{{#Wiki_filter:CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESSION NBR:9804170174 DOC.DATE: 98/04/13 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTIO             SYSTEM (RIDS)
YES FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
ACCESSION NBR:9804170174           DOC.DATE:   98/04/13     NOTARIZED: YES           DOCKET FACIL:50-400 Shearon Harris Nuclear Power             Plant, Unit 1, Carolina           05000400 AUTH. NAME           AUTHOR AFFILIATION ROBINSON,W.R.         Carolina Power &. Light Co.
Carolina Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)DOCKET 05000400
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Submits recpxest for license amend to NRC for Harris Nuclear Plant re deletion of restrictions contained in HNP TS surveillance, which specify that specific surveillance tests must be performed while unit shutdown.TS basis encl.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR I ENCL SIZE TITLE: OR Submittal:
Submits recpxest for license amend to NRC for Harris Nuclear Plant re deletion of restrictions contained in HNP TS surveillance, which specify that specific surveillance tests must be performed while unit shutdown.TS basis encl.
General Distribution RECIPIENT ID CODE/NAME PD2-1 LA FLANDERS,S COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD NOTES:Application for permit renewal filed.COPIES LTTR ENCL 1 1 05000400 Q 0'NTERNAL:
DISTRIBUTION CODE: A001D         COPIES RECEIVED:LTR         I ENCL       SIZE TITLE:   OR Submittal: General Distribution NOTES:Application for permit renewal filed.                                              05000400 Q
ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 EXTERNAL: NOAC 1 1 1 1 1 1 1 1 1 0Ã8 1 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR 1 1 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:
RECIPIENT            COPIES              RECIPIENT             COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME         LTTR ENCL PD2-1 LA                 1     1       PD2-1   PD               1    1 FLANDERS,S                1     1 0'NTERNAL:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 Carolina Power&Light Company PO Box 165 New Hill NC 27562 APR l 5 l998 U.S.Nuclear Regulatory Commission ATTN: NRC Document Control Desk Washington, DC 20555 William R.Robinson Vice President Harris NUclear Plant Serial: HNP-98-056 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT DELETION OF SHUTDOWN REQUIREMENT FROM SELECTED SURVEILLANCES SUPPLEMENTAL INFORMATION Sir or Madam: By letter dated March 17, 1997, Carolina Power&Light Company (CP&L)submitted a Request for License Amendment to the NRC for the Harris Nuclear Plant (HNP)concerning deletion of the restrictions contained in HNP Technical Specification (TS)surveillances which specify that specific surveillance tests must be performed while the unit is shutdown.During subsequent conversations, the NRC requested that CP&L also revise TS Bases section 4.0.2, to clarify guidance related to safely performing surveillance testing at power.Please reference the enclosed TS Bases revision, which responds to the NRC request and provides consistency with the guidance contained in NRC Generic Letter 91-04"Changes in Technical Specification Surveillance Intervals to Accomodate A 24-Month Fuel Cycle".CP&L's 10CFR50.92 and Environmental Consideration Evaluations submitted on March 17, 1997 remain unaffected by the submittal of the enclosed supplemental information.
ACRS                     1      1                Ã8      1      1    1 NRR/DE/ECGB/A             1      1      NRR/DE/EMCB              1    1 NRR/DRCH/HICB             1      1      NRR/DSSA/SPLB            1     1 NRR/DSSA/SRXB            1      1      NUDOCS-ABSTRACT           1     1 OGC/HDS2                  1     0 EXTERNAL: NOAC                                      NRC PDR                                        D N
If you have any questions regarding this matter or need additional information, please contact Mr.J.H.Eads at (919)362-2646.Sincerely, M V~Q 4 Enclosure J.W.Donahue, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief;and that sources of his information are officers, employeess, contractors, and agents of Carolina Power&Light Company.ps'l c rsttss s.'Y~@e"+$0<<A Notary (seal)soTARy My commission expires:~I I I-~9804170174 980413 PDR ADOCK 05000400 PPDR 54'l3 Shearon Harris Road New Hill NC Tel 919 362-2502 Fax 919 362-2095<op~tgglsilssssl}}
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               14   ENCL     13
 
Carolina Power & Light Company                                                 William R. Robinson PO Box 165                                                                     Vice President New Hill NC 27562                                                             Harris NUclear Plant APR     l 5 l998 U.S. Nuclear Regulatory Commission                                               Serial: HNP-98-056 ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT DELETION OF SHUTDOWN REQUIREMENT FROM SELECTED SURVEILLANCES SUPPLEMENTAL INFORMATION Sir or Madam:
By letter dated March 17, 1997, Carolina Power & Light Company (CP&L) submitted a Request for License Amendment to the NRC for the Harris Nuclear Plant (HNP) concerning deletion of the restrictions contained in HNP Technical Specification (TS) surveillances which specify that specific surveillance tests must be performed while the unit is shutdown. During subsequent conversations, the NRC requested that CP&L also revise TS Bases section 4.0.2, to clarify guidance related to safely performing surveillance testing at power.
Please reference the enclosed TS Bases revision, which responds to the NRC request and provides consistency with the guidance contained in NRC Generic Letter 91-04 "Changes in Technical Specification Surveillance Intervals to Accomodate A 24-Month Fuel Cycle".
CP&L's 10CFR50.92 and Environmental Consideration Evaluations submitted on March 17, 1997 remain unaffected by the submittal of the enclosed supplemental information. Ifyou have any questions regarding this matter or need additional information, please contact Mr. J. H.
Eads at (919) 362-2646.
Sincerely, MV Enclosure
                                                                        ~Q       4 J. W. Donahue, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and that sources of his information are officers, employeess, contractors, and agents of Carolina Power     & Light Company.                                                                         ps'l c rsttss
: s. 'Y~@e"+$0
                                                                                                                  <<A My commission expires: ~
9804170174 980413 PDR     ADOCK 05000400 II  I- ~    Notary (seal)                                    soTARy P                        PDR 54'l3 Shearon Harris Road New Hill NC Tel 919 362-2502 Fax 919 362-2095     <op
                                                                                                  ~
tgglsilssssl}}

Latest revision as of 05:45, 22 October 2019

Requests That Encl Revised TS Bases Section 4.0.2 Which Clarifies Guidance Related to Safely Performing Surveillance Testing at Power Be Ref in Response to GL 91-04
ML18016A385
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/13/1998
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A386 List:
References
GL-91-04, GL-91-4, HNP-98-056, HNP-98-56, NUDOCS 9804170174
Download: ML18016A385 (3)


Text

CATEGORY 1 REGULAT RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:9804170174 DOC.DATE: 98/04/13 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits recpxest for license amend to NRC for Harris Nuclear Plant re deletion of restrictions contained in HNP TS surveillance, which specify that specific surveillance tests must be performed while unit shutdown.TS basis encl.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR I ENCL SIZE TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 Q

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 FLANDERS,S 1 1 0'NTERNAL:

ACRS 1 1 Ã8 1 1 1 NRR/DE/ECGB/A 1 1 NRR/DE/EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC NRC PDR D N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris NUclear Plant APR l 5 l998 U.S. Nuclear Regulatory Commission Serial: HNP-98-056 ATTN: NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT DELETION OF SHUTDOWN REQUIREMENT FROM SELECTED SURVEILLANCES SUPPLEMENTAL INFORMATION Sir or Madam:

By letter dated March 17, 1997, Carolina Power & Light Company (CP&L) submitted a Request for License Amendment to the NRC for the Harris Nuclear Plant (HNP) concerning deletion of the restrictions contained in HNP Technical Specification (TS) surveillances which specify that specific surveillance tests must be performed while the unit is shutdown. During subsequent conversations, the NRC requested that CP&L also revise TS Bases section 4.0.2, to clarify guidance related to safely performing surveillance testing at power.

Please reference the enclosed TS Bases revision, which responds to the NRC request and provides consistency with the guidance contained in NRC Generic Letter 91-04 "Changes in Technical Specification Surveillance Intervals to Accomodate A 24-Month Fuel Cycle".

CP&L's 10CFR50.92 and Environmental Consideration Evaluations submitted on March 17, 1997 remain unaffected by the submittal of the enclosed supplemental information. Ifyou have any questions regarding this matter or need additional information, please contact Mr. J. H.

Eads at (919) 362-2646.

Sincerely, MV Enclosure

~Q 4 J. W. Donahue, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and that sources of his information are officers, employeess, contractors, and agents of Carolina Power & Light Company. ps'l c rsttss

s. 'Y~@e"+$0

<<A My commission expires: ~

9804170174 980413 PDR ADOCK 05000400 II I- ~ Notary (seal) soTARy P PDR 54'l3 Shearon Harris Road New Hill NC Tel 919 362-2502 Fax 919 362-2095 <op

~