ML17286A766: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 12/31/1990 | | issue date = 12/31/1990 | ||
| title = Revised Monthly Operating Rept for Dec 1990 for WNP-2 | | title = Revised Monthly Operating Rept for Dec 1990 for WNP-2 | ||
| author name = | | author name = Hutchison L | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OPERATXNG DATA REPORT WNP-2 01-Apr-91 1.DOCKET: 50-397 2.REPORTING PERIOD: Dec-90 | {{#Wiki_filter:OPERATXNG DATA REPORT WNP-2 01-Apr-91 | ||
: 1. DOCKET: 50-397 | |||
: 2. REPORTING PERIOD: Dec-90 OUTAGE + ON-LXNE HOURS 744 | |||
: 3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 | |||
: 4. LICENSED THERMAL POWER (MWt): 3323 | |||
: 5. NAMEPLATE RATXNG (GROSS MWe): 1200.9 | |||
: 6. DESIGN ELECTRICAL RATXNG (NET MWe): 1100 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140 | |||
: 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095 | |||
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: | |||
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
11 REASONS FOR RESTRICTIONS I IF ANY MONTH YEAR CUMULATIVE | |||
: 12. REPORT PERIOD HOURS 744 8760 53024.2 | |||
: 13. HOURS REACTOR CRITICAL 677.2 5908.9 38984.2 | |||
: 14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4 | |||
: 15. HRS GENERATOR ON LXNE 664.3 5755.2 37602.8 | |||
: 16. UNIT RESERVE SHUTDOWN HOURS 0 | |||
: 17. GROSS THERMAL ENERGY (MWH) 2118026 18004585 106349025 | |||
: 18. GROSS ELECTRICAL ENERGY (MWH) 1164 997 90 01 | |||
: 19. NET ELECTRICAL ENERGY (MWH) 685490 5742027 34028170 | |||
: 20. UNIT SERVXCE FACTOR 89. 3~o 65.7c 70.9~o | |||
: 21. UNIT AVAXLABILITYFACTOR 89. 3~o 65 '~o 71 6+o | |||
: 22. UNIT CAPACITY FACTOR (MDC NET) 84.14 59.9>o 58.6~o | |||
: 23. UNIT CAPACITY FACTOR (DER NET) 83. 8~o 59.64 58.34 | |||
: 24. UNIT FORCED OUTAGE RATE 10.7% 6. 6~o 8. 3% | |||
: 25. FORCED OUTAGE HOURS 79.7 405.1 3401.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION) | |||
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: | |||
9105210377 910501 PDR ADOCK 05000397 R PDR}} |
Latest revision as of 14:13, 29 October 2019
ML17286A766 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 12/31/1990 |
From: | Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | |
Shared Package | |
ML17286A764 | List: |
References | |
NUDOCS 9105210377 | |
Download: ML17286A766 (1) | |
Text
OPERATXNG DATA REPORT WNP-2 01-Apr-91
- 1. DOCKET: 50-397
- 2. REPORTING PERIOD: Dec-90 OUTAGE + ON-LXNE HOURS 744
- 3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
- 4. LICENSED THERMAL POWER (MWt): 3323
- 5. NAMEPLATE RATXNG (GROSS MWe): 1200.9
- 6. DESIGN ELECTRICAL RATXNG (NET MWe): 1100
- 7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
- 8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11 REASONS FOR RESTRICTIONS I IF ANY MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 744 8760 53024.2
- 13. HOURS REACTOR CRITICAL 677.2 5908.9 38984.2
- 14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
- 15. HRS GENERATOR ON LXNE 664.3 5755.2 37602.8
- 16. UNIT RESERVE SHUTDOWN HOURS 0
- 17. GROSS THERMAL ENERGY (MWH) 2118026 18004585 106349025
- 18. GROSS ELECTRICAL ENERGY (MWH) 1164 997 90 01
- 19. NET ELECTRICAL ENERGY (MWH) 685490 5742027 34028170
- 20. UNIT SERVXCE FACTOR 89. 3~o 65.7c 70.9~o
- 21. UNIT AVAXLABILITYFACTOR 89. 3~o 65 '~o 71 6+o
- 22. UNIT CAPACITY FACTOR (MDC NET) 84.14 59.9>o 58.6~o
- 23. UNIT CAPACITY FACTOR (DER NET) 83. 8~o 59.64 58.34
- 24. UNIT FORCED OUTAGE RATE 10.7% 6. 6~o 8. 3%
- 25. FORCED OUTAGE HOURS 79.7 405.1 3401.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: