Category:Inspection Report
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 IR 05000413/20224202022-04-0707 April 2022 Security Inspection Report 05000413/2022420 and 05000414/2022420 RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System2022-04-0707 April 2022 Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System IR 05000413/20210062022-03-0202 March 2022 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2021006 and 05000414/2021006) IR 05000413/20224012022-02-18018 February 2022 Security Baseline Inspection Report 05000413/2022401 and 05000414/2022401 IR 05000413/20210042022-01-26026 January 2022 Integrated Inspection Report 05000413/2021004 and 05000414/2021004 ML22011A1802022-01-18018 January 2022 Review of the Spring 2021 Steam Generator Tube Inspection Report IR 05000413/20213012021-11-0808 November 2021 Operator Licensing Examination Report 05000413/2021301 and 05000414/2021301 IR 05000413/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000413/2021402 and 05000414/2021402 IR 05000413/20210032021-10-28028 October 2021 Integrated Inspection Report 05000413/2021003 and 05000414/2021003 IR 05000413/20210102021-09-27027 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000413/2021010 and 05000414/2021010 IR 05000413/20214042021-08-26026 August 2021 Material Control and Accounting Program Inspection Report 05000413/2021404 and 05000414/2021404 (OUO Removed) IR 05000413/20210022021-08-0505 August 2021 Integrated Inspection Report 05000413/2021002 and 05000414/2021002 IR 05000413/20210012021-04-29029 April 2021 Integrated Inspection Report 05000413/2021001 and 05000414/2021001 IR 05000413/20210112021-04-23023 April 2021 NRC Fire Protection Team Inspection Report 05000413/2021011 and 05000414/2021011 IR 05000413/20200062021-03-0303 March 2021 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2020006 and 05000414/2020006 IR 05000413/20214012021-02-26026 February 2021 Security Baseline Inspection Report 05000413/2021401 and 05000414/2021401 IR 05000413/20200042021-01-28028 January 2021 Integrated Inspection Report 05000413/2020004 and 05000414/2020004 IR 05000413/20200112020-12-18018 December 2020 Biennial Problem Identification and Resolution Inspection Report 05000413/2020011 and 05000414/2020011 Dated December 18, 2020 IR 05000413/20204012020-11-23023 November 2020 Security Aseline Inspection Report 05000413/2020401 and 05000414/2020401 IR 05000413/20200032020-10-30030 October 2020 Integrated Inspection Report 05000413/2020003, 05000414/2020003 and 07200045/2020002 IR 05000413/20200052020-08-17017 August 2020 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (NRC Inspection Report 05000413/2020005 and 05000414/2020005) IR 05000413/20200022020-08-0303 August 2020 Integrated Inspection Report 05000413/2020002, 05000414/2020002 and 07200045/2020001 IR 05000413/20200012020-04-28028 April 2020 Integrated Inspection Report 05000413/2020001 and 05000414/2020001 IR 05000413/20200102020-03-10010 March 2020 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000413/2020010 and 05000414/2020010 IR 05000413/20190062020-03-0303 March 2020 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - NRC Inspection Report 05000413/2019006 and 05000414/2019006 IR 05000413/20190042020-01-27027 January 2020 Integrated Report 05000413/2019004 and 05000414/2019004 IR 05000413/20190102020-01-0909 January 2020 Reissue Catawba - Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2019010 and 05000414/2019010 ML19354A8562019-12-20020 December 2019 Design Basis Assurance Inspection (Programs) Inspection Report 0500413/2019010 and 05000414/2019010 IR 05000413/20194112019-11-26026 November 2019 U.S. Nuclear Regulatory Commission Security Inspection Report 05000413/2019411 and 05000414/2019411 IR 05000413/20190032019-11-0707 November 2019 Integrated Inspection Report 05000413/2019003 and 05000414/2019003 2024-02-02
[Table view] Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION une 17, 2014
SUBJECT:
CATAWBA NUCLEAR STATION - NRC OPERATOR LICENSE EXAMINATION REPORT 05000413/2014301 AND 05000414/2014301
Dear Mr. Henderson:
During the period May 19 - 22, 2014, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Catawba Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on May 29, 2014.
Six Reactor Operator (RO) and three Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Docket Nos: 50-413, 50-414 License Nos: NPF-35, NPF-52
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket No.: 50-413, 50-414 License No.: NPF-35, NPF-52 Report No.: 05000413/2014301, 05000414/2014301 Licensee: Duke Energy Carolinas, LLC Facility: Catawba Nuclear Station, Units 1 & 2 Location: York, SC 29745 Dates: Operating Test - May 19 - 22, 2014 Written Examination - May 29, 2014 Examiners: Mark Bates, Chief Examiner, Senior Operations Engineer Gary Callaway, Chief Examiner (Under Instruction), Senior Reactor Technology Instructor Phillip Capehart, Senior Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000413/2014301, 05000414/2014301, Operating Test May 19 - 22, 2014 & Written Exam May 29, 2014; Catawba Nuclear Station; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Catawba Nuclear Station staff developed both the operating tests and the written examination.
The NRC administered the operating tests during the period May 19 - 22, 2014. Members of the Catawba Nuclear Station training staff administered the written examination on May 29, 2014. Six Reactor Operators (RO) and three Senior Reactor Operator (SRO) applicants passed both the operating test and written examination.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope Members of the Catawba Nuclear Station staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC examiners evaluated six Reactor Operator (RO) and three Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period May 19 - 22, 2014.
Members of the Catawba Nuclear Station training staff administered the written examination on May 29, 2014. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Catawba Nuclear Station, met the requirements specified in 10 CFR Part 55, Operators Licenses.
b. Findings No findings were identified. The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
Six RO applicants and three SRO applicants passed both the operating test and written examination.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee did not submit any post-examination comments. A copy of the final written examination and answer key, with all changes incorporated, may be accessed not
earlier than June 10, 2016, in the ADAMS system (ADAMS Accession Numbers ML14167A049 and ML14160B120).
4OA6 Meetings, Including Exit Exit Meeting Summary On May 22, 2014, the NRC examination team discussed generic issues associated with the operating test with K. Henderson, Site Vice President and members of the Catawba Nuclear Station staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel K. Henderson, Site Vice President T. Simril, Plant Manager D. Barker, Operations Manager P. Simbrat; Manager, Regulatory Affairs H. Jarman, Assistant Operations Manager, Shift B. Leonard, Training Manager E. Madsen, Operations Training Supervisor D. Hensley, Lead Exam Writer G. Wood, Simulator Engineer C. Miller, Exam Team Representative S. Tripi, Initial Licensing Training Supervisor T. Golden, Initial License Training Lead Instructor
SIMULATOR FIDELITY REPORT Facility Licensee: Catawba Nuclear Station Facility Docket No.: 50-413, 50-414 Operating Test Administered: May 19 - 22, 2014 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description Unanticipated reactor Following a planned boration, the crew began the process of makeup water flow during flushing the makeup line. As soon as the required valves were simulator exam. opened, and before a reactor makeup water pump was started, the operators observed an instantaneous indication of a total of 20 gallons of reactor makeup water through the associated flow element. Problem Identification C-14-05388 was written to document this issue.
Enclosure 2