|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17206A028 | | | number = ML17206A028 |
| | issue date = 08/07/2017 | | | issue date = 08/07/2017 |
| | title = Summary of 7/19/17 Meeting with Pseg Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 | | | title = Summary of 7/19/17 Meeting with PSEG Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 |
| | author name = Ennis R B | | | author name = Ennis R |
| | author affiliation = NRC/NRR/DORL/LPLI | | | author affiliation = NRC/NRR/DORL/LPLI |
| | addressee name = Sena P P | | | addressee name = Sena P |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000272, 05000311 | | | docket = 05000272, 05000311 |
| | license number = DPR-070, DPR-075 | | | license number = DPR-070, DPR-075 |
| | contact person = Ennis R B, NRR/DORL/LPL1 | | | contact person = Ennis R, NRR/DORL/LPL1 |
| | case reference number = CAC MF9990, CAC MF9991 | | | case reference number = CAC MF9990, CAC MF9991 |
| | package number = ML17206A033 | | | package number = ML17206A033 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 2017 LICENSEE: PSEG Nuclear LLC FACILITY: Salem Nuclear Generating Station, Unit Nos. 1 and 2 | | {{#Wiki_filter:UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 2017 LICENSEE: PSEG Nuclear LLC FACILITY: Salem Nuclear Generating Station, Unit Nos. 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SUMMARY OF MEETING HELD ON JULY 19, 2017, WITH PSEG NUCLEAR LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS FOR REACTOR TRIP AND ENGINEERED SAFETY FEATURE ACTUATION SYTEM INSTRUMENTATION FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (CAC NOS. MF9900 AND MF9901) On July 19, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG, the licensee) by teleconference. The purpose of the meeting was to discuss PSEG's planned submittal of a license amendment request for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, to revise the technical specifications for the reactor trip system and engineered safety feature actuation system (ESFAS) instrumentation. Specifically, the amendments would revise the technical specifications based on Technical Specifications Task Force (TSTF) Traveler TSTF-411, "Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P)," and Traveler TSTF-418, "RPS [Reactor Protection System] and ESFAS Test Times and Completion Times (WCAP-14333)." The meeting notice and agenda, dated July 6, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17187 A029. A list of attendees is enclosed with this meeting summary. The licensee presented an overview of its plans to submit the license amendment request. The presentation closely followed PSEG's slides provided for the meeting (ADAMS Accession No. ML17199S290). The licensee stated that the changes associated with TSTF-411 would only extend the reactor trip breaker test time and allowed outage time. There would be no changes to surveillance test intervals based on previous implementation of a Surveillance Frequency Control Program in accordance with TSTF-425, "Relocate Surveillance Frequencies to Licensee Control -RITSTF [Risk-Informed Technical Specification Task Force] Initiative Sb." The licensee also noted that a number of plant-specific evaluations would be provided to support the proposed change. PSEG indicated that it is looking at precedent for Westinghouse plants with non-improved standard technical specifications to help inform the Salem submittal. The licensee forecasts submittal of the license amendment request in the fourth quarter of 2017. No members of the public were in attendance, and no public meeting feedback forms were received. Please direct any inquiries to me at 301-415-1420 or Rick.Ennis@nrc.gov. Docket Nos. 50-272 and 50-311 | | |
| | ==SUMMARY== |
| | OF MEETING HELD ON JULY 19, 2017, WITH PSEG NUCLEAR LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS FOR REACTOR TRIP AND ENGINEERED SAFETY FEATURE ACTUATION SYTEM INSTRUMENTATION FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (CAC NOS. MF9900 AND MF9901) |
| | On July 19, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG, the licensee) by teleconference. The purpose of the meeting was to discuss PSEG's planned submittal of a license amendment request for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, to revise the technical specifications for the reactor trip system and engineered safety feature actuation system (ESFAS) instrumentation. Specifically, the amendments would revise the technical specifications based on Technical Specifications Task Force (TSTF) Traveler TSTF-411, "Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P)," and Traveler TSTF-418, "RPS [Reactor Protection System] and ESFAS Test Times and Completion Times (WCAP-14333)." |
| | The meeting notice and agenda, dated July 6, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17187A029. A list of attendees is enclosed with this meeting summary. |
| | The licensee presented an overview of its plans to submit the license amendment request. The presentation closely followed PSEG's slides provided for the meeting (ADAMS Accession No. ML17199S290). |
| | The licensee stated that the changes associated with TSTF-411 would only extend the reactor trip breaker test time and allowed outage time. There would be no changes to surveillance test intervals based on previous implementation of a Surveillance Frequency Control Program in accordance with TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF |
| | [Risk-Informed Technical Specification Task Force] Initiative Sb." The licensee also noted that a number of plant-specific evaluations would be provided to support the proposed change. |
| | PSEG indicated that it is looking at precedent for Westinghouse plants with non-improved standard technical specifications to help inform the Salem submittal. The licensee forecasts submittal of the license amendment request in the fourth quarter of 2017. |
| | |
| | No members of the public were in attendance, and no public meeting feedback forms were received. |
| | Please direct any inquiries to me at 301-415-1420 or Rick.Ennis@nrc.gov. |
| | Richard B. Ennis, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendees cc w/enclosure: Distribution via Listserv Richard B. Ennis, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES JULY 19. 2017, MEETING WITH PSEG NUCLEAR LLC BY TELECONFERENCE SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 PLANNED TSTF-411 AND TSTF-418 LICENSE AMENDMENT REQUEST Name Organization Rick Ennis NRC/NRR/DORULPL 1 Dan O'Neal NRC/NRR/DRA/APLA Todd Hilsmeier NRC/NRR/DRA/APLA Gush Singh NRC/NRR/DE/EICB Maraaret Chernoff NRC/NRR/DEE/STSB Paul Duke PSEG Tanya Timberman PSEG Mike Philips PSEG Craia Matos Jensen Huahes (PSEG Contractor) Eric Thornsbury Jensen Huahes (PSEG Contractor) Elliot Rosenfeld New Jersey Department of Environmental Protection Enclosure
| |
|
| |
|
| ==SUBJECT:==
| | List of Attendees cc w/enclosure: Distribution via Listserv |
| SUMMARY OF MEETING HELD ON JULY 19, 2017, WITH PSEG NUCLEAR LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS FOR REACTOR TRIP AND ENGINEERED SAFETY FEATURE ACTUATION SYTEM INSTRUMENTATION FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1AND2 (CAC NOS. MF9900 AND MF9901) DATED AUGUST 7, 2017 DISTRIBUTION: PUBLIC RidsACRS_MailCTR Resource RidsNrrDorlLpl1 Resource RidsNrrDorl Resource RidsNrrPMSalem Resource RidsNrrLALRonewicz Resource RidsRgn1 MailCenter Resource TWertz, NRR JBowen, EDO MChernoff, NRR DO'Neal, NRR THilsmeier, NRR GSingh, NRR CParker, NRR RidsNrrDssStsb Resource RidsNrrDraApla Resource RidsNrrDeEicb Resource ADAMS Accession Nos.: Package: ML 17206A033 M f S ML 17206A028 ee mg ummary: OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NAME REnnis LRonewicz JDanna DATE 07/27/2017 07/26/2017 08/04/2017 OFFICIAL RECORD COPY NRR/DORL/LPL 1/PM REnnis 08/07/2017
| | |
| }} | | LIST OF ATTENDEES JULY 19. 2017, MEETING WITH PSEG NUCLEAR LLC BY TELECONFERENCE SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 PLANNED TSTF-411 AND TSTF-418 LICENSE AMENDMENT REQUEST Name Organization Rick Ennis NRC/NRR/DORULPL 1 Dan O'Neal NRC/NRR/DRA/APLA Todd Hilsmeier NRC/NRR/DRA/APLA Gush Singh NRC/NRR/DE/EICB Maraaret Chernoff NRC/NRR/DEE/STSB Paul Duke PSEG Tanya Timberman PSEG Mike Philips PSEG Craia Matos Jensen Huahes (PSEG Contractor) |
| | Eric Thornsbury Jensen Huahes (PSEG Contractor) |
| | Elliot Rosenfeld New Jersey Department of Environmental Protection Enclosure |
| | |
| | Package: ML17206A033 Mee f mg S ummary: ML17206A028 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME REnnis LRonewicz JDanna REnnis DATE 07/27/2017 07/26/2017 08/04/2017 08/07/2017}} |
Letter Sequence Meeting |
---|
CAC:MF9900, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Open) CAC:MF9990, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Open) CAC:MF9991, Surveillance Test Interval Extensions for Components of the Reactor Protection System - WCAP-15376-P, RPS and ESFAS Test Times and Completion Times - WCAP-14333 (Open) |
|
MONTHYEARML17199S2902017-07-19019 July 2017 TSTF-411 and TSTF-418 Pre-submittal Meeting Slides Project stage: Meeting ML17206A0282017-08-0707 August 2017 Summary of 7/19/17 Meeting with PSEG Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 Project stage: Meeting 2017-07-19
[Table View] |
Similar Documents at Salem |
---|
Category:Meeting Summary
MONTHYEARML24239A8402024-08-28028 August 2024 Summary of August 20, 2024, Pre-Planning Public Meeting with PSEG Nuclear LLC to Discuss Future Amendments in Support of Stretch Power Uprate ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML23276A6242023-10-12012 October 2023 Summary of the Closed Meeting with PSEG Nuclear LLC and Westinghouse Electric Company to Discuss Cobalt-60 Production at Salem Nuclear Generating Station ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23146A1012023-05-31031 May 2023 Summary of May 25, 2023, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Reduction of the Sites Exclusion Area Boundary ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML22153A4492022-06-14014 June 2022 Summary of Pre-Submittal Public Meeting with PSEG Nuclear LLC to Extend Emergency Diesel Generator Allowed Outage Time ML21201A0702021-08-0505 August 2021 Summary of July 20, 2021, Meeting with the National Marine Fisheries Service Regarding Incidental Take of Kemps Ridley Sea Turtles at Salem Nuclear Generating Station, Units 1 and 2 ML21064A0962021-03-0909 March 2021 Summary of 3/4/2021 Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Adoption of ASME Section XI Code Cases N-878, N-879, and N-880 at Hope Creek Generating Station and Salem Nuclear Generating Station ML20204A8422020-07-28028 July 2020 Summary of July 20, 2020, Pre-Submittal Public Meeting with PSEG Nuclear LLC to Discuss Proposed Relief Request for Pressurizer Weld Interval Extension ML20125A1652020-05-0404 May 2020 Summary of April 23, 2020, Teleconference with NMFS Regarding Incidental Take of Atlantic Sturgeon at Salem Nuclear Generating Station ML20113F0892020-04-27027 April 2020 Summary of April 15, 2020, Pre-Submittal Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment on Leak Before Break Analyses ML20108F0652020-04-17017 April 2020 Summary of April 15, 2020, Teleconference with PSEG Nuclear, LLC Regarding Incidental Take of Atlantic Sturgeon at Salem ML19109A1282019-04-16016 April 2019 and Hope Creek Generating Station: Summary of Public Webinar Meeting on April 10, 2019 ML18156A4242018-06-0505 June 2018 Annual Assessment Meeting, 5/30/18 Meeting Summary ML18044A9942018-02-26026 February 2018 Summary of Meeting with PSEG Nuclear LLC Regarding Planned Submittal of License Amendment Request to Revise Technical Specifications Regarding Extending the Allowed Outage Time for the Inverters ML17332A6032017-12-0404 December 2017 Summary of October 27, 2017, Conference Call with PSEG Nuclear LLC Fall 2017 Steam Generator Inspections ML17206A0282017-08-0707 August 2017 Summary of 7/19/17 Meeting with PSEG Planned Submittal of License Amendment Request to Revise Technical Specifications for Reactor Trip and Engineered Safety Feature Actuation System Instrumentation for Salem, Units 1 and 2 (CAC Nos. MF9900 ML17102A7772017-04-10010 April 2017 Summary of Annual Assessment Meeting with PSEG ML16347A3932017-01-0505 January 2017 Summary of Teleconference with PSEG Nuclear LLC Regarding Planned License Amendment Request Regarding Change to the Salem Nuclear Generating Station-Hope Creek Generating Station Emergency Action Levels (MF8875, MF8876, and MF8877) ML16123A1322016-05-17017 May 2016 Summary of Public Pre-Application Meeting Held on March 30, 2016, with PSEG LLC to Discuss License Amendment Request Containment Fan Coil Unit Allowed Outage Time at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML16096A2222016-04-0505 April 2016 March 30, 2016, Summary of Annual Assessment Meeting with PSEG - Salem Nuclear Generating Station & Hope Creek Generating Station ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML15202A2432015-07-29029 July 2015 June 24, 2015, Summary of Pre-Submittal Meeting with PSEG Nuclear LLC on Upgrades and Maintenance to the Chilled Water System at Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML15104A1492015-04-14014 April 2015 Hope, Summary of Annual Assessment Meeting with PSEG ML14167A1592014-09-0202 September 2014 Summary of Category 1 Public Meeting with Salem Nuclear Generating Station, Units 1 and 2 to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 Seismic ML14100A0242014-04-10010 April 2014 Salem and Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13109A2352013-05-10010 May 2013 Summary of Conference Call Regarding the Fall 2012 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 2 ML13099A3242013-04-0909 April 2013 Salem & Hope Creek - Summary of Annual Assessment Meeting with PSEG ML13078A4482013-04-0505 April 2013 Summary of February 28, 2013, Public Meeting with PSEG Final Supplemental Response to Generic Letter 2004-02 for Salem Nuclear Generating Station, Units 1 and 2 ML12144A3312012-05-23023 May 2012 Summary of Meeting at the PSEG to Discuss the Nrc'S Assessment of Pseg'S Safety Performance at Salem & Hope Creek for 2011 ML1129700652011-10-21021 October 2011 Summary of PSEG Drop-in Visit, 9-28-2011 and Slides ML1125200382011-09-19019 September 2011 Summary of, Meeting with PSEG Nuclear LLC to Discuss Proposed License Amendment Regarding Reactor Coolant System Activity for Salem Nuclear Generating Station, Unit Nos. 1 and 2 ML11139A3462011-05-26026 May 2011 Summary of Telephone Conference Call Held on May 10, 2011, Between the NRC and Nuclear, LLC, Concerning a Draft Response to a Draft RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, (Salem) License Renewal Application ML1114002132011-05-20020 May 2011 Summary of Annual Assessment Meeting for Salem and Hope Creek ML1107606042011-04-0505 April 2011 January 25, 2011, Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Information on Buried Piping Inspections at the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107007082011-04-0505 April 2011 February 17, 2011, Summary of Telephone Conference Call Held Between NRC and PSEG, Concerning Information on the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1107608982011-04-0505 April 2011 January 12, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, Llx, Concerning Audit of the Westems Software Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, LR ML1036307352011-02-0909 February 2011 Summary of Telephone Conference Call Held on September 16, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, License Renewal App ML1035005662011-02-0909 February 2011 Summary of Telephone Conference Call Held on 11/18/10 Between the USNRC and PSEG Nuclear, LLC, Concerning Draft Response to the Salem Nuclear Generating Station, Units 1 and 2, Request for Additional Information, and Concerning NRC Open Ite ML1100501562011-01-26026 January 2011 Summary of Telephone Conference Call Held on September 27, 2010, Between the U.S. Nuclear Regulatory Commission and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2 ML1035606562011-01-26026 January 2011 12/13/10 Summary of Telephone Conference Call Held on 12/13/10 Btw the USNRC and PSEG Nuclear, LLC, Concerning Draft Requests for Additional Information Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Appl ML1035401842011-01-0707 January 2011 10/08/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1032102502010-12-13013 December 2010 10/22/10 Summary of Telephone Conference Call Held Btw the USNRC and PSEG Nuclear LLC Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1024600952010-10-14014 October 2010 Summary of Telephone Conference Call Held Between Us NRC and PSEG Nuclear, LLC Concerning Questions Pertaining to the Salem Nuclear Generation Station Units 1&2 LRA ML1026400612010-10-14014 October 2010 09/09/2010-Summary of Telephone Conference Call Between the USNRC and PSEG Nuclear, LLC, Concerning Questions Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1023200572010-09-0303 September 2010 8/16/10 Summary of Telephone Conference Call Held Between the USNRC and PSEG Nuclear LLC Concerning a D-RAI Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022900442010-08-31031 August 2010 Summary of Conference Call Regarding Spring 2010 Steam Generator Tube Inspections at Salem Nuclear Generating Station, Unit No. 1 ML1022305122010-08-18018 August 2010 08/04/10 Summary of Telephone Conference Call Held on Between NRC and PSEG Nuclear, LLC, Concerning Drais Pertaining to the Salem Nuclear Generating Station, Units 1 and 2, License Renewal Application ML1022200122010-08-13013 August 2010 Summary of Telephone Conf Call Held on 7/29/10, Between the USNRC and PSEG Nuclear LLC, Concerning Follow-Up Questions Pertaining to the Salem Nuclear Generating Station, Units 1 & 2, and Hope Creek Generating Station License Renewal Enviro 2024-08-28
[Table view] |
Text
UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 7, 2017 LICENSEE: PSEG Nuclear LLC FACILITY: Salem Nuclear Generating Station, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD ON JULY 19, 2017, WITH PSEG NUCLEAR LLC REGARDING PLANNED SUBMITTAL OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS FOR REACTOR TRIP AND ENGINEERED SAFETY FEATURE ACTUATION SYTEM INSTRUMENTATION FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (CAC NOS. MF9900 AND MF9901)
On July 19, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of PSEG Nuclear LLC (PSEG, the licensee) by teleconference. The purpose of the meeting was to discuss PSEG's planned submittal of a license amendment request for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2, to revise the technical specifications for the reactor trip system and engineered safety feature actuation system (ESFAS) instrumentation. Specifically, the amendments would revise the technical specifications based on Technical Specifications Task Force (TSTF) Traveler TSTF-411, "Surveillance Test Interval Extensions for Components of the Reactor Protection System (WCAP-15376-P)," and Traveler TSTF-418, "RPS [Reactor Protection System] and ESFAS Test Times and Completion Times (WCAP-14333)."
The meeting notice and agenda, dated July 6, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17187A029. A list of attendees is enclosed with this meeting summary.
The licensee presented an overview of its plans to submit the license amendment request. The presentation closely followed PSEG's slides provided for the meeting (ADAMS Accession No. ML17199S290).
The licensee stated that the changes associated with TSTF-411 would only extend the reactor trip breaker test time and allowed outage time. There would be no changes to surveillance test intervals based on previous implementation of a Surveillance Frequency Control Program in accordance with TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - RITSTF
[Risk-Informed Technical Specification Task Force] Initiative Sb." The licensee also noted that a number of plant-specific evaluations would be provided to support the proposed change.
PSEG indicated that it is looking at precedent for Westinghouse plants with non-improved standard technical specifications to help inform the Salem submittal. The licensee forecasts submittal of the license amendment request in the fourth quarter of 2017.
No members of the public were in attendance, and no public meeting feedback forms were received.
Please direct any inquiries to me at 301-415-1420 or Rick.Ennis@nrc.gov.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosure:
List of Attendees cc w/enclosure: Distribution via Listserv
LIST OF ATTENDEES JULY 19. 2017, MEETING WITH PSEG NUCLEAR LLC BY TELECONFERENCE SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 PLANNED TSTF-411 AND TSTF-418 LICENSE AMENDMENT REQUEST Name Organization Rick Ennis NRC/NRR/DORULPL 1 Dan O'Neal NRC/NRR/DRA/APLA Todd Hilsmeier NRC/NRR/DRA/APLA Gush Singh NRC/NRR/DE/EICB Maraaret Chernoff NRC/NRR/DEE/STSB Paul Duke PSEG Tanya Timberman PSEG Mike Philips PSEG Craia Matos Jensen Huahes (PSEG Contractor)
Eric Thornsbury Jensen Huahes (PSEG Contractor)
Elliot Rosenfeld New Jersey Department of Environmental Protection Enclosure
Package: ML17206A033 Mee f mg S ummary: ML17206A028 OFFICE NRR/DORL/LPL 1/PM NRR/DORL/LPL 1/LA NRR/DORL/LPL 1/BC NRR/DORL/LPL 1/PM NAME REnnis LRonewicz JDanna REnnis DATE 07/27/2017 07/26/2017 08/04/2017 08/07/2017