NRC Security Inspection Report 05000275/2016201 and 05000323/2016201 (Cover Letter Only)
ML16279A410
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/26/2016
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Halpin E
Pacific Gas & Electric Co
Andrew Woyanski
References
IR 2016201
Download: ML16279A410 (3)


Text

ber 26, 2016

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000275/2016201 AND 05000323/2016201

Dear Mr. Halpin:

On September 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Diablo Canyon Power Plant, Units 1 and 2. On September 27, 2016, the NRC inspectors discussed results of this inspection with Mr. Jan Nimick, Senior Director, Nuclear Services, and other members of your staff. The results of this inspection are documented in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2.

One cross-cutting aspect was assigned a finding in the area of Human Performance, Questioning Attitude. Specifically, because the licensee failed to stop when faced with uncertain conditions. Risks are evaluated and managed before preceeding [H.11].

If you disagree with a cross-cutting aspect assignment or a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security, and Incident Response; and the NRC resident inspector at the Diablo Canyon Power Plant, Units 1 and 2. This letter will be available for public inspection at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding.

The enclosed report contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.

Therefore, the material enclosed report will not be made publicly available. If you choose to provide a response that contains Safeguards Information, please provide the level of protection described in 10 CFR 73.21. Otherwise, if you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA J. Willis acting for/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos.: 05000275, 05000323 License Nos.: DPR-80, DPR-82 Nonpublic Enclosure: Inspection Report 05000275/2016201 and 05000323/2016201 w/Attachments: Supplemental Information cc w/ enclosure: Douglas Evans, Site Security Manager cc w/o enclosure: James M. Welsch, Vice President, Nuclear Generation ML16279A410 Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By:

Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By:

OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RIV NSIR/DSO/SPEB NAME A. Woyansky J. Clark J. Berry M. Haire R.C. Johnson SIGNATURE (J. Willis for)