| | issue date = 06/22/2015 | | | issue date = 06/22/2015 |
| | title = Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application-Set 25 (TAC Nos. MF0481 and MF0482) | | | title = Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application-Set 25 (TAC Nos. MF0481 and MF0482) |
| | author name = Sayoc E C | | | author name = Sayoc E |
| | author affiliation = NRC/NRR/DLR/RPB1 | | | author affiliation = NRC/NRR/DLR/RPB1 |
| | addressee name = Shea J W | | | addressee name = Shea J |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000327, 05000328 | | | docket = 05000327, 05000328 |
| | license number = | | | license number = |
| | contact person = Sayoc E C, NRR/ DLR,415-4084 | | | contact person = Sayoc E, NRR/ DLR,415-4084 |
| | case reference number = DLR-15-0295, TAC MF0481, TAC MF0482 | | | case reference number = DLR-15-0295, TAC MF0481, TAC MF0482 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 4 | | | page count = 4 |
| | project = TAC:MF0481, TAC:MF0482 | | | project = TAC:MF0481, TAC:MF0482 |
| | stage = Other | | | stage = RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384 |
| | |
| Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482) | | REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482) |
|
| |
|
| ==Dear Mr. Shea:== | | ==Dear Mr. Shea:== |
|
| |
|
| By letter dated January 7, 2013, Tennessee Valley Authority submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR) Part 54, to renew operating licenses DPR-77 and DPR-79 for Sequoyah Nuclear Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission staff. The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. | | By letter dated January 7, 2013, Tennessee Valley Authority submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR) Part 54, to renew operating licenses DPR-77 and DPR-79 for Sequoyah Nuclear Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission staff. The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. |
| These requests for additional information were discussed with Dennis Lundy, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov. Sincerely, /RA by John Daily for/ Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328 Enclosure: Requests for Additional Information | | These requests for additional information were discussed with Dennis Lundy, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov. |
| | Sincerely, |
| | /RA by John Daily for/ |
| | Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328 |
|
| |
|
| cc: ListservJune 22, 2015 June 22, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384 SUBJECT: REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482)
| | ==Enclosure:== |
|
| |
|
| ==Dear Mr. Shea:==
| | Requests for Additional Information cc: Listserv |
| By letter dated January 7, 2013, Tennessee Valley Authority submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR) Part 54, to renew operating licenses DPR-77 and DPR-79 for Sequoyah Nuclear Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission staff. The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
| |
|
| |
|
| These requests for additional information were discussed with Dennis Lundy, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov. Sincerely,
| | ML15159B164 *concurred via email OFFICE LA:DLR/RPB1* PM:DLR/RPB1 BC:DLR/RPB1 PM:DLR/RPB1 NAME YEdmonds ESayoc YDiaz-Sanabria ESayoc (JDaily for ) (JDaily for ) |
| /RA by John Daily for/ Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
| | DATE 6/ 22 /15 6/ 22 /15 6/ 22 /15 6/ 22 /15 |
|
| |
|
| ==Enclosure:==
| | Letter to J. Shea from E. Sayoc date June 22, 2015 |
|
| |
|
| Requests for Additional Information cc: Listserv DISTRIBUTION: See next page ADAMS Accession No.: ML15159B164 *concurred via email OFFICE LA:DLR/RPB1* PM:DLR/RPB1 BC:DLR/RPB1 PM:DLR/RPB1 NAME YEdmonds ESayoc (JDaily for ) YDiaz-Sanabria ESayoc (JDaily for ) DATE 6/ 22 /15 6/ 22 /15 6/ 22 /15 6/ 22 /15 OFFICIAL RECORD COPY Letter to J. Shea from E. Sayoc date June 22, 2015 SUBJECT: REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482)
| | ==SUBJECT:== |
| DISTRIBUTION: E-MAIL: PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPMSequoyah Resource | | REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482) |
| | DISTRIBUTION: |
| | E-MAIL: |
| | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPMSequoyah Resource |
| --------------------- | | --------------------- |
| beth.mizuno@nrc.gov jeremy.wachutka@nrc.gov john.pelchat@nrc.gov gena.woodruff@nrc.gov siva.lingam@nrc.gov wesley.deschaine@nrc.gov galen.smith@nrc.gov scott.shaeffer@nrc.gov jeffrey.hamman@nrc.gov craig.kontz@nrc.gov caudle.julian@nrc.gov generette.lloyd@epa.gov gmadkins@tva.gov clwilson@tva.gov ekwest@tva.gov dllundy@tva.gov | | beth.mizuno@nrc.gov jeremy.wachutka@nrc.gov john.pelchat@nrc.gov gena.woodruff@nrc.gov siva.lingam@nrc.gov wesley.deschaine@nrc.gov galen.smith@nrc.gov scott.shaeffer@nrc.gov jeffrey.hamman@nrc.gov craig.kontz@nrc.gov caudle.julian@nrc.gov generette.lloyd@epa.gov gmadkins@tva.gov clwilson@tva.gov ekwest@tva.gov dllundy@tva.gov |
|
| |
|
| SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION SUPPLEMENTAL REQUESTS FOR ADDITIONAL INFORMATION RAI 3.0.3.2.17-1a (Surveillance Capsule Operating Experience Followup) Background: | | SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION SUPPLEMENTAL REQUESTS FOR ADDITIONAL INFORMATION RAI 3.0.3.2.17-1a (Surveillance Capsule Operating Experience Followup) |
| During Refueling Outage No. 20 at Sequoyah Nuclear Plant (SQN), Unit 1, inservice inspections of the reactor vessel internals (RVI) revealed that two reactor pressure vessel (RPV) surveillance capsules had become dislodged from their baskets and that capsule pieces or specimens from at least one of these capsules had become loose inside the Unit 1 RPV. Apparent damage to some RVI components was noted by Tennessee Valley Authority (TVA or the applicant).
| |
|
| |
|
| Issue: Any damage to RVI components should be assessed to demonstrate that stress profiles for the damaged components remains bounded by those assumed for the as-built component configurations in the applicable Materials Reliability Program (MRP) reports; this is regardless of whether the damage was induced by an age-related aging effect. | | ==Background:== |
| In addition, the staff is concerned that any damage that occurred from the impacts of the loose parts (e.g., causing cold work to the affected components) could create a preferential site for initiation of degradation, such as stress corrosion cracking, during the period of extended operation. Evaluation should adequately address the use of future examinations of the damaged locations using inspection methods that will address this issue. Request: (1) Provide an adequate technical justification for not considering the potential effects of loose part-induced cold work on the likelihood of degradation of the damaged reactor internals, in particular the long term prospects for initiation of stress corrosion cracking in the damaged internals. (2) Provide a basis for not performing subsequent re-inspections of the damaged locations of the Unit 1 reactor internals using inspection methods that will effectively address impact-related damage. | | |
| }} | | During Refueling Outage No. 20 at Sequoyah Nuclear Plant (SQN), Unit 1, inservice inspections of the reactor vessel internals (RVI) revealed that two reactor pressure vessel (RPV) surveillance capsules had become dislodged from their baskets and that capsule pieces or specimens from at least one of these capsules had become loose inside the Unit 1 RPV. |
| | Apparent damage to some RVI components was noted by Tennessee Valley Authority (TVA or the applicant). |
| | Issue: |
| | Any damage to RVI components should be assessed to demonstrate that stress profiles for the damaged components remains bounded by those assumed for the as-built component configurations in the applicable Materials Reliability Program (MRP) reports; this is regardless of whether the damage was induced by an age-related aging effect. |
| | In addition, the staff is concerned that any damage that occurred from the impacts of the loose parts (e.g., causing cold work to the affected components) could create a preferential site for initiation of degradation, such as stress corrosion cracking, during the period of extended operation. Evaluation should adequately address the use of future examinations of the damaged locations using inspection methods that will address this issue. |
| | Request: |
| | (1) Provide an adequate technical justification for not considering the potential effects of loose part-induced cold work on the likelihood of degradation of the damaged reactor internals, in particular the long term prospects for initiation of stress corrosion cracking in the damaged internals. |
| | (2) Provide a basis for not performing subsequent re-inspections of the damaged locations of the Unit 1 reactor internals using inspection methods that will effectively address impact-related damage.}} |
Letter Sequence RAI |
---|
|
Results
Other: CNL-15-095, Revision to the Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule for License Renewal, CNL-15-164, Second Annual Update, License Renewal Application, CNL-15-178, License Renewal Application - Clarifications (TAC Nos. MF0481 and MF0482), ML13032A251, ML13057A873, ML13067A201, ML13141A320, ML15236A067
|
MONTHYEARML13024A0042013-01-0707 January 2013 Transmittal of License Renewal Application Project stage: Request ML13032A2512013-01-10010 January 2013 Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule Revision Due to License Renewal Amendment Project stage: Other ML13057A8732013-03-0808 March 2013 Plan for the Scoping and Screening Regulatory Audit Regarding the Sequoyah Nuclear Plant, Unit 1 and 2, LRA Review Project stage: Other ML13067A2012013-03-11011 March 2013 Plan for the Aging Management Program Regulatory Audit Regarding the Sequoyah Nuclear Plant, Units 1 and 2 License Renewal Application Review (TAC Nos. MF0481 and MF0482) Project stage: Other ML13109A5152013-04-26026 April 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13122A3402013-05-0808 May 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13119A0972013-05-21021 May 2013 Summary of Telephone Conference Call Held on April 22, 2013 Between the U.S. Nuclear Regulatory Commission and Tva,Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, License Renewal Application Project stage: RAI ML13142A3322013-05-21021 May 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: RAI ML13128A5192013-05-31031 May 2013 Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML13134A2012013-06-0505 June 2013 RAI for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13163A4422013-06-0707 June 2013 Response to NRC Request for Additional Information Regarding the Scoping and Screening Methodology Review of the License Renewal Application, Set 3 Project stage: Response to RAI ML13144A7122013-06-11011 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (Tac Nos. MF0481 and MF0482)- Set 6 Project stage: RAI ML13134A3712013-06-13013 June 2013 5/9/2013 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, License Ren Project stage: RAI ML13141A3202013-06-13013 June 2013 Letter Aging Management Programs Audit Report Regarding the Sequoyah Nuclear Plant, Units 1 and 2 Project stage: Other ML13150A4122013-06-24024 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 8 Project stage: RAI ML13178A2832013-06-25025 June 2013 Response to NRC Request for Additional Information Regarding the Reactor Vessel Internals Review of the License Renewal Application, Set 1 Project stage: Response to RAI ML13158A0162013-06-25025 June 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) Set 9 Project stage: RAI ML13190A2762013-07-0101 July 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 4 Project stage: Response to RAI ML13192A3302013-07-0303 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 5 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13204A3992013-07-11011 July 2013 Response to NRC Request for Additional Information Re Reactor Vessel Internals Review of the License Renewal Application, Set 6 Project stage: Response to RAI ML13213A0262013-07-25025 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 4/Buried Piping, Set 8, and Set 9 (TAC MF0481 and MF0482) Project stage: Response to RAI ML13213A0272013-07-29029 July 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Set 7 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13213A0142013-07-30030 July 2013 Revised Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 1 and 3 (TAC MF0481 and MF0482) Project stage: Response to RAI ML13171A0362013-08-0101 August 2013 Summary of Telephone Conference Call Held on June 13, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13204A2572013-08-0202 August 2013 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application (TAC Nos. MF0481 and MF0482) - Set 10 Project stage: RAI ML13225A3872013-08-0909 August 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 1, 6, 7, and Revised Responses for 1.4-2, 1.4-3 and 1.4-4 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13224A1262013-08-22022 August 2013 RAI for Review of Sequoyah, Units 1 & 2 License Renewal Application - Set 11 Project stage: RAI ML13238A2442013-08-30030 August 2013 RAI Set 12 Project stage: RAI ML13252A0362013-09-0303 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Set 10 (30-day), B.1.9-1, B.1.4-4 Revised RAI Responses and Revision to LRA Page 2.4-44 (TAC Nos. MF0481 and MF0482) Project stage: Response to RAI ML13226A3712013-09-10010 September 2013 Summary of Telephone Conference Call Held on August 1, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 Project stage: RAI ML13267A1592013-09-20020 September 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Set 11 (30-day), and Revised RAI Responses for B.1.14-1a, 2.5. Project stage: Response to RAI ML13247A4272013-09-23023 September 2013 Summary of Telephone Conference Call Held on August 19, 2013, Between the NRC and Tennessee Valley Authority, Concerning RAI Pertaining to the Sequoyah Nuclear Plant, Units 1 and 2, LRA Project stage: RAI ML13263A3382013-09-26026 September 2013 RAI Set 14 Project stage: RAI ML13268A4922013-09-27027 September 2013 RAI Set 15 Project stage: RAI ML13276A0182013-09-30030 September 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 10 (B.1.23-2a), 11 (4.1-8a), and 12 (30-day) Project stage: Response to RAI CNL-13-103, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a)2013-10-17017 October 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, Sets 8 (B.1.33-1), 10 (3.0.3-1 Request 1), 12 (B.1.23-2b), 13 (30-day), 14 (B.0.4-1a) Project stage: Response to RAI ML13282A3302013-10-18018 October 2013 RAI Set 16 Project stage: RAI CNL-13-104, Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87)2013-10-21021 October 2013 Response to NRC Request for Additional Information Regarding the Review of License Renewal Application, Sets 11 (B.1.40-4a, B.1.25.1a), 13 (B.1.41-4a),14 (3.5.1-57, 3.5.1-87) Project stage: Response to RAI CNL-13-105, Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a)2013-11-0404 November 2013 Response to NRC Request for Additional Information Regarding Review of the License Renewal Application, Sets 10 (3.0.3-1, Requests 3, 4, 6), 12 (B.1.6-1b, B.1.6-2b), 16 (4.3.1-8a) Project stage: Response to RAI CNL-13-106, Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B2013-11-15015 November 2013 Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units I and 2, License Renewal Application, Sets 13 (B.1.34-5a), 15 (4.2-1a), 16 (B.1.23-2c), 17 (B.1.23-2d), LRA Sections A.1.34 and B.1 Project stage: Response to RAI ML13323A0972013-12-0606 December 2013 RAI Set 18 Project stage: RAI CNL-13-130, Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1..2013-12-16016 December 2013 Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, B.1.41-4b, 3.0.3-1 (Requests La, 3a, 4a, 6a), B.1.23-2e, 3.4.2.1.1-2a, Tables (3.4.1, 3.4.2-3-5, 3.3.1.. Project stage: Response to RAI ML13353A5382013-12-23023 December 2013 RAI Set 19 Project stage: RAI ML13338A3332014-01-0808 January 2014 Summary of Telephone Conference Call Held on August 22, 2013, Between the U.S. Nuclear Regulatory Commission and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah Nuclear Plant, Units 1 an Project stage: RAI CNL-14-021, Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482)2014-03-0303 March 2014 Response to Request for Clarification to NRC Request for Additional Information Re Review of License Renewal Application, LRA B.1.31, B.1.25.1b, B.1.34-8a, B.1.34-9A, LRA Annual Update (TAC MF0481 & MF0482) Project stage: Supplement ML14059A3472014-03-0404 March 2014 Schedule Revision for the Review of the Sequoyah Nuclear Plant License Renewal Application (TAC Nos. MF0481 and MF0482) Project stage: Approval ML14063A5422014-03-0404 March 2014 TVA Response to Request for Clarification to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, LRA B.1.31, B.1.25.1 B, B.1.34-Sa, B.1.34-9a, LRA Annual ... Project stage: Supplement ML14064A4732014-03-12012 March 2014 Request for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, LRA - Set 20 Project stage: RAI ML14094A2942014-04-11011 April 2014 Project Manager Change for the Safety Review of the Sequoyah Nuclear Plant, Units 1 & 2, License Renewal Application (TAC Nos. MF0481 & MF0482) Project stage: Approval CNL-14-052, TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF042014-04-22022 April 2014 TVA Response to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application: RAIs B.1.13-4 and 3.0.3-1-3c, Commitment 9.G, and 2013 LRA Annual Update (TAC Nos. MF0481 Project stage: Response to RAI 2013-07-01
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) ML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification 2024-07-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24152A1542024-05-31031 May 2024 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-03 ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML23307A0832023-11-0808 November 2023 Enclosure - Request for Additional Information HDI-Sequoyah NDE Exemption Request 10-30-2023 ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation ML23062A5942023-02-27027 February 2023 Enclosure - NRC SQN Exemption Rsi Response Staff Follow Up Questions ML23062A5952023-02-27027 February 2023 Staff follow-up Questions to Tva'S 12/19/2022 Response of the Staff'S Rsi Regarding 08/04/2022 SQN Exemption Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22257A0622022-09-14014 September 2022 Requalification Program Inspection - Sequoyah Nuclear Plant ML22255A0842022-09-0909 September 2022 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-04 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22214A1582022-08-0202 August 2022 NRR E-mail Capture - Request for Additional Information for Sequoyah Units 1 and 2 License Amendment Request for Fire and Seismic PRA Modification to 10 CFR 50.69 (L-2022-LLA-0033) ML22151A0102022-05-27027 May 2022 NRR E-mail Capture - Revised Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22146A3322022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Related to Sequoyah Nuclear Plant'S LAR to Adopt TSTF-505 ML22151A0092022-05-26026 May 2022 NRR E-mail Capture - Request for Additional Information Re Sequoyah Nuclear Plant Alternative Request RV-02 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML21237A4952021-08-25025 August 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-04 ML21160A0352021-06-0303 June 2021 Document Request for Sequoyah Nuclear Plant - Radiation Protection Inspection - Inspection Report 2021-03 ML21095A0482021-04-0505 April 2021 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Transition to Westinghouse Fuel ML21092A0972021-04-0202 April 2021 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20259A4782020-09-15015 September 2020 Emergency Preparedness Program Inspection Request for Information ML20261H4172020-09-14014 September 2020 NRR E-mail Capture - Sequoyah Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Hydrologic UFSAR Update ML20261H4162020-09-0202 September 2020 NRR E-mail Capture - Draft Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, Request to Revise UFSAR Hydrologic Analysis ML20189A2112020-07-0101 July 2020 Request for Additional Information Regarding Hydrologic UFSAR Update ML20106F1042020-04-14014 April 2020 Request for Additional Information Regarding the Hydrologic Analysis LAR ML20161A3902020-04-0909 April 2020 Request for Supporting Information for the Sequoyah SPRA Audit Review - Follow-up to Plant Response Question 5 ML20098D8612020-04-0707 April 2020 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2020012 and 05000328/2020012) and Request for Information) ML20036E2842020-02-0505 February 2020 20200123 - Sequoyah Radiation Safety Inspection Document Request Letter ML19323D7562019-11-18018 November 2019 Nrc'S Request for Additional Information - Exigent Amendment ML19235A0992019-08-22022 August 2019 Emergency Preparedness Program Inspection Request for Information ML19162A2462019-06-11011 June 2019 RP Inspection Document Request 2019-03 ML19149A6222019-05-29029 May 2019 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, Request for Alternative to 18-ISI-1 EPID: L-2019-LLR-0006 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19015A4192019-01-15015 January 2019 NRR E-mail Capture - RAI - Sequoyah Nuclear Plant, Units 1 and 2, LAR to Adopt 10 CFR50.69 Risk-informed SSC ML18344A0752018-12-10010 December 2018 NRR E-mail Capture - Request for Additional Information - Sequoyah 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise Updated Final Analysis Report (SQN-TS-17-04) ML18296A0022018-10-22022 October 2018 NRR E-mail Capture - Additional Information Needs - Sequoyah Units 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers Revise Updated Final Analysis Report (SQN-TS-17-04) ML18283B0592018-10-10010 October 2018 NRR E-mail Capture - Additional Information Needs Identified During Audit - Sequoyah 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers Revise Updated Final Analysis Report (SQN-TS-17-04) ML18283A6232018-09-25025 September 2018 04 RP Inspection Document Request ML18233A1942018-08-21021 August 2018 NRR E-mail Capture - Additional Information Needs Identified - Sequoyah 1 and 2, Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise Updated Final Analysis Report (SQN-TS-17-04) ML18138A1102018-05-17017 May 2018 Enclosurequest for Additional Information (Letter to E. D. Schrull Request for Additional Information Regarding Tennessee Valley Authority'S Decommissioning Funding Plan Update for Browns Ferry and Sequoyah Isfsis) ML18057A6372018-02-23023 February 2018 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet Topical Report TVA-NPG-AWA16 - EPIC: L-2016-TOP-0011) ML17191A2062017-07-0606 July 2017 NRR E-mail Capture - Sequoyah Nuclear Station, Unit 1 & 2 - Request for Additional Information Related to LAR for Technical Specification 3.8.1.17 Note Modification (CAC Nos. MF9398 and MF9399) ML17150A0792017-05-23023 May 2017 NRR E-mail Capture - Request for Additional Information Related to TVA Fleet LAR for EAL Change to Adopt NEI-99-01 Rev.6 (CAC Nos. MF9054 - MF9060) ML17112A0402017-04-20020 April 2017 NRR E-mail Capture - Sequoyah Nuclear Station, Unit 1 & 2 - Request for Additional Information Related to LAR for Technical Specification 3.8.1, AC SOURCES-OPERATING ML17004A0612017-01-0404 January 2017 Notification of NRC Triennial Fire Protection Inspection (Team)(Report 05000327/2017007 and 05000328/2017007) ML15194A3882015-07-13013 July 2015 Request for Additional Information Related to LAR to Revise Ice Condenser Ice Mas Tech Spec ML15175A2912015-06-24024 June 2015 E-mail Re. Request for Additional Information RR RP-07 ML15159B1642015-06-22022 June 2015 Requests for Additional Information for the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application-Set 25 (TAC Nos. MF0481 and MF0482) ML15050A0962015-02-19019 February 2015 E-mail Re. Request for Additional Information Related to LAR to Ice Condendser Inc Mass Tech Spec ML15042A4702015-02-11011 February 2015 E-mail Re. Request for Additional Information Related to License Amendment Request to Revise Technical Specification on Ultimate Heat Sink ML14318A8052014-11-12012 November 2014 Requalification Program Inspection - Sequoyah Nuclear Plant 2024-05-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 22, 2015 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482)
Dear Mr. Shea:
By letter dated January 7, 2013, Tennessee Valley Authority submitted an application pursuant to Title 10 of the Code of Federal Regulations (CFR) Part 54, to renew operating licenses DPR-77 and DPR-79 for Sequoyah Nuclear Plant, Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission staff. The staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Dennis Lundy, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-4084 or by e-mail at Emmanuel.Sayoc@nrc.gov.
Sincerely,
/RA by John Daily for/
Emmanuel Sayoc, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-327 and 50-328
Enclosure:
Requests for Additional Information cc: Listserv
ML15159B164 *concurred via email OFFICE LA:DLR/RPB1* PM:DLR/RPB1 BC:DLR/RPB1 PM:DLR/RPB1 NAME YEdmonds ESayoc YDiaz-Sanabria ESayoc (JDaily for ) (JDaily for )
DATE 6/ 22 /15 6/ 22 /15 6/ 22 /15 6/ 22 /15
Letter to J. Shea from E. Sayoc date June 22, 2015
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION - SET 25 (TAC NOS. MF0481 AND MF0482)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrPMSequoyah Resource
beth.mizuno@nrc.gov jeremy.wachutka@nrc.gov john.pelchat@nrc.gov gena.woodruff@nrc.gov siva.lingam@nrc.gov wesley.deschaine@nrc.gov galen.smith@nrc.gov scott.shaeffer@nrc.gov jeffrey.hamman@nrc.gov craig.kontz@nrc.gov caudle.julian@nrc.gov generette.lloyd@epa.gov gmadkins@tva.gov clwilson@tva.gov ekwest@tva.gov dllundy@tva.gov
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION SUPPLEMENTAL REQUESTS FOR ADDITIONAL INFORMATION RAI 3.0.3.2.17-1a (Surveillance Capsule Operating Experience Followup)
Background:
During Refueling Outage No. 20 at Sequoyah Nuclear Plant (SQN), Unit 1, inservice inspections of the reactor vessel internals (RVI) revealed that two reactor pressure vessel (RPV) surveillance capsules had become dislodged from their baskets and that capsule pieces or specimens from at least one of these capsules had become loose inside the Unit 1 RPV.
Apparent damage to some RVI components was noted by Tennessee Valley Authority (TVA or the applicant).
Issue:
Any damage to RVI components should be assessed to demonstrate that stress profiles for the damaged components remains bounded by those assumed for the as-built component configurations in the applicable Materials Reliability Program (MRP) reports; this is regardless of whether the damage was induced by an age-related aging effect.
In addition, the staff is concerned that any damage that occurred from the impacts of the loose parts (e.g., causing cold work to the affected components) could create a preferential site for initiation of degradation, such as stress corrosion cracking, during the period of extended operation. Evaluation should adequately address the use of future examinations of the damaged locations using inspection methods that will address this issue.
Request:
(1) Provide an adequate technical justification for not considering the potential effects of loose part-induced cold work on the likelihood of degradation of the damaged reactor internals, in particular the long term prospects for initiation of stress corrosion cracking in the damaged internals.
(2) Provide a basis for not performing subsequent re-inspections of the damaged locations of the Unit 1 reactor internals using inspection methods that will effectively address impact-related damage.