| issue date = 03/04/2015
| issue date = 03/04/2015
| title = Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2014001 and 05000414/2014001)
| title = Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2014001 and 05000414/2014001)
| author name = Ehrhardt F J
| author name = Ehrhardt F
| author affiliation = NRC/RGN-II/DRP/RPB1
| author affiliation = NRC/RGN-II/DRP/RPB1
| addressee name = Henderson K
| addressee name = Henderson K
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES March 4, 2015
[[Issue date::March 4, 2015]]


Mr. Kelvin Henderson Site Vice President Duke Energy Corporation Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)
==Dear Mr. Henderson:==
On February 10, 2015, the NRC completed its end-of-cycle performance review of the Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).


==Dear Mr. Henderson:==
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
On February 10, 2015, the NRC completed its end-of-cycle performance review of the Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.


Please contact me at 404-997-4611 with any questions you have regarding this letter.
Please contact me at 404-997-4611 with any questions you have regarding this letter.


Sincerely,/RA/ Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52  
Sincerely,
/RA/
Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure: Catawba Inspection/Activity Plan (03/01/2015 - 06/30/2016)
cc distribution via ListServ
 
_________________________  SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By JGW1/ /RA By FJE/
NAME JWorosilo FEhrhardt DATE  3/2/2015 3/2/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated March 4, 2015 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)
DISTRIBUTION:
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)


===Enclosure:===
Page 1 of 2      Catawba 03/04/2015 09:49:28    Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site ISI - UNIT 2 IN-SERVICE INSPECTION      1 2 03/09/2015 03/13/2015 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION      1 2 03/09/2015 03/13/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION      3 1, 2 03/16/2015 03/20/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/16/2015 03/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/16/2015 03/20/2015 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION      4 1, 2 03/23/2015 03/27/2015 IP 7111402 Alert and Notification System Testing 1, 2 03/23/2015 03/27/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/23/2015 03/27/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/23/2015 03/27/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 03/23/2015 03/27/2015 IP 71151  Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP      3 1 04/20/2015 04/24/2015 V23456 CATAWBA/MAY 2015 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTECTION INSPECTION      8 1, 2 06/01/2015 06/05/2015 IP 7111105T Fire Protection [Triennial]
Catawba Inspection/Activity Plan  (03/01/2015 - 06/30/2016) cc distribution via ListServ
1, 2 06/15/2015 06/19/2015 IP 7111105T Fire Protection [Triennial]
CDBI - COMPONENT DESIGN BASES INSPECTION      7 1, 2 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/10/2015 08/14/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/24/2015 08/28/2015 IP 7111121 Component Design Bases Inspection 1, 2 09/14/2015 09/18/2015 IP 7111121 Component Design Bases Inspection ISI - UNIT 1 IN-SERVICE INSPECTION      1 1 11/30/2015 12/04/2015 IP 7111108P Inservice Inspection Activities - PWR HS - TRIENNIAL HEAT SINK PERFORMANCE      1 1, 2 01/11/2016 01/15/2016 IP 7111107T Heat Sink Performance EP - EP EXERCISE INSPECTION      2 1, 2 04/04/2016 04/08/2016 IP 7111401 Exercise Evaluation 1, 2 04/04/2016 04/08/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 04/04/2016 04/08/2016 IP 71151  Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP      3 1 04/18/2016 04/22/2016 V23469 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS This report does not include INPO and OUTAGE activities.


_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By JGW1/ /RA By FJE/ NAME JWorosilo FEhrhardt DATE 3/2/2015 3/2/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated March 4, 2015
This report shows only on-site and announced inspection procedures.


SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)
Page 2 of 2      Catawba 03/04/2015 09:49:28    Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site OL EXAM - INITIAL LICENSE EXAM   3 1 05/16/2016 05/27/2016 V23469 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS This report does not include INPO and OUTAGE activities.
DISTRIBUTION: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
Page 1 of 203/04/201509:49:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCatawbaInspection / Activity Plan03/01/2015-06/30/2016ISI-UNIT 2 IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P03/09/201503/13/2015SGISI-UNIT 2 SG IN-SERVICE INSPECTION1 2 IPInservice Inspection Activities - PWR7111108P03/09/201503/13/2015RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/16/201503/20/20151, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0803/16/201503/20/20151, 2 IPPerformance Indicator Verification7115103/16/201503/20/2015EP-EP PROGRAM INSPECTION41, 2 IPAlert and Notification System Testing711140203/23/201503/27/20151, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140303/23/201503/27/20151, 2 IPEmergency Action Level and Emergency Plan Changes711140403/23/201503/27/20151, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140503/23/201503/27/20151, 2 IPPerformance Indicator Verification7115103/23/201503/27/2015OL EXAM-INITIAL LICENSE EXAM PREP31 CATAWBA/MAY 2015 INITIAL EXAM AT POWER FACILITIESV2345604/20/201504/24/2015TFPI-TRIENNIAL FIRE PROTECTION INSPECTION81, 2 IPFire Protection [Triennial]7111105T06/01/201506/05/20151, 2 IPFire Protection [Triennial]7111105T06/15/201506/19/2015CDBI-COMPONENT DESIGN BASES INSPECTION71, 2 IPComponent Design Bases Inspection711112107/20/201507/24/20151, 2 IPComponent Design Bases Inspection711112108/10/201508/14/20151, 2 IPComponent Design Bases Inspection711112108/24/201508/28/20151, 2 IPComponent Design Bases Inspection711112109/14/201509/18/2015ISI-UNIT 1 IN-SERVICE INSPECTION11 IPInservice Inspection Activities - PWR7111108P11/30/201512/04/2015HS-TRIENNIAL HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T01/11/201601/15/2016EP-EP EXERCISE INSPECTION21, 2 IPExercise Evaluation711140104/04/201604/08/20161, 2 IPEmergency Action Level and Emergency Plan Changes711140404/04/201604/08/20161, 2 IPPerformance Indicator Verification7115104/04/201604/08/2016OL EXAM-INITIAL LICENSE EXAM PREP31 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRSV2346904/18/201604/22/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.


Page 2 of 203/04/201509:49:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCatawbaInspection / Activity Plan03/01/2015-06/30/2016OL EXAM-INITIAL LICENSE EXAM31 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRSV2346905/16/201605/27/2016This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 14:34, 31 October 2019

Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2014001 and 05000414/2014001)
ML15063A543
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 03/04/2015
From: Frank Ehrhardt
NRC/RGN-II/DRP/RPB1
To: Henderson K
Duke Energy Corp
References
IR 2014001
Download: ML15063A543 (6)


Text

UNITED STATES March 4, 2015

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)

Dear Mr. Henderson:

On February 10, 2015, the NRC completed its end-of-cycle performance review of the Catawba Nuclear Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Catawba Nuclear Station, Units 1 and 2 were operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Catawba Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections which will be sent via separate, non-publicly available correspondence. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Please contact me at 404-997-4611 with any questions you have regarding this letter.

Sincerely,

/RA/

Frank Ehrhardt, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52 Enclosure: Catawba Inspection/Activity Plan (03/01/2015 - 06/30/2016)

cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE /RA By JGW1/ /RA By FJE/

NAME JWorosilo FEhrhardt DATE 3/2/2015 3/2/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Kelvin Henderson from Frank Ehrhardt dated March 4, 2015 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (NRC INSPECTION REPORT 05000413/2014001 AND 05000414/2014001)

DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC A. Adams, NRR RidsNrrPMCatawba Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Catawba 03/04/2015 09:49:28 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/09/2015 03/13/2015 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 03/09/2015 03/13/2015 IP 7111108P Inservice Inspection Activities - PWR RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 3 1, 2 03/16/2015 03/20/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/16/2015 03/20/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 03/16/2015 03/20/2015 IP 71151 Performance Indicator Verification EP - EP PROGRAM INSPECTION 4 1, 2 03/23/2015 03/27/2015 IP 7111402 Alert and Notification System Testing 1, 2 03/23/2015 03/27/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 03/23/2015 03/27/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/23/2015 03/27/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 03/23/2015 03/27/2015 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 04/20/2015 04/24/2015 V23456 CATAWBA/MAY 2015 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 8 1, 2 06/01/2015 06/05/2015 IP 7111105T Fire Protection [Triennial]

1, 2 06/15/2015 06/19/2015 IP 7111105T Fire Protection [Triennial]

CDBI - COMPONENT DESIGN BASES INSPECTION 7 1, 2 07/20/2015 07/24/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/10/2015 08/14/2015 IP 7111121 Component Design Bases Inspection 1, 2 08/24/2015 08/28/2015 IP 7111121 Component Design Bases Inspection 1, 2 09/14/2015 09/18/2015 IP 7111121 Component Design Bases Inspection ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 11/30/2015 12/04/2015 IP 7111108P Inservice Inspection Activities - PWR HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 01/11/2016 01/15/2016 IP 7111107T Heat Sink Performance EP - EP EXERCISE INSPECTION 2 1, 2 04/04/2016 04/08/2016 IP 7111401 Exercise Evaluation 1, 2 04/04/2016 04/08/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 04/04/2016 04/08/2016 IP 71151 Performance Indicator Verification OL EXAM - INITIAL LICENSE EXAM PREP 3 1 04/18/2016 04/22/2016 V23469 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Catawba 03/04/2015 09:49:28 Inspection / Activity Plan Report 22 03/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL EXAM - INITIAL LICENSE EXAM 3 1 05/16/2016 05/27/2016 V23469 CATAWBA MAY 2016 INITIAL EXAM AT POWER FACILITIRS This report does not include INPO and OUTAGE activities.