IR 05000275/2016501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17017A512
| number = ML17017A512
| issue date = 01/17/2017
| issue date = 01/17/2017
| title = Diablo Canyon Power Plant, Units 1 and 2 - NRC Emergency Preparedness Annual Inspection Report 05000275/2016501 and 05000323/2016501
| title = NRC Emergency Preparedness Annual Inspection Report 05000275/2016501 and 05000323/2016501
| author name = Gepford H J
| author name = Gepford H
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| author affiliation = NRC/RGN-IV/DRS/PSB-2
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
[[Issue date::January 17, 2017]]


Mr. Edward D. Halpin, Senior Vice President,  
==REGION IV==
 
1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 January 17, 2017 Mr. Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2016501 AND 05000323/2016501
Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6  
 
Avila Beach, CA 93424  
 
SUBJECT DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2016501 AND 05000323/2016501


==Dear Mr. Halpin:==
==Dear Mr. Halpin:==
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000275/2016501 and 05000323/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspection Reports 2016-001, 2016-002, 2016-003, and 2016-004.
On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000275/2016501 and 05000323/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspection Reports 2016-001, 2016-002, 2016-003, and 2016-004.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,/RA/ Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2
 
Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
 
cc: Electronic Distribution DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2016501 AND 05000323/2016501, DATED JANUARY 17, 2017 DISTRIBUTION: Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Christopher.Newport@nrc.gov)
Resident Inspector (John.Reynoso@nrc.gov)
Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Branch Chief, DRP/A (Jeremy.Groom@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Mathew.Kirk@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Balwant.Singal@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)


RIV RSLO (Bill.Maier@nrc.gov)
Sincerely,
/RA/
Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 cc: Electronic Distribution


ADAMS ACCESSION NUMB ER: ML17017A512 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann/dch HGepford SIGNATURE /RA/ /RA/ DATE 1/17/17 1/17/17 OFFICIAL RECORD COPY
ML17017A512 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann/dch HGepford SIGNATURE /RA/ /RA/
DATE 1/17/17 1/17/17
}}
}}

Latest revision as of 10:23, 30 October 2019

NRC Emergency Preparedness Annual Inspection Report 05000275/2016501 and 05000323/2016501
ML17017A512
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/17/2017
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Halpin E
Pacific Gas & Electric Co
References
IR 2016501
Download: ML17017A512 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 January 17, 2017 Mr. Edward D. Halpin, Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 SUBJECT DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2016501 AND 05000323/2016501

Dear Mr. Halpin:

On December 31, 2016, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2016. Issuance of this letter closes NRC Inspection Report 05000275/2016501 and 05000323/2016501. The inspection results associated with the 2016-501 reports are documented in Integrated Resident Inspection Reports 2016-001, 2016-002, 2016-003, and 2016-004.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Heather J. Gepford, PhD, CHP Chief, Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 cc: Electronic Distribution

ML17017A512 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: PElkmann Yes No Non-Publicly Available Sensitive RGN-002 OFFICE SEPI:PSB2 BC:PSB2 NAME PElkmann/dch HGepford SIGNATURE /RA/ /RA/

DATE 1/17/17 1/17/17