| | number = ML14209A627 | | | number = ML14209A627 |
| | issue date = 08/04/2014 | | | issue date = 08/04/2014 |
| | title = Arkansas Nuclear One, Units 1 and 2, Request for Additional Information, Requests to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, for Unit 1 and TSTF-422, Revision 2 for Unit 2, Change in Technical Specifications End St | | | title = Request for Additional Information, Requests to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, for Unit 1 and TSTF-422, Revision 2 for Unit 2, Change in Technical Specifications End States. |
| | author name = Bamford P J | | | author name = Bamford P |
| | author affiliation = NRC/NRR/DORL/LPLIV-2 | | | author affiliation = NRC/NRR/DORL/LPLIV-2 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000313, 05000368 | | | docket = 05000313, 05000368 |
| | license number = DPR-051, NPF-006 | | | license number = DPR-051, NPF-006 |
| | contact person = Bamford P J | | | contact person = Bamford P |
| | case reference number = TAC MF1182, TAC MF1199 | | | case reference number = TAC MF1182, TAC MF1199 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 4, 2014 SUBJECT: ARKANSAS NUCLEAR ONE, UNIT NOS. 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUESTS TO ADOPT CHANGES TO TECHNICAL SPECIFICATION END STATES (TAC NOS. MF1182 AND MF1199) Dear Sir or Madam: By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 13085A282 and ML 13085A283), Entergy Operations, Inc. (Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One, Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441 )," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML 13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML 13347B235 for Unit 2). The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific question is found in the enclosed request for additional information (RAI). The question was sent via electronic transmission on July 28, 2014, to Mr. David Bice, of your staff. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed. After reviewing the draft question, Mr. Bice indicated that there was no need for a clarification teleconference regarding the RAI. The NRC staff requests that you respond within 30 days of the date of this letter. | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 4, 2014 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. |
| -2-If you have any questions regarding this matter, I may be reached at 301-415-2833. Docket Nos. 50-313 and 50-368 Enclosure: Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUESTS PROPOSING ADOPTION OF TSTF-431, REVISION 3 (UNIT 1) AND TSTF-422, REVISION 2 (UNIT 2) REGARDING TECHNICAL SPECIFICATION END STATES ENTERGY OPERATIONS, INC. ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 DOCKET NOS. 50-313 AND 50-368 By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML 13085A282 and ML 13085A283), Entergy Operations, Inc. (Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One (ANO), Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441)," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML 13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML 13347B235 for Unit 2). In order for the U.S. Nuclear Regulatory Commission (NRC) staff to complete its review of the LARs, a response to the following request for additional information is requested. Background: During the LAR review, the NRC staff noticed that one of the regulatory guidance documents used in the staff's regulatory assessment for the TSTFs, and referenced in the staff's associated model safety evaluations, has since been superseded and therefore, is not valid guidance for the adoption of approved TSTF. The issue concerns a specific reference to Regulatory Guide (RG) 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants," contained in both TSTF-431 and TSTF-422. RG 1.182 was withdrawn since it was determined that the document was redundant due to the inclusion of its subject matter in Revision 3 of RG 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated May 2012 (ADAMS Accession No. ML 11361 0098). The withdrawal notice for RG 1.182 was published in the Federal Register on November 27,2012 (78 FR 70846). The notice also states that withdrawal of RG 1.182 neither altered any prior or existing licensing commitments based on its use, nor constituted backfitting as defined in Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.109 (the Backfit Rule), and was not otherwise inconsistent with the issue finality provisions in 10 CFR Part 52. Enclosure
| | 1448 S.R. 333 Russellville, AR 72802 |
| -2 -In addition, the NRC staff observed that RG 1.160 endorsed Revision 4A of the Nuclear Management and Resources Council (NUMARC) 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated April 2011 (ADAMS Accession No. ML 11116A 198). NUMARC 93-01 provides methods that are acceptable to the NRC staff for complying with the provisions of 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The model safety evaluation for the TSTFs currently refers to the guidance in Revision 2 of the NUMARC 93-01, dated April 1996 (ADAMS Accession No. ML 101020415). Request for Additional Information: In order to justify adoption of the TSTF changes, please confirm that ANO, Units 1 and 2, adhere to the RG 1.160 guidance, including the updated version of NUMARC 93-01. In addition, please confirm that the topical reports supporting the LARs comply with NUMARC 93-01, Section 11, and identify, if any, inconsistencies with this section.
| | |
| -2-If you have any questions regarding this matter, I may be reached at 301-415-2833. Sincerely, IRA/ Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368 Enclosure: Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL4-1 Reading RidsAcrsAcnw MaiiCTR Resource RidsNrrDorllpl4-1 Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsRgn4MaiiCenter Resource RGrover, NRRIDSS/STSB ADAMS Accession No.: ML 14209A627 OFFICE NRRJDORL/LPL4-1/PM NRRJDORLILPL4-1/LA NAME PBamford JBurkhardt DATE 7/29/14 7/29/14 NRR/DSS/STSB/BC REIIiott 7/29/14 OFFICIAL RECORD COPY NRRJDORL/LPL4-1/BC NRRJDORLILPL4-1 /PM EOesterle PBamford 8/1/14 8/4/14
| | ==SUBJECT:== |
| }} | | ARKANSAS NUCLEAR ONE, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUESTS TO ADOPT CHANGES TO TECHNICAL SPECIFICATION END STATES (TAC NOS. MF1182 AND MF1199) |
| | |
| | ==Dear Sir or Madam:== |
| | |
| | By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML13085A282 and ML13085A283), Entergy Operations, Inc. |
| | (Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One, Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441 )," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML13347B235 for Unit 2). |
| | The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific question is found in the enclosed request for additional information (RAI). The question was sent via electronic transmission on July 28, 2014, to Mr. David Bice, of your staff. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed. After reviewing the draft question, Mr. Bice indicated that there was no need for a clarification teleconference regarding the RAI. The NRC staff requests that you respond within 30 days of the date of this letter. |
| | |
| | If you have any questions regarding this matter, I may be reached at 301-415-2833. |
| | Sincerely, |
| | ~ |
| | Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Distribution via Listserv |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUESTS PROPOSING ADOPTION OF TSTF-431, REVISION 3 (UNIT 1) AND TSTF-422, REVISION 2 (UNIT 2) |
| | REGARDING TECHNICAL SPECIFICATION END STATES ENTERGY OPERATIONS, INC. |
| | ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 DOCKET NOS. 50-313 AND 50-368 By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML13085A282 and ML13085A283), Entergy Operations, Inc. |
| | (Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One (ANO), Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441)," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML13347B235 for Unit 2). In order for the U.S. Nuclear Regulatory Commission (NRC) staff to complete its review of the LARs, a response to the following request for additional information is requested. |
| | |
| | ==Background:== |
| | |
| | During the LAR review, the NRC staff noticed that one of the regulatory guidance documents used in the staff's regulatory assessment for the TSTFs, and referenced in the staff's associated model safety evaluations, has since been superseded and therefore, is not valid guidance for the adoption of approved TSTF. The issue concerns a specific reference to Regulatory Guide (RG) 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants," contained in both TSTF-431 and TSTF-422. |
| | RG 1.182 was withdrawn since it was determined that the document was redundant due to the inclusion of its subject matter in Revision 3 of RG 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated May 2012 (ADAMS Accession No. ML113610098). The withdrawal notice for RG 1.182 was published in the Federal Register on November 27,2012 (78 FR 70846). The notice also states that withdrawal of RG 1.182 neither altered any prior or existing licensing commitments based on its use, nor constituted backfitting as defined in Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.109 (the Backfit Rule), and was not otherwise inconsistent with the issue finality provisions in 10 CFR Part 52. |
| | Enclosure |
| | |
| | In addition, the NRC staff observed that RG 1.160 endorsed Revision 4A of the Nuclear Management and Resources Council (NUMARC) 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated April 2011 (ADAMS Accession No. ML11116A198). NUMARC 93-01 provides methods that are acceptable to the NRC staff for complying with the provisions of 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The model safety evaluation for the TSTFs currently refers to the guidance in Revision 2 of the NUMARC 93-01, dated April 1996 (ADAMS Accession No. ML101020415). |
| | Request for Additional Information: |
| | In order to justify adoption of the TSTF changes, please confirm that ANO, Units 1 and 2, adhere to the RG 1.160 guidance, including the updated version of NUMARC 93-01. In addition, please confirm that the topical reports supporting the LARs comply with NUMARC 93-01, Section 11, and identify, if any, inconsistencies with this section. |
| | |
| | ML14209A627 OFFICE NRRJDORL/LPL4-1/PM NRRJDORLILPL4-1/LA NRR/DSS/STSB/BC NRRJDORL/LPL4-1/BC NRRJDORLILPL4-1 /PM NAME PBamford JBurkhardt REIIiott EOesterle PBamford DATE 7/29/14 7/29/14 7/29/14 8/1/14 8/4/14}} |
Letter Sequence RAI |
---|
TAC:MF1182, DC Electrical Rewrite - Update to TSTF-360, Change in Technical Specifications End States - CE NPSD-1186, Change in Technical Specifications End States - BAW-2441 (Approved, Closed) TAC:MF1199, Change in Technical Specifications End States - CE NPSD-1186, Change in Technical Specifications End States - BAW-2441 (Approved, Closed) |
|
MONTHYEAR2CAN031303, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186)2013-03-26026 March 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186) Project stage: Request 1CAN031306, License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441)2013-03-26026 March 2013 License Amendment Request, Adoption of Technical Specification Task Force (TSTF)-431, Revision 3 Change in Technical Specifications End States (BAW-2441) Project stage: Request ML13130A2172013-05-10010 May 2013 Acceptance Review Email, License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, Change in Technical Specifications End States (BAW-2441) Project stage: Acceptance Review ML13182A3332013-07-0101 July 2013 Acceptance Review Email, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186) Project stage: Acceptance Review ML13301A6752013-10-28028 October 2013 NRR E-mail Capture - RAI Related to the LAR on Adoption of TSTF-431, Revision 3, Change in TS End States (BAW-2441) Project stage: RAI 1CAN111302, Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441)2013-11-14014 November 2013 Response to Request for Additional Information ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) Project stage: Response to RAI ML13326A3452013-11-22022 November 2013 NRR E-mail Capture - RAI Related to the Adoption of (TSTF)-422, Revision 2 Project stage: RAI 2CAN121303, Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-4222013-12-12012 December 2013 Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-422 Project stage: Response to RAI ML14209A6272014-08-0404 August 2014 Request for Additional Information, Requests to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, for Unit 1 and TSTF-422, Revision 2 for Unit 2, Change in Technical Specifications End States. Project stage: RAI 0CAN081407, Response to Request for Additional Information Adoption of Technical Specification Task Force TSTF-431, Revision 3 and Adoption of TSTF-422, Revision 2 Regarding Technical Specifications End States2014-08-19019 August 2014 Response to Request for Additional Information Adoption of Technical Specification Task Force TSTF-431, Revision 3 and Adoption of TSTF-422, Revision 2 Regarding Technical Specifications End States Project stage: Response to RAI 1CAN101405, License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441).2014-10-22022 October 2014 License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441). Project stage: Supplement 2CAN101401, Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186)2014-10-22022 October 2014 Arkansas, Unit 2 - License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) Project stage: Supplement 1CAN121403, License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441).2014-12-0505 December 2014 License Amendment Request Supplemental ANO-1 Adoption of TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441). Project stage: Supplement 2CAN121403, License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186).2014-12-0505 December 2014 License Amendment Request Supplemental Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186). Project stage: Supplement ML15023A1472015-03-0303 March 2015 Issuance of Amendment No. 253, Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-431, Revision 3, Change in Technical Specifications End States (BAW-2441) Project stage: Approval ML15068A3192015-03-31031 March 2015 Issuance of Amendment No. 301, Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186) Project stage: Approval 2013-07-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 4, 2014 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NOS. 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUESTS TO ADOPT CHANGES TO TECHNICAL SPECIFICATION END STATES (TAC NOS. MF1182 AND MF1199)
Dear Sir or Madam:
By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML13085A282 and ML13085A283), Entergy Operations, Inc.
(Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One, Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441 )," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML13347B235 for Unit 2).
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific question is found in the enclosed request for additional information (RAI). The question was sent via electronic transmission on July 28, 2014, to Mr. David Bice, of your staff. The draft question was sent to ensure that it was understandable, the regulatory basis was clear, and to determine if the information was previously docketed. After reviewing the draft question, Mr. Bice indicated that there was no need for a clarification teleconference regarding the RAI. The NRC staff requests that you respond within 30 days of the date of this letter.
If you have any questions regarding this matter, I may be reached at 301-415-2833.
Sincerely,
~
Peter J. Bamford, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUESTS PROPOSING ADOPTION OF TSTF-431, REVISION 3 (UNIT 1) AND TSTF-422, REVISION 2 (UNIT 2)
REGARDING TECHNICAL SPECIFICATION END STATES ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 DOCKET NOS. 50-313 AND 50-368 By two letters dated March 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML13085A282 and ML13085A283), Entergy Operations, Inc.
(Entergy, the licensee), submitted license amendment requests (LARs) proposing changes to the Technical Specifications (TS) for Arkansas Nuclear One (ANO), Units 1 and 2. The proposed amendments would modify the TS requirements for end states associated with the implementation of Technical Specification Task Force (TSTF) traveler TSTF-431, "Change in Technical Specifications End States (BAW-2441)," for Unit 1, and TSTF-422, Revision 2, "Change in Technical Specifications End States (CE NPSD-1186)," for Unit 2. Both TSTFs may be found at ADAMS Accession No. ML093570241. The proposed end states modifications would permit, for some systems, entry into a hot shutdown (Mode 4) end state rather than the current cold shutdown (Mode 5) end state. Supplements to the LARs were submitted by Entergy on November 14, 2013 (ADAMS Accession No. ML13319A877 for Unit 1), and December 12, 2013 (ADAMS Accession No. ML13347B235 for Unit 2). In order for the U.S. Nuclear Regulatory Commission (NRC) staff to complete its review of the LARs, a response to the following request for additional information is requested.
Background:
During the LAR review, the NRC staff noticed that one of the regulatory guidance documents used in the staff's regulatory assessment for the TSTFs, and referenced in the staff's associated model safety evaluations, has since been superseded and therefore, is not valid guidance for the adoption of approved TSTF. The issue concerns a specific reference to Regulatory Guide (RG) 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants," contained in both TSTF-431 and TSTF-422.
RG 1.182 was withdrawn since it was determined that the document was redundant due to the inclusion of its subject matter in Revision 3 of RG 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated May 2012 (ADAMS Accession No. ML113610098). The withdrawal notice for RG 1.182 was published in the Federal Register on November 27,2012 (78 FR 70846). The notice also states that withdrawal of RG 1.182 neither altered any prior or existing licensing commitments based on its use, nor constituted backfitting as defined in Title 10 of the Code of Federal Regulations (1 0 CFR), Section 50.109 (the Backfit Rule), and was not otherwise inconsistent with the issue finality provisions in 10 CFR Part 52.
Enclosure
In addition, the NRC staff observed that RG 1.160 endorsed Revision 4A of the Nuclear Management and Resources Council (NUMARC) 93-01, "Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," dated April 2011 (ADAMS Accession No. ML11116A198). NUMARC 93-01 provides methods that are acceptable to the NRC staff for complying with the provisions of 10 CFR 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants." The model safety evaluation for the TSTFs currently refers to the guidance in Revision 2 of the NUMARC 93-01, dated April 1996 (ADAMS Accession No. ML101020415).
Request for Additional Information:
In order to justify adoption of the TSTF changes, please confirm that ANO, Units 1 and 2, adhere to the RG 1.160 guidance, including the updated version of NUMARC 93-01. In addition, please confirm that the topical reports supporting the LARs comply with NUMARC 93-01, Section 11, and identify, if any, inconsistencies with this section.
ML14209A627 OFFICE NRRJDORL/LPL4-1/PM NRRJDORLILPL4-1/LA NRR/DSS/STSB/BC NRRJDORL/LPL4-1/BC NRRJDORLILPL4-1 /PM NAME PBamford JBurkhardt REIIiott EOesterle PBamford DATE 7/29/14 7/29/14 7/29/14 8/1/14 8/4/14