| issue date = 08/31/1990
| issue date = 08/31/1990
| title = Monthly Operating Rept for Aug 1990 for WNP-2.W/900907 Ltr
| title = Monthly Operating Rept for Aug 1990 for WNP-2.W/900907 Ltr
| author name = BAKER J W, HUTCHISON L B
| author name = Baker J, Hutchison L
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DIST BUTION DEMONSTRATION SYSTEM~~I'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9009190193 DOC.DATE: 90/08/31 NOTARIZED:
{{#Wiki_filter:ACCELERATED DIST BUTION DEMONSTRATION SYSTEM
NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.
  ~~
Washington Public Power Supply System BAKER,J.W.
I'EGULATORY INFORMATION DISTRIBUTION SYSTEM                         (RIDS)
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000397
ACCESSION NBR: 9009190193           DOC. DATE: 90/08/31   NOTARIZED: NO           DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public           Powe   05000397 AUTH. NAME           AUTHOR AFFILIATION HUTCHISON,L.B.       Washington Public Power Supply System BAKER,J.W.           Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Aug 1990 for WNP-2.W/900907 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 2 ENCL SIZE: TITLE: Monthly Operating Report (per Tech Spec&)NOTES RECIPIENT ID CODE/NAME PD5 LA ENG,P.L.INTERNAL: ACRS AEOD/DSP/TPAB
Monthly operating rept         for Aug 1990   for WNP-2.W/900907   ltr.
~~J1LRQ/PEB10 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN5 NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Spec&)
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 September,-
2  ENCL      SIZE:
7, 1990 U.S.Nuclear Regulatory Commission Document Control Desk Washington D.C.20555
NOTES RECIPIENT               COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD5 LA                     3    3      PD5 PD                1    1 ENG,P.L.                   1    1 INTERNAL: ACRS                       10    10    AEOD/DOA                1    1 AEOD/DSP/TPAB               1    1      IRM TECH ADV          2    2
        ~~J1LRQ/ PEB10               1    1    NRR/DOEA/OEAB11 RGN5 1    1 1    1                            1    1 EXTERNAL: EG&G BRYCE,J.H               1     1     NRC PDR                 1     1 NSIC                        1     1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR             26   ENCL   26


==Dear.Sir.:==
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September,-  7, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C.        20555
 
==Dear. Sir.:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT AUGUST 1990 Transmitted herewith is the Monthly Operating Report for the month of August 1990 as required by our, Technical Specification 6.9.1.6.J..Baker, WNP-2 Plant Manager, (MD 927M)JWB:LBH:bap Enclosure cc: Mr,.J.B.Martin, NRC Region V Mr.C.J.Bosted, NRC Resident Inspector.
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT AUGUST 1990 Transmitted herewith is the Monthly Operating Report for the month of August 1990 as required by our, Technical Specification 6.9.1.6.
(901A)Ms.Dottie Sherman, ANI, Farmington, CT Mr.J.T.Wheelock, INPO Mr.W.H.Lovelace, NRC, Washington D.C.9009190193 900S31 PDR ADOCK 05000397;I l R PDC QEQ+
J.. Baker, WNP-2 Plant   Manager, (MD 927M)
~.~l~II  
JWB:LBH:bap Enclosure cc:   Mr,. J.B. Martin,     NRC Region   V Mr. C.J. Bosted,       NRC Resident Inspector. (901A)
~DOCKET NO.UNIT NNiE WNP-2 9/4/90 REPCAT PERIOD Aug 19 90 mcnth, year TI5.'DDAD llPE TQSJBN BE~sM MMEMIKI lNIT SiQTDONNS/REDUCTIONS 5I tWT COMPLETED BY TELEPi (ONE LB Hutchi'Son (509)377=~486 PREVE R C RRENC 90-02 4/21/90 S.147.6 C'90-03 8/7/90 S 4.55 B HA HECFUN Generator was removed from grid to perform overspeed testing of main turbine.It was then returned to service after successful completion of overspeed tests.RC Fuel XX Refueling outage RF-5 concluded.
Ms. Dottie Sherman, ANI, Farmington, CT Mr. J.T. Wheelock, INPO Mr . W.H. Lovelace,   NRC,   Washington D.C.
l.SUbt"iARY WNP-2 returned to service from refueling outage.Subsequently, a scheduled outage for testing occured T'YPE F-Forced S-Sched A-Equip Failure D-Maint or Test C-Ref ueling D-Regulatory Restriction E-Operator Training h License Examination F-Admin G-Oper Error H-Other 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM h COMPONENT Exhibit F h H Instructions for Preparation of Data Entry Sheet Licensee Event Report (LER)File (NUREG-0161)
9009190193 900S31                                                                     QEQ+
RAGE DAILY UNIT POWER LEVEL~MONTH August 1990 DAY AVERAGE DAILY POWER LEVEL (t~wE-Net) 2.3.5.6.7.17.l 8.19.20.2l.22.23.DOCKET NO.UNIT WNP"2 DATE COMPLETED BY LB Hutchison TEL'EPHPqE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL (MwE-Net)932 932 1050 1056 1048 1049 1067 8.9 10.12.13.14.15.16.309 584 851 983 1036 904 573 902 1024 24.25.26.27.28.29.30.31.1067 1071 1070 1066 1059 1053 1060 1051 INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
PDR     ADOCK 05000397           ;I l R                       PDC
OPERATING DATA REPORT WNP-2 01-Sep-90 1.DOCKET: 50-397 2.REPORTING PERIOD: Aug-90 3.UTILITY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LXCENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXIMUM DEPENDABLE CAPACXTY (NET MWe): 9~I F CHANGES OCCUR ABOVE S XNCE LAST REPORT i G I VE REASONS one 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ll.REASONS FOR RESTRICTIONS, IF ANY: 12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15.HRS GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY (MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILXTY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24.UNXT FORCED OUTAGE RATE 25.FORCED OUTAGE HOURS MONTH 744 668.7 0.0 591.9 0.0 1751164 572460 546814 79.5~o 79.5%67.1~o 66~8+o 0.0%0.0 YEAR CUMULATIVE 5831 50095.2 3322.6 36397.8 0.0 340.4 3231.3 35078.9 0.0 381.7 9984501 98328941 3311840 32715790 3162389 31448532 55.44 70.0%55.4~o 70.8~o 49.5~o 57'~o 47.6~o 57'>o 0.04 7.9~o 0.0 2996.2 26~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:}}
 
~ .
    ~ l
        ~ II
 
                                                                                                        ~
DOCKET NO.
UNIT NNiE         WNP-2 9/4/90 lNIT SiQTDONNS    / REDUCTIONS                  COMPLETED BY          LB Hutchi'Son REPCAT PERIOD         Aug     19 90                                                                 TELEPi (ONE            (509) 377=~486 mcnth,     year TI5.   'DDAD   llPE   TQSJBN   BE~sM MMEMIKI                   5I       tWT                                       PREVE   R C RRENC 90-02     4/21/90   S   . 147.6     C                           RC      Fuel XX    Refueling outage RF-5 concluded.
'90-03     8/7/90     S     4.55     B                           HA     HECFUN     Generator was removed from grid to perform overspeed testing of main turbine.
then returned to service after successful It was completion of overspeed tests.
: l.                   WNP-2   returned to service from refueling outage. Subsequently, a scheduled outage   for testing SUbt"iARY          occured T'YPE                                                                         SYSTEM h COMPONENT F-Forced       A-Equip Failure               F-Admin        1-Manual            Exhibit F h H S-Sched        D-Maint or Test               G-Oper Error   2-Manual Scram       Instructions for C-Ref ueling                  H-Other        3-Auto Scram         Preparation of D-Regulatory Restriction                      4-Continued         Data Entry Sheet E-Operator Training                          5-Reduced Load       Licensee Event Report h License Examination                    9-Other             (LER)   File (NUREG-0161)
 
RAGE DAILY UNIT   POWER LEVEL DOCKET NO.
WNP "2 UNIT DATE COMPLETED BY LB Hutchison
( 509 ) 377-2486 TEL'EPHPqE
~MONTH August 1990 DAY AVERAGE  DAILY  POWER  LEVEL                  DAY AVERAGE DAILY POWER LEVEL (t~wE-Net)                                          (MwE-Net)
: 17.              932
: 2.                                                  l 8.              932
: 3.                                                  19.              1050
: 20.              1056
: 5.                                                 2l.               1048
: 6.                                                 22.               1049
: 7.                                                 23.               1067
: 8.               309                               24.               1067 9                584                                25.               1071
: 10.                851                                26.               1070 983                                27.               1066 1036                              28.               1059 12.
904                                29.               1053 13.
573                                                  1060
: 14.                                                  30.
902                                                  1051
: 15.                                                  31.
: 16.                1024 INSTRUCTIONS On   this form, list the average daily unit power level in VWe-Net           for each day   in the reporting month. Compute to the nearest whole megawatt.
These   figures will   be used   to plot   a graph for each reporting month. Note that when maximum dependable capacity         is used for the net electrical rating of the unit, there may be occasions when         the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the                 average   daily unit power output sheet should be footnoted to explain the apparent             anomaly.
 
OPERATING DATA REPORT WNP-2 01-Sep-90
: 1. DOCKET:   50-397
: 2. REPORTING PERIOD:     Aug-90             OUTAGE +   ON-LINE   HOURS         744
: 3. UTILITY CONTACT:                  LEONARD HUTCHISON       (509) 377-2486
: 4. LXCENSED THERMAL POWER (MWt):                                                3323
: 5. NAMEPLATE RATING (GROSS MWe):                                              1200.9
: 6. DESIGN ELECTRICAL RATING (NET MWe):                                          1100
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                    1140
: 8. MAXIMUM DEPENDABLE CAPACXTY (NET MWe):                                       1095 9 ~   IF CHANGES OCCUR ABOVE S XNCE LAST REPORT   i G IVE  REASONS one
: 10. POWER TO WHICH   RESTRICTED, IF ANY (NET MWe):
ll. REASONS   FOR RESTRICTIONS,   IF ANY:
MONTH          YEAR    CUMULATIVE
: 12. REPORT PERIOD HOURS                                 744        5831    50095.2
: 13. HOURS REACTOR CRITICAL                           668.7        3322.6    36397.8
: 14. RX RESERVE SHTDWN HRS                               0.0          0.0      340.4
: 15. HRS GENERATOR ON LINE                             591.9        3231.3    35078.9
: 16. UNIT RESERVE SHUTDOWN HOURS                         0.0          0.0      381.7
: 17. GROSS THERMAL ENERGY (MWH)                     1751164      9984501    98328941
: 18. GROSS ELECTRICAL ENERGY (MWH)                   572460      3311840    32715790
: 19. NET ELECTRICAL ENERGY (MWH)                     546814      3162389    31448532
: 20. UNIT SERVICE FACTOR                                 79. 5~o     55.44      70.0%
: 21. UNIT AVAILABILXTYFACTOR                            79.5%       55.4~o     70.8~o
: 22. UNIT CAPACITY FACTOR (MDC NET)                      67. 1~o    49.5~o     57 '~o
: 23. UNIT CAPACITY FACTOR (DER NET)                      66 8+o
                                                            ~        47.6~o     57 '>o
: 24. UNXT FORCED OUTAGE RATE                              0.0%        0.04         7. 9~o
: 25. FORCED OUTAGE HOURS                                  0.0         0.0      2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)
: 27. IF CURRENTLY     SHUTDOWN ESTIMATED STARTUP DATE:}}

Latest revision as of 14:19, 29 October 2019

Monthly Operating Rept for Aug 1990 for WNP-2.W/900907 Ltr
ML17286A311
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/31/1990
From: John Baker, Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9009190193
Download: ML17286A311 (6)


Text

ACCELERATED DIST BUTION DEMONSTRATION SYSTEM

~~

I'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9009190193 DOC. DATE: 90/08/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1990 for WNP-2.W/900907 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Spec&)

2 ENCL SIZE:

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 ENG,P.L. 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2

~~J1LRQ/ PEB10 1 1 NRR/DOEA/OEAB11 RGN5 1 1 1 1 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 26

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 September,- 7, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington D.C. 20555

Dear. Sir.:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT AUGUST 1990 Transmitted herewith is the Monthly Operating Report for the month of August 1990 as required by our, Technical Specification 6.9.1.6.

J.. Baker, WNP-2 Plant Manager, (MD 927M)

JWB:LBH:bap Enclosure cc: Mr,. J.B. Martin, NRC Region V Mr. C.J. Bosted, NRC Resident Inspector. (901A)

Ms. Dottie Sherman, ANI, Farmington, CT Mr. J.T. Wheelock, INPO Mr . W.H. Lovelace, NRC, Washington D.C.

9009190193 900S31 QEQ+

PDR ADOCK 05000397 ;I l R PDC

~ .

~ l

~ II

~

DOCKET NO.

UNIT NNiE WNP-2 9/4/90 lNIT SiQTDONNS / REDUCTIONS COMPLETED BY LB Hutchi'Son REPCAT PERIOD Aug 19 90 TELEPi (ONE (509) 377=~486 mcnth, year TI5. 'DDAD llPE TQSJBN BE~sM MMEMIKI 5I tWT PREVE R C RRENC 90-02 4/21/90 S . 147.6 C RC Fuel XX Refueling outage RF-5 concluded.

'90-03 8/7/90 S 4.55 B HA HECFUN Generator was removed from grid to perform overspeed testing of main turbine.

then returned to service after successful It was completion of overspeed tests.

l. WNP-2 returned to service from refueling outage. Subsequently, a scheduled outage for testing SUbt"iARY occured T'YPE SYSTEM h COMPONENT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F h H S-Sched D-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Ref ueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report h License Examination 9-Other (LER) File (NUREG-0161)

RAGE DAILY UNIT POWER LEVEL DOCKET NO.

WNP "2 UNIT DATE COMPLETED BY LB Hutchison

( 509 ) 377-2486 TEL'EPHPqE

~MONTH August 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (t~wE-Net) (MwE-Net)

17. 932
2. l 8. 932
3. 19. 1050
20. 1056
5. 2l. 1048
6. 22. 1049
7. 23. 1067
8. 309 24. 1067 9 584 25. 1071
10. 851 26. 1070 983 27. 1066 1036 28. 1059 12.

904 29. 1053 13.

573 1060

14. 30.

902 1051

15. 31.
16. 1024 INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

OPERATING DATA REPORT WNP-2 01-Sep-90

1. DOCKET: 50-397
2. REPORTING PERIOD: Aug-90 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LXCENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACXTY (NET MWe): 1095 9 ~ IF CHANGES OCCUR ABOVE S XNCE LAST REPORT i G IVE REASONS one
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

ll. REASONS FOR RESTRICTIONS, IF ANY:

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 5831 50095.2
13. HOURS REACTOR CRITICAL 668.7 3322.6 36397.8
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 591.9 3231.3 35078.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 1751164 9984501 98328941
18. GROSS ELECTRICAL ENERGY (MWH) 572460 3311840 32715790
19. NET ELECTRICAL ENERGY (MWH) 546814 3162389 31448532
20. UNIT SERVICE FACTOR 79. 5~o 55.44 70.0%
21. UNIT AVAILABILXTYFACTOR 79.5% 55.4~o 70.8~o
22. UNIT CAPACITY FACTOR (MDC NET) 67. 1~o 49.5~o 57 '~o
23. UNIT CAPACITY FACTOR (DER NET) 66 8+o

~ 47.6~o 57 '>o

24. UNXT FORCED OUTAGE RATE 0.0% 0.04 7. 9~o
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)