424 X 0.37516 X 0.31285-271-112 85-371-121 26 V-675 SI-194 H-2285-5 W85-3SI-A-030-HCBA-24 24PSV-189 ZONE 90SI-A-194-GCBC-16SI-A-368-GCBC-10SI-19416 X 1.59471-12271-123SI-36810 X 0.25070-12471-143SI-3686 X 0.28071-145-REFERENCE DRAWINGS 02-P-SIF-105 02-P-SIF-151 13-P-ZCG-112 ZONE 89 SI-194H-16SI-194 H-26SI-368 H-271-11271-12371-12471-12171-11971-12571-11871-12771-14871-13671-12271-11671-11571-14971-11371-15171-13171-13771-13071-13371-13471-14071-13971-14271-14371-145 ZONE 22UV-65485-2 W W B B C B B3INT-ISI-2 Rev. 4 187 of 210 UNIT 2LINE#DIA/SCHFROMTOSI-30724" x 0.562"84-1284-37SI-30720" x 0.375"84-3984-46 SI-918" x 0.312"80-1484-87SI-810" x 0.250"84-5184-84 REFERENCE DWG'S 02-P-SIF-201 ZONE 93 WEST WRAP84-12V-205EL72'84-14 84-16 H2SI-A-307-GCBC-24" 84-18 84-20 84-22 84-26 84-24 84-5184-2884-2984-31 84-53SI-A-008-GCBC-10"84-55 84-57 84-59 84-61 84-63 84-65 84-67 84-6984-7184-72V-470 84-74 84-75 84-7784-7984-80 84-82 84-84HPSI PUMP #1 84-33 84-87 84-86 SI-A-009-GCBC-18" 84-35 84-37 84-39 84-50V-105 80-15 80-14V-157 ZONE 76CSP SUCTIONSI-A-307-GCBC-20" 84-85 84-41 84-43HV-68384-44 84-46V-201 ZONE 70LPSI "A" SUCTIONCONT. ONCONT. ONCONT. ONSI-307 W 84-34CONT. ON ZONE 103 RWT SUCTION H6 H7 H8 H1 H2 H5 H4 H3 H1 H5SI-008 SI-008 SI-008SI-008SI-009SI-009SI-009SI-307 SI-307 SI-30784-48H15 SI-307 W H3SI-307 W H10 SI-307 H5SI-307ZONE 116 ZONE 102 SAFETY INJECTION PUMPS A TRAIN SUCTION W W W W W W W W W B B B B B B B B B B B B B BSI-008-H002REMOVED PER EDC 94-004663INT-ISI-2 Rev. 4 188 of 210 UNIT 2 86-20 86-14 86-12 86-18 86-16 25 86-27 86-29 86-31V-306 86-5 86-86-23 CH-A-142-HCBA-20" 86-33 86-1 86-35 86 86-10 8 86-86-7 86-3 86-5SI PUMP SUCT.
CH-A-424-GCBC-20"HV531ZONE 102 REFUELINGWATERTANK 86-59 86-57 CH-A-142-HCBA-20" 86-51 86-49 86-47 86-62 86-45 86-4386-41 86-60 86-55 86-53 86-37 ESSENTIAL PIPE TUNNEL 88'AUX BLDG 86-39LINE#DIA/SCHFROMTOCH- 42420" x 0.375"86-186-20CH- 14220" x 0.375"86-2186-59 Reference DWG'S.
02-P-SIF-20102-P-ZYA-925
-21 CONT ON88' PIPE CHASEH20 CH-14270El. 51 6" H14CH-142 H22CH-142 H13 CH-142 H2 CH-424 H3 CH-424 H6CH-424 H8CH-142 H1 CH-424 H4 CH-142 H6 CH-142 H1 CH-142 H3CH-142 H2CH-142 W W ZONE 103 REFUELING WATER SUCTION A TRAIN W W W W W W W B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 189 of 210 UNIT 2LINE#DIA/SCHFROMTOSI-30824" x 0.562"85-1285-37SI-30820" x 0.375"85-3885-49SI-3318" x 0.312"85-5081-13SI-3110" x 0.250"85-5985-80 CH-1503 X 0.216104-1104-5 REFERENCE DWG'S 02-P-SIF -202 ZONE 90EAST WRAP 85-12 85-1485-1885-20 85-22 85-24 85-26 85-2885-59 85-6185-6985-6385-6585-67 85-7185-72V-206V-402 85-7485-7585-77 85-78SI-B-031-GCBC-10" 85-80 85-29 85-3185-3885-3785-50SI-B-033-GCBC-18"V-15881-14V-104 81-13 85-58 85-56 85-5485-52ZONE 79CONT. SPRAYPUMP "B" SUCT.V-200 85-49 85-47 85-46HV-69285-44 85-42SI-B-308-GCBC-20" SI-B-308-GCBC-24" 85-40 85-33 85-3485-36ZONE 105RWT SUCT.T.O.G. EL. 70'6" HPSI PUMP #2 LPSI PUMP"B" SUCT.CONT. ON W H3 H1 H4CONT. ONCONT. ONZONE 73CONT. ON H3H15SI-308 H1 H4 H2H11 H5 H8 H9 H5 SI-308 SI-308SI-308 SI-308 SI-308SI-31 SI-31SI-31 SI-033SI-308SI-308 SI-308ZONE 117 ZONE 104 SAFETY INJECTION PUMPS B TRAIN SUCTIONV-327 104-4 104-5 104-3CH-B-150-GCBC-3104-2104-1 85-16 02-P-CHF-206 W W W W W W W W W W B B B B B B B B B B B B C3INT-ISI-2 Rev. 4 190 of 210 UNIT 2 87-75CH-B-149-HCBA-20"LINE#DIA/SCHFROMTOCH-42520" x 0.375"87-187-18CH-14920" x 0.375"87-1987-75 87-73 87-71 87-69 87-67 87-65 87-63 87-6187-5987-57 87-55 87-53 87-5187-49 87-8887-47 87-86 87-4587-8487-43 87-82 87-41 87-8087-39 87-78 87-37 87-35 87-33 87-31 87-29 EL. 88'70'87-27CH-B-149-HCBA-20" 87-25 87-23 87-2187-76 87-19HV53087-18 87-1487-16 EL 51'6" 87-12CH-B-425-GCBC-20" 87-10 87-8V-305 87-7 87-5 87-3 87-1 ZONE 104 SI-PUMP SUCTIONAUX. BLDG.
88'ESSENTIAL PIPE TUNNEL REFUELINGWATER TANKCONT. ON Reference DWG'S.
02-P-SIF-20202-P-ZYA-925 W W WH21 CH-149 H13CH-149H10 CH-149H12 CH-149 H27CH-149H25 CH-149 H26 CH-149 H2CH-149 H6CH-149 H4CH-149 H5CH-149 H8CH-149 H14CH-149 H3CH-149 H1CH-149 H1CH-425 H6CH-425 H9CH-149 ZONE 105 REFUELING WATER SUCTION B TRAIN W W W W W W W W W W W H7 CH-149 W B B B B B B B B B B B B B B B B B B B3INT-ISI-2 Rev. 4 191 of 210 UNIT 2REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-099SI-100SI-100 4 X 0.337 4 X 0.438 4 X 0.438106-1106-7106-24 106-6106-44106-28 HV-604 SI-A-100-CCBA-4 SI-105 H-BSI-100 H-2SI-99 H-1SI-100 H-9SI-100 H-10SI-100 H-1SI-100 H-8SI-100 H-6 SI-100 H-5 SI-105H-DSI-105 H-C SI-100 H-3 SI-106 H-1 SI-99 H-2106-68106-69106-17106-44106-65106-72106-6106-24106-20106-4106-70106-71106-66106-49106-18106-25106-59106-32106-29106-1106-33106-21106-50106-30106-67106-12106-7106-42106-40106-51106-10106-23106-48106-22106-8106-41106-9106-16106-31106-38106-36106-47106-35106-3106-39106-2106-5106-46106-19106-45106-27106-43106-61106-37106-60106-62ZONE 108 SI-A-105-CCBB-2SI-A-106-CCBA-3 V424 V-404 V-218 UV-666 02-P-SIF-203 SI-100H-15 SI-100H-7106-14106-13106-15106-11 V-476 HV-698106-54106-52106-56106-57106-58106-63106-55106-53106-64 A APOINT A CONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING SI-100 H-34106-26EL 41-2EL 46-3EL 41-2EL 48-10SI-A-105-CCBB-2SI-A-100-CCBA-4SI-100 H-11SI-A-99-CCBB-4SI-1052 X 0.344106-49106-72EL 88SI-1052 X 0.344106-63106-68SI-1063 X 0.438106-45106-48 ZONE 106 HPSI PUMP ROOM A DISCHARGE HPSI A PUMP106-34 EL 51-6106-28SI-100 H-4SI-100 H-16SI-100 H-36 NOTE:    SW = SOCKET WELD SW SW SWZONE 118 SI-105 H-J W W W W W W W W W W W W W W W W W W W W A B C B C B B B B B B C B B C B B B B B B B B3INT-ISI-2 Rev. 4 192 of 210 UNIT 2 ZONE 107 HPSI PUMP ROOM B DISCHARGEREFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-107SI-107SI-107 4 X 0.337 4 X 0.337 3 X 0.438107-1107-23107-68107-41107-27107-71 SI-112 H-DSI-107 H-8 SI-107 H-5SI-107 H-46 SI-107 H-3 SI-107 H-48 SI-107 H-12 SI-107 H-2107-15107-11107-41107-8107-45107-38107-37107-35107-24107-44107-71107-3107-6107-1107-26107-33107-36107-25107-34107-2107-14107-39107-31107-16107-23107-4107-5107-42107-47107-46 ZONE 109SI-B-107-CCBB-4SI-B-107-CCBB-4 V405 HV-609 HV-69902-P-SIF-204 SI-107 H-4107-12107-40107-32107-7107-10107-43107-21107-9POINT A CONTINUEDTHIS DRAWING EL 47-3EL 41-2EL 46-9SI-B-107-CCBA-3SI-B-112-CCBB-2 HPSI B PUMPSI-1122 X 0.344107-42107-65SI-1122 X 0.344107-56107-60SI-1122 X 0.344107-66107-67 DISCHARGE SI-107H-11 SI-107 H-7SI-107 H-6SI-107 H-9SI-107 H-10 V-478107-28107-20107-18107-19107-17107-69107-70107-48107-13107-30107-29107-22107-27107-68SI-112 H-H SI-112 H-G SI-112H-C107-57107-63107-61107-62107-58107-52107-59107-54107-53107-55SI-B-112-CCBB-2 V426 V-219 UV667107-64107-67107-49107-50107-51107-56107-65107-66107-60 APOINT A CONTINUEDTHIS DRAWINGEL 41-2 V400 A EL 44SI-107 H-1EL 46-3EL 48-10EL 51-6NOTE:    SW = SOCKET WELD SW SW SWZONE 119 W W W W W W W W W W W W W W B B B B B B B B C A C C B B B B B B3INT-ISI-2 Rev. 4 193 of 210 UNIT 2 ZONE 108 HPSI DISCHARGE 88 PIPE CHASEREFERENCE DRAWINGSSI-A-100-CCBA-402-P-SIF-203SI-100 H-18108-702-P-SIF-204 02-P-CHF-207EL. 89 4SI-100 H-21SI-100 H-26 SI-100H-29SI-100 H-13SI-100H-12SI-100 H-19 SI-100 H-32SI-100 H-35 SI-100 H-31SI-118 H-S SI-118H-R SI-118 H-P SI-118 H-NSI-118 H-E SI-118H-HSI-118 H-A108-17108-8108-16108-13108-12108-9108-11108-2108-18108-4108-14108-5108-19108-6108-15108-27108-26108-33108-35108-31108-25108-39108-22108-40108-41108-38108-32108-28108-29108-37108-34108-36108-24108-23108-20108-21108-30108-43108-44108-42108-45SI-A-100-CCBA-4 SI-E-118-CCBA-2EL. 89 EL. 922 EL. 92EL. 922 EL. 93 10 V508ZONE 112ZONE 106 CHARGING PUMP AZONE 111108-3108-1108-10 SI-100 H-20LINE #DIA X SCHFROMTOSI-100SI-118 4 X 0.438 2 X 0.344 108-1108-35 108-34 108-45 W W W W W W W W W W W W W W B B C B B B B B B C B B B B B B B B3INT-ISI-2 Rev. 4 194 of 210 UNIT 2 ZONE 109 HPSI DISCHARGE 88 PIPE CHASEREFERENCE DRAWINGS SI-B-107-CCBB-4 02-P-SIF-203SI-107 H-25 SI-107H-26 SI-107 H-35SI-107 H-21 SI-107H-20SI-107 H-14SI-107H-13SI-107H-47SI-107H-16 SI-107H-19SI-107H-15 SI-107 H-34SI-107 H-37 SI-107 H-36109-37109-35109-34109-36109-33109-32109-31109-30109-9109-8109-5109-6109-4109-7109-3109-1109-2109-29109-26109-28109-24109-27109-25109-23109-22109-20109-21109-16109-14109-19109-15109-18109-13109-17109-12109-11109-10109-40109-41109-42109-43 02-P-SIF-204 SI-B-107-CCBB-4EL. 88 6EL. 51 8FROMHPSI B 40EL. 89 4EL. 91EL. 89 4EL. 92 2ZONE 107ZONE 113EL. 93 10LINE #DIA X SCHFROMTOSI-1074 X 0.337109-1109-43ZONE 110 W W W W W W W W W B B C B B C B B C B B B B B3INT-ISI-2 Rev. 4 195 of 210 UNIT 2REFERENCE DRAWINGSSI-B-107-CCBB-4 02-P-SIF-203110-24EL. 88 6ZONE 109 SI-236 H-BSI-107 H-ASI-218 H-1SI-218 H-3SI-218 H-2SI-218 H-B SI-110H-ASI-107 H-42 SI-107H-45SI-107 H-41 SI-107 H-39 SI-103H-DSI-103 H-BSI-103H-E110-15110-29110-30110-31110-22110-28110-65110-17110-21110-66110-25110-12110-16110-23110-19110-10110-14110-20110-18110-5110-9110-13110-11110-3110-8110-53110-7110-1110-4110-6110-2110-35110-36110-37110-39110-32110-34110-38110-33110-57110-56110-60110-62110-59110-58110-61110-63110-47110-45110-46110-50110-49110-48110-64110-51110-42110-41110-40110-44110-43 UV636 UV646UV637ZONE 111ZONE 114ZONE 111EL. 85EL. 93 5EL. 86 9EL. 88 6EL. 85 9/16SI-107 H-44SI-107 H-43SI-E-218-CCBA-2 SI-E-218-CCBA-4SI-B-110-CCBB-2SI-E-218-CCBA-3SI-A-103-CCBA-2SI-E-236-CCBA-2SI-B-107-CCBB-2 SI-103H-A110-55110-54110-52 ZONE 110 HPSI DISCHARGEWEST WRAPLINE #DIA X SCHFROMTOSI-1032 X 0.344110-40110-52SI-1074 X 0.337110-1110-10SI-1102 X 0.344110-11110-17SI-2182 X 0.344110-18110-22SI-2183 X 0.438110-38110-39SI-1072 X 0.344110-53110-59SI-2184 X 0.438110-23110-37SI-2362 X 0.344110-60110-64 W W W W W W B B B B C B B B B C B B C B B B C 153INT-ISI-2 Rev. 4 196 of 210 UNIT 2REFERENCE DRAWINGS 02-P-SIF-203 SI-100 H-37111-29 UV647 16EL. 85SI-A-100-CCBA-4ZONE 110ZONE 110111-30111-33111-31111-34111-37111-32111-35111-38111-36111-39111-40111-22111-28111-26111-27111-25111-24111-17111-18111-20111-19111-21111-23111-8111-12111-15111-13111-16111-14111-11111-5111-6111-9111-7111-10111-4111-2111-1111-3SI-100 H-B SI-236 H-2 SI-236H-1 SI-236H-3 SI-100 H-30 SI-100H-ASI-A-100-CCBA-2SI-E-236-CCBA-4SI-E-236-CCBA-3EL. 88 6EL. 85EL. 93 5ZONE 108111-41 ZONE 111 HPSI DISCHARGEWEST WRAPLINE #DIA X SCHFROMTO SI-1002 X 0.344111-9111-25SI-2363 X 0.438111-40111-41SI-2364 X 0.438111-26111-39SI-1004 X 0.438111-1111-8ZONE 114111-42 W W W B C B B B B B3INT-ISI-2 Rev. 4 197 of 210 UNIT 2SI-176 H-2 SI-101 H-ASI-176 H-3112-3112-25112-8112-42112-46112-45112-35112-44SI-176 H-1112-43SI-102 H-BSI-102 H-A SI-100 H-17SI-101 H-D112-17112-21112-26SI-A-100-CCBA-4 14112-40112-18112-38112-39112-32112-41112-30112-33112-31112-37112-29112-36112-24112-34112-20112-28 UV-617112-4112-12112-9112-23112-5112-14112-16112-27112-6112-13112-7112-2112-1112-15112-22112-10112-11SI-E-176-CCBA-3SI-E-176-CCBA-4SI-A-101-CCBA-2 ZONE 108ZONE 115SI-A-102-CCBA-2 SI-101 H-B112-19 UV-627 ZONE 113 ZONE 113LINE #DIA X SCHFROMTOSI-100SI-101SI-1024 X 0.4382 X 0.3442 X 0.344112-1112-7112-21112-6112-20112-32SI-1764 X 0.438112-33112-44SI-1763 X 0.438112-45112-46REFERENCE DRAWINGS 02-P-SIF-204 ZONE 112 HPSI DISCHARGE EAST WRAPEL 88-9EL 92-6EL 93-5SI-101 H-C W W W W B B B B B B B B B B3INT-ISI-2 Rev. 4 198 of 210 UNIT 2 SI-107H-22 SI-109H-A SI-157 H-4 SI-157 H-6SI-107 H-24113-38113-37113-51113-7113-2113-1113-41113-49 SI-176 H-A A POINT ACONTINUEDTHIS DRAWING SI-108H-A SI-157H-5113-3SI-B-107-CCBB-4 13113-30113-31113-20 UV-626113-9113-36113-43113-39113-25113-42113-28113-14113-12113-11113-10113-17113-18113-16113-13113-19113-8113-15113-4113-21113-23113-26113-6113-22113-5113-24113-40113-27113-35113-33113-34113-48113-47113-45113-44 UV-616 SI-157H-9SI-E-157-CCBA-4SI-E-157-CCBA-4SI-B-108-CCBB-2SI-B-109-CCBB-2 A POINT ACONTINUEDTHIS DRAWING ZONE 109 ZONE 115REFERENCE DRAWINGSLINE #DIA X SCHFROMTO 02-P-SIF-204 SI-1082 X 0.344113-7113-15SI-1092 X 0.344113-21113-27SI-1574 X 0.438113-33113-49SI-1573 X 0.438113-50113-51SI-1572 X 0.344113-16113-20SI-157 H-A SI-157H-1SI-1074 X 0.337113-1113-6113-50 ZONE 112 ZONE 112113-29 ZONE 113 HPSI DISCHARGE EAST WRAPSI-E-176-CCBA-2SI-E-157-CCBA-2EL 86EL 92-6EL 88-9EL 84-6113-46113-32SI-1762 X 0.344113-28113-32 W W W W B B C B B B B B B B B3INT-ISI-2 Rev. 4 199 of 210 UNIT 2 ZONE 114  CONTAINMENT HPSI HEADER LOOP 1A & 1BSI-218 H5 SI-236H-5114-16114-9 15 16114-20114-5114-7114-11114-1114-3114-4114-2114-21114-19114-8114-17114-6114-15114-22114-18SI-E-218-CCBA-3SI-E-236-CCBA-3 ZONE 97 ZONE 111REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-218SI-236 3 X 0.438 3 X 0.438114-1114-12114-11114-23 02-P-SIF-103 ZONE 96EL 93-5 V-133EL 93-5114-12114-14 V-143114-23114-13 EL 93-5ZONE 110 B B3INT-ISI-2 Rev. 4 200 of 210 UNIT 2 ZONE 115 CONTAINMENT HPSI HEADER LOOP 2A & 2B SI-157 H-11115-17115-20115-19115-7115-5 13 14115-8115-9115-6115-11115-12115-10115-1115-3115-14115-21115-15115-22115-16115-18115-2115-4115-13SI-176 H-4SI-E-157-CCBA-3SI-E-176-CCBA-3 ZONE 99ZONE 112ZONE 113REFERENCE DRAWINGSLINE #DIA X SCHFROMTOSI-157SI-176 3 X 0.438 3 X 0.438115-1115-13115-12115-22 02-P-SIF-136 ZONE 98EL 91-4EL 93-5 V-113 V-123EL 89-9EL 93-5B B3INT-ISI-2 Rev. 4 201 of 210 UNIT 2 ZONE 116 HPSI PUMP AREFERENCE DRAWINGS1) TAG NUMBER: 2MSIAP022) SERIAL NUMBER: INGERSOL RANDDISCHARGE SUCTIONZONE 102 ZONE 106116-1D W116-1A W 116-1C W 116-1B W N116-1116-2S/N 0776-16 02-P-SIF-201 02-P-SIF-2033) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 DISCHARGE HEAD STUDS B B B B3INT-ISI-2 Rev. 4 202 of 210 UNIT 2 ZONE 117 HPSI PUMP BREFERENCE DRAWINGSDISCHARGE SUCTION1) TAG NUMBER: 2MSIBP022) SERIAL NUMBER: INGERSOL RANDZONE 104 ZONE 107117-1D W 117-1B W117-1A W 117-1C W N117-1117-2S/N 0776-173) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 DISCHARGE HEAD STUDS02-P-SIF-201 02-P-SIF-203 B B B B3INT-ISI-2 Rev. 4 203 of 210 UNIT 2REFERENCE DRAWINGSLINE #DIA X SCHFROMTO SI-1063 X 0.438118-1118-49 HV-604 SI-106H-18SI-106 H-24 SI-106H-3SI-106H-11 SI-106 H-10SI-106 H-9 SI-106 H-7SI-106 H-14SI-106 H-15 SI-106H-13SI-106H-16118-31118-48118-32118-34118-3118-36118-4118-20118-22118-25118-49118-5118-27118-43118-47118-14118-33118-26118-13118-28118-29118-19118-10118-8118-37118-7118-1118-35118-2118-39118-38118-17118-15118-9ZONE 39SI-A-106-CCBA-302-P-SIF-203 SI-106 H-6SI-106 H-8118-42118-45 V-523 HV-321 APOINT A CONTINUEDTHIS DRAWINGSI-106 H-23118-18EL 46-3EL 85SI-106 H-12EL 92 6ZONE 118 HPSI A LONG TERM RECIRCULATION118-6EL 51-6118-21SI-106 H-4SI-106 H-5 SI-106H-21 SI-106 H-22SI-106 H-2 77118-44SI-106 H-25 SI-106 H-20 SI-106 H-19118-41118-40118-46 A POINT ACONTINUEDTHIS DRAWING118-23118-16118-24118-11118-1202-P-SIF-105SI-A-106-CCBA-3 ZONE 106 SI-106 H-26118-30 W W W W W W W W W W W W W W W W W W B B B B B B B B B B B B B B B B B B B B C B B C3INT-ISI-2 Rev. 4 204 of 210 UNIT 2LINE #DIA X SCHFROMTOSI-114 SI-3193 X 0.4382 X 0.344119-1119-53119-52119-57 ZONE 119 HPSI B LONG TERM RECIRCULATIONREFERENCE DRAWINGSSI-114 H-8SI-114 H-4SI-114 H-1 SI-114H-10SI-114 H-22SI-114 H-9 SI-114H-26119-54119-52119-14119-24119-49119-11119-10119-8119-23119-30119-2119-26119-32119-41119-57119-6119-9119-7119-47119-12119-4119-56119-55119-21119-53119-35119-15119-17 ZONE 40SI-E-319-CCBA-2SI-B-114-CCBA-3 HV331 HV-609 V-509 02-P-SIF-105 SI-114H-27119-43119-13119-5119-16119-19119-31119-20119-25EL 46-3EL 87-3EL 46-8SI-B-114-CCBA-3SI-114 H-7SI-114 H-3 SI-114 H-2 SI-114 H-5SI-114 H-6119-3119-44119-33119-50119-18119-22119-42119-36119-1119-34119-40SI-B-114-CCBA-3 V-533119-46119-51119-45EL 87-3AEL 88SI-114 H-21EL 85-4EL 92-6EL 51-6SI-319 H-ASI-319 H-G 67 A ZONE 107 SI-319 H-J119-29119-28119-27SI-114H-17SI-114H-15SI-114 H-16119-37119-38119-39 02-P-SIF-20402-P-CHF-207 SI-114 H-13SI-114 H-12 SI-319H-B POINT ACONTINUEDTHIS DRAWING POINT ACONTINUEDTHIS DRAWING119-48 W W W W W W W W W W W W B B B B C B B B B C B B C B B B B B B C B B B3INT-ISI-2 Rev. 4 205 of 210 UNIT 2 ZONE 120CONTAINMENT SPRAY A CONT ZONE 93LINE #DIA X SCHFROMTOSI-08810 X 0.250120-1120-19REFERENCE DRAWINGS 13-P-ZCG-105 21120-9120-12120-6120-11120-10120-7120-5120-8120-2120-1 V-164SI-A-088-GCBC-10120-13120-4120-3EL 116-4120-14120-15120-16120-19120-18120-17SI-88H-2 C EL 89-9EL 91-5EL 95-5EL 1123INT-ISI-2 Rev. 4 206 of 210 UNIT 2 ZONE 121CONTAINMENT SPRAY BCONT ZONE 90LINE #DIA X SCHFROMTOSI-13010 X 0.250121-1121-21REFERENCE DRAWINGS 13-P-ZCG-105 22SI-130H-7121-13121-6121-14121-07121-5121-18 V-165SI-A-130-GCBC-10121-08121-4121-19EL 116-4121-15121-16121-17121-20121-21121-3121-1121-2121-9121-11121-12121-10 W SI-130 H-3 C CEL 112EL 93-5EL 90-5EL 95-53INT-ISI-2 Rev. 4 207 of 210  


SECTION 11.0 Terms and Definitions 3INT-ISI-2 Rev. 4 208 of 210 AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing DR: Disregard ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal 3INT-ISI-2 Rev. 4 209 of 210 Recirc: Recirculation  RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness TL: Prolonged Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve
AHE:   Augmented High Energy ANII:   Authorized Nuclear Inservice Inspector APS:   Arizona Public Service Company, et al ASME:     American Society of Mechanical Engineers Aux:   Auxiliary BWR:     Boiling Water Reactor CE:   Combustion Engineering CEDM:     Control Element Drive Mechanism CFR:   Code of Federal Regulations CH:   Charging CHR:   Containment Heat Removal Circ: Circumferential CL:   Cold Leg CRD:   Control Rod Drive CS: Containment Spray CSP:   Containment Spray Pump DWG:     Drawing DR:   Disregard ECCS:   Emergency Core Cooling System FW:   Feedwater HL:   Hot Leg HPSI:   High Pressure Safety Injection HV:   Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB:   Inspection and Enforcement Bulletin IEIN:   Inspection and Enforcement Information Notice Inj: Injection INPO:   Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI:   Low Pressure Safety Injection MSSS:     Main Steam Support Structure NDE:   Nondestructive Examination NRC:   Nuclear Regulatory Commission PDV:   Pressure Differential Valve PSV:   Pressure Relief or Safety Valve PWR:   Pressurized Water Reactor PVNGS:     Palo Verde Nuclear Generating Station PZR:   Pressurizer RC:   Reactor Coolant RCP:   Reactor Coolant Pump REV:   Revision RHR:   Reactor Residual Heat Removal 3INT-ISI-2 Rev. 4         209 of 210


3INT-ISI-2 Rev. 4 210 of 210}}
Recirc: Recirculation RCS:  Reactor Coolant System RPV:  Reactor Pressure Vessel RVLMS:    Reactor Vessel Level Monitoring System REM:  Roentgen Equivalent Man SDCHX:    Shutdown Cooling Heat Exchanger SD:  Shutdown SER:  Significant Event Report SG:  Steam Generator SI: Safety Injection SN:  Serial Number T: Thickness TL:  Prolonged Tech. Spec: Technical Specification UFSAR:    Updated Final Safety Analysis Report USNRC:    United States Nuclear Regulatory Commission UV:  Multivariable Control Valve V:  Valve 3INT-ISI-2 Rev. 4         210 of 210}}

Latest revision as of 09:47, 4 November 2019

3INT-ISI-2, Rev. 4, Palo Verde, Unit 2, 3rd Interval: Inservice Inspection Program Summary Manual
ML14035A402
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/28/2013
From:
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML14035A409 List:
References
102-06824-TNW/RKR 3INT-ISI-2, Rev. 4
Download: ML14035A402 (210)


Text

3rd Inspection Interval Inservice Inspection Program Summary Manual PVNGS Unit 2 Arizona Public Service Company PVNGS PO Box 52034 5801 S. Wintersburg Road Phoenix, AZ 85072-2034 Tonopah, AZ 85354 Brannin, Digitally signed by Brannin, Michael P(Z08286)

Digitally signed by Hansen, Douglas B(Z41530)

Michael DN: cn=Brannin, Michael P(Z08286)

Hansen, Douglas DN: cn=Hansen, Douglas B(Z41530)

Reason: I have reviewed this P(Z08286)

Reason: Program Owner Date: 2013.08.28 13:45:20 -07'00' B(Z41530) document Preparer: ____________________________ ___ Reviewer: __________________________________

Date: 2013.08.28 13:49:18 -07'00' Digitally signed by Schrecker, Schrecker, Kenneth D(Z99981) Digitally signed by Dilorenzo, Michael DN: cn=Schrecker, Kenneth Dilorenzo, Michael D(Z99838)

Kenneth D(Z99981)

DN: cn=Dilorenzo, Michael D(Z99838)

Reason: Program Engineering Department Reason: I am approving this D(Z99838) Leader D(Z99981) document Section Leader: _________________________

Date: 2013.08.29 06:55:38 -07'00' Department Leader: __________________________

Date: 2013.08.29 07:11:30 -07'00' Digitally signed by Hogstrom, Hogstrom, Robert (YH2450)

DN: cn=Hogstrom, Robert Robert (YH2450)

Date: 2013.08.28 14:06:17 ANII (YH2450) _______________________ -07'00' Commercial Service Date: 09-19-1986 Program No: 3INT-ISI-2 Rev. 4 3INT-ISI-2 Rev. 4 1 of 210

TABLE OF CONTENTS Summary of Changes.3 1.0 Summary ......................................................................................................... 4 2.0 Code Applicability .......................................................................................... 4 3.0 Description ...................................................................................................... 5 3.1 Scope ............................................................................................................ 5 3.2 System Boundaries ....................................................................................... 6 3.3 Accessibility ................................................................................................. 6 3.4 Examination Techniques .............................................................................. 7 3.5 Inspection Intervals...................................................................................... .7 3.6 Examination Categories ............................................................................... .8 3.7 Evaluation and Repair.................................................................................. .8 3.8 System Pressure Tests.................................................................................. .8 3.9 Exemptions .................................................................................................. .8 3.10 Code Cases .............................................................................................. .9 3.11 Outage Plan Table9 3.12 References....10 4.0 ASME Class 1 Summary............................................................................... 11 5.0 ASME Class 2 Summary............................................................................... 38 6.0 ASME Class 3 Summary............................................................................... 69 7.0 Augmented Summary .................................................................................... 76 8.0 Requests for Relief ........................................................................................ 89 9.0 Boundary Drawing Listing ............................................................................ 91 10.0 Zone Drawings .............................................................................................. 93 11.0 Terms and Definitions ................................................................................. 208 3INT-ISI-2 Rev. 4 2 of 210

SUMMARY

OF CHANGES Revision 4 Cover Page revised Table of Contents Updated Section 1.1, added a reference to TRM Section 3.1.3 Added reference to the Pressure Test Program D1.20, Added DG welded attachments and adjusted percentages per CRAI 4420287 F1.30, Added DG supports and adjusted percentages per CRAI 4420287 3INT-ISI-2 Rev. 4 3 of 210

PALO VERDE NUCLEAR GENERATING STATION UNIT 2 INSERVICE INSPECTION - PROGRAM

SUMMARY

1.0

SUMMARY

1.1 This document contains a detailed description of the 3rd 10 Year Interval Inservice Inspection (ISI) Program for Palo Verde Nuclear Generating Station Unit 1. This program conforms to the requirements of 10CFR50.55a (g), PVNGS Technical Specifications, Technical Requirements Manual, and the PVNGS UFSAR. Exceptions that are known as of this document preparation date are included in the Requests for Relief Section 8.0.

1.2 The revision is being prepared to update the ISI Program for the 3rd 10 Year Interval. This includes the utilization of the 2001 Edition including the 2003 Addenda of ASME Section XI with the exceptions noted below:

1.2.1 Requests for relief from ASME Section XI requirements are included in Section 8.0.

These Relief Requests are prepared in a format similar to that documented in the NEI White Paper Revision 1 dated June 2004, entitled: Standard Format for Requests from Commercial Reactor Licensees Pursuant to 10CFR50.55a.

1.2.2 The 2007 Edition thru the 2008 Addenda was utilized for B-L-1, B-M-1, and C-G for pump and valve body welds requirements. (Ref. Letter 102-06454 and SER dated 09-18-2012). (ACT 4343138) 1.2.3 For clarification, this Interval 3 program was prepared, as was Interval 1 and 2 programs, utilizing 40 month periods.

1.2.4 To support future ISI Programs, reference to the reactor vessel internals aging management program was added (Reference 3.12.3). (CRAI 4353644) 1.3 This revision does not utilize risk informed inservice inspection methodology at this time.

1.4 The information presented is in a form consistent with the 1st and 2nd 10 Year Interval ISI Program, the applicable requirements of Standard Review Plan manual and procedures and the recommendations contained in NRC letter dated July 17, 1981, from Mr. R.L. Tedesco, NRC, to E. E. Van Brunt, Jr., APS, Guidance for Preparing Preservice and Inservice Inspection Programs and Relief Requests - Palo Verde Nuclear Generating Station Units 1, 2 and 3.

2.0 CODE APPLICABILITY 2.1 Based on paragraph 10 CFR 50.55a(b) (2) that was published 12 months prior to the start of the 3rd 10 Year Interval (3-18-07), the 2001 Edition including the 2003 Addenda of ASME Section XI was referenced as the Code to utilize for preparation of this program. Several exceptions to this code are documented in 10CFR50.55a; each of these exceptions was utilized during the preparation of this program.

  • The exemptions of IWB-1220 for Class 1 piping must utilize the 1989 Edition.

3INT-ISI-2 Rev. 4 4 of 210

  • When qualifying VT-3 personnel per IWA-2317, the proficiency of the training must be demonstrated by initial qualification examination and subsequent examinations on a 3 year interval.
  • The 1997 Edition must be used for IWA-2240 alternative examination methods, a combination of methods, or newly developed techniques.
  • Items B3.120 and B3.140 (nozzle inner radius examinations) of the 1998 Edition must be utilized. An enhanced visual examination with a resolution sensitivity to detect a 1-mil wire or crack may be performed in place of an ultrasonic examination.
  • Must utilize the 1995 Edition for examination Item B7.80 per 50.55a (b)(2)(xxi)(B).
  • IWA-2220, Ultrasonic examination methods are prohibited for surface examinations.
  • The surface examination requirements for HPSI systems, Items B9.20, B9.21 and B9.22 are not required to be performed.

2.2 If a code required examination was considered to be impractical during the preparation of this document because of plant design, geometry, accessibility or other conditions, a Request for Relief from that requirement was prepared and included in Section 8.0. If a code required examination is identified to be impractical during the course of an inspection and the code required percentages are not met, a request for relief will be prepared and submitted after each inspection period, and the final interval closeout no later than 12 months after expiration of the Interval.

2.3 This ISI Program will implement the ASME Section XI 2001 Edition Appendix VIII (Performance Demonstration for Ultrasonic Examination Systems) in accordance with 10 CFR 50.55a. These examinations will be conducted in accordance with the Performance Demonstration Initiative (PDI). The PDI Code Comparison document (Reference 3.12.2) explains the complex relationship of regulatory requirements, ASME requirements, code editions, and the PDI program. (CRAI 4378832)

3.0 DESCRIPTION

3.1 SCOPE 3.1.1 This Inservice Inspection Program Summary includes all applicable nondestructive examinations required by ASME Section XI as identified below:

1. Examination of ASME Class 1, 2, and 3 pressure retaining components and their supports 3.1.2 This program also includes an augmented section that includes examinations for other items required to be examined as identified below.
1. Examinations of welds in Class 1 components fabricated with Alloy 600/82/182 4materials in accordance with 10CFR50.55a and Code Case N-722-1.
2. Examination of the Reactor Vessel Closure Head in accordance with 10CFR50.55a and Code Case N-729-1.
3. Examination of welds in Class 1 piping and vessel nozzle butt welds fabricated with alloy 82/182 in accordance with 10CFR50.55a and Code Case N-770-1.

3INT-ISI-2 Rev. 4 5 of 210

4. Examination of high energy line piping in accordance with UFSAR 6.6.1(CRAI 4178275).
5. Examination of the Reactor Coolant Pump Flywheels in accordance with PVNGS Technical Specifications Section ITS 5.5.7.
6. USNRC Circulars, Information Notices, Bulletins, or Orders
7. INPO or other industry operating experiences
8. Combustion Engineering or Westinghouse bulletins or notices
9. Special examinations to satisfy other commitments or concerns that are based on operating experiences, USNRC. These examinations are scheduled throughout this program and reference the applicable notification documents.

3.1.3 Those items that may generally be included in an Inservice Inspection Program, but are not included are identified below:

1. Pressure testing of ASME Class 1, 2, and 3 piping will be performed in accordance with the Pressure testing Program
2. The inservice testing of snubbers will be performed in accordance with 10CFR50.55a.
3. The inservice examination of steam generator tubing will be performed in accordance with the PVNGS Technical Specifications Section T5.5.9.
4. The Examination Program for the ASME Subsections IWE and IWL will be performed in accordance with 10CFR50.55a and the PVNGS Technical Specifications.

3.2 SYSTEM BOUNDARIES 3.2.1 A complete set of P&ID drawings indicating the Inservice Inspection boundary are maintained at the PVNGS site. These drawings illustrate the ASME Class 1, 2, and 3 systems; components; and boundaries scheduled for examinations and pressure testing. A referenced listing of these drawings is documented in Section 9.0.

3.2.2 A set of ISI (Zone) Drawings is included in Section 10.0. These drawings are utilized for the planning and scheduling of specific ASME Class 1 and 2 examinations throughout the 10 Year Interval. These also document the location and number of welds, components, and supports. (CRAI4398776) 3.3 ACCESSIBILITY 3.3.1 The preservice examinations were performed with examination techniques, automated or manual, similar to those planned for use during Inservice Inspections. The examination limitations noted during the preservice examinations were documented in Requests for Relief submitted with the preservice examination program. There has also been a number of additional code limitations noted during the 1st and 2nd 10 Year Intervals and Request for Relief submitted. If included in the required 3rd Interval examinations they will again be evaluated and relief requested. Note Section 8.0 identifies all the reliefs submitted during the preparation and implementation of the 3rd Interval.

3INT-ISI-2 Rev. 4 6 of 210

3.3.2 All items that are scheduled for examination will be examined to the extent practical.

In addition, any code limitations that are noted during the examinations will be documented. If relief is required from any of these examinations, a Request for Relief will be submitted after the relief is discovered and prior to 12 months after the interval ends.

3.4 EXAMINATION TECHNIQUES 3.4.1 The three types of examinations utilized to perform Inservice Inspections, along with the actual nondestructive examination technique, are identified in the legend below:

VT - Visual VT - 1 (General Condition)

VT - 2 (Leakage)

VT - 3 (Mechanical and Structural Condition)

VE (Visual Examination)

S - Surface PT - Liquid Penetrant MT - Magnetic Particle ET - Eddy Current VOL - Volumetric UT - Ultrasonic RT - Radiography 3.4.2 All the above nondestructive examination techniques will be performed using specific techniques and procedures that are identified in ASME Section XI, or alternative examinations that are demonstrated to be equivalent or superior to those identified.

The provision for substitution of these alternative examination methods, combination of methods, or newly developed techniques will utilize the 1997 Addenda for IWA-2240.

3.5 INSPECTION INTERVALS 3.5.1 The Inservice Inspection Program was prepared in accordance with Program B of ASME Section XI. The 1st, 2nd, and 3rd 10 Year Intervals and corresponding inspection periods are defined below:

First Inspection Interval: 09/19/86 to 03/17/97 Second Inspection Interval: 03/18/97 to 03/17/07 Third Inspection Interval: 03/18/07 to 03/17/17 Period One: 03/18/07 to 07/17/10 Period Two: 07/18/10 to 11/17/13 Period Three: 11/18/13 to 03/17/17 It should be noted that the intervals/periods may change to allow for extended outage durations per IWA-2400 of ASME Section XI.

3INT-ISI-2 Rev. 4 7 of 210

3.6 EXAMINATION CATEGORIES 3.6.1 The examination categories of ASME Section XI were utilized to develop this program for all systems, components, and supports. The Subprogram summary tables contained in Sections 4.0 and 5.0 are organized by examination category for ASME Class 1 and 2 systems, respectively. For each examination category, these tables identify the system or identification, nondestructive examination method, total number of items, required examination amount for each inspection period, and running percentage. For ASME Class 3 systems, the examinations categories are identified in Section 6.0.

3.7 EVALUATION AND REPAIR 3.7.1 The evaluation of all examination results will be performed in accordance with ASME Section XI Articles IWx-3000. In addition, all applicable repairs and replacements will be performed in accordance with ASME Section XI Articles IWX-4000 and 7000. Pressure tests will be performed on welded and mechanical joint repairs or replacements, in accordance with IWx-4000 and 5000 and 10CFR50. Both the evaluations and repair or replacement will be performed in accordance with the 2001 Edition including the 2003 Addenda of ASME Section XI, or later editions and addenda of ASME Section XI referenced in 10CFR50. Later editions and addenda will be documented with the NRC.

3.7.2 It should be noted that a relief was requested (Relief Request 36) to perform repair and replacement of all three PVNGS units to the 2001 Edition including the 2003 Addenda. This request was documented in conjunction with the relief to perform full structural weld metal overlays. (APS letter to the USNRC 102-05641 dated 2-8-2007).

3.7.3 All repairs and replacements will be documented in accordance with the Work Control program, and are maintained at Palo Verde for review.

3.8 SYSTEM PRESSURE TESTS 3.8.1 ASME Class 1, 2, and 3 components will be pressure tested per the requirements of IWB-5000, IWC-5000 and IWD-5000, except where relief has been requested.

3.8.2 Pressure tests will also be performed on repairs and replacements per ASME Section XI, 10CFR50.55a, and the PVNGS Repair and Replacement program.

3.9 EXEMPTIONS 3.9.1 The exemption criteria identified in the 2001 Edition including the 2003 Addenda of ASME Section XI was utilized for all ASME Class 1, 2, and 3 components and systems. The only exception is that required by 10CFR50.55a for the ASME Class 1 piping exemptions. These are in accordance with the 1989 Edition of ASME XI.

3.9.2 A thorough review of all the systems and components was performed in accordance with the above exemptions and a complete set of color coded Inservice Inspection Exemption drawings was prepared. These drawings are maintained at the PVNGS site for review.

3INT-ISI-2 Rev. 4 8 of 210

3.10 CODE CASES 3.10.1 The following Code Cases are accepted for use in Regulatory Guide 1.147 and may be utilized during Interval 3 where applicable (CRAIs 4338597, 4404322, and 4308456):

1. N-460 Alternative examination coverage for Class 1 and 2 welds
2. N-526 Alternative requirements for successive inspections of Class 1 and 2 vessels
3. N-532-4 Alternative requirements to repair and replacement documentation
4. N-534 Alternative Requirements for Pneumatic Pressure Testing.
5. N-537 Location of Ultrasonic Depth-Sizing Flaws (CRAI 4404322)
6. N-566-2 Corrective Action for Leakage Identified at Bolted Connections
7. N-613-1 Ultrasonic examination of full penetration nozzles in vessels
8. N-624 Successive inspections
9. N-652-1 Alternative requirements to categories B-G-1, B-G-2, and C-D bolting
10. N-663 Alternative requirements for Classes 1 and 2 Surface Examinations
11. N-666 Weld Overlay of Class 1, 2, and 3 Socket Welded Connections
12. N-685 Lighting Requirements for Surface Examinations
13. N-695 Alternative for Qualification Requirements for Dissimilar Metal Piping Welds, Appendix VIII Supplement 10
14. N-700 Alternative Rules for Selection of Class 1, 2, and 3 Vessel Welded Attachments for Examination 15 N-705 Evaluation Criteria for Temporary Acceptance of Degradation in Moderate Energy Class 2 or 3 Vessels and Tanks (CRAI 4308456) 3.10.2 The following Code Cases are conditionally accepted for use in Regulatory Guide 1.147 may be utilized with the specified conditions during Interval 3 where applicable:
1. N-513-3 Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RG 1.147 documents acceptance condition is that the repair or replacement activity temporarily deferred under the provisions of this Code Case shall be performed during the next scheduled outage.
2. N-648-1 Alternative requirements for inner radius examinations of reactor vessel nozzles RG 1.147 documents acceptance condition is that in place of a UT examination, licensees may perform a visual examination with enhanced magnification that has a resolution sensitivity to detect a 1-mil width wire or crack, utilizing the allowable flaw length criteria of Table IWB-3512-1 with limiting assumptions on the flaw aspect ratio. The provisions of Table IWB-2500-1, Examination Category B-D, continue to apply except that, in place of examination volumes, the surfaces to be examined are the external surfaces shown in the figures applicable to this table (the external surface is from point M to point N in the figure).

3.10.3 The following Code Cases are required to be utilized by 10CFR50.55a with additional specified conditions. These are planned to be utilized with the specified conditions during Interval 3:

1. N-722-1 Additional Examinations for PWR Pressure Retaining Welds in Class 1 Components Fabricated With Alloy 600/82/182 Materials
2. N-729-1 Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds
3. N-770-1 Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld filler Material With or Without Application of Listed Mitigation Activities. (Note Reference 3.12.1).

3.11 OUTAGE PLAN TABLE The outage plan table, controlled by procedure 73DP-9XI03 and 73DP-9EE02, identifies the components scheduled for examination including successive examinations from prior periods. The examination procedures and a listing of calibration blocks are also identified.

3INT-ISI-2 Rev. 4 9 of 210

3.12 REFERENCES 3.12.1 N001-0604-00903, Calculation PV-23Q-405, dated 5-25-11(CRAI 4348769) 3.12.2 EPRI 2012 Technical Report titled Nondestructive Evaluation:

Performance Demonstration Initiative (PDI) Comparisons to ASME Section XI, Appendix VIII 2007 Edition with 2008 Addendum, and 10CFR50.55a, Year 2011 dated November 2012 (CRAI 4378832) 3.12.3 MN755-A00003 titled PWR Internals Aging Management Program Plan for Palo Verde Nuclear Generating Station Units 1, 2, and 3 dated 9-7-12 (CRAI 4353644) 3.12.4 EPRI 2012 Technical Report 1024994, Materials Reliability Program:

Assessment of Residual Heat Removal Mixing Tee Thermal Fatigue in PWR Plants, dated August 2012. (CRAI 4312834) 3INT-ISI-2 Rev. 4 10 of 210

SECTION 4.0 ASME CLASS 1 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 11 of 210

INDEX EXAM CATEGORIES B-A Pressure Retaining Welds in Reactor Vessel B-B Pressure Retaining Welds in Vessels Other Than Reactor Vessels B-D Full Penetration Welded Nozzles in Vessels B-F Pressure Retaining Dissimilar Metal Welds in Vessel Nozzles B-G-1 Pressure Retaining Bolting, Greater Than 2 Inches in Diameter B-G-2 Pressure Retaining Bolting, 2 Inches and Less in Diameter B-J Pressure Retaining Welds in Piping B-K Welded Attachments for Vessels, Piping, Pumps and Valves B-L-1 & B-M-1 Pressure Retaining Welds in Pump and Valve Bodies B-L-2 & B-M-2 Pump Casings and Valve Bodies B-N-1 Interior of Reactor Vessel B-N-2 Welded Core Support Structures and Interior Attachments to Reactor Vessels B-N-3 Removable Core Support Structures B-O Pressure Retaining Welds in Control Rod Housings B-P All Pressure Retaining Components B-Q Steam Generator Tubing F-A Class 1 Supports 3INT-ISI-2 Rev. 4 12 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-A; PRESSURE *Auto exam with core RETAINING WELDS IN REACTOR VESSEL barrel removed

  • RR 40 exam by 2027 B1.10 SHELL WELDS B1.11 CIRCUMFERENTIAL 1-Reactor Vessel welds 79173 Vol 3 0 1 0 0 2 0 3* 3 100 B1.12 LONGITUDINAL 1-Reactor Vessel welds 79173 Vol 9 0 1 0 0 2 0 9* 3 100 B1.20 HEAD WELDS B1.21 CIRCUMFERENTIAL B1.22 MERIDIONAL 1-Reactor Vessel Bottom Head weld 79173 Vol 1 0 1 0 0 2 0 1* 3 100 3INT-ISI-2 Rev. 4 13 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO 2-Closure Head weld N05065-CHA-01 Vol 0 0 0 0 RVH Replaced R15 B1.30 SHELL-TO-FLANGE WELD 1-Reactor Vessel weld 79173 Vol 1 0 1 0 0 2 0 1* 3 100 B1.40 HEAD-TO-FLANGE WELD 2-Closure Head weld N05065-CHA-01 S & Vol 0 0 0 0 RVH Replaced R15 3INT-ISI-2 Rev. 4 14 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-B; PRESSURE RETAINING WELDS VESSELS OTHER THAN REACTOR VESSELS

  • category running percent - - - - 2 1 29 2 2 57 4 3 100 PRESSURIZER B2.10 SHELL -TO-HEAD WELDS B2.11 CIRCUMFERENTIAL 5- Pressurizer weld 79373 Vol 2 1 1
  • 1 3
  • B2.12 LONGITUDINAL **

5- Pressurizer weld 79373 Vol 4 2 1 ** **1' of each 2 3 ** intesecting circ exam area STEAM GENERATORS ***

B2.30 HEAD WELDS B2.31 CIRCUMFERENTIAL *** Multiple Vessels 3- Steam Generator 1 weld 212 Vol 1 1 2

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-D; FULL PENETRATION WELDED NOZZLES IN VESSELS-INSPECTION PROGRAM B

  • RR 40 exam by 2027 REACTOR VESSEL B3.90 NOZZLE-TO-VESSEL WELDS 1- Reactor Vessel Outlets - 2 79173 Vol 6 6* 3 100 *Auto exam with Inlets - 4 core barrel removed B3.100 NOZZLE INSIDE RADIUS SECTION 1- Reactor Vessel Outlets - 2 79173 Vol 6 6* 3 100 *Auto exam with Inlets - 4 core barrel removed PRESSURIZER B3.110 NOZZLE-TO-VESSEL WELDS 5- Pressurizer Surge - 1 79373 Vol 6 1 1 16 Spray - 1 2 2 50 Safeties - 4 3 3 100 B3.120 NOZZLE INSIDE RADIUS SECTION**

5- Pressurizer Surge - 1 79373 Vol 6 1 1 16 Spray - 1 2 2 50 Safeties - 4 3 3 100 3INT-ISI-2 Rev. 4 16 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO STEAM GENERATORS B3.130 NOZZLE-TO-VESSEL WELDS B3.140 NOZZLE INSIDE RADIUS SECTION** **added inner radius

  • Outlet - 2 2 2
  • Outlet - 2 2 3
  • B3.140 NOZZLE INSIDE RADIUS SECTION 3- Steam Generator 1 Inlet - 1 212 Vol 3 1 1
  • Outlet - 2 2 2
  • Outlet - 2 2 3

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-F; PRESSURE RETAINING DISSIMILAR METAL WELDS IN VESSEL NOZZLES PRESSURIZER NOMINAL PIPE SIZE > 4 INCH B5.40 NOZZLE TO SAFEEND BUTT WELDS 20- Surge butt welds RC-028-12 S & Vol 6 * *

  • Mitigated with FSWO 29- Spray butt welds RC-018-4 S & Vol Moved to augmented 31- Safeties (4) butt welds RC-001-6 S & Vol RC-003-6 S & Vol RC-005-6 S & Vol RC-007-6 S & Vol 3INT-ISI-2 Rev. 4 18 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-G-1; PRESSURE RETAINING BOLTING GREATER THAN 2 IN. IN DIAMETER REACTOR VESSEL B6.10 CLOSURE HEAD NUTS 2- Closure Head nuts 7.237 x 7.91" VT-1 54 18 1 33 18 2 66 18 3 100 B6.20 CLOSURE STUDS 2- Closure Head studs 7.380 x 76.37" Vol 54 18 1 33 18 2 66 18 3 100 B6.40 THREADS IN FLANGE 1- Reactor Vessel Stud Holes 79173 Vol 54 0 0 0 0 0 0 54 3 100 B6.50 CLOSURE WASHERS BUSHINGS 2- Closure Head Washers 7.50 x 1.27 VT-1 54 18 1 33 18 2 66 18 3 100 3INT-ISI-2 Rev. 4 19 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO PUMPS B6.180 BOLTS AND STUDS 16- Reactor Coolant Pump 1A Flange Studs 4.33 x 32.87 Vol 16 16 3 100

    • VT-1 exams on 1 pump FLANGE SURFACE WHEN per interval (with B12.XX B6.190 CONNECTION DISASSEMBLED exams) 16- Reactor Coolant Pump 1A surface 1110-1A VT-1 1 ** ** **

17- Reactor Coolant Pump 1B surface 1110-1B VT-1 1 ** ** **

18- Reactor Coolant Pump 2A surface 1110-2A VT-1 1 ** ** **

19- Reactor Coolant Pump 2B surface 1110-2B VT-1 1 ** ** **

    • VT-1 exams on 1 pump per interval (with B12.XX B6.200 NUTS, BUSHINGS, AND WASHERS exams) 16- Reactor Coolant Pump 1A nuts & ring 1110-1A VT-1 16 ** ** **

17- Reactor Coolant Pump 1B nuts & ring 1110-1B VT-1 16 ** ** **

18- Reactor Coolant Pump 2A nuts & ring 1110-2A VT-1 16 ** ** **

19- Reactor Coolant Pump 2B nuts & ring 1110-2B VT-1 16 ** ** **

3INT-ISI-2 Rev. 4 20 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-G-2; PRESSURE RETAINING BOLTING 2 IN. AND LESS IN DIAMETER PRESSURIZER B7.20 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31 x 14.5 VT-1 20 20 *** ***

STEAM GENERATOR B7.30 BOLTS, STUDS AND NUTS 3- Steam Generator 1 MANWAYS Studs & Nuts 1.31 x 14.5 VT-1 40 40 *** ***

4- Steam Generator 2 MANWAYS Studs & Nuts 1.31 x 14.5 VT-1 40 40 *** ***

        • When disassembled and only once per interval. One bolted connection among a group of similar PIPING bolted connections.

B7.50 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6 VT-1 8 8 **** ****

Flange Bolting RC-003-6 VT-1 8 8 **** ****

Flange Bolting RC-005-6 VT-1 8 8 **** ****

Flange Bolting RC-007-6 VT-1 8 8 **** ****

37- Charging Line Flange V435 CH-005-2 VT-1 8 8 **** ****

3INT-ISI-2 Rev. 4 21 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO PUMPS B7.60 BOLTS, STUDS AND NUTS 16- Reactor Coolant Pump 1A seal cover 1.1 x 8.27 VT-1 16 16 ** ** **VT-1 exams 17- Reactor Coolant Pump 1B seal cover 1.1 x 8.27 VT-1 16 16 ** ** required once per 18- Reactor Coolant Pump 2A seal cover 1.1 x 8.27 VT-1 16 16 ** ** interval (B-L-2) 19- Reactor Coolant Pump 2B seal cover 1.1 x 8.27 VT-1 16 16 ** **

VALVES B7.70 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties PSV-200 RC-001-6 VT-1 12 12 **** *** During VENDOR (Body Bolts) PSV-201 RC-003-6 VT-1 12 12 **** *** disassembly (B-M-2)

PSV-202 RC-005-6 VT-1 12 12 **** ***

PSV-203 RC-007-6 VT-1 12 12 **** ***

30- Aux Pressurizer Spray HV-203 CH-521-2 VT-1 4 4 ** ** **VT-1 exams HV-205 CH-520-2 VT-1 4 4 ** ** required once per interval

        • When disassembled and only once per CRD HOUSING interval B7.80 BOLTS, STUDS AND NUTS 2-Closure Head RVLMS Locations Grayloc Clamps CEDM 92 VT-1 4 4 **** ****

CEDM 96 VT-1 4 4 **** ****

3INT-ISI-2 Rev. 4 22 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.10 NPS 4 OR LARGER B9.11

  • CIRCUMFERENTIAL WELDS 6- RCS Primary Piping HL 1** butt welds RC-032-42 ID S* & Vol 62 7 1 11 ** AUTO EXAM OF HL 2** butt welds RC-063-42 ID 6 2 21 NOZZLE TO EXT AND CL 1A to RCP butt welds RC-033-30 ID 6 3 31 EXT TO PIPE WELDS CL 1B to RCP butt welds RC-030-30 ID *SURFACE EXAMS CL 2A to RCP butt welds RC-073-30 ID NOT REQUIRED IN CL 2B to RCP butt welds RC-084-30 ID CONJUNCTION WITH CL 1A to RPV** butt welds RC-034-30 ID AUTO EXAMINATIONS CL 1B to RPV** butt welds RC-031-30 ID (EWR-3673722 &

CL 2A to RPV** butt welds RC-079-30 ID CODE CASE N663)

CL 2B to RPV** butt welds RC-093-30 ID 20- Pressurizer Surge Line butt welds RC-028-12 S & Vol 11 1 1 9 DM MOVED TO AUG 2 3 27 21- Shutdown Cooling Loop 1 butt welds RC-051-16" S & Vol 24 2 1 8 DM MOVED TO AUG SI-240-16 22- Shutdown Cooling Loop 2 butt welds RC-068-16 S & Vol 18 2 1 11 DM MOVED TO AUG SI-193-16" 7 2 38 3 3 66 23- Safety Injection 1A butt welds SI-207-14 S & Vol 18 4 1 28 DM MOVED TO AUG SI-203-12 24- Safety Injection 1B butt welds SI-223-14 S & Vol 18 5 2 28 DM MOVED TO AUG SI-221-12 25- Safety Injection 2A butt welds SI-160-14 S & Vol 22 6 3 27 DM MOVED TO AUG SI-156-12 3INT-ISI-2 Rev. 4 23 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO 26- Safety Injection 2B butt welds SI-179-14 S & Vol 18 5 3 28 DM MOVED TO AUG SI-175-12 28 & 29- Pressurizer Spray butt welds RC-018-4 S & Vol 13 1 1 7 1 2 14 2 3 29 31- Pressurizer Safeties butt welds RC-001-6 S & Vol 12 1 1 8 RC-003-6 1 2 17 RC-005-6 1 3 25 RC-007-6 36- Letdown Line (delay coil) butt welds RC-091-16 S & Vol 4 1 3 25 B9.20 LESS THAN NPS 4

  • CIRCUMFERENTIAL WELDS B9.21 OTHER THAN PWR HPSI SYSTEMS 27- Pressurizer Spray 1A butt welds RC-062-3 S 38 9 1 26 DM MOVED TO AUG RC-016-3 28- Pressurizer Spray 1B butt welds RC-017-3 S 36 10 3 26 DM MOVED TO AUG RC-018-3 30- Aux Pressurizer Spray butt welds CH-009-2 S 11 3 2 27 CH-520-2 CH-521-2 32- Drain Line Loop 1A butt welds RC-060-2 S 5 1 1 20 DM MOVED TO AUG 33- Drain Line Loop 1B butt welds RC-058-2 S 5 1 2 20 DM MOVED TO AUG 34- Drain Line Loop 2A butt welds RC-096-2 S 5 2 3 40 DM MOVED TO AUG 3INT-ISI-2 Rev. 4 24 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO 35- Drain Line Loop 2B butt welds RC-089-2 S 5 2 3 40 36- Letdown Line butt welds RC-091-2 S 70 6 1 8 DM MOVED TO AUG CH-001-2 6 2 16 6 3 25 37- Charging Line butt welds CH-005-3 S 60 5 1 8 DM MOVED TO AUG CH-005-2 5 2 17 6 3 27 38- Drain Line Loop 1 butt welds RC-070-2 S 1 1 2 100 CIRCUMFERENTIAL WELDS OF B9.22 PWR HPSI SYSTEMS 39- HPSI Long Term Recirculation 1 butt welds SI-248-3 Vol 52 8 3 15 40- HPSI Long Term Recirculation 2 butt welds SI-199-3 Vol 25 3 1 12 10 2 52 BRANCH PIPE CONNECTION B9.30 WELDS B9.31 NPS 4 OR LARGER

  • 9.31 running percent - - - 7 1 1 14 1 3 28 6- RCS Primary Piping Surge branch weld RC-032-42 ID S & Vol 1 SD Cooling 1 branch weld RC-032-42 ID S & Vol 1 SD Cooling 2 branch weld RC-063-42 ID S & Vol 1 SI 1A branch weld RC-034-30 ID S & Vol 1 SI 1B branch weld RC-031-30 ID S & Vol 1 SI 2A branch weld RC-079-30 ID S & Vol 1 SI 2B branch weld RC-093-30 ID S & Vol 1 3INT-ISI-2 Rev. 4 25 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO B9.32 LESS THAN NPS 4

  • 9.32 running percent - - - 14 1 1 7 1 2 14 2 3 28 6- RCS Primary Piping Drain 1A branch weld RC-033-30 ID S 1 PZR Spray 1A branch weld RC-034-30 ID S 1 Drain 1B branch weld RC-030-30 ID S 1 PZR Spray 1B branch weld RC-031-30 ID S 1 Drain 2A branch weld RC-073-30 ID S 1 Charging branch weld RC-079-30 ID S 1 Letdown branch weld RC-084-30 ID S 1 21- Shutdown Cooling Loop 1 branch weld RC-051-16 S 2 2 Drain & 3" HPSI 22- Shutdown Cooling Loop 2 branch weld RC-068-16 S 1 3" HPSI 36- Letdown Line branch weld RC-091-16 S 4 3INT-ISI-2 Rev. 4 26 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO B9.40 SOCKET WELDS

  • 9.40 running percent - - - 17 2 1 12 2 2 23 2 3 35 30- Aux PZR Spray socket weld CH-520-2" S 2 CH-521-2" S 2 32- Drain Line Loop 1A socket weld RC-060-2 S 3 33- Drain Line Loop 1B socket weld RC-058-2 S 3 34- Drain Line Loop 2A socket weld RC-096-2 S 3 35- Drain Line Loop 2B socket weld RC-089-2 S 3 38- Drain Line Loop 1 socket weld RC-070-2 S 1 EXAM CATEGORY B-K; WELDED ATTACHMENTS FOR VESSELS. PIPING, PUMPS AND VALVES PRESSURE VESSELS B10.10 WELDED ATTACHMENTS **Accessible Side 3- Steam Generator 1
  • support skirt 212 S** 1 1 2 100
  • Multiple vessels 4 -Steam Generator 2
  • support skirt 211 S** 1 5- Pressurizer support skirt 79373 S** 1 1 1 50 3INT-ISI-2 Rev. 4 27 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO PIPING B10.20 WELDED ATTACHMENTS

  • B10.20 running percent - - - 13 1 1 8 1 3 15 22- Shutdown Cooling 2 attachment SI-193-16 S 1 RC-068-16" S 1 27- PZR Spray 1A attachment RC-062-3" S 1 28- PZR Spray 1B attachment RC-017-3" S 1 29- Combined PZR Spray attachment RC-18-3" S 1 36- Letdown Line attachment RC-091-16 S 4 37- Charging Line attachment CH-005-3" S 3 40- HPSI Long Term 2 attachment SI-199-3" S 1 EXAM CATEGORIES B-L-EXAM CATEGORY B-L-1, PRESSURE 1 and B-M-1 deleted in RETAINING WELDS IN PUMP CASINGS; B-M- the 2007 Ed., 2008 Add.

1, PRESSURE RETAINING WELDS IN VALVE See letter 102-06454 BODIES; B-L-2, PUMP CASINGS; B-M-2, and SER dated VALVE BODIES 09/18/2012.

B12.20 PUMP CASING 16- Reactor Coolant Pump 1A casing 1110-1A VT-3 4 1 *

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO B12.50 VALVE BODY, EXCEEDING NPS 4 16" Borg Warner Gate Valves Utilizing Forged Construction Zone 21 UV-651 RC-051-16 VT-3 4 1 *

  • Exam required when UV-653 SI-240-16 VT-3 valve is disassembled Zone 22 UV-652 RC-068-16 VT-3 UV-654 SI-193-16 VT-3 14" Borg Warner Gate Valves Utilizing Forged Construction Zone 23 UV-634 SI-207-14 VT-3 4 1 *
  • Exam required when Zone 24 UV-644 SI-223-14 VT-3 valve is disassembled Zone 25 UV-614 SI-160-14 VT-3 Zone 26 UV-624 SI-179-14 VT-3 12" Borg Warner Check Valves Utilizing Cast Construction Zone 23 V-542 SI-203-12" VT-3 4 1 *
  • Exam required when Zone 24 V-543 SI-221-12 VT-3 valve is disassembled Zone 25 V-540 SI-156-12 VT-3 Zone 26 V-541 SI-175-12 VT-3 3INT-ISI-2 Rev. 4 29 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO 14" Borg Warner Check Valves Utilizing Cast Construction Zone 23 V-235 SI-207-14 VT-3 8 1 *

  • Exam required when V-237 SI-207-14 VT-3 valve is disassembled Zone 24 V-245 SI-223-14 VT-3 V-247 SI-223-14 VT-3 Zone 25 V-215 SI-160-14 VT-3 V-217 SI-160-14 VT-3 Zone 26 V-225 SI-179-14 VT-3 V-227 SI-179-14 VT-3 Dresser PSV Utilizing Forged Construction Zone 31 PSV-200 RC-001-6 VT-3 4 1 *
  • Exam required when PSV-201 RC-003-6 VT-3 valve is disassembled PSV-202 RC-005-6 VT-3 PSV-203 RC-007-6 VT-3 3INT-ISI-2 Rev. 4 30 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL; B-N-2, WELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTS TO REACTOR VESSELS; B-N-3, REMOVABLE CORE SUPPORT STRUCTURES B13.10 VESSEL INTERIOR At 3 year intervals 1- Reactor Vessel accessible areas 79173 VT-3 1 1 1 100 R14, R16, R18, and R20 2 2 100 3 3 100 B13.50 INTERIOR ATTACHMENTS WITHIN BELTLINE REGION 1- Reactor Vessel accessible welds 79173 VT-1 1 1* 3 100 *RR 44 exam by 2027 B13.60 INTERIOR ATTACHMENTS BEYOND BELTLINE REGION 1- Reactor Vessel accessible welds 79173 VT-3 1 1* 3 100 *RR 44 exam by 2027 B13.70 CORE SUPPORT STRUCTURE 1- Reactor Vessel accessible areas 79173 VT-3 1 1* 3 100 *RR 44 exam by 2027 3INT-ISI-2 Rev. 4 31 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO  ; NO RETAINING WELDS IN CONTROL ROD

  • exam category running percent - - - 126 0 1 * *Replaced RV Head 10 3 11 R15 B14.10 WELDS IN CRD HOUSING 32 peripheral 2- Reactor Vessel Lower Housing 66 thru 97 Vol 32 Closure Head CEDM Housings 2- Reactor Vessel Upper Housing 66 thru 97 Vol 32 Closure Head CEDM Housings 2- Reactor Vessel Lower Tube 66-91,93-95,97 Vol 32 Closure Head RVLMS 92 and 96 CEDM Housings 2- Reactor Vessel Upper Tube 66-91,93-95,97 Vol 30 Closure Head CEDM Housings 3INT-ISI-2 Rev. 4 32 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY B-P; ALL PRESSURE Note Augmented for VT-2 RETAINING COMPONENTS of insulated bolting B15.10 PRESSURE RETAINING Class 1 IWB-5222a VT-2 * * * * *NOTE Pressure Test COMPONENTS Program B15.10 PRESSURE RETAINING Class 1 IWB-5222b VT-2 * * *

  • COMPONENTS
y TUBING Specifications B16.20 STEAM GENERATOR TUBING IN * * * * * *

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO EXAM CATEGORY F-A; SUPPORTS F1.10 CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS

  • F-A; A running percent NONE F1.10 CLASS 1 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
  • F-A; B running percent - - - 87 7 1 8 8 2 17 8 3 26 20- Pressurizer Surge Line supports RC-28-12 VT-3 1 21- Shutdown Cooling 1 supports RC-51-16 VT-3 13 SI-240-16 22- Shutdown Cooling supports SI-193-16 VT-3 5 RC-068-16" 23- Safety Injection 1A supports SI-207-14 VT-3 2 24- Safety Injection 1B supports SI-223-14 VT-3 1 25- Safety Injection 2A supports SI-156-12 VT-3 1 26- Safety Injection 2B supports SI-179-14 VT-3 2 SI-175-12 27- Pressurizer Spray 1A supports RC-62-3 VT-3 8 RC-16-3 28- Pressurizer Spray 1B supports RC-17-3 VT-3 10 RC-18-3 RC-18-4 30- Aux Pressurizer Spray supports CH-521-2 VT-3 1 32- Drain Line 1A supports RC-60-2 VT-3 1 33- Drain Line 1B supports RC-58-2 VT-3 1 36- Letdown Line supports RC-91-2 VT-3 15 CH-001-2 RC-91-16 37- Charging Line supports CH-5-3 VT-3 16 39- HPSI Long Term Recirculation 1 supports SI-248-3 VT-3 7 40- HPSI Long Term Recirculation 2 supports SI-199-3 VT-3 3 3INT-ISI-2 Rev. 4 34 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO 3INT-ISI-2 Rev. 4 35 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO F1.10 CLASS 1 PIPING SUPPORTS C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)

  • F-A; C running percent - - - 38 4 1 10 4 2 21 4 3 32 20- Pressurizer Surge Line supports RC-28-12 VT-3 3 21- Shutdown Cooling 1 supports SI-240-16 VT-3 2 22- Shutdown Cooling supports RC-68-16 VT-3 2 23- Safety Injection 1A supports SI-207-14 VT-3 1 24- Safety Injection 1B supports SI-223-14 VT-3 2 25- Safety Injection 2A supports SI-160-14 VT-3 1 26- Safety Injection 2B supports SI-179-14 VT-3 2 SI-175-12 27- Pressurizer Spray 1A supports RC-62-3 VT-3 3 28- Pressurizer Spray 1B supports RC-17-3 VT-3 3 29- Combined Pressurizer Spray supports RC-18-4 VT-3 3 30- Aux Pressurizer Spray supports CH-521-2 VT-3 1 37- Charging Line supports CH-5-3 VT-3 11 39- HPSI Long Term Recirculation 1 supports SI-248-3 VT-3 3 40- HPSI Long Term Recirculation 2 supports SI-199-3 VT-3 1 3INT-ISI-2 Rev. 4 36 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECTION RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT PERIOD  %

NO NO F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS

  • F-A; B running percent - - - 39 4 1 28 **14 req'd due to 5 2 56 multiple components 6 3 100 1 - Reactor Vessel columns 79173 VT-3 4 3 - Steam Generator 1* skirt 212 VT-3 1 *multiple comp 4 - Steam Generator-2* skirt 211 VT-3 1 5 - Pressurizer skirt 79373 VT-3 1 16- Reactor Coolant Pump 1A** columns 1110-1A VT-3 8 **multiple comp 17- Reactor Coolant Pump 1B** columns 1110-1B VT-3 8 18- Reactor Coolant Pump 2A** columns 1110-2A VT-3 8 19- Reactor Coolant Pump 2B** columns 1110-2B VT-3 8 F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS

SECTION 5.0 ASME CLASS 2 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 38 of 210

INDEX EXAM CATEGORY C-A Pressure Retaining Welds in Pressure Vessels C-B Pressure Retaining Nozzle Welds in Vessels C-C Welded Attachments for Vessels, Piping, Pumps, and Valves C-D Pressure Retaining Bolting Greater than 2 Inch in Diameter C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping C-H All Pressure Retaining Components F-A Class 2 Supports 3INT-ISI-2 Rev. 4 39 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION EXAM CATEGORY C-A; PRESSURE PERIOD RETAINING WELDS IN PRESSURE VESSELS

  • category running percent - - - 23** 4 1 23 **23 Total, 17 REQ'D 8 2 71 multiple vessels 5 3 100 STEAM GENERATORS C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to conical section) 41- Steam Generator 1 welds 212 Vol 2 2 2 42- Steam Generator 2 welds 211 Vol 2 C1.20 HEAD CIRCUMFERENTIAL WELDS (head to shell) 41- Steam Generator 1 welds 212 Vol 1 1 2 42- Steam Generator 2 welds 211 Vol 1 C1.30 TUBESHEET-TO-SHELL WELDS 41- Steam Generator 1 welds 212 Vol 1 1 2 42- Steam Generator 2 welds 211 Vol 1 REGENERATIVE HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 3 3 3 C1.20 HEAD CIRCUMFERENTIAL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 2 2 3 C1.30 TUBESHEET-TO-SHELL WELDS 68- Regenerative Heat Exchanger welds 79313 Vol 4 4 2 LETDOWN HEAT EXCHANGER C1.10 SHELL CIRCUMFERENTIAL WELDS 69- Letdown Heat Exchanger welds N2373 Vol 1 1 1 3INT-ISI-2 Rev. 4 40 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PERIOD C1.30 TUBESHEET-TO-SHELL WELDS 69- Letdown Heat Exchanger welds N2373 Vol 1 1 1 SHUTDOWN COOLING HEAT EXCH C1.10 SHELL CIRCUMFERENTIAL WELDS (shell to flange) 84- SDCHX A welds S-18343 Vol 1 1 1 87- SDCHX B welds S-18344 Vol 1 C1.30 TUBESHEET-TO-SHELL WELDS 84- SDCHX A welds S-18343 Vol 1 1 1 87- SDCHX B welds S-18344 Vol 1 3INT-ISI-2 Rev. 4 41 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION EXAM CATEGORY C-B; PRESSURE PERIOD RETAINING NOZZLE WELDS IN VESSELS C2.20 NOZZLES WITHOUT REINFORCING PLATE IN VESSELS >1/2 IN.

NOMINAL THICKNESS C2.21 NOZZLE-TO-SHELL (NOZZLE TO HEAD OR NOZZLE TO NOZZLE)

WELD

  • C2.21 running percent - - - 20** 2 1 20 ** 20 Total, 10 REQ'D 4 2 60 multiple vessels 4 3 100 41- Steam Generator 1 welds 212 S & Vol 8 4 2 42- Steam Generator 2 welds 211 S & Vol 8 4 3 84- SDCHX A welds S-18343 S & Vol 2 1 1 87- SDCHX B welds S-18344 S & Vol 2 1 1 C2.22 NOZZLE INSIDE RADIUS SECTION
  • C2.22 running percent - - - 12** 2 1 33 ** 12 Total, 6 REQ'D 2 2 67 multiple vessels 2 3 100 41- Steam Generator 1 welds 212 Vol 4 2 2 42- Steam Generator 2 welds 211 Vol 4 2 3 84- SDCHX A welds S-18343 Vol 2 1 1 87- SDCHX B welds S-18344 Vol 2 1 1 3INT-ISI-2 Rev. 4 42 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PERIOD EXAM CATEGORY C-C; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES PRESSURE VESSELS C3.10 WELDED ATTACHMENTS

  • C3.10 running percent - - - 6** 1 1 25 ** 6 Total; 4 REQD 1 2 50 Multiple Vessels 2 3 100 Multiple Vessels 41- Steam Generator 1 lugs 212 S 2 1 1 1 2 42- Steam Generator 2 lugs 211 S 2 68- Regenerative Heat Exchanger supports 79313 S 2 2 3 PIPING C3.20 WELDED ATTACHMENTS

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 58- Aux Feed S/G 1 attachment SG-008 S 1 PERIOD 59- Aux Feed S/G 2 attachment SG-011 S 2 62- Auxiliary Feedwater SG 1 attachment AF-018 S 1 63- Auxiliary Feedwater SG 1 attachment AF-016 S 1 64- Blowdown SG 1 attachment SG-039 S 7 1 2 SG-053 65- Blowdown SG 2 attachment SG-048 S 7 2 2 SG-052 70- LPSI Pump Room A Suction attachment SI-067 S 3 SI-241 SI-307 71- LPSI Pump Room A Discharge attachment SI-078 S 4 SI-087 73- LPSI Pump Room B Suction attachment SI-034 S 2 SI-308 74- LPSI Pump Room B Discharge attachment SI-129 S 3 76- CS Pump Room A Suction attachment SI-009 S 2 SI-067 77- CS Pump Room A Discharge attachment SI-079 S 6 2 3 SI-082 79- CS Pump Room B Suction attachment SI-033 S 1 SI-034 80- CS Pump Room B Discharge attachment SI-119 S 4 3INT-ISI-2 Rev. 4 44 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 82- SDCHX Room A attachment SI-078 S 3 PERIOD SI-079 83- SDCHX Room B attachment SI-070 S 11 2 1 SI-082 SI-087 SI-089 SI-090 85- SDCHX Room B attachment SI-119 S 6 1 2 SI-123 86- SDCHX Room B attachment SI-072 S 12 2 3 SI-129 SI-134 SI-135 88- East Wrap attachment SI-072 S 4 SI-073 89- East Wrap attachment SI-173 S 3 SI-194 90- East Wrap attachment SI-134 S 1 91- West Wrap attachment SI-070 S 4 92- West Wrap attachment SI-002 S 4 1 1 SI-239 SI-241 93- West Wrap attachment SI-089 S 1 94- A Train Pipe Chase & 88' attachment SI-070 S 9 SI-089 SI-241 3INT-ISI-2 Rev. 4 45 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 95- B Train Pipe Chase & 88' attachment SI-072 S 9 1 PERIOD 2

SI-134 1 3 SI-194 96- Containment LPSI to 1A attachment SI-202 S 1 97- Containment LPSI to 1B attachment SI-220 S 3 98- Containment LPSI to 2A attachment SI-155 S 2 99- Containment LPSI to 2B attachment SI-174 S 3 1 2 100- Containment LPSI A Suction attachment SI-007 S 2 SI-369 101- Containment LPSI B Suction attachment SI-030 S 3 SI-194 SI-368 102- SI Pump Suction A attachment SI-008 S 12 1 1 SI-009 SI-307 103- Refueling Water Suction A attachment CH-142 S 9 1 3 CH-424 104- SI Pump Suction B attachment SI-031 S 10 2 2 SI-033 SI-308 105- Refueling Water Suction B attachment CH-149 S 15 3 3 CH-425 106- HPSI Room Discharge A attachment SI-099 S 20 2 1 SI-100 SI-105 SI-106 3INT-ISI-2 Rev. 4 46 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 107- HPSI Room Discharge B attachment SI-107 S 14 3 PERIOD 2

SI-112 108- HPSI 88 Pipechase attachment SI-100 S 14 2 3 SI-118 109- HPSI 88 Pipechase attachment SI-107 S 9 1 1 110- HPSI Discharge West Wrap attachment SI-103 S 6 1 2 SI-107 SI-218 SI-236 111- HPSI Discharge West Wrap attachment SI-100 S 3 112- HPSI Discharge East Wrap attachment SI-100 S 4 SI-101 SI-102 SI-176 113- HPSI Discharge attachment SI-107 S 4 SI-157 SI-176 118- HPSI Long Term attachment SI-106 S 18 3 3 119- HPSI Long Term attachment SI-114 S 12 2 1 121- Containment Spray B attachment SI-130 S 1 3INT-ISI-2 Rev. 4 47 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PUMPS PERIOD C3.30 WELDED ATTACHMENTS

  • C3.30 running percent - - - 20** 2 2 10 **20 Total, 10 REQ'D Multiple Vessels 72- LPSI Pump A lugs 0876-40 S 3 75- LPSI Pump B lugs 0876-41 S 3 78- Containment Spray A lugs 0876-42 S 3 81- Containment Spray B lugs 0876-43 S 3 116- HPSI A lugs 0776-16 S 4 117- HPSI B lugs 0776-17 S 4 2 2 3INT-ISI-2 Rev. 4 48 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION EXAM CATEGORY C-D; PRESSURE PERIOD RETAINING BOLTING GREATER THAN 2 in.

IN DIAMETER

  • category running percent - - - 10** 1 1 33 **10 total 3 required 1 2 67 Multiple Items 1 3 100 PUMPS C4.30 BOLTS AND STUDS 116- HPSI A 16 studs 0776-14 VOL 1 117- HPSI B 16 studs 0776-15 VOL 1 1 1 VALVES C4.40 BOLTS AND STUDS 47- Main Steam SG 1 West 20 studs UV-170 VOL 1 1 1 48- Main Steam SG 1 East 20 studs UV-180 VOL 1 1 2 49- Main Steam SG 2 East 20 studs UV-171 VOL 1 50- Main Steam SG 2 West 20 studs UV-181 VOL 1 56- Feedwater SG No. 1 20 studs UV-132 VOL 1 1 3 UV-174 1 57- Feedwater SG No. 2 20 studs UV-137 VOL 1 UV-177 1 3INT-ISI-2 Rev. 4 49 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PERIOD EXAM CATEGORY C-F-1; PRESSURE RETAINING WELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOY PIPING PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING C5.10 >NPS 4 C5.11 CIRCUMFERENTIAL WELD

  • C5.11 running percent - - - 517 22 1 2 *1101 WELDS USED 25 2 4 FOR % DUE TO C-F-1 41 3 8 See note 2 in code 54- Feedwater SG No. 1 Butt Welds SG-2-14 S & Vol 10 2 2 SG-13-14 55- Feedwater SG No. 2 Butt Welds SG-5-14 S & Vol 10 1 3 SG-14-14 58-Aux Feed S/G 1 6 x 0.562 AF-004 S & Vol 19 4 1 6 x 0.432 SG-008 8 x 0.500 SG-008 59-Aux Feed S/G 2 6 x 0.562 AF-006 S & Vol 27 4 2 6 x 0.432 SG-011 8 x 0.500 SG-011 62-Aux Feed S/G 1 6 x 0.562 AF-004 S & Vol 20 3 3 AF-018 63-Aux Feed S/G 2 6 x 0.562 AF-006 S & Vol 16 4 1 AF-016 70-LPSI Pump Room A Suction 20 x 0.375 SI-307 S & Vol 20 4 1 73-LPSI Pump Room B Suction SI-308 82 & 85 SDC Heat Exch 20 x 0.500 SI-078 S & Vol 8 2 2 Room A & B SI-123 3INT-ISI-2 Rev. 4 50 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 83 & 86 SDC Heat Exch 14 x 0.375 SI-90 S & Vol 56 7 PERIOD 2

Room A & B SI-135 16 x 0.375 SI-70 SI-72 20 x 0.500 SI-70 SI-72 88 & 91 Safety Injection 12 x 0.375 SI-72 S & Vol 77 13 3 East and West Wraps SI-73 SI-70 SI-71 12 x 1.125 SI-155 SI-174 SI-72 SI-73 SI-70 SI-71 SI-202 SI-220 20 x 0.500 SI-72 SI-70 90 & 93 Safety Injection 24 x 0.375 SI-30 S & Vol 10 2 1 East and West Wraps SI-7 24 x 0.562 SI-308 SI-307 94 & 95 Safety Injection A & B 20 x 0.500 SI-70 S & Vol 15 4 1 SI-72 1 2 3INT-ISI-2 Rev. 4 51 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 96, 97, 98, 99 Containment LPSI 12 x 1.125 SI-202 S & Vol 105 14 PERIOD 3

Loop 1A, 1B, 2A & 2B SI-220 2 2 SI-155 SI-174 12 x 1.312 SI-202 SI-220 SI-155 SI-174 100 & 101 Containment LPSI 16 x 1.594 SI-241 S & Vol 8 1 2 Loop A & B, Suction SI-194 24 x 0.375 SI-7 SI-30 102-Safety Injection A Suction 24 x 0.562 SI-307 S & Vol 18 4 1 20 x 0.375 SI-307 103-Refueling Water Tank Suction A 20 x 0.375 CH-424 S & Vol 33 20 x 0.375 CH-142 104-Safety Injection B Suction 24 x 0.562 SI-308 S & Vol 19 4 3 20 x 0.375 SI-308 105-Refueling Water Tank B Suction 20 x 0.375 CH-425 S & Vol 46 7 3 20 x 0.375 CH-149 13 2 3INT-ISI-2 Rev. 4 52 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PIPING WELDS > 1/5 IN NOMINAL PERIOD WALL THICKNESS FOR PIPING >

C5.20 NPS 2 AND < NPS 4 C5.21 CIRCUMFERENTIAL WELD

  • C5.21 running percent - - - 580 10 1 2 14 2 5 18 3 8 104 SI B Train Suction 3 X 0.216 CH-150 S & Vol 4 1 3 106 & 107 HPSI Room Discharge 4 x 0.438 SI-100 S & Vol 137 10 1 A and B 4 x 0.337 SI-99 SI-107 3 x 0.438 SI-106 SI-107 2 x 0.344 SI-105 SI-112 108 & 109 HPSI 88 Pipechase 4 x 0.438 SI-100 S & Vol 86 7 2 2 x 0344 SI-118 4 x 0.377 SI-107 110 & 111 HPSI Discharge 4 x 0.337 SI-107 S & Vol 106 8 3 West Wrap 4 x 0.438 SI-218 SI-100 SI-236 3 x 0.438 SI-218 SI-236 2 x 0.344 SI-103 SI-107 SI-110 SI-218 SI-236 SI-100 3INT-ISI-2 Rev. 4 53 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 112 & 113 HPSI Discharge 4 x 0.337 SI-107 S & Vol 97 8 PERIOD 2

East Wrap 4 x 0.438 SI-100 SI-176 SI-157 3 x 0.438 SI-176 SI-157 2 x 0.344 SI-101 SI-102 SI-108 SI-109 SI-157 SI-176 114 & 115 HPSI Header 3 x 0.438 SI-218 S & Vol 44 3 2 Loop 1A, 1B, 2A & 2B SI-236 SI-157 SI-176 118 & 119 HPSI Long Term 3 x 0.438 SI-106 S & Vol 106 9 3 SI-114 2 x 0.344 SI-319 C5.30 SOCKET WELDS 106 & 107 HPSI Room Discharge 2 x 0.344 SI-105 S 3 1 3 17 A and B SI-112 S 3 3INT-ISI-2 Rev. 4 54 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PIPE BRANCH CONNECTIONS OF PERIOD C5.40 BRANCH PIPING > NPS 2 C5.41 CIRCUMFERENTIAL

  • C5.41 running percent - - - 27 1 1 4 1 2 7 1 3 11 82 & 85 SDC Heat Exch 20 x 10 SI-78 S 2 1 1 Room A & B SI-123 S 2 83 & 86 SDC Heat Exch 20 x 6 SI-70 S 4 1 3 Room A & B 20 x 10 SI-72 S 4 20 x 14 88 & 91 Safety Injection 20 x 12 SI-70 S 1 East and West Wraps SI-72 S 1 89 & 92 SDC Suction 18 x 12 SI-194 S 1 East and West Wraps SI-241 S 1 96, 97, 98, 99 Containment LPSI 12 x 3 SI-202 S 1 1 2 Loop 1A, 1B, 2A & 2B SI-220 S 1 SI-155 S 1 SI-174 S 1 102-Safety Injection A Suction 24 x 10 SI-307 S 3 24 x 18 24 x 20 104-Safety Injection B Suction 24 x 10 SI-308 S 4 24 x 18 24 x 20 24 x 3 3INT-ISI-2 Rev. 4 55 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PERIOD EXAM CATEGORY C-F-2; PRESSURE RETAINING WELDS IN CARBON OR LOW ** Note exam items are ALLOY STEEL PIPING in Aug Summary PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING C5.50 >NPS 4 C5.51 CIRCUMFERENTIAL WELD

  • C5.51 running percent - - - 370 9 1 2 10 2 5 16 3 8 43- Main Steam SG 1 East Butt Welds SG-36-28 S & Vol 19 2 1 SG-36-32 44- Main Steam SG 1 West Butt Welds SG-33-28 S & Vol 21 2 2 SG-33-32 45- Main Steam SG 2 East Butt Welds SG-42-28 S & Vol 19 2 3 SG-42-32 46- Main Steam SG 2 West Butt Welds SG-45-28 S & Vol 21 2 1 SG-45-32 1 3 47- Main Steam SG 1 West Butt Welds ** S & Vol **

48- Main Steam SG 1 East Butt Welds ** S & Vol **

49- Main Steam SG 2 East Butt Welds ** S & Vol **

50- Main Steam SG 2 West Butt Welds ** S & Vol **

51- Atmospheric Dump No. 1 Butt Welds ** S & Vol **

52- Atmospheric Dump No. 2 Butt Welds ** S & Vol **

53- Steam to Aux Feedwater Butt Welds ** S & Vol **

3INT-ISI-2 Rev. 4 56 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 54- Feedwater SG No. 1 Butt Welds SG-2-24 S & Vol 45 4 PERIOD 3

SG-2-16 SG-2-14 SG-13-16 SG-13-14 55- Feedwater SG No. 2 Butt Welds SG-5-24 S & Vol 44 5 1 SG-5-16 2 3 SG-5-14 SG-14-16 SG-14-14 56- Feedwater SG No. 1 Butt Welds SG-201-24 S & Vol **

SG-202-24 57- Feedwater SG No. 2 Butt Welds SG-204-24 S & Vol **

SG-205-24 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6 S & Vol 23 2 2 SG-8-8 59- Aux & Downcomer FW SG 2 Butt Welds SG-11-6 S & Vol 18 2 3 SG-11-8 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8 S & Vol **

SG-008-8 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8 S & Vol **

SG-11-8 64- Blowdown SG 1 Butt Welds SG-39-6 S & Vol 75 6 2 SG-53-6 SG-522-6 65- Blowdown SG 2 Butt Welds SG-48-6 S & Vol 85 5 3 SG-52-6 SG-523-6 3INT-ISI-2 Rev. 4 57 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 66- Blowdown SG 1 Butt Welds SG-39-6 S & Vol ** PERIOD 67- Blowdown SG 2 Butt Welds SG 6 S & Vol **

Scope from AHE5.81 PIPE BRANCH CONNECTIONS OF moved to C5.81. (CRAI C5.80 BRANCH PIPING > NPS 2 4178275)

C5.81 CIRCUMFERENTIAL 47- Main Steam SG 1 West 28 x 12 SG-206-28 S 7 7 1 28 x 6 48- Main Steam SG 1 East 28 x 12 SG-207-28 S 8(1) 9 3 28 x 6 49- Main Steam SG 2 East 28 x 12 SG-208-28 S 8(1) 9 3 28 x 6 50- Main Steam SG 2 West 28 x 12 SG-209-28 S 7 7 3 28 x 6 EXAM CATEGORY C-G deleted in the 2007 Ed.,

2008 Add. See letter 102-06454 and SER dated EXAM CATEGORY C-H; ALL PRESSURE 09/18/2012. (ACT RETAINING COMPONENTS 4343138)

PRESSURE RETAINING C7.10 COMPONENTS Class 2 IWC-5222 VT-2 * * *

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION PERIOD EXAM CATEGORY F-A; SUPPORTS F1.20 CLASS 2 PIPING SUPPORTS A-ONE DIRECTIONAL (RODS)

  • F-A; A running percent - - - 3 1 2 33 83- SDCHX Room A supports SI-87 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-100 VT-3 1 107- HPSI Room Discharge B supports SI-107 VT-3 1 F1.20 CLASS 2 PIPING SUPPORTS RESTRAINTS

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 3 PERIOD AF-016 64- Blowdown SG 1 supports SG-39 VT-3 11 1 1 SG-53 VT-3 1 2 65- Blowdown SG 2 supports SG-48 VT-3 12 3 2 SG-52 VT-3 70- LPSI Pump Room A Suction supports SI-067 VT-3 3 SI-241 SI-307 71- LPSI Pump Room A Discharge supports SI-87 VT-3 5 2 3 SI-78 73- LPSI Pump Room B Suction supports SI-034 VT-3 3 SI-308 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 76- CS Pump Room A Suction supports SI-9 VT-3 4 SI-67 77- CS Pump Room A Discharge supports SI-79 VT-3 8 2 3 SI-82 79- CS Pump Room B Suction supports SI-033 VT-3 3 3 3 SI-034 80- CS Pump Room B Discharge supports SI-119 VT-3 5 1 2 82- SDCHX Room A supports SI-78 VT-3 2 SI-79 83- SDCHX Room A supports SI-70 VT-3 13 1 1 SI-82 VT-3 SI-87 VT-3 3INT-ISI-2 Rev. 4 60 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION SI-89 VT-3 PERIOD SI-90 VT-3 85- SDCHX Room B supports SI-119 VT-3 8 1 2 SI-123 86- SDCHX Room B supports SI-72 VT-3 10 2 3 SI-129 VT-3 SI-134 VT-3 SI-135 VT-3 SI-147 VT-3 88- East Wrap supports SI-72 VT-3 5 SI-73 VT-3 89- East Wrap supports SI-38 VT-3 4 1 1 SI-173 VT-3 SI-194 VT-3 90- East Wrap supports SI-130 VT-3 3 SI-134 91- West Wrap supports SI-70 VT-3 7 1 1 SI-71 VT-3 92- West Wrap supports SI-2 VT-3 5 1 1 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 3 1 1 94- A Train Pipe Chase & 88' supports SI-70 VT-3 14 SI-89 VT-3 SI-241 VT-3 95- B Train Pipe Chase & 88' supports SI-194 VT-3 14 3 3 SI-72 VT-3 2 2 SI-134 VT-3 3INT-ISI-2 Rev. 4 61 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 96- Containment LPSI to 1A supports SI-202 VT-3 10 1 PERIOD 2

97- Containment LPSI to 1B supports SI-220 VT-3 16 4 2 98- Containment LPSI to 2A supports SI-155 VT-3 4 99- Containment LPSI to 2B supports SI-174 VT-3 5 100- Containment LPSI A Suction supports SI-7 VT-3 2 SI-369 VT-3 101- Containment LPSI B Suction supports SI-30 VT-3 4 SI-194 VT-3 SI-368 VT-3 102- SI Pump Suction A supports SI-8 VT-3 14 2 1 SI-9 VT-3 SI-307 VT-3 103- Refueling Water Suction A supports CH-142 VT-3 14 CH-424 VT-3 104- SI Pump Suction B supports SI-31 VT-3 12 1 2 SI-33 VT-3 1 3 SI-308 VT-3 105- Refueling Water Suction B supports CH-149 VT-3 19 6 3 CH-425 VT-3 2 2 106- HPSI Room Discharge A supports SI-100 VT-3 18 2 1 SI-105 SI-106 107- HPSI Room Discharge B supports SI-107 VT-3 14 3 2 SI-112 3INT-ISI-2 Rev. 4 62 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 108- HPSI 88 Pipechase supports SI-100 VT-3 16 4 PERIOD 3

SI-118 109- HPSI 88 Pipechase supports SI-107 VT-3 11 1 1 110- HPSI Discharge West Wrap supports SI-103 VT-3 13 1 2 SI-107 SI-110 SI-218 SI-236 111- HPSI Discharge West Wrap supports SI-100 VT-3 6 1 3 SI-236 112- HPSI Discharge East Wrap supports SI-100 VT-3 10 1 3 SI-101 SI-102 SI-176 113- HPSI Discharge supports SI-107 VT-3 10 1 1 SI-108 SI-109 SI-157 SI-176 114 HPSI Header supports SI-218 VT-3 2 1 2 Loop 1A & 1B SI-236 115 HPSI Header supports SI-157 VT-3 2 Loop 2A & 2B SI-176 118 - HPSI Long Term supports SI-106 VT-3 22 3 3 119 - HPSI Long Term supports SI-114 VT-3 19 2 1 SI-319 3INT-ISI-2 Rev. 4 63 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION F1.20 CLASS 2 PIPING SUPPORTS PERIOD C-SUPPORTS THAT ALLOW THERMAL MOVEMENT (SPRING)

  • F-A; C running percent - - - 167 9 1 5 11 2 12 10 3 17 43- Main Steam SG 1 East supports SG-36 VT-3 1 44- Main Steam SG 1 West supports SG-33 VT-3 2 45- Main Steam SG 2 East supports SG-42 VT-3 1 46- Main Steam SG 2 West supports SG-45 VT-3 2 47- Main Steam SG 1 West supports SG-206 VT-3 1 48- Main Steam SG 1 East supports SG-207 VT-3 1 49- Main Steam SG 2 East supports SG-208 VT-3 1 50- Main Steam SG 2 West supports SG-209 VT-3 1 51- Atmospheric Dump No. 1 supports SG-59 VT-3 2 SG-70 52- Atmospheric Dump No. 2 supports SG-84 VT-3 2 SG-103 54- Feedwater SG No. 1 supports SG-002 VT-3 9 2 1 SG-013 VT-3 55- Feedwater SG No. 2 supports SG-005 VT-3 10 1 1 SG-014 56- Feedwater SG No. 1 supports SG-202 VT-3 1 3INT-ISI-2 Rev. 4 64 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 57- Feedwater SG No. 2 supports SG-205 VT-3 1 PERIOD 58- Aux & Downcomer FW SG 1 supports SG-8 VT-3 11 2 3 AF-4 VT-3 59- Aux & Downcomer FW SG 2 supports SG-11 VT-3 11 2 2 AF-6 VT-3 60- Downcomer Feedwater SG 1 supports SG-200 VT-3 2 61- Downcomer Feedwater SG 2 supports SG-203 VT-3 2 1 3 62- Auxiliary Feedwater SG 1 supports AF-018 VT-3 2 2 2 AF-4 VT-3 63- Auxiliary Feedwater SG 2 supports AF-006 VT-3 2 64- Blowdown SG 1 supports SG-39 VT-3 6 1 1 1 2 65- Blowdown SG 2 supports SG-48 VT-3 5 2 2 71- LPSI Pump Room A Discharge supports SI-78 VT-3 1 74- LPSI Pump Room B Discharge supports SI-129 VT-3 3 1 3 77- CS Pump Room A Discharge supports SI-79 VT-3 2 79- CS Pump Room B Suction supports SI-034 VT-3 1 80- CS Pump Room B Discharge supports SI-119 VT-3 5 1 2 SI-147 82- SDCHX Room A supports SI-78 VT-3 1 3INT-ISI-2 Rev. 4 65 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 83- SDCHX Room A supports SI-70 VT-3 5 1 PERIOD 1

SI-87 VT-3 SI-90 VT-3 85- SDCHX Room B supports SI-119 VT-3 2 SI-123 86- SDCHX Room B supports SI-72 VT-3 15 2 3 SI-129 SI-134 SI-135 88- East Wrap supports SI-72 VT-3 9 1 3 SI-73 89- East Wrap supports SI-194 VT-3 1 91- West Wrap supports SI-70 VT-3 3 SI-71 92- West Wrap supports SI-239 VT-3 4 1 1 SI-241 VT-3 93- West Wrap supports SI-89 VT-3 1 94- A Train Pipe Chase & 88' supports SI-89 VT-3 1 95- B Train Pipe Chase & 88' supports SI-72 VT-3 4 1 3 SI-194 96- Containment LPSI to 1A supports SI-202 VT-3 1 99- Containment LPSI to 2B supports SI-174 VT-3 2 1 2 1 3 100- Containment LPSI A Suction supports SI-241 VT-3 1 3INT-ISI-2 Rev. 4 66 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION 101- Containment LPSI B Suction supports SI-194 VT-3 1 PERIOD 102- SI Pump Suction A supports SI-307 VT-3 1 1 1 104- SI Pump Suction B supports SI-308 VT-3 1 1 2 106- HPSI Room Discharge A supports SI-99 VT-3 3 1 1 SI-100 107- HPSI Room Discharge B supports SI-107 VT-3 3 1 2 108- HPSI 88 Pipechase supports SI-100 VT-3 2 SI-118 109- HPSI 88 Pipechase supports SI-107 VT-3 3 110- HPSI Discharge West Wrap supports SI-107 VT-3 4 1 3 SI-218 111- HPSI Discharge West Wrap supports SI-236 VT-3 1 113- HPSI Discharge supports SI-157 VT-3 1 118 - HPSI Long Term supports SI-106 VT-3 2 119 - HPSI Long Term supports SI-114 VT-3 4 1 1 SI-319 120- Containment Spray A supports SI-88 VT-3 1 121- Containment Spray B supports SI-130 VT-3 2 3INT-ISI-2 Rev. 4 67 of 210

ASME DESCRIPTION, NDE TOTAL EXAM INSPECT RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL REMARKS METHOD ITEMS AMOUNT  %

NO NO ION F1.40 SUPPORTS OTHER THAN PERIOD PIPING SUPPORTS

  • F-A; B running percent - - - 22** 2 1 17 **22 Total, 12 REQ'D 5 2 58 Multiple Items 5 3 100 68- Regenerative Heat Exchanger supports 79313 VT-3 2 2 3 72- LPSI Pump A supports 0876-41 VT-3 3 75- LPSI Pump B supports 0876-42 VT-3 3 3 2 78- CS Pump A supports 0876-43 VT-3 3 81- CS Pump B supports 0876-44 VT-3 3 3 3 116- HPSI Pump A supports 0776-16 VT-3 4 2 1 117- HPSI Pump B supports 0776-17 VT-3 4 2 2 F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS

SECTION 6.0 ASME CLASS 3 EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 69 of 210

INDEX EXAM CATEGORY D-A Welded Attachments for Vessels, Piping, Pumps and Valves D-B All Pressure Retaining Components F-A Class 3 Supports 3INT-ISI-2 Rev. 4 70 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD EXAM CATEGORY D-A; WELDED ATTACHMENTS FOR VESSELS, PIPING, PUMPS, AND VALVES Pressure Vessels

  • D1.10 Welded Attachments
  • D1.10; running percent - - - 22** 3 1 33 **10 req'd due to 3 2 66 multiple comp 4 3 100 DF System attachments DFA-T02 VT-1 2 2 1 DFB-T02 DG System attachments DGA-E04 VT-1 8 1 1 DGA-E05 2 2 DGB-E04 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1 VT-1 4 2 3 ECA-T-1 ECB-E-1 ECB-T-1 EW System attachments EWA-E01 VT-1 4 1 1 EWA-T01 1 3 EWB-E01 EWB-T01 PC System attachments PCA-E1 VT-1 2 1 2 PCB-E1 SI System attachments SIA-E01 VT-1 2 1 3 SIB-E01 3INT-ISI-2 Rev. 4 71 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD Piping D1.20 Welded Attachments

  • D1.20; running percent - - - 243 11 1 4 11 2 9 11 3 13 AF System attachments piping VT-1 9 1 1 CT System attachments piping VT-1 3 1 1 DG System attachments piping VT-1 14 2 3 EC System attachments piping VT-1 14 1 3 EW System attachments piping VT-1 37 4 1 2 2 NC System attachments piping VT-1 19 2 1 1 3 PC System attachments piping VT-1 13 1 1 SG System attachments piping VT-1 3 1 1 1 2 SI System attachments piping VT-1 2 1 1 SP System attachments piping VT-1 129 8 2 7 3 3INT-ISI-2 Rev. 4 72 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD EXAM CATEGORY D-B; ALL PRESSURE RETAINING COMPONENTS D2.10 Pressure retaining components Class 3 IWD-5221 VT-2 * * * *

  • Note Pressure Test Program EXAM CATEGORY F-A; SUPPORTS F1.30 CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS
  • F-A; B running percent - - - 319 16 1 5 11 2 8 17 3 13 AF System supports piping VT-3 18 2 1 1 2 4 3 CT System supports piping VT-3 3 1 1 DG System supports piping VT-3 30 2 3 EC System supports piping VT-3 16 2 3 EW System supports piping VT-3 67 6 1 2 2 NC System supports piping VT-3 35 4 1 2 3 PC System supports piping VT-3 17 1 1 SG System supports piping VT-3 4 1 1 1 2 SI System supports piping VT-3 4 1 1 SP System supports piping VT-3 125 7 2 7 3 3INT-ISI-2 Rev. 4 73 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD F1.30 CLASS 3 PIPING SUPPORTS B-MULTIDIRECTIONAL RESTRAINTS

  • F-A; C running percent - - - 57 7 1 12 5 2 21 4 3 28 AF System supports piping VT-3 10 1 1 1 2 DG System supports piping VT-3 4 1 3 EC System supports piping VT-3 2 1 3 EW System supports piping VT-3 10 2 1 NC System supports piping VT-3 1 1 1 PC System supports piping VT-3 13 2 1 2 3 SG System supports piping VT-3 7 2 2 SI System supports piping VT-3 1 1 2 SP System supports piping VT-3 9 1 1 1 2 3INT-ISI-2 Rev. 4 74 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD F1.40 SUPPORTS OTHER THAN PIPING SUPPORTS

  • F-A; B running percent - - - 22 3 1 30 **10 req'd due to 3 2 60 multiple comp 4 3 100 DF System supports DFA-T02 VT-3 2 1 1 DFB-T02 DG System supports DGA-E04 VT-3 8 1 1 DGB-E04 1 2 DGA-E05 1 3 DGB-E05 DGA-X01A DGA-X01B DGB-X01A DGB-X01B EC System attachments ECA-E-1 VT-3 4 1 1 ECB-E-1 1 2 ECA-T-1 ECB-T-1 EW System attachments EWA-E01 VT-3 4 2 3 EWB-E01 EWA-T01 EWB-T01 PC System attachments PCA-E1 VT-3 2 1 2 PCB-E1 SI System attachments SIA-E01 VT-3 2 1 3 SIB-E01 3INT-ISI-2 Rev. 4 75 of 210

SECTION 7.0 AUGMENTED EXAMINATION

SUMMARY

3INT-ISI-2 Rev. 4 76 of 210

INDEX EXAM CATEGORY N-722-1 PWR Components Containing Alloy 600/82/182 N-729-1 PWR Reactor Vessel Upper Head N-770-1 PWR Pressure Retaining Dissimilar Metal Piping and Vessel Nozzle Butt Welds containing Alloy 82/182 B-J Pressure Retaining Welds in Piping B-P All Pressure Retaining Components C-F-1 Pressure Retaining Welds in Austenitic Stainless Steel or High Alloy Piping C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED HIGH ENERGY C-F-2 Pressure Retaining Welds in Carbon or Low Alloy Steel Piping AUGMENTED FLYWHEEL NA Reactor Coolant Pump Flywheel Examinations 3INT-ISI-2 Rev. 4 77 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD EXAM CATEGORY CC722-1; PWR COMPONENTS CONTAINING ALLOY 600/82/182 REACTOR VESSEL RPV bottom mounted instrument B15.80 penetrations

  • Required R16, R18, 1-Reactor Vessel (1-31) ICI Penetrations 78173 VE 61 61 *
      • Prorated over inverval per Footnote 6 B15.135 3- Cold leg instrument connections Penetrations 224 VE 4 4 *** *** of Code Case.

4- Cold leg instrument connections Penetrations 225 VE 4 4 *** ***

PRESSURIZER B15.140 5- Heater Penetrations Penetrations 78373 VE 36 36 ** ** **Each RFO (5-36)

B15.180 5- Instrument Connections Instruments 78373 VE 7 7 ** **

(5-37, 1 through 7)

PIPING B15.200 6- Hot Leg Instrument Connections Instruments RCS VE 27 27 ** **

(6-101)

B15.205 Cold leg instrument connections 6- RCP Pressure Taps (6-100) Instrument RCP VE 4 4 1 25 6- Cold Leg Instrumentation (6-99) Instrument RCs VE 12 6 2 63 6 3 100 3INT-ISI-2 Rev. 4 78 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD B15.215 Cold leg full penetration welds 23- Safety Injection 1A (9-10) butt welds SI-207-14 VE 1 1 *** *** *** VE in conjunction with N-770-1 VOL, 24- Safety Injection 1B (11-10) butt welds SI-223-14 VE 1 1 *** *** prorated over inverval per Footnote 6 of 25- Safety Injection 2A (13-10) butt welds SI-160-14 VE 1 1 *** *** Code Case 26- Safety Injection 2B (15-9) butt welds SI-179-14 VE 1 1 *** ***

27- Pzr Spray 1A (9-11) butt welds RC-062-3" VE 1 1 *** ***

28- Pzr Spray 1B (11-11) butt welds RC-017-3" VE 1 1 *** ***

32- Drain Line Loop 1A (8-18) butt welds RC-060-2 VE 1 1 *** ***

33- Drain Line Loop 1B (10-18) butt welds RC-058-2 VE 1 1 *** ***

34- Drain Line Loop 2A (12-18) butt welds RC-096-2 VE 1 1 *** ***

36- Letdown Line (14-18) butt welds RC-091-2 VE 1 1 *** ***

37- Charging Line (13-11) butt welds CH-005-3 VE 1 1 *** ***

3INT-ISI-2 Rev. 4 79 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD CODE CASE N-729-1; PWR REACTOR VESSEL UPPER HEAD REACTOR VESSEL UPPER HEAD Head with nozzles and partial-penetration welds of PWSCC-resistant B4.30 materials 2-Closure Head CEDM Penetrations Head Surface N05065-CHA-01 VE 97 97

  • 100 *R15 (Head Replaced)

(2-89) REQUIRED R18, R21 2-Closure Head Vent Penetration Vent Nozzle N05065-CHA-01 VE 1 1

  • 100 *R15 (Head Replaced)

(2-88) REQUIRED R18, R21 Nozzles and partial-penetration welds of B4.40 PWSCC-resistant materials in head 2-Closure Head CEDM Nozzles & J-Weld CEDM Nozzle N05065-CHA-01 S or Vol 97 97

  • 100
  • not to exceed 2020 (2-89) 2-Closure Head Vent Nozzle & J-Weld Vent Nozzle N05065-CHA-01 S or Vol 1 1
  • 100
  • not to exceed 2020 (2-88) 3INT-ISI-2 Rev. 4 80 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD CODE CASE N-770-1; PWR PRESSURE RETAINING DISSIMILAR METAL PIPING AND VESSEL NOZZLE BUTT WELDS CONTAINING ALLOY 82/182 Cracked butt weld reinforced by full structural weld overlay of Alloy 52/152 material INSPECTION ITEM F NOMINAL PIPE SIZE > 4 INCH Mitigated with FSWO NOZZLE TO SAFEEND BUTT WELDS During R14; 1st ISI R16 29- Spray butt welds RC-18-4 Vol 6 1 2 14 *Design Calc Exam 20- Surge* butt welds RC-028-12 Vol 1 3 28 Freq. every 3 years.

31- Safeties (4) butt welds RC-001-6 Vol R18, R20, R22.

RC-003-6 Vol (CRAI 4348769)

RC-005-6 Vol RC-007-6 Vol NPS 4 OR LARGER Mitigated with FSWO

  • CIRCUMFERENTIAL WELDS During R13; 1st ISI R15
    • Design Calc Frequency every 6 20- Pressurizer Surge Line** butt welds RC-028-12 Vol 3 1 3 33 years, R20 21- Shutdown Cooling Loop 1 butt welds RC-051-16" Vol (CRAI 4348769) 22- Shutdown Cooling Loop 2 butt welds RC-068-16 Vol 3INT-ISI-2 Rev. 4 81 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD Unmitigated butt weld at cold leg operating temperature INSPECTION ITEM B Examined R15, 23- Safety Injection 1A butt welds SI-207-14 VE & Vol 1 1 100 REQUIRED R19 Examined R15, 24- Safety Injection 1B butt welds SI-223-14 VE & Vol 1 1 100 REQUIRED R19 Examined R15, 25- Safety Injection 2A butt welds SI-160-14 VE & Vol 1 1 100 REQUIRED R19 Examined R15, 26- Safety Injection 2B butt welds SI-179-14 VE & Vol 1 1 100 REQUIRED R19 27- Pressurizer Spray 1A butt welds RC-062-3 VE & Vol 1 1 100 REQUIRED R17, R21 28- Pressurizer Spray 1B butt welds RC-017-3 VE & Vol 1 1 100 REQUIRED R17, R21 32- Drain Line Loop 1A butt welds RC-060-2 VE & Vol 1 1 100 REQUIRED R17, R21 33- Drain Line Loop 1B butt welds RC-058-2 VE & Vol 1 1 100 REQUIRED R17, R21 34- Drain Line Loop 2A butt welds RC-096-2 VE & Vol 1 1 100 REQUIRED R17, R21 36- Letdown Line butt welds RC-091-2 VE & Vol 1 1 100 REQUIRED R17, R21 37- Charging Line butt welds CH-005-2 VE & Vol 1 1 100 REQUIRED R17, R21

  • 100% each outage UNINSULATED (SUPPORTS EXAM CATEGORY B-P; ALL PRESSURE PRESSURE TEST RETAINING COMPONENTS PROGRAM)

REACTOR VESSEL B15.10 CLOSURE HEAD NUTS 2- Closure Head nuts 7.237 x 7.91" VT-2 54 0 ** 0 B15.10 CLOSURE STUDS 2- Closure Head studs 7.380 x 76.37" VT-2 54 54 *

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD PRESSURIZER B15.10 BOLTS, STUDS AND NUTS 5- Pressurizer Manway Studs & Nuts 1.31 x 14.5 VT-2 20 20 *

  • PIPING B15.10 BOLTS, STUDS AND NUTS 31- Pressurizer Safeties Flange Bolting RC-001-6 VT-2 8 8 *

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD EXAM CATEGORY B-J; PRESSURE RETAINING WELDS IN PIPING B9.20 LESS THAN NPS 4 CIRCUMFERENTIAL WELDS OTHER B9.21 THAN PWR HPSI SYSTEMS 30- Aux Pressurizer Spray** butt welds CH-009-2 S 2 2 3 100 ** IEB 88-08 & IN 97-19 2 welds and base metal down stream of V431 Removed AUG B-G-1 per CRAI 4052305.

PIPING WELDS > 3/8 IN NOMINAL WALL THICKNESS FOR PIPING >NPS 4

CIRCUMFERENTIAL WELD C5.11 54-FW SG 1 14 x 0.938 SG-002 S & Vol 2* 2 2 100 *Examination REQD by SG-013 IEB 79-13 & SER 83-07 (54-1 & 15; 55-1 & 15)

C5.11 55-FW SG 2 14 x 0.938 SG-005 S & Vol 2* 2 3 100 SG-014 C5.11 58- Aux & Downcomer FW SG 1 Butt Welds SG-8-6 S & Vol 1** 1 2 100 **Examination REQD by SG-8-8 IEB 79-13 & SER 83-07 (58-1; 59-1)

C5.11 59- Aux & Downcomer FW SG 2 Butt Welds SG-11-6 S & Vol 1** 1 3 100 SG-11-8 3INT-ISI-2 Rev. 4 84 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD

(*) Identifies the number EXAM CATEGORY C-F-2; PRESSURE of welds that are not in RETAINING WELDS IN CARBON OR LOW the ASME CL 2 ALLOY STEEL PIPING boundary PIPING WELDS > 3/8 IN NOMINAL **100% of all WALL THICKNESS FOR PIPING >NPS intersecting longitudinal AHE5.50 4 welds will be examined Except scope in parenthesis (outside class boundary), surface and volumetric exam to meet C-F-2 requirements.

Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI AHE5.51 CIRCUMFERENTIAL WELD** 4178275)

  • category running percent 199 53 1 27 146 3 100 47- Main Steam SG 1 West Butt Welds SG-206-28 S & Vol 11(1) 12 1 SG-206-12 SG-206-6 48- Main Steam SG 1 East Butt Welds SG-207-28 S & Vol 11(1) 12 3 SG-207-12 SG-207-6 49- Main Steam SG 2 East Butt Welds SG-208-28 S & Vol 11(1) 12 3 SG-208-12 SG-208-6 50- Main Steam SG 2 West Butt Welds SG-209-28 S & Vol 11(1) 12 3 SG-209-12 SG-209-6 3INT-ISI-2 Rev. 4 85 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD 51- Atmospheric Dump No. 1 Butt Welds SG-59-12 S & Vol 27 13 1 SG-70-12 14 3 52- Atmospheric Dump No. 2 Butt Welds SG-84-12 S & Vol 27 27 3 SG-103-12 53- Steam to Aux Feedwater Butt Welds SG-81-6 S & Vol 29 14 1 SG-83-6 15 3 56- Feedwater SG No. 1 Butt Welds SG-201-24 S & Vol 4(2) 6 3 SG-202-24 SG-224-24" 57- Feedwater SG No. 2 Butt Welds SG-204-24 S & Vol 4(2) 6 3 SG-205-24 SG-225-24" 60- Downcomer Feedwater SG 1 Butt Welds SG-200-8 S & Vol 6(8) 14 1 SG-008-8 61- Downcomer Feedwater SG 2 Butt Welds SG-203-8 S & Vol 6(8) 14 3 SG-11-8 66- Blowdown SG 1 Butt Welds SG-39-6 S & Vol 2(14) 16 3 67- Blowdown SG 2 Butt Welds SG 6 S & Vol 2(10) 12 3 PIPING WELDS >1/5" NOMINAL WALL THICKNESS FOR PIPING > NPS 2 AHE5.60 AND < NPS 4 Volumetric exams of AHE required per UFSAR 6.6.1. (CRAI AHE5.61 CIRCUMFERENTIAL** 4178275)

  • category running percent 41 11 1 24 3INT-ISI-2 Rev. 4 86 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD 30 3 100 51- Atmospheric Dump No. 1 Butt Welds SG-95-4 S & Vol 20 11 1 9 3 52- Atmospheric Dump No. 2 Butt Welds SG-100-4 S & Vol 21 21 3 PIPE BRANCH CONNECTIONS OF AHE5.80 BRANCH PIPING > NPS 2 Category deleted, scope moved to C5.81. (CRAI AHE5.81 CIRCUMFERENTIAL 4178275)

EXAM CATEGORY NA; RCP FLYWHEEL EXAMINATIONS PER REG GUIDE 1.14 NA 16-Reactor Coolant Pump 1A flywheel 1A S&VOL 4 4 3 100 S OF ALL EXPOSED 17 Reactor Coolant Pump 1B flywheel 1B SURFACES and UT OF 3INT-ISI-2 Rev. 4 87 of 210

ASME DESCRIPTION, NDE TOTAL EXAM RUNNING ITEM ZONE-COMPONENT OR SYSTEM IDENTIFICATION LINE OR SERIAL INSPECTION REMARKS METHOD ITEMS AMOUNT  %

NO NO PERIOD 18-Reactor Coolant Pump 2A flywheel 2A HIGH STRESS AREAS 19-Reactor Coolant Pump 2B flywheel 2B 3INT-ISI-2 Rev. 4 88 of 210

SECTION 8.0 REQUESTS FOR RELIEF 3INT-ISI-2 Rev. 4 89 of 210

RELIEF REQUESTS INDEX NUMBER DESCRIPTION

31. Reactor Coolant System Hot Leg Alloy 600 Small-Bore Nozzles
34. Included for reference to document that the Interval 2 Reactor Vessel volumetric examinations were extended for 1 fuel cycle.

NRC accepted as documented by SER attached to Letter dated September 20, 2006.

35. Included for reference to document that the Interval 2 Reactor Vessel visual examinations were extended for 1 fuel cycle.
36. Full Structural Weld Metal Overlay and for Units 1 and 3 only; Request to use 2001 Edition thru 2003 Addenda for Repair and Replacements NRC accepted as documented by SER attached to Letter dated June 21, 2007
37. Alternative to ASME Code Case N-638-1, Similar and Dissimilar Metal Welding Using Ambient Temperature Machine GTAW Temperbead Technique.

NRC accepted as documented by SER attached to Letter dated June 21, 2007 38 Included for reference to document the Close out of U2 2nd Interval

39. Safety Injection Tank alternative repair method.

Submitted by APS letter 102-05869-DCM/RJR, dated July 11, 2008

40. Extended Reactor Vessel Examinations to meet the PWROG program Submitted by APS letter
41. Request to utilize Appendix 1 of Code Case N-729-1.

Submitted by APS letter

42. Request to utilize Leak Path Assessments N-729-1 previously qualified Submitted by APS letter
43. Included for reference to document the Closeout of U3 2nd Interval Submitted by APS letter
44. Extended Reactor Vessel Examinations Submitted by APS letter
45. Included for reference to document the Closeout of U2 RPV 2nd Interval
46. Included for reference to document the Closeout of U1 2nd Interval
47. Included for reference to document the Closeout of U3 RPV 2nd Interval
48. Request for Relief to use UT in Lieu of RT
49. Request to use Alternate Inspection method for Reactor Vessel Leak-off line 3INT-ISI-2 Rev. 4 90 of 210

SECTION 9.0 ISI BOUNDARY DRAWINGS 3INT-ISI-2 Rev. 4 91 of 210

BOUNDARY DRAWING INDEX Drawing No. Drawing Title Code Class 02-M-AFP-001 Auxiliary - Feedwater System 2&3 02-M-CHP-001 Chemical and Volume Control System 1&2 02-M-CHP-002 Chemical and Volume Control System 2&3 02-M-CHP-003 Chemical and Volume Control System 2 02-M-CLP-001 Containment Integrated and Local Leak Rate Test 2 02-M-CPP-001 Containment Purge System 2 02-M-CTP-001 Condensate Purge System 2 02-M-DFP-001 Diesel Fuel Oil & Transfer System 3 02-M-DGP-001 Diesel Generator System 3 02-M-DWP-002 Demineralized Water System 2 02-M-ECP-001 Essential Chilled Water System 3 02-M-EWP-001 Essential Cooling Water System 3 02-M-FPP-006 Fire Protection System 2 02-M-GAP-001 Service Gas Supply System (N2 and H2) 2&3 02-N-GRP-001 Gaseous Radwaste System 2 02-M-HCP-001 HVAC Containment Building 2 02-M-HPP-001 Containment Hydrogen Control 2 02-M-IAP-002 Instrument and Service Air System 2 02-M-IAP-003 Instrument and Service Air System 2 02-M-NCP-002 Nuclear Cooling Water System 3 02-M-NCP-003 Nuclear Cooling Water System 2 02-M-PCP-001 Fuel Pool Cooling & Cleanup System 2&3 02-M-RCP-001 Reactor Coolant System 1&2 02-M-RCP-002 Reactor Coolant System 1&2 02-M-RDP-001 Radioactive Waste Drain System 2 02-M-SGP-001 Main Steam System 2&3 02-M-SGP-002 Main Steam System 2 02-M-SIP-001 Safety Injection and Shutdown Cooling System 2 02-M-SIP-002 Safety Injection and Shutdown Cooling System 1&2 02-M-SIP-003 Safety Injection and Shutdown Cooling System 2 02-M-SPP-001 Essential Spray Pond System 3 02-M-SPP-002 Essential Spray Pond System 3 02-N-SSP-001 Nuclear Sampling System 2 02-M-WCP-001 Normal Chilled Water System 2 13-M-ZZP-001 Symbols and Legend N/A 13-M-ZZP-002 Symbols and Legend N/A 3INT-ISI-2 Rev. 4 92 of 210

SECTION 10.0 ZONE DRAWINGS 3INT-ISI-2 Rev. 4 93 of 210

ZONE DRAWING INDEX Drawing No. Drawing Title Code Class Zone 1 Reactor Vessel 1 Zone 2 Closure Head 1 Zone 3 Steam Generator 1 1 Zone 4 Steam Generator 2 1 Zone 5 Pressurizer 1 Zone 6 RCS Primary Piping 1 Zone 16 Reactor Coolant Pump 1A 1 Zone 17 Reactor Coolant Pump 1B 1 Zone 18 Reactor Coolant Pump 2A 1 Zone 19 Reactor Coolant Pump 2B 1 Zone 20 Pressurizer Surge Line 1 Zone 21 Shutdown Cooling Loop 1 1 Zone 22 Shutdown Cooling Loop 2 1 Zone 23 Safety Injection 1A 1 Zone 24 Safety Injection 1B 1 Zone 25 Safety Injection 2A 1 Zone 26 Safety Injection 2B 1 Zone 27 Pressurizer Spray 1A 1 Zone 28 Pressurizer Spray 1B 1 Zone 29 Combined Pressurizer Spray 1 Zone 30 Aux. Pressurizer Spray 1 Zone 31 Pressurizer Safeties 1 Zone 32 Drain Line 1A 1 Zone 33 Drain Line 1B 1 Zone 34 Drain Line 2A 1 Zone 35 Drain Line 2B 1 Zone 36 Letdown Line 1 Zone 37 Charging Line 1 Zone 38 Drain Line Loop 1 1 Zone 39 HPSI Long Term Recirc 1 1 Zone 40 HPSI Long Term Recirc 2 1 Zone 41 Steam Generator 1 2 Zone 42 Steam Generator 2 2 Zone 43 Main Steam SG1 East 2 Zone 44 Main Steam SG1 West 2 Zone 45 Main Steam SG2 East 2 Zone 46 Main Steam SG2 West 2 Zone 47 Main Steam SG1 West 2 Zone 48 Main Steam SG1 East 2 Zone 49 Main Steam SG2 East 2 Zone 50 Main Steam SG2 West 2 Zone 51 Atmospheric Dump No. 1 2 Zone 52 Atmospheric Dump No. 2 2 Zone 53 Steam to Aux Feedwater System 2 Zone 54 Feedwater SG No. 1 2 Zone 55 Feedwater SG No. 2 2 Zone 56 Feedwater SG No. 1 2 Zone 57 Feedwater SG No. 2 2 Zone 58 Aux & Downcomer Feedwater SG 1 2 Zone 59 Aux & Downcomer Feedwater SG 2 2 Zone 60 Downcomer Feedwater SG 1 2 Zone 61 Downcomer Feedwater SG 2 2 Zone 62 Aux Feedwater SG 1 2 Zone 63 Aux Feedwater SG 2 2 3INT-ISI-2 Rev. 4 94 of 210

ZONE DRAWING INDEX (Continued)

Drawing No. Drawing Title Code Class Zone 64 Blowdown SG 1 2 Zone 65 Blowdown SG 2 2 Zone 66 Blowdown SG 1 2 Zone 67 Blowdown SG 2 2 Zone 68 Regenerative Heat Exchanger 2 Zone 69 Letdown Heat Exchanger 2 Zone 70 LPSI Pump Room A Suction 2 Zone 71 LPSI Pump Room A Discharge 2 Zone 72 LPSI Pump A 2 Zone 73 LPSI Pump Room B Suction 2 Zone 74 LPSI Pump Room B Discharge 2 Zone 75 LPSI Pump B 2 Zone 76 Containment Spray Pump Room A Suction 2 Zone 77 Containment Spray Pump Room A Discharge 2 Zone 78 Containment Spray Pump A 2 Zone 79 Containment Spray Pump Room B Suction 2 Zone 80 Containment Spray Pump Room B Discharge 2 Zone 81 Containment Spray Pump B 2 Zone 82 Shutdown Cooling Heat Exchange Room A 2 Zone 83 Shutdown Cooling Heat Exchange Room A 2 Zone 84 Shutdown Cooling Heat Exchanger A 2 Zone 85 Shutdown Cooling Heat Exchanger Room B 2 Zone 86 Shutdown Cooling Heat Exchanger Room B 2 Zone 87 Shutdown Cooling Heat Exchanger B 2 Zone 88 East Wrap 2 Zone 89 East Wrap 2 Zone 90 East Wrap 2 Zone 91 West Wrap 2 Zone 92 West Wrap 2 Zone 93 West Wrap 2 Zone 94 A Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 95 B Train Misc. Pipe Chases & 88' Pipe Tunnel 2 Zone 96 Containment LPSI Header to Loop 1A 2 Zone 97 Containment LPSI Header to Loop 1B 2 Zone 98 Containment LPSI Header to Loop 2A 2 Zone 99 Containment LPSI Header to Loop 2B 2 Zone 100 Containment LPSI Train A Suction 2 Zone 101 Containment LPSI Train B Suction 2 Zone 102 SI Pumps Train A Suction 2 Zone 103 Refueling Water Suction Train A 2 Zone 104 SI Pumps Train B Suction 2 Zone 105 Refueling Water Suction Train B 2 Zone 106 HPSI Pump Room A Discharge 2 Zone 107 HPSI Pump Room B Discharge 2 Zone 108 HPSI Discharge 88 Pipe Chase 2 Zone 109 HPSI Discharge 88 Pipe Chase 2 Zone 110 HPSI Discharge West Wrap 2 Zone 111 HPSI Discharge West Wrap 2 Zone 112 HPSI Discharge East Wrap 2 Zone 113 HPSI Discharge East Wrap 2 Zone 114 Containment HPSI Header Loop 1A & 1B 2 Zone 115 Containment HPSI Header Loop 2A & 2B 2 Zone 116 HPSI Pump A 2 Zone 117 HPSI Pump B 2 Zone 118 HPSI Long Term 2 Zone 119 HPSI Long Term 2 Zone 120 Containment Spray A 2 Zone 121 Containment Spray B 2 3INT-ISI-2 Rev. 4 95 of 210

180° 1-18 1-19 NOTES:

1-17 TAG NO. 2MRCEX01 SERIAL NO. 79173 (C-E)

N.B NO. 22513 1-1 90° 270° 1-12 1-8 180° 1-4 1-11 100% LIGAMENTS 1-7 54 STUD HOLES 1-20 COUNTED CLOCKWISE 1-16 1-15 1-3 FROM 0° 1-30 0° PLANT NORTH 90° 270° 1-14 1-13 3INT-ISI-2 Rev. 4 0° 1-9 1-5 SHELL SEGMENT 182 1/4 CROSS SECTION 11 1/4

-LONG SEAMS-OUTLET INLET REFERENCE DWG:

N001-3.01-15 AND 17 N001-3.01-41 AND 61 N001-3.01-72 1-10 SUPPORT COLUMNS RX INTERIOR 40 AT 1A B RX INTERIOR 1-6 41 AT 1B B RX INTERIOR 9 1/16 42 AT 2A B 43 AT 2B B UNIT 2 ZONE 1 SHEAR 1-2 KEYS 96 of 210 ICI Penetrations 1 thru 61 REACTOR VESSEL 1-31 6 1/2

NOTES:

1) Full ITEM ID include -CEDM or RVLMS NO
2) TAG NO. 2MRCEX01 SERIAL NO. N05065-CHA-01 (Doosan)

N.B. NO. 1685 2-71 NOTE 3 2-61 3) ITEM 71 CONTAINS 4 SINGLE STUDS IN A GRAYLOC CLAMP 2-70 REFERENCE DWGS:

2-60 13-MN-740 (Replaced RV HEAD SPEC)

RVLMS R15 WO 3377051 LOCATED 2-59 AT 92 & 96 2-58 UT Baseline Completed on 2-61 at CEDM locations:

2-88 54, 59, 65, 69, 71, 73, 77 79, 81, 82, 84, 85, 87, 88, 89 VENT LINE NUTS 1 THRU 18 19 THRU 36 37 THRU 54 CLOSURE HEAD 7.38 STUDS 8.6

  1. 1 THRU #54 1 THRU 18 19 THRU 36 WASHERS 180° 37 THRU 54 1 THRU 18 3INT-ISI-2 Rev. 4 19 THRU 36 76.37 37 THRU 54 93 84 94 77 78 69 70 87 88 68 71 76 79 92 95 90° 83 85 270° 91 96 75 80 67 72 86 66 73 89 74 81 90 82 97 11.5 STUD LOCATIONS 1 THRU 54 UNIT 2 ZONE 2 0° CW FROM 0° CLOSURE HEAD 97 of 210 TOP VIEW CLOSURE HEAD

112° MANWAY STUDS & NUTS NOTES:

90° 326

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

45°

2) Tag NO 2MRCEE01A Serial NO. 212 0° MANWAY N. B. NO. 161 STUDS & NUTS NOTE 1- 324 REFERENCE DWGS:

MN725-A16, A17, A19 and A20 0° 180° MN725-A31, A32, A36, A52 and A72 MN725-A243 and A390 315° LOOKING DOWN

.87 TUBESHEET 202.1 3INT-ISI-2 Rev. 4 107 25 37 6.37 106 315° 102 100 31 6.7 45°101 14.50 105 1.310 27 9.3 2.75 104 17.3 140 SKIRT B 4.63

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS (20 EA)

UNIT 2 ZONE 3 98 of 210 STEAM GENERATOR #1

112° MANWAY STUDS & NUTS NOTES:

90° 426

-NOTE 1- 1) Stud Location is #1 TDC Going CW to #20.

45°

2) Tag NO 2MRCEE01B Serial NO. 211 0° MANWAY N. B. NO. 160 STUDS & NUTS NOTE 1- 424 REFERENCE DWGS:

MN725-A16, A17, A19 and A20 0° 180° MN725-A31, A32, A36, A52 and A72 MN725-A243 and A390 315° LOOKING DOWN

.87 TUBESHEET 202.1 3INT-ISI-2 Rev. 4 107 25 37 6.37 106 315° 102 100 31 6.7 45°101 14.50 105 1.310 27 9.3 2.75 104 17.3 140 SKIRT B 4.63

.56 CHANNEL HEAD CROSS SECTION MANWAY STUDS (20 EA)

UNIT 2 ZONE 4 99 of 210 STEAM GENERATOR #2

0° ZONE 29

.87 514 511 513 270° 90° 521 6.37 510 MANWAY STUDS & NUTS 512 NOTE 1-58 14.50 TOP VIEW 1.310 0° 2.75 5

96 1/4 .56 57 ID 270° 90° 55 MANWAY STUDS 56 368.5 3INT-ISI-2 Rev. 4 UPPER SHELL NOTES:

52 1) STUD LOCATION IS #1 TDC 0° GOING CW TO #20 48.7 51 ID 2) TAG NO 2MRCEX02 (TYP) SERIAL NO. 79373 (C-E)

N.B. NO. 22252 540 4 54 53 SKIRT B 59 270° 90° REFERENCE DWGS:

N001-6.04-6, 31 AND 90 ZONE 20 UNIT 2 ZONE 5 LOWER SHELL 100 of 210 PRESSURIZER

REFERENCE DWGS:

    • 13-P-ZCG-103 N001-6.07-83 AND 112 N001-6.07-90 THRU 94 N001-6.07-96 THRU 100 MN725-A343 and A383 10-1 12-1 10-4 17-2 18-2 12-4 10-17 RCP 1B RCP 2A 12-17 ZONE 17 ZONE 18 RC-30 11-9 13-9 RC-73 10-7 12-7 17-1 11-8 18-1 13-8 11-1 13-1 11-4 13-4 11-7 13-7 1B 2A 12-13 10-13 RC-31 1-28 1-29 RC-79 12-10 10-10 3-103 4-103 12-19 10-19 6-9 6-1 6-4 6-7 1-27 1-30 7-7 7-1 12-16 6-8 7-8 7-4 10-16 REACTOR SG 1 SG 2 RC-32 VESSEL RC-63 ZONE 3 ZONE 4 ZONE 1 3INT-ISI-2 Rev. 4 8-16 14-16 8-19 14-19 8-10 14-10 9-9 RC-34 1-32 1-31 RC-93 14-13 8-13 9-7 15-7 9-4 15-4 1A 9-1 15-1 2B 16-1 9-8 15-8 19-1 8-7 14-7 RC-33 RC-84 RCP 1A RCP 2B 8-17 ZONE 16 ZONE 19 14-17 6-99 Cold Leg Instrument Nozzles 6-100 RCP Pressure Taps 6-101 Hot Leg Instrument Nozzles (27) 19-2 8-4 16-2 ** Note Reference Drawings for Locations 14-4 8-1 14-1 NOTES:
1) PIPE LONG SEAMS AT 3:00 AND 9:00 POSITIONS (FOR CE PIPING ONLY) UNIT 2 ZONE 6
2) ELBOW LONG SEAMS AT LONG AND SHORT RADIUS (FOR CE PIPING ONLY) 101 of 210 3) ANSALDO PIPING AND ELBOWS ARE SEAMLESS (XX-13, XX-16 and XX-19 only)

RCS PRIMARY PIPING

4) PIPING WCL STAMPED WITH CENTER PUNCH MARKS. CE WELDS REFERENCED WITH FOOTAGE MARKS. ANSALDO WELDS REFERENCED WITH CENTER PUNCH MARKS EACH 250 mm.
5) FOR REPLACEMENT WELDS, PORTIONS OF THE ORIGINAL WELD MAY REMAIN. THE ORIGINAL WELD CAP IS JOINED TO THE REPLACEMENT WELD.

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEP01A SERIAL NO. 1110-1A (C-E)

N.B. NO. 23457 UPPER HORIZONTAL SNUBBER (2) C SUPPORTS (2) B MOTOR SUPPORT STAND 16-17 AND 16-18 16-19 AND 16-20 1.1 7.28 8.27 16-31 SEAL HOUSING STUDS & NUTS- NOTE 1 6.89 16-32 FLANGE STUDS &

16-30 16-33 NUTS- NOTE 1 FLANGE SURFACE 163 SEAL HOUSING 3INT-ISI-2 Rev. 4 STUDS 16-34 164 4.33 CASING INTERNAL SURFACE 32.87 LOWER HORIZONTAL 4.528 6.93 SUPPORTS (2) B 16-21 AND 16-22 COLUMN 16-12 THRU 16-15 REFERENCE DWGS:

SUPPORTS CW FROM DISC N001-6.02-418 (4) NOZZLE N001-6.02-420 THRU 423 B

FLANGE STUDS N001-6.02-107 & 108 UNIT 2 ZONE 16 NUTS & RINGS 102 of 210 REACTOR COOLANT PUMP 1A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEP01B SERIAL NO. 1110-1B (C-E)

N.B. NO. 23458 UPPER HORIZONTAL MOTOR SUPPORT SNUBBER (2) C SUPPORTS (2) B STAND 17-17 AND 17-18 17-19 AND 17-20 1.1 7.28 8.27 17-31 SEAL HOUSING STUDS & NUTS- NOTE 1 6.89 17-32 FLANGE STUDS &

17-30 17-33 NUTS- NOTE 1 FLANGE SURFACE 173 SEAL HOUSING 3INT-ISI-2 Rev. 4 STUDS 174 17-34 4.33 CASING INTERNAL SURFACE 32.87 LOWER HORIZONTAL 4.528 6.93 SUPPORTS (2) B 17-21 AND 17-22 COLUMN 17-12 THRU 17-15 REFERENCE DWGS:

SUPPORTS CW FROM DISC N001-6.02-418 (4) NOZZLE N001-6.02-420 THRU 423 B

FLANGE STUDS N001-6.02-107 & 108 UNIT 2 ZONE 17 NUTS & RINGS 103 of 210 REACTOR COOLANT PUMP 1B

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEP01C SERIAL NO. 1110-2A (C-E)

N.B. NO. 23459 UPPER HORIZONTAL MOTOR SUPPORT SNUBBER (2) C SUPPORTS (2) B STAND 18-17 AND 18-18 18-19 AND 18-20 1.1 7.28 8.27 18-31 SEAL HOUSING STUDS & NUTS- NOTE 1 6.89 18-32 FLANGE STUDS &

18-30 18-33 NUTS- NOTE 1 FLANGE SURFACE 183 SEAL HOUSING 3INT-ISI-2 Rev. 4 STUDS 184 18-34 4.33 CASING INTERNAL SURFACE 32.87 LOWER HORIZONTAL 4.528 6.93 SUPPORTS (2) B 18-21 AND 18-22 COLUMN 18-12 THRU 18-15 REFERENCE DWGS:

SUPPORTS CW FROM DISC N001-6.02-418 (4) NOZZLE N001-6.02-420 THRU 423 B

FLANGE STUDS N001-6.02-107 & 108 UNIT 2 ZONE 18 NUTS & RINGS 104 of 210 REACTOR COOLANT PUMP 2A

NOTES:

1) STUD LOCATIONS CW FROM DISCHARGE CL
2) TAG NO. 2MRCEP01D SERIAL NO. 1110-2B (C-E)

N.B. NO. 23460 UPPER HORIZONTAL MOTOR SUPPORT SNUBBER (2) C SUPPORTS (2) B STAND 19-17 AND 19-18 19-19 AND 19-20 1.1 7.28 8.27 19-31 SEAL HOUSING STUDS & NUTS- NOTE 1 6.89 19-32 FLANGE STUDS &

19-30 19-33 NUTS- NOTE 1 FLANGE SURFACE 193 SEAL HOUSING 3INT-ISI-2 Rev. 4 STUDS 194 19-34 4.33 CASING INTERNAL SURFACE 32.87 LOWER HORIZONTAL 4.528 6.93 SUPPORTS (2) B 19-21 AND 19-22 COLUMN 19-12 THRU 19-15 REFERENCE DWGS:

SUPPORTS CW FROM DISC N001-6.02-418 (4) NOZZLE N001-6.02-420 THRU 423 B

FLANGE STUDS N001-6.02-107 & 108 NUTS & RINGS UNIT 2 ZONE 19 105 of 210 REACTOR COOLANT PUMP 2B

OVERLAY R14 PLANT WO 2967833 NORTH 2967837 PRESSURIZER ZONE 5 20-9 20-10 B

RC028 20-6 H-3 C RC028 H-4 20-5 CS 5-34 OL EL 110-5 SS 20-4 20-1 OL 20-7 20-8 C EL 108-1 3/4 RC028 20-11 OL H-2 RC028 H-1 RC-E-028-BCAA-12 6-10 OL SS C

3INT-ISI-2 Rev. 4 CS RC-E-028-BCAA-12 PRESSURIZER HOT LEG VAULT ZONE 6 20-2 20-3 REFERENCE DRAWINGS EL 108-5 02-P-RCF-101 UNIT 2 ZONE 20 106 of 210 PRESSURIZER SURGE

PLANT LOOP 1 HOT LEG ZONE 6 NORTH 6-11 OL REFERENCE DRAWINGS CS/SS 02-P-SIF-105 21-20 OL CONT ON ZONE 39 RC-A-051-BCAA-16 UV-651 21-19 21-18 B OVERLAY 21-3 RC-051 B

R14 H-2 RC-051 21-24 21-1A 21-26 WO 2967844 H-3 21-17 21-25 21-1 21-16 CONT ON ZONE 38 SI-240 C H-14 B SI-240 H-15 21-15 B 21-14 SI-240 B SI-240 H-16 21-13B H-17 SECONDARY EL 89-9 SHIELD WALL 21-10 3INT-ISI-2 Rev. 4 21-13 UV-653 21-9 21-11 21-21 21-12 B B SI-240 SI-240 H-4 H-9 SI-240 B

21-22 B SI-240 H-10 C SI-240 H-11 H-13 B SI-A-240-BCAA-16 SI-240 H-2 CONT ON 21-4 ZONE 100 21-5 B SI-240 H-7 SI-240 B

H-3 SI-240 B 21-8 21-6 UNIT 2 ZONE 21 H-5 21-7 107 of 210 SHUTDOWN COOLING LOOP 1

OVERLAY R14 WO 2967848 22-21 22-22 W B SI-193 B SI193 H-23 22-23 H-20 SI193 B T-WALL H-17 REFERENCE DRAWINGS 02-P-SIF-105 CONT ON UV-654 ZONE 101 22-18 SI-B-193-BCAA-16 22-17 SI193 H-8 B 22-15 22-14 LOOP 2 HOT LEG ZONE 6 22-11 22-9 OL 7-9 CS/SS 3INT-ISI-2 Rev. 4 22-7A UV-652 22-4 OL 22-1 22-5 22-26 CONT ON ZONE 40 22-2 22-6 SECONDARY 22-3 SHIELD WALL 22-7 22-31 RC68 W RC-B-068-BCAA-16 H-1 RC68 C

H-4 RC68 C H-3 B

UNIT 2 ZONE 22 108 of 210 SHUTDOWN COOLING LOOP 2

SI-207 C H-7 23-2 23-15 23-14 23-12 SI-207 C V-237 23-1 23-16 H-3 9-10 SI-E-207-BCAA-14 CS/SS UV-634 23-4 SI-207 B 23-9 23-22 SECONDARY 23-6 LOOP 1 COLD H-11 SHIELD WALL LEG ZONE 6 23-17 23-8 23-7 V-235 SI-E-203-BCAA-12 23-19 V-542 23-23 23-20 23-24 3INT-ISI-2 Rev. 4 SI TANK 1A 23-26 CONT ON ZONE 96 REFERENCE DRAWINGS 02-P-SIF-103 UNIT 2 ZONE 23 109 of 210 SAFETY INJECTION 1A

SI TANK 1B 24-19 24-18 24-17 24-16 V-245 24-14 UV-644 24-11 B REFERENCE DRAWINGS SI-223 02-P-SIF-103 24-9 SI-223 C

H-1 24-21 H-3 SECONDARY SHIELD WALL SI-223 C

SI-E-221-BCAA-12 H-8 24-22 3INT-ISI-2 Rev. 4 24-8 SI-E-223-BCAA-14 V-247 24-7 V-543 24-23 24-6 24-4 24-25 24-3 CONT ON ZONE 97 24-2 24-1 11-10 CS/SS UNIT 2 ZONE 24 LOOP 1B COLD LEG ZONE 6 110 of 210 SAFETY INJECTION 1B

25-7 25-20 25-8 25-6 25-22 SI-E-160-BCAA-14 V-217 25-37 25-19 25-23 UV-614 25-4 25-18 25-2 25-1 SI-160 C 25-13 13-10 SECONDARY CS/SS H-1 25-14 SHIELD WALL 25-9 25-15 25-11 25-10 LEG ZONE 6 LOOP 2A COLD 25-16 V-215 SI-E-156-BCAA-12 3INT-ISI-2 Rev. 4 25-26 SI TANK 2A 25-27 V-540 REFERENCE DRAWINGS 02-P-SIF-136 SI-156 B 25-29 H-9 CONT ON ZONE 98 UNIT 2 ZONE 25 111 of 210 SAFETY INJECTION 2A

LOOP 2B COLD LEG ZONE 6 15-9 26-1 CS/SS V-227 26-2 26-4 26-6 REFERENCE DRAWINGS 26-7 02-P-SIF-136 SI-E-179-BCAA-14 26-8 SI-179 C H-8 26-31 SECONDARY SHIELD WALL SI-179 B 26-11 3INT-ISI-2 Rev. 4 H-11 26-9 26-12 26-19 UV-624 FLOOR 26-14 EL - 100 26-15 26-16 B 26-17 SI-175 V-225 H-21 SI-175 C

SI-E-175-BCAA-12 H-23 SI TANK 2B UNIT 2 ZONE 26 26-22 CONT ON 112 of 210 ZONE 99 SAFETY INJECTION 2B 26-23 26-25 V-541

PLANT NORTH 27-2 REFERENCE DRAWINGS 27-3 02-P-RCF-102 PRESSURIZER VAULT ZONE 29 COMBINED PZR SPRAY 27-4 EL 131 11 3/8 EL 127-9 3/8 27-5 EL 119-6 27-1 27-36 RC-16 H-7 27-37 B

27-34 27-6 C RC-62 EL 123-10 H-24 27-38 RC-62 C

RC-E-016-BCAA-3 H-21 27-8 27-10 RC-62 B 27-39 V-243 27-22 H-28 27-21 27-33 27-12 C B 27-27 RC-62 BRC-62 RC-62 B B H-39 RC-62 B 27-32 H-37 H-38 H-32 RC-62 H-30 PV 27-31 RC-E-062-BCAA-3 100E RC-62 C

3INT-ISI-2 Rev. 4 27-13 H-33 27-23 27-26 RC-E-062-BCAA-3 27-24 27-25 27-28 27-14 V-240 27-42 EL 116-10 27-29 B RC-62 27-43 H-26 W

27-20 EL 111-0 27-40 27-30 PRESSURIZER VAULT 27-15 27-18 27-41 EL 101-4 27-44 27-16 SS COLD LEG CS 9-11 LOOP 1A UNIT 2 ZONE 27 ZONE 6 113 of 210 PRESSURIZER SPRAY 1A

ZONE 29 COMBINED REFERENCE DRAWINGS PZR SPRAY 02-P-RCF-102 RC-18 B

PLANT H-12 NORTH 28-1 B

28-2 B 28-3 28-4 RC-E-018-BCAA-4 B 28-6 28-5 28-39 RC-18 H-9 EL 114-6 RC-E-018-BCAA-3 C RC-17 H-26 28-9 C 28-40 RC-17 PRESSURIZER BRC-17 H-30 VAULT H-31 RC-17 B 28-11 28-7 H-46 B

28-13 RC-17 B H-24 V-242 RC-17 H-33 28-14 28-46 PV 28-36 100F EL 123-10 28-37 28-23 RC-17 C

EL 127 9 3/8 28-35 H-42 3INT-ISI-2 Rev. 4 28-24 B RC-E-017-BCAA-3 RC-17 28-15 H-40 BRC-17 28-29 28-34 EL 110-0 28-30 28-41 28-22 H-38 EL 102-1/4 28-33 28-20 28-28 28-42 28-25 28-45 28-44 28-17 V-241 PRESSURIZER EL 116-10 VAULT 1A & 1B 28-26 28-27 CUBICLE RC-17 B

28-43 H-43 28-18 B RC-17 SS 11-11 28-31 28-32 H-34 CS W

UNIT 2 ZONE 28 COLD LEG LOOP 1B ZONE 6 114 of 210 PRESSURIZER SPRAY 1B

REFERENCE DRAWINGS 02-P-RCF-102 PLANT NORTH 29-5 WP EL 158-2 29-14 29-4 RC-018-BCAA-4 ZONE 30 AUX SPRAY 29-3 29-10 29-2 29-1 OL OL 5-33 SS 158-1 5/16 CS NOZZLE PRESSURIZER EL 152-5 5/8 ZONE 5 29-11 RC-18 C

H-16 C

RC-18 H-18 C

3INT-ISI-2 Rev. 4 W

RC-18 H-17 OVERLAY R14 WO 2967827 29-11A ZONE 27 PZR SPRAY 1A 29-12 29-13 C L EL 130-11 3/8 ZONE 28 UNIT 2 ZONE 29 PZR SPRAY 115 of 210 1B COMBINED PZR SPRAY

HV-205 30-7A WO 3376259 30-15A 30-6 HV-203 SW REFERENCE DRAWINGS30-14A 30-5 02-P-CHF-107 SW CH-521 B H-A 30-13 30-21 30-9 30-16 SW C SW CH-521 30-17 EL 153-8 H-B 30-12A SW 30-11 30-10 CH-B-521-BCAA-2 30-20 SW 3INT-ISI-2 Rev. 4 CH-A-520-BCAA-2 V-431 30-4 CH-E-009-BCAA-2 30-2 UNIT 2 ZONE 30 ZONE 29 30-1 116 of 210 COMBINED PZR SPRAY AUX. PZR SPRAY

PSV 200 PSV 203 RC-E-007-BCAA-6 FLANGE BOLTING FLANGE BOLTING 31-3 PSV 31-15 202 31-14 31-1 31-2 31-13 RC-E-005-BCAA-6 FLANGE BOLTING CS RC-E-001-BCAA-6 31-11 CS 5-29 5-32 SS SS OL OL 31-10 31-9 CS 5-31 SS OL PSV 201 3INT-ISI-2 Rev. 4 FLANGE BOLTING 31-7 REFERENCE DRAWINGS 02-P-RCF-114 RC-E-003-BCAA-6 OVERLAYS R14 31-6 CS WO 2967812 5-30 SS 2967813 31-5 OL 2967816 2967825 NOTE:

8 - 2 X 13 1/2 STUD PRESSURIZER 16 - NUTS ZONE 5 UNIT 2 ZONE 31 TOP HEAD 117 of 210 PRESSURIZER SAFETIES

N COLD LEG ZONE 6 LOOP 1A EL 89 9 11/16 CS 8-18 SS 32-1 32-4 RC-E-060-BCAA-2 32-5 REFERENCE DRAWINGS V-334 02-P-CHF-110 32-6 NOTE:

SW 32-2 SW = SOCKET WELD B 32-3 3INT-ISI-2 Rev. 4 RC-60 H-A 32-8 WP EL 88-10 3/16 SW V-234 32-9 SW UNIT 2 ZONE 32 118 of 210 DRAIN LINE 1A

EL 89 V-235 33-9 SW N V-335 33-8 SW 33-6 RC-E-058-BCAA-2 SW RC-58 B

H-A 33-5 COLD LEG REFERENCE DRAWINGS ZONE 6 LOOP 1B 02-P-CHF-110 33-4 NOTE:

SW = SOCKET WELD CS 3INT-ISI-2 Rev. 4 33-1 10-18 SS 33-3 33-2 UNIT 2 ZONE 33 119 of 210 DRAIN LINE 1B

N V-233 COLD LEG LOOP 2A ZONE 6 12-18 CS SS 34-9 SW 34-1 REFERENCE DRAWINGS 02-P-CHF-110 34-8 SW NOTE:

SW = SOCKET WELD V-333 3INT-ISI-2 Rev. 4 34-6 34-2 SW 34-3 34-5 34-4 RC-E-096-BCAA-2 UNIT 2 ZONE 34 120 of 210 DRAIN LINE 2A

EL 88 9 5/8 LETDOWN LINE ZONE 36 35-1 N

35-2 35-3 RC-E-089-BCAA-2 35-4 REFERENCE DRAWINGS 02-P-CHF-110 35-5 V-332 NOTE:

SW = SOCKET WELD 35-6 3INT-ISI-2 Rev. 4 SW 35-8 SW V-232 35-9 SW UNIT 2 ZONE 35 121 of 210 DRAIN LINE 2B

34 33 39 35 32 REFERENCE DRAWINGS RC91 W 02-CHF-142 38 RC91 HQ EL B HP B 76 131 49 29 W B RC91 48 28 31 H6 47 50 75 30 B RC91 27 HAQ RC91 B

40 26 HAJ 46 W 25 W RC91 B RC91 41 84 H5 HAP B 83 85 42 51 77 24 23 45 43 22 44 52 53 78 EL 54 79 121 82 55 80 21 B RC91 56 EL HAD 119 81 RC91 B 57 RC-E-091-BCAA-2 HJ B RC91 58 HAC 10 59 9 11 60 20 18 8 B 17 RC91 19 HAK 3INT-ISI-2 Rev. 4 61 62 RC91 B

16 HT 15 12 B 14 RC91 UV-515 HU 13 64 EL 65 94 SS 67 14-18 63 ZONE 6 CS 68 1 69 3 2 70 7 B 4 UV-516 RC91 HW ZONE 35 B 5 6 CH1 EL HA CH-E-001-BCAA-2 102 UNIT 2 ZONE 36 122 of 210 LETDOWN LINE

22 21 EL 134 CH-5 B

B 20 23 B H8 CH-5 CH-5 C CH-5 H38 B

CH-5 H17 H7 17 EL 134 C CH-5 H14 C CH-5 H13 W H19 CH-5 B

B CH-5 18A CH-5 H18 H33 15 H37 53 B W 14 B 27 CH-5 B CH-5 52 CH-5 54 H32 C H39 55 H9 24 BCH-5 V433 W 10 57 56 51 H22 CH-5 C CH-5 C

9 H10 58 50 EL 25 26 11 115 H21 C 8 59 CH-5 49 CH-5 C 13 18B EL C CH-5 H4 7 60 110 H20 H6 6 12 61 19 62 V434 5

FLANGE BOLTING 30 C 48 CH-5 28 3 31 H42 29 32 4 2 EL 112 CH-5 B V435 SS H27 13-11 CS 33 CHE-005-BCAA-3 CH-5 B

3INT-ISI-2 Rev. 4 34 H3 ZONE 6 CH-5 B CH-5 B H36 H44 1 CH-5 C

H28 REFERENCE DWG.

02-P-CHF-109 44 47 43 45 CH-5 B B H35 CH-5 H34 41 42 40 37 38 36 UNIT 2 ZONE 37 PDV240 123 of 210 39 CHARGING LINE EL 101

REFERENCE DRAWINGS 02-P-SIF-105 NOTE:

SW = SOCKET WELD RC-E-070-BCAA-2 38-1 3INT-ISI-2 Rev. 4 ZONE 21 38-1SW SHUTDOWN COOLING UNIT 2 ZONE 38 124 of 210 DRAIN LINE LOOP 1

REFERENCE DWG.

02-P-SIF-105 CONT POINT A 39-71 B 39-70 SI248 39-72 SHUTDOWN COOLING H32 39-59 39-69 ZONE 21 39-58 39-68 39-57 39-67 39-66 39-56 39-65 39-73 C SI248 SI248 B

N 39-55 39-64 H35 H36 39-63 SI248 B H34 39-54 39-62 39-28 39-53 SI-A-248-BCAA-3 39-29 39-61 POINT A SI-A-248-BCAA-3 39-60 39-27 B V-522 SI248 39-20 H19 39-21 SI248 C 39-26 SI248 C H20 39-25 B H18 39-22 V-523 39-24 39-1 39-2 39-19 CL EL 83 5 39-23 SI248 B

39-18 H29 39-3 SI-A-248-BCAA-3 3INT-ISI-2 Rev. 4 39-17A CL EL 86 8 1/4 CL EL 88 2 39-11 39-5 39-17 39-16 39-10 39-15 CL EL 86 8 1/4 39-14 39-34 39-6 39-13 39-9 CL EL 86 8 1/4 39-12 SI248 B

H25 39-7 V-957 SI248 B H28 39-52 UNIT 2 ZONE 39 39-51 125 of 210 HPSI LONG TERM RECIRC LOOP 1

PLANT NORTH V

533 40-22 40-23 EL. 93 40-21 ZONE 40-1 22 40-2 40-37 40-5 V 958 40-38 40-3 40-4 40-16 SI199 B 40-17 H22 40-15 40-18 3INT-ISI-2 Rev. 4 40-6 40-20 40-7 40-19 C EL. 89-391/2 BSI199 SI-B-199-BCAA-3 W H17 SI199 C

H18 SI199 B V H15 532 40-14 40-25 40-13 REFERENCE DRAWINGS 40-10 40-12 02-P-SIF-105 40-8 40-9 EL. 84 UNIT 2 ZONE 40 126 of 210 HPSI LONG TERM RECIRCULATION 2

NOTES:

1) 0° IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5 X 9
3) STUDS ARE 16-1 X 6
4) TAG NO. 2MRCEE01A SERIAL NO. 212 (ANSALDO)

N. B. NO. 161

@ 90° ZONE 44 @ 270° ZONE 43 REFERENCE DWGS:

115 114 MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 3.41 4.3 107 SECONDARY 232 ID 5.83 90° MANWAYS

-NOTE 2- 270° 116 DOWNCOMER RECIRC @ 45° 3INT-ISI-2 Rev. 4 106 41 C 90° SNUBBER LUGS ZONE 58 DOWNCOMER @ 0° 42 C 270° 90° 112 6.54 109 270° 113 105 193 ID 4.88 SECONDARY HANDHOLES AT 0° AND 270° 110 -NOTE 3-DOWNCOMER ZONE 64 BLOWDOWN

@ 180° 103 AT 45° SECONDARY 102 AT 315° HAND HOLES AT 12° UNIT 2 ZONE 41 AT 0° , 90° ZONE 54 FEEDWATER 180° , 270° 127 of 210 -NOTE 3- 104 ZONE 64 BLOWDOWN STEAM GENERATOR 1 31 101 AT 90° TUBE SHEET 100 AT 270°

NOTES:

1) 0° IS AT CENTER OF COLD LEG MANWAY
2) STUDS ARE 16 - 1.5 X 9
3) STUDS ARE 16-1 X 6
4) TAG NO. 2MRCEE01B SERIAL NO. 211 (ANSALDO)

N.B. NO. 160

@ 90° ZONE 46 ZONE 45 REFERENCE DWGS:

115 @ 270° 114 MN725-A18, A19, A26, A28 and A29 MN725-A30, A38, A54 and A55 MN725-A243, A390 and A395 3.41 4.3 107 SECONDARY 232 ID 5.83 90° MANWAYS

-NOTE 2- 270° 116 DOWNCOMER RECIRC @ 45° 3INT-ISI-2 Rev. 4 106 41 C 90° SNUBBER LUGS ZONE 59 42 C 270° 6.54 109 90° 112 270° 113 105 193 ID 4.88 SECONDARY HANDHOLES AT 0° AND 270° 110 -NOTE 3-DOWNCOMER ZONE 65 BLOWDOWN

@ 180° 103 AT 45° SECONDARY 102 AT 315° HAND HOLES AT 12° UNIT 2 ZONE 42 AT 0° , 90° ZONE 55 FEEDWATER 180° , 270° 128 of 210 -NOTE 3- 104 ZONE 65 BLOWDOWN STEAM GENERATOR 2 31 101 AT 90° TUBE SHEET 100 AT 270°

LINE # DIA/SCH FROM TO PLANT SG-36 32x 2 43-1 -

NORTH SG-36 28x 1.25 43-2 43-25 C EL. 157-10 1/8 SG-E-036-DLBB-28 43-14 43-5 43-12 43-7 43-11 BSG36W 43-26 H16 43-8 C EL. 132 43-4 C EL. 132-31/16 43-15 C EL. 158 SG36 C 43-25 ZONE H11 C EL. 171 43-17 48 43-10 43-20 43-24 2

43-18 43-22 3INT-ISI-2 Rev. 4 W

B SG36 43-21 43-2 H17 43-1 ZONE 41 REFERENCE DRAWINGS 02-P-SGF-118 UNIT 2 ZONE 43 129 of 210 MAIN STEAM (EAST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO PLANT SG-33 32x 2 44-1 -

NORTH SG-33 28x 1.25 44-2 44-30 C EL. 157-93/4 SG-E-033-DLBB-28 44-14 44-5 44-12 44-7 C EL. 132 44-11 C EL. 132-33/8 44-18 44-20 44-30 ZONE B W 47 SG33 44-28 44-31 1 H16 44-21 44-8 44-15 44-26 44-17 SG33 C 44-24 C H17 44-10 SG33 44-4 W 44-23 H11 C EL. 171 3INT-ISI-2 Rev. 4 44-2 44-1 ZONE 41 REFERENCE DRAWINGS 02-P-SGF-118 UNIT 2 ZONE 44 130 of 210 MAIN STEAM (WEST)

STEAM GENERATOR 1

LINE # DIA/SCH FROM TO PLANT SG-42 32x 2 45-1 -

NORTH SG-42 28x 1.25 45-2 45-25 C EL. 132 45-25 C EL. 171-111/16 ZONE 45-4 3 49 45-24 45-22 45-2 45-21 45-5 C EL. 157-10 1/8 45-12 45-1 C EL. 171 45-7 45-14 ZONE 45-26 45-11 42 B W SG42 3INT-ISI-2 Rev. 4 H17 BSG42W 45-20 H16 45-8 45-18 SG-E-042-DLBB-28 45-15 45-17 45-10 C EL. 132-31/16 SG42C H11 REFERENCE DRAWINGS 02-P-SGF-118 UNIT 2 ZONE 45 131 of 210 MAIN STEAM (EAST)

STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-45 32x 2 46-1 -

NORTH SG-45 28x 1.25 46-2 46-28 C EL. 132 46-28 ZONE 50 4

46-27 46-25 C EL. 171 46-4 C W SG45 H17 46-24 46-2 46-23 46-5 46-21 46-1 46-7 3INT-ISI-2 Rev. 4 SG-E-045-DLBB-28 46-12 ZONE 46-14 42 46-11 46-20 46-29 BSG45W H16 46-18 46-8 C 46-15 EL. 158 C 46-10 SG45 H11 C EL. 132 46-17 REFERENCE DRAWINGS 02-P-SGF-118 UNIT 2 ZONE 46 132 of 210 MAIN STEAM (WEST)

STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-206 28x 1.750 47-1 47-30 NORTH SG-206 6x 1.500 47-4 47-20 SG-206 12x 0.844 47-28 47-29 UV 170 TURBINE ZONE 51 BUILDING 47-25 47-30 PSV 572 PSV 47-24 573 PSV 47-27 574 47-23 SG206 C

H-1 PSV 47-20 575 47-28 PSV 47-16 47-19 692 47-12 47-15 3INT-ISI-2 Rev. 4 SG-E-206-DLBB-12 47-8 47-11 47-4 47-7 47-29 47-1 EL. 120-0 47-3 1 47-2 REFERENCE DRAWINGS 02-P-SGF-155 SG-E-206-DLBB-28 02-P-SGF-401 EL. 132-0 ZONE 44 NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 2 ZONE 47 12-1 1/4DIA. FLANGE BOLTS PER VALVE 133 of 210 2 - MSIV, 20-2 1/4DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 1

LINE # DIA/SCH FROM TO PLANT SG-207 28x 1.750 48-1 48-30 NORTH SG-207 6x 1.500 48-4 48-20 SG-207 12x 0.844 48-28 48-29 ZONE 51 ZONE 51 UV 180 TURBINE BUILDING PSV 48-25 579 48-35 PSV 48-30 578 SG207 C

PSV 48-27 48-24 H-1 577 48-23 48-20 ZONE 53 48-28 PSV 48-16 48-19 576 PSV 48-12 691 48-15 SG-E-207-DLBB-12 3INT-ISI-2 Rev. 4 48-11 48-8 48-34 48-29 48-4 48-7 48-1 48-3 2 48-2 REFERENCE DRAWINGS 02-P-SGF-155 SG-E-207-DLBB-28 02-P-SGF-401 REV 5 EL. 132-0 ZONE 43 MAIN STEAM S/G #1 90° (EAST) INSIDE CONTAINMENT NOTE: UNIT 2 ZONE 48 1 - MAIN STEAM RELIEF VALVE 12-1 1/4DIA. FLANGE BOLTS 134 of 210 PER VALVE MAIN STEAM (EAST) 2 - MSIV, 20-2 1/4DIA. BODY TO STEAM GENERATOR 1 BONNET BOLTS

LINE # DIA/SCH FROM TO PLANT SG-208 28x 1.750 49-1 49-30 NORTH SG-208 6x 1.500 49-4 49-20 SG-208 12x 0.844 49-28 49-29 ZONE 52 UV ZONE 52 171 TURBINE BUILDING PSV 49-25 554 49-35 PSV 49-30 555 49-24 PSV 49-27 556 C 49-23 SG208 49-20 H-1 ZONE 53 49-28 PSV 49-16 49-19 557 PSV 49-12 695 49-15 SG-E-208-DLBB-12 3INT-ISI-2 Rev. 4 49-11 49-8 49-34 49-29 49-4 49-7 49-1 49-3 3 49-2 REFERENCE DRAWINGS 02-P-SGF-155 SG-E-208-DLBB-28 02-P-SGF-401 EL. 132-0 ZONE 45 NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 2 ZONE 49 12-1 1/4DIA. FLANGE BOLTS PER VALVE 135 of 210 2 - MSIV, 20-2 1/4DIA. BODY TO MAIN STEAM (EAST)

BONNET BOLTS STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-209 28x 1.750 50-1 50-30 NORTH SG-209 6x 1.500 50-4 50-20 SG-209 12x 0.844 50-28 50-29 ZONE 52 UV 181 TURBINE S/G #2 ADV BUILDING 50-25 50-30 PSV 561 PSV 50-24 560 PSV 50-27 559 50-23 SG209 C

H-1 PSV 50-20 558 50-28 PSV 50-16 50-19 694 50-12 3INT-ISI-2 Rev. 4 50-15 SG-E-209-DLBB-12 50-8 50-11 50-4 50-7 50-29 50-1 50-3 4 50-2 REFERENCE DRAWINGS 02-P-SGF-155 SG-E-209-DLBB-28 02-P-SGF-401 EL. 132-0 ZONE 46 NOTE:

1 - MAIN STEAM RELIEF VALVE UNIT 2 ZONE 50 12-1 1/4DIA. FLANGE BOLTS PER VALVE 136 of 210 2 - MSIV, 20-2 1/4DIA. BODY TO MAIN STEAM (WEST)

BONNET BOLTS STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-59 12x 0.844 51-1 51-40 NORTH SG-70 12x 0.844 51-37 51-39 SG-95 4 x 0.337 51-65 51-76 51-3 51-2 51-4 C

SG59 51-5 H-6 51-8A 51-6 HV 51-8B SG-E-59-DLBB-12 184 51-86 51-9 51-7 51-40 V 955 51-73 51-72 51-85 SG-E-70-DLBB-12 UV 51-71 51-31 169 51-1 51-30 51-33 51-68 51-70 ZONE 51-32 51-67 47 51-34 51-74 C 51-29 51-84 SG70 51-78 51-69 H-6 51-89 V48 3INT-ISI-2 Rev. 4 51-27 51-80 HV 51-79 51-75 51-28 178 51-83 51-81 51-76 51-88 51-77 51-26 V 51-82 949 ZONE 51-39 51-66 48 51-87 SG-E-95-DLBB-4 51-65 51-37 ZONE 48 REFERENCE DRAWINGS UNIT 2 ZONE 51 02-P-SGF-158 137 of 210 ATMOSPHERIC DUMP 1

LINE # DIA/SCH FROM TO PLANT SG-103 12x 0.844 52-1 52-40 NORTH SG-84 12x 0.844 52-38 52-41 SG-100 4 x 0.337 52-65 52-76 52-34 52-35 52-33 WO 3779477 REPLACED WELDS C

SG84 52-32 SG-E-100-DLBB-4 52-68 AND 52-69 H-6 52-29 52-31 UV 52-70 52-89 183 HV 52-28 52-72 185 52-71 52-68A 52-73 52-27 52-30 52-69A 52-41 52-74 52-84 V 84 52-83 52-75 SG-E-84-DLBB-12 52-90 52-76 52-88 52-82 52-80 ZONE V 49 958 52-79 52-5 52-4 52-3 52-87 52-2 3INT-ISI-2 Rev. 4 52-78 52-6 52-65 52-81 52-77 C 52-7 52-86 SG103 52-38 H-6 52-67 V 52-9 52-8 952 ZONE 52-66 HV 49 179 52-85 SG-E-103-DLBB-12 52-1 52-10 52-40 ZONE 50 REFERENCE DRAWINGS 02-P-SGF-158 UNIT 2 ZONE 52 138 of 210 ATMOSPHERIC DUMP 2

LINE # DIA/SCH FROM TO PLANT SG-81 6x 0.432 53-1 53-15 NORTH SG-83 6x 0.432 53-21 53-35 53-34 53-32 53-5 53-4 53-31 53-6 SG-E-83-DLBB-6 53-2 53-27 53-30 53-7 53-16 SG-E-81-DLBB-6 53-26 53-8 53-1 EL. 122-5 53-28 53-29 53-10 53-9 MAIN STEAM ZONE 48 53-35 3INT-ISI-2 Rev. 4 53-24 53-23 EL. 122-5 53-25 UV 53-22 138 MAIN STEAM ZONE 53-13 53-21 49 53-12 53-11 UV REFERENCE DRAWINGS 134 53-14 02-P-AFF-131 53-15 UNIT 2 ZONE 53 139 of 210 STEAM TO AUXILARY FEEDWATER SYSTEM

LINE # DIA/SCH FROM TO PLANT SG-2 14x 0.938 54-15 54-24 NORTH SG-2 16x 0.844 54-25A 54-26 SG-2 16x 1.75 54-107 -

SG-2 24x 1.218 54-13, 54-60 54-27 ZONE 54-60 56 SG-13 14x 0.938 54-1 54-10A SG-13 16x 0.844 54-11B 54-12A SG-13 16x 1.75 54-100 - 8 EL. 115 54-59 SG-E-2-DLBB-14 V V 54-49 SG-2 C 54-37 003 007 54-47 54-50 H-3 54-38 54-36 SG-2 C BSG-2W 54-57 54-39 H-2 H-1 EL. 93 SS CS 54-20 54-51 54-45 54-56 SG-E-2-DCBA-14 54-19 C SG-2 C SG-2 54-18 H-6 W 54-43 H-4 54-52 54-55 54-17 SG-2 B 54-41 SG-2 B 54-2 H-8 W H-5 54-54 SG-E-13-DCBA-14 54-16 54-53 54-3 SS 54-21 SG-2 B 54-5 CS 54-15 H13 PSE 2R17 54-107 SG-2 C WO 3821198 H14 W 3INT-ISI-2 Rev. 4 SS C REPLACED WELDS CS 54-6A ZONE SG-2 SG-2C 41 H12 54-6, 7, 8, 9, 10, 11B, 12 54-7A 54-22 H15 W SS 54-23 SG-E-13-DLBB-14 54-4 CS 54-1 54-26 54-100 54-27 54-12A 54-13 54-24 54-25A C

SG-13 54-28 54-25B H1 54-8A 54-29 SG-E-2-DLBB-16 REFERENCE DRAWINGS 54-14 SG-E-2-DLBB-24 02-P-SGF-119 54-11C 54-35 MN725-A256 54-9A 54-10A EL. 93 54-33 54-34 54-32 54-30 SG-2 C UNIT 2 ZONE 54 H-9 SG-2B 54-31 W H10 SG-2 C 140 of 210 H11 FEEDWATER SG-E-13-DLBB-16 STEAM GENERATOR 1

LINE # DIA/SCH FROM TO ZONE 57 PLANT SG-5 14x 0.938 55-15 55-24 55-60 NORTH SG-5 16x 0.844 55-25 55-26 SG-5 16x 1.75 55-107 - 10 SG-5 24x 1.218 55-13, 55-60 55-27 EL. 115 SG-14 14x 0.938 55-1 55-10 55-59 SS 55-15 CS SG-14 16x 0.844 55-11 55-12 55-107 55-16 SG-14 16x 1.75 55-100 -

55-17 55-100 SG-5-DCBA-14 SS 55-1 ZONE 55-18 CS 42 SS 55-20 CS 55-2 55-57 55-21 SG-5-DLBB-14 B W 55-3 SG-5 55-19 H-1 SG-14-DCBA-14 55-55 55-4 55-54 55-56 SG-5 C 55-53 55-5 H12 55-22 55-26 SS 55-14 55-23 C SG-5 CS 55-6 55-27 55-52 55-13 H-2 SG-5 C 55-7 55-24 H-3 55-12 55-25 55-50 55-11 55-28 55-51 55-29 55-49 55-8 SG-5 3INT-ISI-2 Rev. 4 W SG-5 H-4 C 55-47 C SG-5 H-5 B SG14 V EL. 105 H-1 SG-5 H-7 C H13 B 005 55-9 W SG-5 H14 C 55-45 55-10 CSG-5W W 55-43 SG-14-DLBB-16 H-6 SG-5 V 55-35 H-8 B 006 EL. 94 55-36 55-38 55-41 55-34 55-39 SG-5-DLBB-24 55-37 55-33 W 55-32 55-30 SG-5 H-9 C REFERENCE DRAWINGS UNIT 2 ZONE 55 BSG-5 55-31 H11 SG-5 02-P-SGF-119 H10C 141 of 210 MN725-A256 FEEDWATER STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-202 24x 1.531 1 4 NORTH SG-201 24x 1.812 6 7 SG-224 24x 1.812 9 11 EL. 115-6 56-11 UV 174 SG-224-DLBB-24 UV 56-7 132 56-9 W

SG202 C H-1 56-4 NOTE:

3INT-ISI-2 Rev. 4 SG-E-201-DLBB-24 FWIV, 20-2 1/2 DIA 56-6 BODY TO BONNET BOLTS PER VALVE 56-1 REFERENCE DRAWINGS SG-E-202-DLBB-24 02-P-SGF-119 02-P-FWF-403 EL. 115-6 ZONE 54 8

UNIT 2 ZONE 56 142 of 210 FEEDWATER STEAM GENERATOR 1

LINE # DIA/SCH FROM TO PLANT SG-205 24x 1.531 57-1 57-4 NORTH SG-204 24x 1.812 57-6 57-7 SG-225 24x 1.812 57-9 57-11 EL. 115-6 57-11 UV 177 SG-225-DLBB-24 UV 57-7 137 57-9 W

SG205 C H-2 57-4 NOTE:

3INT-ISI-2 Rev. 4 SG-E-204-DLBB-24 FWIV, 20-2 1/2 DIA 57-6 BODY TO BONNET BOLTS PER VALVE 57-1 REFERENCE DRAWINGS SG-E-205-DLBB-24 02-P-SGF-119 02-P-FWF-403 EL. 115-6 ZONE 55 10 UNIT 2 ZONE 57 143 of 210 FEEDWATER STEAM GENERATOR 2

LINE # DIA/SCH FROM TO PLANT SG-8 6x 0.562 58-1 58-3 NORTH SG-8 8x 0.500 58-4 58-25 AF-4 6x 0.562 58-19 58-34 EL. 143-4 5/16 SG-8 6x 1.800 41-111 -

58-38 SG-E-008-DCBA-6 41-111 58-2 ZONE 58-3 41 58-1 CSSS CS 58-4 SS SG-8 C SG-8 C H20 H-5 B C C SG-8 SG-8 SG-8 11 ZONE SG-8 C SG-8 H-8 H10 B W BSG-8 H11 60 SG-8 H-4 H-3 C 58-25 H-6 SG-8 C 58-12 58-13 H-2 H-9 SG-8 C

H-7 EL. 131-0 58-14 58-24 58-5 58-7 SG-8 B 58-8 58-11 H18 58-23 EL. 104-0 58-9 58-6 58-10 EL. 120-0 58-22 EL. 131-0 V EL. 131-0 SG-E-008-DLBB-8 652 58-14A 58-17 58-21 SG-8 B 58-16B 58-18 H19 3INT-ISI-2 Rev. 4 58-16A 58-27 EL. 100-0 58-26 SG-8 C 58-37 ZONE H14 58-19 75 62 CS 58-15 SS 58-16 58-33 SG-8 C V H15 58-20 CAF-4 079 58-36 H-1 58-31 58-32 58-27A 58-34 EL. 89 9 1/2 58-30 58-29 58-28 AF-A-004-DCBA-6 REFERENCE DRAWINGS 02-P-SGF-120 MN725-A254 UNIT 2 ZONE 58 144 of 210 AUXILIARY & DOWNCOMER FEEDWATER SG #1

LINE # DIA/SCH FROM TO SG-11 6x 1.800 42-111 -

SG-11 6x 0.562 59-1 59-3 PLANT SG-11 8x 0.500 59-4 59-25 NORTH AF-6 6x 0.432 59-16C -

AF-6 6x 0.562 59-20 59-34 59-13 SS 59-14 CS59-40 59-39 SG11 C

H10 SG11 C H11 59-41 EL. 120-0 59-12 59-11 59-36 SG-E-011-DLBB-8 SG11 C SG-E-011-DCBA-8 H-7 SG11 SG11 59-10 H18 B ZONE H-9 59-21 42-111 SG11 12 61 EL. 131-0 H-8 59-18 59-22 CS SG11 B V ZONE 59-1 SS H13

SG11 W EL. 104-0 3INT-ISI-2 Rev. 4 H-6 SG11 B C 59-16C 59-25 H-17 SG11 59-24 59-8 H14 EL. 143-45/8 59-20 59-19 59-7 59-15 59-16 EL. 100-0 59-2 SG-E-011-DCBA-6 59-3 CSG11 SG11 C 59-34 76 ZONE H-4 H16 59-28 63 CSG11 59-26 V H-5 59-20A 59-29 CAF-6 080 SS 59-4 CSG11 H-1 CS C H20 SG11 B W SG11 H-3 H-2 AF-B-006-DCBA-6 59-30 59-33 59-5 SG-E-011-DLBB-8 59-32 EL. 89-91/2 59-35 59-31 EL. 131-0 59-6 REFERENCE DRAWINGS 02-P-SGF-120 UNIT 2 ZONE 59 MN725-A254 145 of 210 AUXILIARY & DOWNCOMER FEEDWATER SG #2

LINE # DIA/SCH FROM TO PLANT TURBINE SG-200 8x 0.719 60-2 60-12 BUILDING NORTH SG-008 8x 0.719 60-14 60-17 60-2 60-3 C EL. 114-105/16 60-4 60-5 60-6 SG-E-200-DLBB-8 3INT-ISI-2 Rev. 4 UV C 172 SG200 60-7 C H-14 SG200 H-13 UV 60-8 SG-E-008-DLBB-8 130 60-9 V642 REFERENCE DRAWINGS 60-11 02-P-SGF-156 60-16 60-12 60-14 60-15 11 60-17 UNIT 2 ZONE 60 C EL. 104-0 146 of 210 ZONE DOWNCOMER FEEDWATER 58 STEAM GENERATOR #1

LINE # DIA/SCH FROM TO PLANT TURBINE SG-203 8x 0.719 61-2 61-12 BUILDING NORTH SG-011 8x 0.719 61-14 61-17 61-2 C

61-3 EL. 114-105/16 61-4 61-5 61-6 SG-E-203-DLBB-8 3INT-ISI-2 Rev. 4 UV C 175 SG203 61-7 C H-13 SG203 H-14 UV 61-8 SG-E-011-DLBB-8 135 61-9 V693 REFERENCE DRAWINGS 61-11 02-P-SGF-156 61-16 61-12 61-14 61-15 12 61-17 UNIT 2 ZONE 61 C EL. 104-0 147 of 210 ZONE DOWNCOMER FEEDWATER 59 STEAM GENERATOR #2

LINE # DIA/SCH FROM TO PLANT AF-18 6x 0.562 62-4 62-14 NORTH AF-4 6x 0.562 62-18 62-24 C EL. 94-5 62-13 62-12 62-11 62-10 62-25 62-13A 62-9 AF-18C H2 UV AF-B-018-DCBA-6 36 BW AF-18 H1 62-8 62-14 C EL. 94-5 62-18 62-7 UV 34 3INT-ISI-2 Rev. 4 62-19 AF-E-004-DCBA-6 62-20 62-4 62-21 62-22 62-23 REFERENCE DRAWINGS 62-6 AF-4 C 02-P-AFF-132 75 H3 02-P-AFF-133 62-24 62-5 ZONE 58 UNIT 2 ZONE 62 148 of 210 AUXILIARY FEEDWATER STEAM GENERATOR #1

LINE # DIA/SCH FROM TO PLANT AF-16 6x 0.562 63-18 63-19 NORTH AF-6 6x 0.562 63-4 63-30 C 63-29 AF6 63-28 H4 63-30 ZONE 59 76 63-27 63-26 UV 37 63-25 63-24 63-18 C EL. 82 -4 UV 63-18A 35 AF-B-006-DCBA-6 3INT-ISI-2 Rev. 4 B 63-4 AF16W 63-14 H1 AF-A-016-DCBA-6 63-19 63-20 REFERENCE DRAWINGS 02-P-AFF-132 02-P-AFF-133 AF6 B H2 63-21 AF6 63-23 AF6 H3 B H5 63-22 C

UNIT 2 ZONE 63 149 of 210 AUXILARY FEEDWATER STEAM GENERATOR #2

LINE # DIA/SCH FROM TO REFERENCE DRAWINGS 02-P-SGF-122 ZONE 64-80 SG-53 6x 0.562 64-1 64-14 41 SG-39 6x 0.562 64-30 64-31 02-P-SGF-177 64-79 SG-39 6x 0.562 64-15 64-53 PLANT SG-522 6x 0.562 64-60 64-80 64-78 NORTH 64-77 EL. 122 64-76 C SG522 64-69 H-2 EL. 109 64-68 64-70 64-8 SG-E-53-DABA-6 64-9 EL. 116 64-10 64-82 64-75 64-21 64-81 64-20 64-71 64-74 64-22 64-3 64-72 64-73 64-7 64-87 64-5 64-65 64-23 64-2 64-6 64-24 64-64 64-25 SG-E-522-DABA-6 ZONE HV 64-57 64-26 47 64-67 B 41 64-1 64-11 64-66 C SG39 H29 64-30 64-63 EL. 112 C SG39 SG39 H30 H38 HV 64-27 64-62 ZONE 64-19 41 SG-E-39-DABA-6 64-61 EL. 105 66 64-29 UV 500P 46 EL. 104 HV 64-12 43 A 3INT-ISI-2 Rev. 4 POINT A 64-60 CONTINUED 64-51 64-18 B W 64-50 64-53 A SG53 BW B 64-58 POINT A H-5 SG39 SG39 CONTINUED V 64-49 THIS DRAWING H15 64-39 H18 64-52 64-59 64-14 64-37 289 C 64-38 64-43 B C SG39 64-36 SG39 SG39 H31 64-16 H25 WSG39 H36 64-31 64-44 64-40 B H-5 64-15 B 64-55 B 64-41 64-54 SG39 SG39 64-46 EL. 97 H16 64-42 SG39 H22 W H24 W B W C 64-45 SG39 H12 64-33 SG-E-039-DABA-6 64-35 SG39 W UNIT 2 ZONE 64 B H-9 SG39 B H10 150 of 210 EL. 89-3 64-32 BLOWDOWN STEAM GENERATOR #1

LINE # DIA/SCH FROM TO REFERENCE DRAWINGS 02-P-SGF-140 SG-48 6x 0.562 65-1 65-14 02-P-SGF-177 SG-48 6x 0.562 65-29 65-52 PLANT SG-52 6x 0.562 65-15 65-28 NORTH SG523 6x 0.652 65-56 65-89 65-28 ZONE 65-27 67 UV 65-25 65-50 500R SG-E-52-DABA-6 EL. 109 65-49 47 ZONE 65-24 42 65-52 65-1 65-23 65-6 65-48 65-51 65-22 65-21 65-5 65-6A 65-45 65-2 65-8 65-20 B SG48 SG523 C 65-3 65-44 H27 H-1 65-86 65-19 65-87 65-43 65-42 EL. 122 65-85 EL. 109 65-53 B SG-E-48-DABA-6 SG48B65-7 CSG48 65-89 H29 C SG48 W H30 65-18 SG48 H23 65-88 65-9 H24 V 65-90 CSG48 HV W 290 65-41 A ZONE H31 42 SG48 65-84 65-10 65-40 H21 42 65-17 65-54 65-36 65-38 EL. 116 65-80 HV 65-55 W 65-37 65-79 44 A POINT A SG52 B 65-83 65-78 CONTINUED H5 65-11 THIS DRAWING SG48B 65-82 BSG48W H18 65-81 BSG523 65-91 65-15 H16 3INT-ISI-2 Rev. 4 65-77 EL. 97 65-35 H-2 65-76 65-92 65-34 C 65-14 SG523 H-3 65-75 B SG48 65-13 65-33 65-74 H5 65-31 BW 65-68 65-69 65-73 65-29 SG48 W B H14 65-67 65-72 SG48 65-66 65-71 H10 65-70 SG48 B

EL. 116 H11 65-65 SG-E-48-DABA-6 W 65-64 65-60 EL. 112 65-63 65-59 HV 65-30 65-62 48 65-61 65-58 UNIT 2 ZONE 65 SG-E-523-DABA-6 151 of 210 BLOWDOWN 65-57 POINT A STEAM GENERATOR #2 A CONTINUED 65-56 EL. 100

LINE # DIA/SCH FROM TO SG-39 6x 0.562 66-1 66-15 PLANT NORTH TURBINE BUILDING 66-11 66-12 66-13 66-15 66-10 C EL. 108 - 8 66-14 66-9 C EL. 108 - 8 66-8 SG-E-039-DABA-6 66-7 3INT-ISI-2 Rev. 4 66-5 66-28 REFERENCE DRAWINGS 66-4 02-P-SGF-157 C EL. 106-0 UV 500Q 66-2 66-25 66-1 66-3 46 ZONE SG-E-039-DABA-6 UNIT 2 ZONE 66 64 152 of 210 BLOWDOWN STEAM GENERATOR #1

LINE # DIA/SCH FROM TO PLANT NORTH SG-48 6x 0.562 67-1 67-12 C EL. 108 - 8 67-12 67-11 C EL. 108 - 8 67-6 3INT-ISI-2 Rev. 4 67-10 67-5 67-7 67-9 67-8 REFERENCE DRAWINGS UV 02-P-SGF-157 500S SG-E-48-DABA-6 67-2 67-22 67-3 47 67-1 ZONE 65 UNIT 2 ZONE 67 153 of 210 BLOWDOWN STEAM GENERATOR #2

NOTES:

Tag No. 2MCHEE01 Serial No. 79313 (AMETEK)

N.B. No. 547 Reference Drawings:

N001-7.03-1 N001-7.03-48 thru 50 W W 11 B 10 B 68-4 68-2 68-1 68-3 INLET TOP VIEW FACING HEAT EXCHANGER 3INT-ISI-2 Rev. 4 68-5 LONG SEAMS OUTLET NEAR & FAR SIDE 68-7 68-6 8 SCH 160 PIPE 68-8 68-9 AND FITTINGS LOOKING PLANT SOUTH UNIT 2 ZONE 68 154 of 210 REGENERATIVE HEAT EXCHANGER

Tubesheet NOTES:

Tag No. 2MCHNE02 Serial No. N2373 (Richmond Engr)

N.B. No. 77334 32 Studs 1 x 9 3/4 Reference Drawings:

3/4 N001-7.03-26 Channelhead Cross Section N001-7.03-27 N001-7.03-28 N001-7.03-29 69-1 69-2 3INT-ISI-2 Rev. 4 UNIT 2 ZONE 69 155 of 210 LETDOWN HEAT EXCHANGER

EL. 47 10 SI-67 W

B LINE # DIA X SCH FROM TO ZONE 76 H-4 SI-67 16 X 0.312 70-103 70-109 70-109 SI-241 18 X 0.312 70-44 70-47 SI-307 14 X 0.312 70-63 70-69 70-107 70-50 SI-307 20 X 0.375 70-49 70-61 70-52 SI-307 W 70-106 B H-16 70-104 REFERENCE DRAWINGS 70-53 02-P-SIF-201 70-49 SI-A-067-GCBC-16 V-201 70-55 70-47 W

SI-241 B

ZONE 102 H-20 3INT-ISI-2 Rev. 4 70-56 SI-A-241-GCBC-18 70-103 EL. 41 10 SI-A-307-GCBC-20 70-60 70-58 70-61 70-46 LPSI PUMP A 70-44 SUCTION 70-65 70-59 ZONE 94 70-69 SI-A-307-GCBC-14 UNIT 2 ZONE 70 70-64 70-63 156 of 210 LPSI PUMP ROOM 70-68 A SUCTION 70-66

74-52 ZONE 83 LINE # DIA X SCH FROM TO 74-54 SI-A-087-FCBA-10 SI-78 10 X 0.365 72-29 72-32 ZONE 76 SI-87 8 X 0.322 72-5 72-6 B SI-87 10 X 0.365 72-8 72-57 SI-87 H-3 74-57 EL 62-9 74-51 74-55 SI-78 B 74-49 72-32 H-3 REFERENCE DRAWINGS 02-P-SIF-207 W EL 62-9 74-48 72-30 SI-A-078-FCBA-10 74-46 SI-78 C H-1 SI-87 74-45A 72-29 H-2 B 74-45 V-435 W 72-21 SI-A-087-FCBA-10 3INT-ISI-2 Rev. 4 72-27 HV-306 72-20 72-18 72-26 LPSI 72-5 PUMP A 72-24 DISCHARGE 72-6 72-23 72-8 B

SI-87 72-9 H-1 V-434 72-15 EL 46-9 W

72-17 TOG EL.

51-6 72-11 UNIT 2 ZONE 71 72-14 W SI-87 B 157 of 210 LPSI PUMP ROOM A 72-12 H-11 DISCHARGE

W B NOTES:

72-3C

1) TAG NUMBER: 2MSIAP01
2) SERIAL NUMBER: 0876-40 INGERSOL RAND W W 72-3B B 72-3A B WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 71 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 SUCTION ZONE 70 UNIT 2 ZONE 72 158 of 210 LPSI PUMP A

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS 02-P-SIF-202 SI-308 14 X 0.312 71-63 71-69 SI-308 20 X 0.375 71-49 71-61 SI-194 18 X 0.312 71-44 71-47 SI-34 16 X 0.312 71-105 71-111 V-200 71-108 ZONE 104 SI-34 W LPSI ZONE 79 B 71-49 PUMP B H-4 SUCTION 71-110 SI-B-308-GCBC-14 71-69 ZONE 95 SI-B-034-GCBC-16 71-68 71-107 71-111 71-50 71-105 3INT-ISI-2 Rev. 4 71-44 71-66 71-46 71-52 71-65 SI-B-194-GCBC-18 SI-308 B 71-64 H-12 71-47 71-63 71-59 71-61 SI-308 B

71-53 71-60 H-13 W 71-55 SI-B-308-GCBC-20 71-56 71-58 UNIT 2 ZONE 73 159 of 210 C/L EL. 41 10 LPSI PUMP ROOM B SUCTION

ZONE 86 LINE # DIA X SCH FROM TO 75-48 SI-129 8 X 0.322 73-5 73-6 SI-129 SI-129 10 X 0.365 73-8 75-51 H-6 C 75-46 SI-123 10 X 0.365 73-27 73-30 75-51 EL 62-9 75-49 75-45 EL 62-9 REFERENCE DRAWINGS 73-30 02-P-SIF-208 ZONE 79 75-43 SI-B-123-FCBA-10 75-42 73-28 75-40 73-27 SI-129 W B

H-4 SI-129 B 75-39 H-5 V-447 73-25 3INT-ISI-2 Rev. 4 W

HV-307 73-19 73-24 SI-B-129-FCBA-10 73-22 73-17 73-21 73-15 73-14 SI-129 SI-129 H-1 B V-446 73-12 SI-129 H-2 C H-3 73-85 W C 73-5 73-6 73-11 LPSI UNIT 2 ZONE 74 PUMP B EL 46-9 DISCHARGE 160 of 210 LPSI PUMP ROOM B 73-8 73-9 DISCHARGE

W B NOTES:

73-3C 1) TAG NUMBER: 2MSIBP01

2) SERIAL NUMBER: 0876-41 INGERSOL RAND W W 73-3B B 73-3A B WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 74 REFERENCE DRAWINGS N001-11.01-36 N001-11.01-50 SUCTION ZONE 73 UNIT 2 ZONE 75 161 of 210 LPSI PUMP B

80-20 ZONE 82 V-184 EL. 70 80-19 70-113 72-35 SI-A-067-GCBC-14 SI-A-078-FCBA-10 70-114 72-33 B SI-67 80-18 B SI-67 H-1 70-111 ZONE 71 B SI-67 H-2 W 70-110 EL. 47 10 H-3 80-10 80-9 ZONE 70 80-17 80-16 V-157 REFERENCE DRAWINGS 80-11 SI-A-009-GCBC-18 80-8 02-P-SIF-201 EL. 41 10 02-P-SIF-207 80-12 80-13 3INT-ISI-2 Rev. 4 80-7 LINE # DIA X SCH FROM TO ZONE 102 SI-067 16 X 0.312 70-110 70-111 B W SI-067 14 X 0.312 70-113 80-16 CONTAINMENT SPRAY PUMP A SI-9 SI-009 14 X 0.312 80-1 80-4 SUCTION H-4 SI-009 18 X 0.312 80-5 80-13 80-6 SI-078 10 X 0.365 72-33 72-35 80-1 80-5 80-4 80-2 80-3 UNIT 2 ZONE 76 162 of 210 CONTAINMENT SPRAY PUMP ROOM A SUCTION

ZONE 83 EL 70 EL 58-6 LINE # DIA X SCH FROM TO 82-33 SI-079 8 X 0.322 82-1A -

82-35 SI-079 10 X 0.365 82-1 82-27 82-32 SI-082 10 X 0.365 82-31 82-35 82-13 82-34 B REFERENCE DRAWINGS SI-82 EL 53-6 W 02-P-SIF-207 H-2 82-14 82-12 V-485 SI-A-082-FCBA-10 TOG EL 51-6 82-15 82-31 W

SI-79 B W 82-10 H-4 SI-79 82-23 B 82-16 H-6 82-9 82-11 HV-684 82-17 82-22 82-8 82-29 82-18 82-7 82-19 82-24 3INT-ISI-2 Rev. 4 82-28 W SI-79 SI-79 SI-79 82-6 H-1 H-2 H-3 SI-A-079-FCBA-10 82-21 B C B B 82-25 82-5 82-4 SI-79 W H-5 82-20 W CONTAINMENT SI-79 SPRAY PUMP A ZONE 82 B DISCHARGE H-7 SI-A-079-FCBA-10 82-1A 82-1 EL 70 SI-79 82-3 B 82-2 H-8 SI-79 C

H-9 82-27 UNIT 2 ZONE 77 82-26 163 of 210 CONTAINMENT SPRAY PUMP ROOM A DISCHARGE

NOTES:

W B 1) TAG NUMBER: 2MSIAP03 80-3C

2) SERIAL NUMBER: 0876-42 INGERSOL RAND W W 80-3B B 80-3A B WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 77 REFERENCE DRAWINGS N001-11.01-36 SUCTION ZONE 76 UNIT 2 ZONE 78 164 of 210 CONTAINMENT SPRAY PUMP A

EL 47-10 LINE # DIA X SCH FROM TO 81-17 SI-033 14 X 0.312 81-1 81-4 81-16 SI-033 18 X 0.312 81-5 81-12 SI-34 C SI-034 14 X 0.312 81-15 71-101 H-6 SI-034 16 X 0.312 71-103 71-104 SI-123 10 X 0.365 73-31 73-33 SI-B-034-GCBC-14 REFERENCE DRAWINGS ZONE 85 ZONE 104 02-P-SIF-202 EL 41-10 02-P-SIF-208 EL 70 81-18 SI-B-123-FCBA-10 V-158 73-33 CONTAINMENT SPRAY PUMP B 81-19 81-15 SUCTION 73-31 71-104 81-1 V-185 SI-B-033-GCBC-14 3INT-ISI-2 Rev. 4 81-12 71-100 ZONE 74 71-101 81-11 71-103 81-10 ZONE 73 W 81-2 SI-34 SI-33 B B 81-9 H-4 H-1 SI-B-034-GCBC-16 81-3 SI-34 B 81-4 H-3 SI-B-033-GCBC-18 81-5 81-6 81-8 81-7 UNIT 2 ZONE 79 165 of 210 CONTAINMENT SPRAY PUMP ROOM B SUCTION

ZONE 86 LINE # DIA X SCH FROM TO SI-119 8 X 0.322 83-1A -

SI-147 SI-119 10 X 0.365 83-1 83-26 EL 70 C H-1 SI-147 10 X 0.365 83-30 83-34 83-32 REFERENCE DRAWINGS EL 53-6 02-P-SIF-208 83-34 83-31 EL 58-6 ZONE 85 83-12 83-33 83-13 83-60 83-11 SI-B-147-FCBA-10 EL 70 83-14 SI-B-119-FCBA-10 TOG EL 51 6 83-30 V-484 SI-119 83-16 B H-9 83-17 SI-119 SI-119 HV-689 83-22 C 83-26 83-15 SI-119 W H-8 B

3INT-ISI-2 Rev. 4 H-4 W H-6 C SI-119 83-5 SI-119 C H-7 B

83-6 H-5 83-25 83-7 83-18 C 83-21 SI-119 83-8 H-1 83-4 83-24 SI-119 B 83-20 83-10 EL 63-0 H-2 83-19 83-23 W W SI-119 B 83-3 H-3 CONTAINMENT SI-B-119-FCBA-10 83-9 SPRAY PUMP B DISCHARGE EL 49-2 83-2 UNIT 2 ZONE 80 83-1A 83-1 166 of 210 CONTAINMENT SPRAY PUMP ROOM B DISCHARGE

W NOTES:

B 81-3C 1) TAG NUMBER: 2MSIBP03

2) SERIAL NUMBER: 0876-43 INGERSOL RAND W W 81-3B B 81-3A B WELDED SUPPORT FEET AND SUPPORT COLUMNS VIEW LOOKING DOWN TWENTY-FOUR 2 DIAMETER STUDS (21 @ 9.5 LONG AND 3 @ 8.88 LONG) 3INT-ISI-2 Rev. 4 DISCHARGE ZONE 80 REFERENCE DRAWINGS N001-11.01-36 SUCTION ZONE 79 UNIT 2 ZONE 81 167 of 210 CONTAINMENT SPRAY PUMP B

LINE # DIA X SCH FROM TO SI-078 10 X 0.365 72-36 72-48 SI-078 20 X 0.500 72-49 72-52 SI-079 10 X 0.365 82-28 72-61 82-29 REFERENCE DRAWINGS 82-28 02-P-SIF-207 82-30 B

W 72-54 72-58 SI-79 72-60 H-10 SI-A-079-FCBA-10 72-50 HV-678 72-52 72-38 CS/SS ZONE 77 72-55 72-57 B 72-61 W 72-39 SI-78 72-47 72-49B H-4 72-45 SDCHX A 72-41 INLET 72-36 3INT-ISI-2 Rev. 4 NOZZLE 72-48 HV-685 SI-A-078-FCBA-20 ZONE 76 72-42 72-44 72-49A SI-A-078-FCBA-10 SI-78 C H-5 W 72-49 UNIT 2 ZONE 82 168 of 210 SHUTDOWN COOLING HEAT EXCHANGER ROOM A

LINE # DIA X SCH FROM TO SI-070 20 X 0.500 74-1 74-19 W B

REFERENCE DRAWINGS SI-070 16 X 0.375 74-21 74-25 SI-82 ZONE 94 02-P-PCF-201 H-1 82-37 02-P-SIF-203 SI-070 20 X 0.500 74-27 74-27 82-38 02-P-SIF-207 B SI-89 SI-082 10 X 0.365 82-36 82-38 HV-688 H-5 SI-087 10 X 0.365 74-58 74-74 82-36 74-84 82-44 SI-089 10 X 0.365 74-77 82-44 74-83 W 82-43 SI-87 B W SI-089 10 X 0.365 82-39 82-40 74-81 HV-687 H-8 C SI-89 82-41 SI-090 14 X 0.375 74-105 74-118 H-2 SI-87 74-87 H-7 B SI-131 6 X 0.280 74-97 74-100 82-39 ZONE 77 74-70 82-40 SI-87 SI-A-082-FCBA-10 A SI-87 82-42 74-71 H-6 74-66 B SI-89 C H-5 74-64 74-67 H-1 W 74-7 74-73 74-63 74-9 74-69 74-80 SI-87 C 74-61 74-60 74-86 74-10 H-9 SI-89 74-78 B 74-6 74-118 74-58 H-3 74-112 74-12 SI-A-089-FCBA-10 74-4 74-114 W

W SI-87 74-157 3INT-ISI-2 Rev. 4 SI-A-087-FCBA-10 SI-90 C V-458 B V-460 74-77 H-4 74-3 H-2 SDCHX A ZONE 71 OUTLET 74-100 74-13 NOZZLE 74-115 74-111 ZONE 94 SI-E-131-FCBA-6 74-108 74-117 74-109 W W 74-106 SI-70 SI-90 W H-6 B

74-74 B SI-90 B 74-99 SI-70 74-1 H-1 B SI-70 CS/SS H-4 HV-686 H-1 HV-657 74-98 H-7 W B 74-97 74-76 C SI-70 74-75 74-15 H-3 74-27 SI-A-090-FCBA-14 74-25 74-96 74-22 74-105 74-24 B W SI-70 74-21 SI-A-070-FCBA-20 H-2 UNIT 2 ZONE 83 74-19 74-104A 74-18 74-16 169 of 210 SHUTDOWN COOLING HEAT EXCHANGER ROOM A

NOTES:

1) TAG NUMBER: 2MSIAE01
2) SERIAL NUMBER: S-18343 TUBE SHEET (ENGR & FABRICATORS) 1/8 CLAD 1-7/16 3) NATIONAL BOARD NUMBER 1710
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5 X 17 REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 74-121 75-122 DETAIL 74-123 3INT-ISI-2 Rev. 4 74-124 30 deg.

Inconel Weld SA-105 30 deg.

Clad 74-122 INLET NOZZLE - ZONE 82 UNIT 2 ZONE 84 74-121 OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 83 170 of 210 SHUTDOWN COOLING HEAT EXCHANGER A

EL 75 73-36 73-34 B W EL 80-2 73-45 C SI-123 SI-123 73-37 B SI-123 W H-1 H-2 EL 75 H-5 W

73-39 SI-123 83-28 B SI-B-123-FCBA-10 T OF EL 70 H-8 83-29 HV-694 73-45A 83-27 EL 80-2 73-43 73-40 73-46 ZONE 79 HV-679 73-42 73-60 W 73-48 T OF EL 70 SI-119 B SI-119 B W 73-47 H-13 73-62 H-10 73-56 73-63 ZONE 80 SI-119 C H-11 SI-119 B SI-123 SI-B-119-FCBA-10 B 73-59 W H-6 73-57 H-14 SI-123 3INT-ISI-2 Rev. 4 B

H-7 73-64 73-49 SI-B-123-FCBA-20 SDCHX B 73-54 INLET CS/SS NOZZLE 73-51 73-52 REFERENCE DRAWINGS 02-P-SIF-208 LINE # DIA X SCH FROM TO UNIT 2 ZONE 85 SI-119 10 X 0.365 83-27 73-63 171 of 210 SHUTDOWN COOLING HEAT SI-123 10 X 0.365 73-34 73-46 EXCHANGER ROOM B SI-123 20 X 0.500 73-48 73-54

LINE # DIA X SCH FROM TO SI-072 20 X 0.500 75-1 75-17 SI-072 16 X 0.375 75-19 75-23 SI-072 20 X 0.500 75-25 75-26 SI-129 10 X 0.365 75-53 75-61 SI-131 6 X 0.280 75-81 75-84 75-58 SI-B-129-FCBA-10 SI-134 10 X 0.365 75-62 75-72 C ZONE 95 75-60 SI-72 C B H-6 75-61 SI-134 10 X 0.365 83-38 83-43 SI-129 SI-129 W

B SI-72 H-10 H-11 SI-135 14 X 0.375 75-87 75-100 W C H-5 75-25 SI-129 SI-147 10 X 0.365 83-35 83-37 75-26 75-96 75-23 H-12 SI-B-135-FCBA-14 C 75-22 C

ZONE 95 W SI-135 SI-135 HV-658 H-2 H-3 75-20 W 75-94 B SI-135 75-97 75-19 75-68 75-66 75-94A SI-B-134-FCBA-10 H-1 75-56 75-93 75-17 W

C SI-134 75-65 75-91 75-99 75-90 75-16 H-8 75-100 75-88 75-14 75-69 75-55 83-43 V-455 3INT-ISI-2 Rev. 4 75-71 75-63 75-82 75-87 75-72 SI-134 SI-E-131-FCBA-6 C SI-129 W 83-41 C H-7 C H-1 75-81 SI-72 75-54 83-42 H-3 SI-134 75-83 SI-129 C C H-2 75-84 75-13 H-8 83-39 V-464 B HV-695 75-53 SI-134 75-12 SI-129 SI-147 83-37 C B 83-40 H-3 75-9 H-9 H-2 W 75-11A SI-134 SI-129 SI-134 B H-13 B

W H-5 SI-B-134-FCBA-10 W H-7 75-11 SI-72 W 83-36 83-38 C SI-134 75-62 B B H-12 HV-693 H-6 83-35 HV-696 ZONE 74 SI-B-147-FCBA-10 SI-B-072-FCBA-20 C 75-8 SI-72 W

75-4 H-4 REFERENCE DRAWINGS UNIT 2 ZONE 86 75-7 W 02-P-PCF-201 75-2 75-1 75-5 SI-72 02-P-SIF-204 172 of 210 B SHUTDOWN COOLING HEAT ZONE 80 H-1 02-P-SIF-208 SDCHX B OULLET SI-72 EXCHANGER ROOM B NOZZLE H-2 C

NOTES:

1) TAG NUMBER: 2MSIBE01
2) SERIAL NUMBER: S-18344 TUBE SHEET (ENGR & FABRICATORS) 1/8 CLAD 1-7/16 3) NATIONAL BOARD NUMBER 1711
4) ZERO DEGREE FOR GIRTH WELDS IS TDC. 90 DEGREE IS AT INLET NOZZLE SIDE.

64 STUDS 1.5 X 17 REFERENCE DRAWINGS:

N001-7.03-020 N001-7.03-25 N001-11.01-209 CHANNEL HEAD CROSS SECTION 75-76 75-77 DETAIL 75-78 3INT-ISI-2 Rev. 4 75-79 30 deg.

Inconel Weld SA-105 30 deg.

Clad 75-77 INLET NOZZLE - ZONE 85 UNIT 2 ZONE 87 75-76 OUTLET NOZZLE (OPPOSITE SIDE) - ZONE 86 173 of 210 SHUTDOWN COOLING HEAT EXCHANGER B

LINE # DIA X SCH FROM TO REFERENCE DRAWINGS SI-072 12 X 0.375 78-2 78-11 02-P-SIF-208 SI-072 12 X 1.125 78-13 78-14 78-21 17 78-20 SI-072 20 X 0.500 75-35 75-38 SI-073 12 X 0.375 79-1 79-11 ZONE 98 78-19 SI-073 12 X 1.125 79-13 79-14 SI-155 12 X 1.125 78-16 78-21 78-18 SI-E-155-CCBA-12 SI-172 10 X 0.365 78-10C 78-10D 78-17 ZONE 99 UV-615 SI-174 12 X 1.125 79-16 79-21 78-16 C W C C 78-14 SI-72 SI-72 SI-72 18 78-13 H-20 H-21 H-22 78-11 78-10B B 79-21 78-10A SI-72 SI-E-172-FCBA-10 78-10C W 78-3 H-19 79-20 78-2 78-10J 78-9J 78-5 78-10K 79-19 78-9G 75-38 78-6 SI-72 3INT-ISI-2 Rev. 4 w C 78-10D H-18 SI-72 H-13 B HV-690 SI-72 75-37 78-7 B H-14 75-36 ZONE 89 SI-72 C B 79-1 H-11 SI-E-174-CCBA-12 SI-72 78-8 H-15 SI-B-072-FCBA-20 79-6 75-35 78-9F ZONE 95 78-9 79-7 SI-73 78-9K H-1 C C

SI-72 SI-72 C H-17 H-16 79-8 79-18 UV-625 UNIT 2 ZONE 88 78-9C 79-11 79-10 174 of 210 B C SI-73 SI-73 W EAST WRAP 79-17 79-16 79-14 SI-B-073-FCBA-12 79-13 H-2 H-3

REFERENCE DRAWINGS 02-P-SIF-202 02-P-SIF-208 71-1 71-2 ZONE 101 UV-656 71-4 26 71-208 SI-194 C 71-7 71-8 SI-B-194-GCBC-16 H-23 71-70 71-5 71-10 B

TOG B SI-194 87-3 71-13 W w

SI-194 71-210 SI-194 H-13 B 71-11 H-14 71-14 H-12 SI-E-173-GCBC-16 71-16 71-90 SI-B-194-GCBC-18 SI-B-038-GCBC-12 71-71 71-18 71-91 3INT-ISI-2 Rev. 4 71-73 71-93 ZONE 95 V-442 71-75 71-94 71-76 ZONE 88 71-78 71-88 LINE # DIA X SCH FROM TO HV-690 71-87A SI-38 12 X 0.250 71-90 71-94 B 71-79 W SI-173 16 X 0.312 71-70 71-71 SI-173 H-1 SI-173 10 X 0.250 71-73 71-87A 71-85 71-81 UNIT 2 ZONE 89 SI-173 10 X 0.365 71-88 -

SI-194 16 X 0.312 71-1 71-11 71-82 71-84 175 of 210 EAST WRAP SI-194 18 X 0.312 71-13 71-18

90-46 LINE # DIA X SCH FROM TO 90-45 SI-030 24 X 0.375 85-6 85-8 ZONE 121 22 SI-134 10 X 0.365 83-53 83-57 90-44 B SI-134 8 X 0.322 83-58 83-59 SI-130 SI-308 24 X 0.562 85-9 85-11 H-2 SI-B-130-GCBC-10 SI-130 10 X 0.365 90-42 90-46 SI-130 8 X 0.322 90-40 90-41 90-43 83-59 B 83-53 SI-134 W EL 95 H-9 90-42 90-41 SI-B-134-FCBA-10 90-40 83-57 UV-671 83-54 ZONE 95 83-58 83-55 B

SI-134 3INT-ISI-2 Rev. 4 H-10 83-56 ZONE 101 85-6 24 UV-676 90-50 SI-B-030-HCBA-24 85-9 REFERENCE DRAWINGS 90-51 02-P-SIF-202 V-206 02-P-SIF-208 SI-B-308-GCBC-24 85-11 UNIT 2 ZONE 90 176 of 210 EAST WRAP ZONE 104 EL 73-7

LINE # DIA X SCH FROM TO SI-070 20 X 0.500 74-42 74-44 77-21 SI-070 12 X 0.375 76-2 76-11 77-20 20 76-21 ZONE 96 19 SI-070 12 X 1.125 76-13 76-14 ZONE 97 SI-071 12 X 0.375 74-103 77-11 77-19 SI-E-202-CCBA-12 SI-071 12 X 1.125 77-13 77-14 76-20 SI-071 10 X 0.365 77-10C 77-10D SI-202 12 X 1.125 76-16 76-21 TOG 76-19 77-18 EL 87-3 76-3 SI-220 12 X 1.125 77-16 77-21 TOG SI-E-220-CCBA-12 EL 87-3 76-5 77-17 76-2 W

76-18 SI-70 UV-645 77-16 76-6 74-44 B 76-17 H-12 W B SI-71 77-14 76-16 SI-70 C C 74-102 B H-3 77-13 UV-635 H-16 SI-70 76-7 77-10B 77-11 SI-70 H-10 B

76-13 H-14 TOG 77-10A 77-10C 74-103 3INT-ISI-2 Rev. 4 EL 87-3 76-14 76-11 77-10D 74-104 W

HV-691 B SI-70 B

SI-70 H-11 77-7 ZONE 92 H-13 TOG 74-43 EL 87-3 SI-A-070-FCBA-12 74-42 77-8 77-10 SI-71 76-8 W B ZONE 94 SI-A-070-FCBA-20 76-10 H-2 SI-70 SI-A-071-FCBA-12 B H-9 REFERENCE DRAWINGS SI-70 02-P-SIF-207 C H-15 UNIT 2 ZONE 91 177 of 210 WEST WRAP

70-1 ZONE 100 70-1A 27 REFERENCE DRAWINGS 70-1B 02-P-SIF-201 70-97 70-2 02-P-SIF-207 70-98 70-4 EL. 84-3 V-256 70-95 EL 87-3 70-91 70-89 EL 87-3 70-88 70-5 70-92 70-86 70-94 70-7 w

SI-239 C SI-A-241-GCBC-16 H-1 SI-A-002-GCBC-12 70-70 70-74 70-8 SI-241 H-15 C

70-71 70-76 70-73 SI-241 H-14 B SI-239 SI-E-239-GCBC-10 C 70-10 SI-241 H-2 B

H-11 3INT-ISI-2 Rev. 4 70-11 70-13 70-20 SI-241 ZONE 91 H-9 B

70-77 70-85 70-83 W UV-655 70-14 70-17 70-79 HV-691 70-22 70-16 70-82A 70-80 70-16A 70-19 EL 70 w

SI-239 SI-241 C B H-3 H-21 EL 78-9 ZONE 94 W SI-241 H-12 B

LINE # DIA X SCH FROM TO SI-002 12 X 0.250 70-85 70-98 UNIT 2 ZONE 92 SI-239 10 X 0.250 70-70 70-82A 178 of 210 SI-239 10 X 0.365 70-83 -

WEST WRAP SI-241 16 X 0.312 70-1 70-14 SI-241 18 X 0.312 70-16 70-22

93-43 LINE # DIA X SCH FROM TO ZONE 120 93-41 SI-089 8 X 0.322 82-66 82-67 21 SI-089 10 X 0.365 82-55 82-65 UV-672 SI-007 24 X 0.375 84-6 84-8 82-67 SI-307 24 X 0.562 84-9 84-11 93-42 93-40 82-65 SI-088 10 X 0.365 93-42 93-43 SI-A-088-GCBC-10 82-66 SI-088 8 X 0.322 93-40 93-41 82-64 EL 89-9 REFERENCE DRAWINGS C 82-63 02-P-SIF-201 SI-89 02-P-SIF-207 SI-A-089-FCBA-10 H-12 TOG EL 87-3 82-55 B SI-89 82-56 H-11 W B SI-89 H-13 EL 92-6 3INT-ISI-2 Rev. 4 TOG B 82-62 EL 87-3 SI-89 H-10 ZONE 94 82-57 ZONE 100 84-6 82-61 82-60 23 SI-A-007-HCBA-24 82-58 82-59 EL 84-8 93-50 93-51 84-9 SI-A-307-GCBC-24 UV-674 84-11 UNIT 2 ZONE 93 V-205 179 of 210 WEST WRAP ZONE 102 EL 73-7

ZONE 91 EL 90-2 74-41 EL 92-6 W B ZONE 92 82-54 74-34 74-32 ZONE 93 SI-70 H-8 82-53 74-40 EL 64 B

70-23 74-38 SI-89 SI-241 H-9 B W 82-52 W B H-17 74-37 SI-70 H-5 74-35 SI-241 SI-A-089-GCBC-10 H-8 B

70-24 SI-A-070-FCBA-20 SI-241 82-47 B 82-48 74-31 H-7 70-25 82-49 SI-241 B B C H-6 82-51 SI-89 82-46 SI-70 70-27 H-7 H-4 EL 89-4 W 82-50 B B 70-28 74-30 SI-89 W SI-89 H-8 H-6 82-45 70-30 3INT-ISI-2 Rev. 4 EL 88 SI-241 74-28 B ZONE 83 EL 72 H-5 W SI-A-241-GCBC-18 EL 41-10 ZONE 83 SI-241 B

B 70-37 SI-241 H-4 70-31 W H-3 B W ZONE 70 SI-241 H-2 W 70-33 70-39 70-40 70-34 70-36 70-43 70-41 UNIT 2 ZONE 94 LINE # DIA X SCH FROM TO 180 of 210 SI-070 20 X 0.500 74-28 74-41 A TRAIN MISC. PIPE CHASES REFERENCE DRAWINGS; SI-089 10 X 0.365 82-45 82-54 02-P-SIF-201 AND 88 PIPE TUNNEL 02-P-SIF-207 SI-241 18 X 0.312 70-23 70-43

C B SI-72 SI-72 ZONE 89 H-8 H-10 71-19 EL 95 EL 92-6 B 71-20 ZONE 88 EL 89-9 ZONE 90 83-52 W SI-194 75-33 H-11 71-22 B

71-25 SI-194 83-51 C 71-23 H-9 SI-72 75-31 H-9 SI-72 C 71-26 W H-7 B B SI-B-134-FCBA-10 W

SI-194 SI-194 75-30 H-10 H-15 71-27 83-50 75-29 71-29 75-27 SI-B-194-GCBC-18 83-48 71-30 83-49 B 71-32 83-47 SI-134 SI-B-072-FCBA-20 W H-11 EL 72 SI-194 W B B EL 92-1 H-8 SI-134 ZONE 86 B

SI-194 H-12 83-46 W

H-7 71-33 W

3INT-ISI-2 Rev. 4 W B B SI-194 SI-194 SI-194 H-6 C 83-45 83-44 H-4 H-21 71-34 B

SI-134 REFERENCE DRAWINGS; H-4 02-P-SIF-202 71-37 02-P-SIF-208 71-36 EL 88 71-40 ZONE 86 71-39 B

SI-194 B W 71-41 H-5 SI-194 H-2 EL 41-10 71-43 UNIT 2 ZONE 95 LINE # DIA X SCH FROM TO ZONE 73 181 of 210 SI-072 20 X 0.500 75-27 75-33 B TRAIN MISC. PIPE CHASES SI-134 10 X 0.365 83-44 83-52 AND 88 PIPE TUNNEL SI-194 18 X 0.312 71-19 71-43

76-38 A B ZONE 23 76-47 SI-202 H-7 76-37 V-542 76-46 B 76-36 SI-202 H-6 76-45 76-35 76-34 76-44 EL 89-9 76-43 B 76-33 76-32 B SI-202 B SI-202 H-16 SI-E-202-CCBA-12 B FL EL 100 SI-202 H-1 W C B SI-202 SI-202 H-3 B SI-202 SI-202 H-17 H-12 B H-18 H-4 ZONE 114 SI-202 H-2 76-31 76-42 76-30 B SI-202 76-29 76-40 76-41 H-15 76-28 3INT-ISI-2 Rev. 4 76-79 76-25 76-39 76-27 76-24 SI-E-202-CCBA-12 V-134 76-23 76-22 19 ZONE 91 REFERENCE DRAWINGS 02-P-SIF-103 A

LINE # DIA X SCH FROM TO UNIT 2 ZONE 96 SI-202 12 X 1.125 76-22 76-25 182 of 210 CONTAINMENT SI-202 12 X 1.312 76-27 76-47 LPSI HEADER TO LOOP 1A

77-46D B ZONE 24 77-46 SI-220 77-47 77-46C 77-45 H-1 BSI-220 77-44 77-43 V-543 H-27 B 77-46E B 77-46G SI-220 SI-220 77-46B B 77-46F H-5 W H-23 SI-220 77-46A A H-24 77-42 SI-E-220-CCBA-12 B

77-38 SI-220 B 77-41 H-10 SI-220 B 77-40 77-37 H-12 W SI-220 B H-7 B 77-36 SI-220 SI-220 H-13 H-8 77-39 77-35 77-34 77-52 77-33 77-32 3INT-ISI-2 Rev. 4 77-38A B B B 77-29 SI-220 SI-220 SI-220 77-28 H-9 H-19 H-15 77-31 W LINE # DIA X SCH FROM TO 77-28A A

EL 89-9 SI-220 12 X 1.125 77-22 77-25 77-28D 77-30 SI-220 12 X 1.312 77-27 77-47 77-28C ZONE 114 B

B SI-220 SI-220 H-17 77-28B H-18 SI-220 REFERENCE DRAWINGS B SI-E-220-CCBA-12 H-20 77-83 02-P-SIF-103 77-25 77-24 77-27 V-144 77-23 UNIT 2 ZONE 97 77-22 183 of 210 CONTAINMENT ZONE 91 20 LPSI HEADER TO LOOP 1B

LINE # DIA X SCH FROM TO SI-155 12 X 1.125 78-22 78-25 SI-155 12 X 1.312 78-27 78-47 EL 89-9 78-23 78-24 78-22 17 78-39 78-38 78-33 78-32 78-25 78-34 ZONE 88 78-27 B W SI-155 V-114 H-7 FL EL ZONE 115 100 78-40 78-35 78-78 78-28 78-41 3INT-ISI-2 Rev. 4 78-37 78-29 78-31 78-36 B SI-155 SI-E-155-CCBA-12 78-30 H-2 ZONE 25 78-42 REFERENCE DRAWINGS 78-47 02-P-SIF-136 78-46 V-540 78-43 B

W SI-155 B H-5 SI-155 78-45 78-44 H-6 UNIT 2 ZONE 98 184 of 210 CONTAINMENT LPSI HEADER TO LOOP 2A

LINE # DIA X SCH FROM TO SI-174 12 X 1.125 79-23 79-25 SI-174 12 X 1.312 79-27 79-47 C

SI-174 79-37 H-10 79-36 B W B W

SI-174 SI-174 H-13 H-8 SI-E-174-CCBA-12 79-38 79-45 79-44 W SI-174 B

V-541 SI-174 H-12 B SI-174 H-4 C H-5 79-46 79-41 79-35 ZONE 115 79-47 79-39 79-34 79-43 79-40 3INT-ISI-2 Rev. 4 79-42 B 79-70 SI-174 EL 93-5 79-27 79-25 H-11 ZONE 26 V-124 18 79-23 ZONE 88 REFERENCE DRAWINGS 02-P-SIF-136 UNIT 2 ZONE 99 185 of 210 CONTAINMENT LPSI HEADER TO LOOP 2B

LINE # DIA X SCH FROM TO SI-007 24 X 0.375 84-2 84-3 REFERENCE DRAWINGS 02-P-SIF-105 SI-241 16 X 0.312 70-116 70-119 02-P-SIF-151 PSV-179 SI-241 16 X 1.594 70-120 70-121 13-P-ZCG-112 SI-369 10 X 0.250 70-122 70-132 SI-369 6 X 0.280 70-134 - 70-134 70-132 ZONE 21 70-123 70-121 SI-A-369-GCBC-10 70-125 SI-A-241-GCBC-16 V-653 W B SI-369 C

SI-241 H-1 70-120 H-19 70-122 70-119 3INT-ISI-2 Rev. 4 70-131 70-117 70-129 84-2 70-126 70-116 SI-A-007-HCBA-24 27 ZONE 70-128 92 V-673 84-3 W B 84-5 23 ZONE UNIT 2 ZONE 100 93 186 of 210 CONTAINMENT LPSI TRAIN A SUCTION

ZONE 71-123 22 71-122 UV-654 85-2 SI-194 71-121 H-22 B

SI-A-030-HCBA-24 71-119 V-675 B

W SI-194 85-3 H-16 W B 85-5 24 ZONE SI-A-194-GCBC-16 90 71-118 71-116 71-115 SI-194 71-113 PSV-189 C SI-A-368-GCBC-10 H-26 3INT-ISI-2 Rev. 4 71-112 71-130 71-124 LINE # DIA X SCH FROM TO 71-125 26 ZONE 71-148 SI-030 24 X 0.375 85-2 85-3 71-145 71-127 89 71-149 SI-194 16 X 0.312 71-112 71-121 71-143 71-151 SI-194 16 X 1.594 71-122 71-123 SI-368 10 X 0.250 70-124 71-143 W

71-131 B 71-134 SI-368 6 X 0.280 71-145 -

SI-368 71-136 H-2 71-133 71-137 REFERENCE DRAWINGS 02-P-SIF-105 UNIT 2 ZONE 101 71-139 02-P-SIF-151 71-142 13-P-ZCG-112 187 of 210 71-140 CONTAINMENT LPSI TRAIN B SUCTION

LINE# DIA/SCH FROM TO SI-307 24" x 0.562" 84-12 84-37 SI-307 20" x 0.375" 84-39 84-46 SI-008-H002 REMOVED PER CONT. ON SI-9 18" x 0.312" 80-14 84-87 EDC 94-00466 ZONE 93 84-12 WEST WRAP SI-8 10" x 0.250" 84-51 84-84 V-205 EL72' 84-14 REFERENCE DWG'S 02-P-SIF-201 84-69 84-74 84-67 84-82 84-16 B W 84-72 SI-008 H3 84-65 84-80 V-470 BW SI-307 B SI-008 84-79 H15 H4 84-63 84-71 84-75 84-84 SI-A-307-GCBC-24" SI-A-008-GCBC-10" 84-61 B BSI-008 W 84-77 84-55 SI-008 H5 HPSI W

PUMP #1 84-18 H1 ZONE 116 84-59 CONT. ON 84-53 ZONE 76 84-57 CSP SUCTION B CONT. ON 80-14 3INT-ISI-2 Rev. 4 SI-009 ZONE 70 W

H5 LPSI "A" BW V-157 SUCTION SI-307 V-105 H2 SI-A-009-GCBC-18" 80-15 84-50 V-201 84-20 SI-009 B

84-24 W B 84-48 H2 84-51 B SI-307 SI-009 HV-683 84-86 84-46 H6 H1 W 84-22 W 84-87 84-43 84-44 SI-307 H3 84-28 SI-A-307-GCBC-20" B 84-26 84-35 SI-307 B B SI-307 84-41 W 84-29 84-33 H10 H8 W SI-307 84-31 H7 84-34 SI-307 84-37 W H5 84-39 UNIT 2 ZONE 102 B CONT. ON 84-85 ZONE 103 RWT SUCTION 188 of 210 SAFETY INJECTION PUMPS A TRAIN SUCTION

CH-A-142-HCBA-20" 86-33 86-35 86-31 ESSENTIAL 88' PIPE TUNNEL AUX BLDG W 86-59 B 88' PIPE CHASE CH-142 REFUELING W B H8 WATER CH-142 86-29 TANK H20 CH-142 B 86-57 86-37 H4 B 70 CONT ON CH-142 ZONE 102 H6 W SI PUMP SUCT.

86-60 86-39 86-27 86-1 CH-A-142-HCBA-20" 86-3 CH-142 B 86-55 H2 W 86-5 86-5 CH-142 B

CH-142 B 86-41 H22 H3 86-25 B 86-43 V-306 CH-142 86-23 H13 86-7 BCH-142 B W H1 CH-142 86- 8 3INT-ISI-2 Rev. 4 H14 W 86-45 86-20 86-21 86-53 86-62 HV531 86-10 86-16 86-47 BCH-424 86-18 W W CH-424 H1 B 86-51 W H6 86-49 CH-424 CH-A-424-GCBC-20" B H2 El. 51 6" CH-424 H3 B

86-14 86-12 Reference DWG'S.

LINE# DIA/SCH FROM TO UNIT 2 ZONE 103 02-P-SIF-201 02-P-ZYA-925 CH- 424 189 of 210 20" x 0.375" 86-1 86-20 REFUELING WATER SUCTION CH- 142 20" x 0.375" 86-21 86-59 A TRAIN

V-327 LINE# DIA/SCH FROM TO 104-5 CONT. ON 85-12 SI-308 24" x 0.562" 85-12 85-37 ZONE 90 CH-B-150-GCBC-3 EAST WRAP SI-308 20" x 0.375" 85-38 85-49 85-14 104-4 85-16 SI-33 18" x 0.312" 85-50 81-13 104-3 104-2 SI-31 10" x 0.250" 85-59 85-80 104-1 V-206 T.O.G. EL. 70'6" CH-150 3 X 0.216 104-1 104-5 B SI-308 W H1 85-18 REFERENCE DWG'S B SI-308 B SI-308 C 02-P-SIF -202 H4 H2 W SI-308 02-P-CHF-206 H15 W 85-20 85-26 85-28 85-29 85-31 CONT. ON ZONE 105 RWT SUCT.

85-22 85-36 B SI-308 BSI-308 W B 85-33 H8 H9 85-34 W SI-308 85-24 H3 85-37 85-59 85-38 85-50 BSI-308 SI-B-033-GCBC-18" 85-61 W H5 85-40 85-63 SI-B-308-GCBC-24" 85-65 SI-31 3INT-ISI-2 Rev. 4 B 85-52 SI-B-308-GCBC-20" W B H1 SI-31 85-54 H4 B 85-56 85-67 SI-31 W 85-42 H5 B W 85-58 85-74 85-44 SI-033 85-46 85-69 85-75 H3 V-104 81-14 B HV-692 85-71 SI-308 85-72 85-77 81-13 H11 85-47 V-402 W V-158 85-49 85-78 CONT. ON V-200 ZONE 79 SI-B-031-GCBC-10" CONT. SPRAY CONT. ON PUMP "B" SUCT. ZONE 73 LPSI PUMP UNIT 2 ZONE 104 "B" SUCT.

85-80 190 of 210 SAFETY INJECTION PUMPS B TRAIN SUCTION HPSI PUMP #2 ZONE 117

B W 87-37 87-39 CH-149 ESSENTIAL AUX. BLDG. H8 PIPE TUNNEL 88' 87-41 CH-149 B 87-35 H9 87-43 87-82 W

W 87-78 CH-149 B 87-45 H13 EL. 88' REFUELING 87-80 BCH-149 WATER TANK B H21 CH-149 CH-149B 87-47 H12 H10 W 87-88 W 87-84 87-49 B CH-149 W 87-86 H7 87-31 87-51 CH-149 B H14 W 87-27 87-33 87-75 87-29 CH-149 B B CH-B-149-HCBA-20" 87-53 H4 CH-149 H6 CH-149 B

W 70' H5 CH-B-149-HCBA-20" 87-73 87-25 B W CH-149 W

B H2 CH-149 W B 87-55 3INT-ISI-2 Rev. 4 H25 B CH-149 B CH-149 CH-149 H3 W W B 87-23 H1 H26 87-57 CH-149 H27 87-21 87-76 87-59 B 87-71 V-305 CH-425 HV530 87-61 87-5 W H1 87-63 87-19 87-16 87-10 W

87-65 87-3 87-18 BCH-425 87-69 87-67 H6 87-8 87-7 EL 51'6" 87-1 87-12 Reference DWG'S.

87-14 02-P-SIF-202 CH-B-425-GCBC-20" SI-PUMP 02-P-ZYA-925 SUCTION CONT. ON UNIT 2 ZONE 105 ZONE 104 191 of 210 LINE# DIA/SCH FROM TO REFUELING WATER SUCTION B TRAIN CH-425 20" x 0.375" 87-1 87-18 CH-149 20" x 0.375" 87-19 87-75

LINE # DIA X SCH FROM TO SI-099 4 X 0.337 106-1 106-6 B A SI-100 SI-100 106-10 106-11 SI-100 4 X 0.438 106-7 106-44 ZONE 108 W H-2 H-3 106-12 V-476 SI-100 4 X 0.438 106-24 106-28 EL 88 SI-105 2 X 0.344 106-49 106-72 106-33 106-9 106-13 B 106-32 106-8 SI-105 2 X 0.344 106-63 106-68 W SI-100 SI-106 3 X 0.438 106-45 106-48 106-31 V-404 H-11 B SI-A-100-CCBA-4 106-30 SI-100 B 106-34 106-26 106-7 H-34 W W SI-100 106-44 106-27 106-14 106-6 B

H-4 W SI-100 106-28 106-5 106-49 W SI-100 H-10 B W

B H-16 106-50 SI-100 106-51 B B B SI-100 W SI-100 W SI-A-105-CCBB-2 H-15 H-1 EL 48-10 SI-100 W 106-25 H-9 106-4 H-36 106-29 106-43 A 106-15 POINT A 106-23 CONTINUED 106-36 EL 51-6 W THIS DRAWING 106-22 SI-100 B 106-37 106-35 106-21 B C H-5 HV-698 SI-99 W SI-100 ZONE 118 W SI-99 106-24 106-38 H-1 W H-8 H-2 C B EL 46-3 HV-604 106-16 W SI-100 C 106-42 H-6 C 106-20 106-17 106-48 106-3 106-41 B

SI-100 SI-106 106-2 H-7 106-18 SI-A-100-CCBA-4 W H-1 POINT A 106-39 3INT-ISI-2 Rev. 4 CONTINUED THIS DRAWING 106-40 B SI-A-106-CCBA-3 A

106-54 SI-105 SI-A-99-CCBB-4 106-63 106-47 EL 41-2 H-J W 106-45 106-52 106-46 106-53 106-64 106-1 106-19 V-218 106-55 106-56 106-57 106-65 HPSI A 106-58 106-66 PUMP EL 41-2 B SI-105 106-67 H-D W SI-A-105-CCBB-2 106-59 B

W SI-105 106-68 H-C 106-60 SW V424 REFERENCE DRAWINGS 106-61 UNIT 2 ZONE 106 SW B 106-62 SI-105 02-P-SIF-203 106-69 W 192 of 210 H-B HPSI PUMP ROOM A 106-70 NOTE:

106-71 UV-666 SW = SOCKET WELD DISCHARGE 106-72 SW

LINE # DIA X SCH FROM TO SI-107 4 X 0.337 107-1 107-41 SI-107 4 X 0.337 107-23 107-27 W

SI-107 3 X 0.438 107-68 107-71 W B SI-107 107-35 SI-112 2 X 0.344 107-42 107-65 B SI-107 H-11 107-36 SI-112 2 X 0.344 107-56 107-60 W H-10 107-37 B SI-107 ZONE 109 SI-112 2 X 0.344 107-66 107-67 H-9 C SI-107 W

SI-107 H-12 REFERENCE DRAWINGS B 107-34 C H-8 SI-107 W 02-P-SIF-204 W EL 51-6 W H-1 SI-107 C 107-33 V405 B SI-107 H-2 107-3 NOTE: W 107-4 H-7 107-7 107-38 A SI-107 SW = SOCKET WELD B SI-107 107-5 H-3 107-8 H-6 107-2 EL 46-3 107-32 107-9 107-6 107-42 EL 46-9 EL 48-10 107-43 107-39 107-10 V-478 107-44 107-40 107-31 107-41 107-25 107-12 107-45 SI-B-107-CCBB-4 107-11 107-26 107-46 SI-B-107-CCBB-4 HV-609 B SI-107 107-47 B SI-107 107-24 107-48 ZONE H-46 107-30 H-5 107-13 W 107-1 POINT A 119 W CONTINUED SI-112 THIS DRAWING 107-14 EL 41-2 B A H-D 107-15 3INT-ISI-2 Rev. 4 107-49 107-56 W 107-29 W SI-107 HPSI B SI-112 107-71 B H-4 PUMP EL 44 B

H-G 107-23 107-50 107-57 V-219 107-27 A POINT A SI-B-112-CCBB-2 107-16 CONTINUED THIS DRAWING 107-51 HV-699 107-58 107-28 EL 47-3 EL 41-2 107-59 107-20 107-70 107-60 107-22 107-52 SI-B-112-CCBB-2 107-68 SI-B-107-CCBA-3 107-21 B SI-112 V400 107-69 W V426 107-19 H-C 107-53 107-17 SW W SI-107 107-54 107-67 SW H-48 107-55 107-66 B 107-18 107-61 107-64 UNIT 2 ZONE 107 107-62 UV667 193 of 210 B SI-112 HPSI PUMP ROOM B 107-63 H-H DISCHARGE 107-65 SW

LINE # DIA X SCH FROM TO SI-100 4 X 0.438 108-1 108-34 SI-118 2 X 0.344 108-35 108-45 REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204 CHARGING 02-P-CHF-207 PUMP A V508 B

B W SI-118 W

108-30 SI-100 H-R W 108-45 H-21 B SI-100 H-18 108-31 ZONE 112 EL. 93 10 B 108-32 W SI-118 H-N 108-25 108-44 108-34 EL. 922 108-24 108-29 108-43 108-33 B 108-22 108-23 SI-118 108-26 C W SI-A-100-CCBA-4 H-P W B SI-100 108-21 SI-100 H-20 108-20 108-28 108-17 H-19 EL. 92 108-27 108-41 108-16 B 108-35 108-37 W SI-100 108-15 108-36 EL. 922 3INT-ISI-2 Rev. 4 H-26 SI-118 B 108-39 W SI-100 B H-A 108-42 H-29 108-6 C 108-7 SI-118 SI-E-118-CCBA-2 ZONE 111 108-8 108-1 H-S 108-40 SI-118 B 108-2 B 108-38 W H-H W SI-100 108-19 B SI-100 108-18 EL. 89 H-35 H-13 108-14 B W SI-118 108-9 H-E 108-3 108-13 B SI-100 SI-A-100-CCBA-4 H-12 B 108-5 W W 108-10 SI-100 H-32 108-12 EL. 89 4 108-4 108-11 UNIT 2 ZONE 108 B SI-100 W H-31 194 of 210 HPSI DISCHARGE 88 PIPE CHASE ZONE 106

LINE # DIA X SCH FROM TO SI-107 4 X 0.337 109-1 109-43 REFERENCE DRAWINGS 02-P-SIF-203 02-P-SIF-204 B

W SI-107 ZONE 113 H-21 EL. 93 10 109-23 109-22 B

109-21 SI-107 109-24 H-25 109-19 109-18 109-20 109-17 SI-107 C

109-33 B 109-30 109-25 H-19 SI-107 109-26 SI-107C 109-7 109-34 109-14 W H-34 109-27 H-20 109-6 109-36 SI-107 B 109-11 109-43 109-8 H-26 W ZONE 110 109-16 109-13 109-37 109-10 EL. 92 2 109-28 109-15 109-12 B 109-35 EL. 89 4 SI-107 109-32 109-29 H-47 109-5 EL. 91 SI-B-107-CCBB-4 109-9 B W 3INT-ISI-2 Rev. 4 C 109-42 SI-107 EL. 88 6 SI-107 SI-107 109-31 W H-16 B H-15 H-37 W SI-107 B

109-41 H-35 109-4 B 109-2 EL. 89 4 W 109-3 SI-107 109-1 109-40 H-36 SI-B-107-CCBB-4 SI-107 SI-107 H-14 EL. 51 8 B H-13 W FROM B HPSI B 40 W ZONE 107 UNIT 2 ZONE 109 195 of 210 HPSI DISCHARGE 88 PIPE CHASE

LINE # DIA X SCH FROM TO SI-103 2 X 0.344 110-40 110-52 SI-107 2 X 0.344 110-53 110-59 SI-107 4 X 0.337 110-1 110-10 SI-110 2 X 0.344 110-11 110-17 SI-218 2 X 0.344 110-18 110-22 REFERENCE DRAWINGS SI-218 3 X 0.438 110-38 110-39 110-39 ZONE 114 15 SI-218 4 X 0.438 110-23 110-37 110-38 02-P-SIF-203 SI-236 2 X 0.344 110-60 110-64 110-37 B W SI-E-218-CCBA-3 SI-236 EL. 93 5 SI-E-218-CCBA-4 H-B 110-36 SI-E-236-CCBA-2 B 110-35 110-61 SI-103 W B EL. 86 9 110-48 SI-218 110-60 H-D W 110-34 110-62 H-1 110-59 EL. 88 6 110-63 110-64 110-33 UV637 SI-E-218-CCBA-2 ZONE 111 110-32 110-49 110-46 UV646 SI-218 B 110-65 110-57 H-2 B 110-50 110-19 SI-218 110-56 110-47 110-44 110-66 SI-107 B SI-218 C H-B SI-103 110-20 B H-A B 110-43 H-3 110-58 H-B SI-103 110-21 B SI-103 EL. 88 6 110-31 UV636 H-E 3INT-ISI-2 Rev. 4 110-30 H-A 110-55 110-29 110-15 110-54 110-45 110-42 110-52 110-51 110-18 110-14 110-28 SI-B-107-CCBB-2 110-41 110-13 110-17 SI-110 B SI-A-103-CCBA-2 110-12 B H-A SI-107 W 110-22 110-16 H-42 110-40 110-24 EL. 85 9/16 110-23 ZONE 111 110-25 SI-107 C H-43 110-2 110-1 B SI-B-110-CCBB-2 SI-107 W 110-6 SI-107 C H-39 110-11 110-53 H-44 110-10 110-5 110-9 SI-107 B UNIT 2 ZONE 110 W

H-45 110-8 EL. 85 ZONE 109 196 of 210 110-7 HPSI DISCHARGE SI-107 C 110-4 WEST WRAP 110-3 H-41 SI-B-107-CCBB-4

LINE # DIA X SCH FROM TO 111-41 SI-100 2 X 0.344 111-9 111-25 ZONE 114 SI-100 4 X 0.438 111-1 111-8 111-40 111-39 16 SI-236 3 X 0.438 111-40 111-41 SI-236 4 X 0.438 111-26 111-39 EL. 93 5 SI-E-236-CCBA-3 111-38 111-37 B 111-36 SI-236 W

H-1 REFERENCE DRAWINGS 111-35 02-P-SIF-203 SI-236 C H-2 111-34 SI-236 B SI-E-236-CCBA-4 H-3 SI-100 B 111-33 111-21 H-A 111-32 111-31 111-20 111-30 111-19 UV647 111-29 111-22 SI-100 B 111-23 H-B ZONE 110 111-17 111-28 111-42 111-16 111-24 111-18 B W SI-100 3INT-ISI-2 Rev. 4 EL. 88 6 111-27 111-15 H-37 111-26 EL. 85 111-5 111-25 EL. 85 111-14 111-6 SI-A-100-CCBA-4 ZONE 110 111-2 111-1 B

111-9 SI-100 W 111-13 H-30 111-7 111-12 111-8 111-4 111-3 ZONE 108 111-11 111-10 SI-A-100-CCBA-2 UNIT 2 ZONE 111 197 of 210 HPSI DISCHARGE WEST WRAP

LINE # DIA X SCH FROM TO SI-100 4 X 0.438 112-1 112-6 SI-101 2 X 0.344 112-7 112-20 SI-102 2 X 0.344 112-21 112-32 ZONE 113 SI-176 4 X 0.438 112-33 112-44 112-20 SI-176 3 X 0.438 112-45 112-46 ZONE 115 SI-A-101-CCBA-2 14 112-46 SI-E-176-CCBA-3 B B SI-101 SI-101 112-16 112-45 H-D H-A 112-17 B B 112-18 UV-617 112-44 SI-101 W SI-176 W H-3 H-C EL 93-5 112-13 112-42 112-43 112-19 112-12 112-41 SI-E-176-CCBA-4 112-15 112-14 112-40 EL 88-9 B 112-11 112-39 SI-176 B 112-35 SI-101 H-1 112-29 112-10 112-30 H-B SI-176 B 112-36 UV-627 H-2 ZONE 113 112-26 112-38 112-31 112-25 112-34 112-24 112-37 112-33 3INT-ISI-2 Rev. 4 112-27 112-23 112-32 112-28 SI-102 B SI-A-102-CCBA-2 W SI-102 H-A H-B B 112-22 112-9 112-8 EL 92-6 112-7 112-21 112-1 112-6 112-2 112-5 SI-100 B W

H-17 ZONE 108 112-4 112-3 REFERENCE DRAWINGS SI-A-100-CCBA-4 02-P-SIF-204 UNIT 2 ZONE 112 198 of 210 HPSI DISCHARGE EAST WRAP

LINE # DIA X SCH FROM TO SI-108 2 X 0.344 113-7 113-15 SI-107 4 X 0.337 113-1 113-6 REFERENCE DRAWINGS SI-109 2 X 0.344 113-21 113-27 B SI-157 4 X 0.438 113-33 113-49 02-P-SIF-204 113-48 W SI-157 SI-157 3 X 0.438 113-50 113-51 113-49 H-6 SI-157 2 X 0.344 113-16 113-20 113-50 SI-176 2 X 0.344 113-28 113-32 113-47 113-51 113-46 ZONE 115 13 113-45 B

POINT A SI-157 113-44 CONTINUED THIS DRAWING H-5 SI-E-157-CCBA-4 A SI-157C 113-16 UV-616 H-4 B 113-36 113-43 113-17 SI-157 113-15 113-42 113-35 H-1 113-18 113-41 113-19 113-34 113-13 113-38 113-20 113-40 113-12 113-39 ZONE 112 B SI-157 EL 86 113-33 W H-A 113-37 W B SI-E-157-CCBA-2 SI-176 BSI-108 EL 88-9 SI-157B H-A H-A 113-11 H-9 113-29 113-14 A UV-626 POINT A 113-30 113-10 SI-E-157-CCBA-4 CONTINUED B THIS DRAWING 3INT-ISI-2 Rev. 4 SI-109 SI-B-108-CCBB-2 H-A 113-31 113-28 113-25 113-27 113-24 113-26 113-23 113-22 113-32 SI-E-176-CCBA-2 113-1 BW ZONE 112 EL 92-6 SI-107 SI-B-109-CCBB-2 H-22 113-9 113-21 113-2 113-8 113-7 ZONE 109 113-6 113-5 B UNIT 2 ZONE 113 SI-107 SI-B-107-CCBB-4 H-24 199 of 210 HPSI DISCHARGE 113-3 EAST WRAP 113-4 EL 84-6

LINE # DIA X SCH FROM TO SI-218 3 X 0.438 114-1 114-11 SI-236 3 X 0.438 114-12 114-23 REFERENCE DRAWINGS 02-P-SIF-103 114-20 114-19 EL 93-5 114-8 114-9 SI-E-236-CCBA-3 114-18 114-7 B SI-E-218-CCBA-3 SI-236 114-17 B SI-218 114-6 114-21 H-5 H5 114-16 114-5 EL 93-5 114-4 114-22 114-15 114-14 EL 93-5 3INT-ISI-2 Rev. 4 114-11 V-143 114-13 ZONE 96 114-3 114-23 114-12 V-133 114-2 ZONE 97 16 114-1 ZONE 111 15 ZONE 110 UNIT 2 ZONE 114 200 of 210 CONTAINMENT HPSI HEADER LOOP 1A & 1B

LINE # DIA X SCH FROM TO SI-157 3 X 0.438 115-1 115-12 SI-176 3 X 0.438 115-13 115-22 REFERENCE DRAWINGS 02-P-SIF-136 ZONE 113 13 115-1 115-14 115-13 EL 93-5 SI-E-157-CCBA-3 14 115-15 ZONE 112 115-17 EL 93-5 115-2 115-16 115-3 115-4 B SI-176 115-5 V-123 H-4 B 115-21 115-6 SI-157 V-113 H-11 115-18 EL 89-9 3INT-ISI-2 Rev. 4 115-7 115-19 115-20 115-8 SI-E-176-CCBA-3 EL 91-4 115-9 115-12 115-22 115-10 115-11 ZONE 98 ZONE 99 UNIT 2 ZONE 115 201 of 210 CONTAINMENT HPSI HEADER LOOP 2A & 2B

W N W B 1) TAG NUMBER: 2MSIAP02 B 116-1B 116-1A

2) SERIAL NUMBER: INGERSOL RAND S/N 0776-16
3) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 W

W B B 116-1C 116-1D DISCHARGE ZONE 102 ZONE 106 3INT-ISI-2 Rev. 4 SUCTION DISCHARGE 116-1 116-2 HEAD STUDS UNIT 2 ZONE 116 202 of 210 HPSI PUMP A

W N W B B 117-1B 1) TAG NUMBER: 2MSIBP02 117-1A

2) SERIAL NUMBER: INGERSOL RAND S/N 0776-17
3) DISCHARGE HEAD STUDS 16@ 2.25 DIA. X 10.88 REFERENCE DRAWINGS 02-P-SIF-201 02-P-SIF-203 W

W B B 117-1C 117-1D DISCHARGE ZONE 104 ZONE 107 3INT-ISI-2 Rev. 4 SUCTION DISCHARGE 117-1 117-2 HEAD STUDS UNIT 2 ZONE 117 203 of 210 HPSI PUMP B

LINE # DIA X SCH FROM TO SI-106 3 X 0.438 118-1 118-49 118-48 118-47 118-46 B

118-27 SI-106 118-49 REFERENCE DRAWINGS W B W ZONE 39 H-18 118-45 118-28 SI-106 02-P-SIF-203 W V-523 118-44 H-23 118-19 B 77 02-P-SIF-105 SI-106 118-43 BW 118-20 H-14 SI-106 118-42 H-13 A

POINT A CONTINUED THIS DRAWING 118-26 118-41 SI-A-106-CCBA-3 118-40 B 118-25 HV-321 118-33 SI-106 118-18 H-26 B SI-106 EL 92 6 EL 85 118-17 W H-21 B BSI-106 SI-106 118-21 POINT A 118-34 H-25 A CONTINUED BSI-106 H-22 THIS DRAWING 118-22 118-24 H-24 118-35 118-29 118-39 BSI-106 B SI-106 W 118-23 SI-106 B W H-16 118-38 H-20 B H-15 SI-106 W B W H-12 SI-106 118-37 118-36 118-32 118-30 W

H-3 118-16 118-31 C SI-106 B 118-5 3INT-ISI-2 Rev. 4 SI-106 H-19 H-11 W 118-4 W 118-6 118-3 B W B W B SI-106 118-2 SI-106 SI-106 H-4 W B H-2 H-5 SI-106 B H-10 W

SI-106 118-7 HV-604 118-15 H-6 118-1 ZONE 106 118-8 EL 51-6 118-9 B SI-106 W

118-10 H-9 EL 46-3 SI-106 B 118-14 UNIT 2 ZONE 118 W

H-7 204 of 210 C 118-13 HPSI A LONG TERM SI-106 H-8 SI-A-106-CCBA-3 RECIRCULATION 118-11 118-12

LINE # DIA X SCH FROM TO SI-114 3 X 0.438 119-1 119-52 119-27 W B SI-319 2 X 0.344 119-53 119-57 119-28 SI-114 B H-13 B SI-114 119-29 B SI-114 C SI-114 H-26 SI-B-114-CCBA-3 SI-319 H-21 H-12 C V-509 119-25 SI-319 H-B 119-39 119-26 119-57 H-A 119-53 A 119-38 119-24 W B POINT A 119-56 CONTINUED THIS DRAWING SI-114 119-23 B SI-E-319-CCBA-2 SI-319 H-17 EL 87-3 H-J EL 87-3 119-22 119-33 119-21 119-54 119-37 119-32 B 119-20 SI-319 B 119-36 SI-114 H-G 119-30 H-27 119-35 SI-114 B 119-19 B

119-34 H-15 EL 85-4 SI-114 SI-114 C W EL 92-6 119-31 H-10 119-55 H-16 B SI-114 119-18 W 119-47 H-9 119-17 W V-533 119-48 B 119-46 W SI-114 119-8 119-16 119-50 119-49 B

H-7 SI-B-114-CCBA-3 W SI-114 119-9 119-15 ZONE 40 67 B 119-45 H-6 119-10 SI-114 119-52 3INT-ISI-2 Rev. 4 W B H-5 119-44 EL 51-6 119-51 SI-114 119-7 C

SI-114 HV331 W H-4 B H-8 119-43 119-41 W B SI-114 119-6 119-11 H-3 EL 88 A SI-114 SI-B-114-CCBA-3 EL 46-3 119-42 POINT A H-2 CONTINUED W B THIS DRAWING 119-12 119-40 SI-114 119-5 119-14 H-22 EL 46-8 119-13 119-4 B

W SI-114 H-1 119-3 UNIT 2 ZONE 119 119-2 REFERENCE DRAWINGS HV-609 205 of 210 02-P-SIF-105 HPSI B LONG TERM 02-P-SIF-204 RECIRCULATION 02-P-CHF-207 119-1 ZONE 107

LINE # DIA X SCH FROM TO SI-088 10 X 0.250 120-1 120-19 EL 116-4 120-18 120-17 EL 112 120-19 120-16 120-15 C 120-14 SI-88 H-2 120-13 SI-A-088-GCBC-10 EL 95-5 120-1 3INT-ISI-2 Rev. 4 120-2 EL 89-9 120-11 EL 91-5 120-12 120-10 21 120-3 120-6 120-9 120-4 V-164 CONT ZONE 93 120-5 120-7 120-8 UNIT 2 ZONE 120 206 of 210 CONTAINMENT REFERENCE DRAWINGS 13-P-ZCG-105 SPRAY A

LINE # DIA X SCH FROM TO SI-130 10 X 0.250 121-1 121-21 EL 116-4 121-19 121-21 EL 112 121-18 121-20 121-17 SI-A-130-GCBC-10 121-16 C W SI-130 H-7 C 121-3 3INT-ISI-2 Rev. 4 SI-130 EL 93-5 121-2 H-3 121-13 121-15 121-12 22 EL 95-5 121-1 121-4 CONT ZONE 90 121-14 V-165 121-5 121-6 121-11 121-07 121-08 EL 90-5 121-9 121-10 UNIT 2 ZONE 121 207 of 210 CONTAINMENT REFERENCE DRAWINGS 13-P-ZCG-105 SPRAY B

SECTION 11.0 Terms and Definitions 3INT-ISI-2 Rev. 4 208 of 210

AHE: Augmented High Energy ANII: Authorized Nuclear Inservice Inspector APS: Arizona Public Service Company, et al ASME: American Society of Mechanical Engineers Aux: Auxiliary BWR: Boiling Water Reactor CE: Combustion Engineering CEDM: Control Element Drive Mechanism CFR: Code of Federal Regulations CH: Charging CHR: Containment Heat Removal Circ: Circumferential CL: Cold Leg CRD: Control Rod Drive CS: Containment Spray CSP: Containment Spray Pump DWG: Drawing DR: Disregard ECCS: Emergency Core Cooling System FW: Feedwater HL: Hot Leg HPSI: High Pressure Safety Injection HV: Hand Control Valve Hx: Heat Exchanger ICI: In Core Instrumentation IEB: Inspection and Enforcement Bulletin IEIN: Inspection and Enforcement Information Notice Inj: Injection INPO: Institute for Nuclear Power Operations ISI: Inservice Inspection LPSI: Low Pressure Safety Injection MSSS: Main Steam Support Structure NDE: Nondestructive Examination NRC: Nuclear Regulatory Commission PDV: Pressure Differential Valve PSV: Pressure Relief or Safety Valve PWR: Pressurized Water Reactor PVNGS: Palo Verde Nuclear Generating Station PZR: Pressurizer RC: Reactor Coolant RCP: Reactor Coolant Pump REV: Revision RHR: Reactor Residual Heat Removal 3INT-ISI-2 Rev. 4 209 of 210

Recirc: Recirculation RCS: Reactor Coolant System RPV: Reactor Pressure Vessel RVLMS: Reactor Vessel Level Monitoring System REM: Roentgen Equivalent Man SDCHX: Shutdown Cooling Heat Exchanger SD: Shutdown SER: Significant Event Report SG: Steam Generator SI: Safety Injection SN: Serial Number T: Thickness TL: Prolonged Tech. Spec: Technical Specification UFSAR: Updated Final Safety Analysis Report USNRC: United States Nuclear Regulatory Commission UV: Multivariable Control Valve V: Valve 3INT-ISI-2 Rev. 4 210 of 210