| | issue date = 02/20/2019 | | | issue date = 02/20/2019 |
| | title = Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information | | | title = Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information |
| | author name = Werner G E | | | author name = Werner G |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Welsch J M | | | addressee name = Welsch J |
| | addressee affiliation = Pacific Gas & Electric Co | | | addressee affiliation = Pacific Gas & Electric Co |
| | docket = 05000275, 05000323 | | | docket = 05000275, 05000323 |
Line 14: |
Line 14: |
| | page count = 8 | | | page count = 8 |
| }} | | }} |
| See also: [[followed by::IR 05000275/2019002]] | | See also: [[see also::IR 05000275/2019002]] |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:February 20 , 2019 Mr. James M. Welsch | | {{#Wiki_filter:February 20, 2019 |
| Vice President Nuclear Generation
| | Mr. James M. Welsch |
| and Chief Nuclear Officer
| | Vice President Nuclear Generation |
| Pacific Gas and Electric Company
| | and Chief Nuclear Officer |
| Diablo Canyon Power Plant
| | Pacific Gas and Electric Company |
| P.O. Box 56, Mail Code 104/6
| | Diablo Canyon Power Plant |
| Avila Beach, CA
| | P.O. Box 56, Mail Code 104/6 |
| 93424 SUBJECT: DIABLO CANYON POWER PLANT
| | Avila Beach, CA 93424 |
| - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT
| | SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF INSPECTION (NRC |
| 0 50002 75/2019002, 05000323/2019002
| | INSPECTION REPORT 05000275/2019002, 05000323/2019002 AND |
| AND REQUEST FOR INFORMATION
| | REQUEST FOR INFORMATION |
| Dear Mr. Welsch: From April 8 to April 12 , 2019 , two inspectors
| | Dear Mr. Welsch: |
| from the U.S. Nuclear Regulatory Commission's
| | From April 8 to April 12, 2019, two inspectors from the U.S. Nuclear Regulatory |
| (NRC) Region
| | Commissions (NRC) Region IV office will perform the baseline biennial requalification |
| IV office will perform the baseline biennial requalification
| | inspection at Diablo Canyon Power Plant, using NRC Inspection Procedure 71111.11B, |
| inspection at Diablo Canyon Power Plant
| | Licensed Operator Requalification Program. |
| , using NRC Inspection Procedure | | Experience has shown that this inspection is a resource intensive inspection both for the NRC |
| 71111.11B , "Licensed Operator Requalification Program." Experience has shown that this inspection is
| | inspectors and your staff. In order to minimize the impact to your onsite resources and to |
| a resource intensive inspection both for the NRC inspector s and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into three | | ensure a productive inspection, we have enclosed a request for documents needed for this |
| groups. The first group (Sectio
| | inspection. These documents have been divided into three groups. The first group (Section A |
| n A of the enclosure) identifies
| | of the enclosure) identifies information to be provided prior to the inspection to ensure that the |
| information to be provided prior to the
| | inspectors are adequately prepared. The second group (Section B of the enclosure) identifies |
| inspection to ensure that the inspector s are adequately prepared. The second group (Section
| | the information the inspectors will need upon arrival at the site. The third group (Section C of |
| B of the enclosure) identifies the information the inspector
| | this enclosure) identifies the items which are necessary to close out the inspection and are |
| s will need upon arrival at the site. The third group (Section C of this enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
| | usually sent a few weeks after the team has left the site. It is important that all of these |
| We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be
| | documents are up to date and complete in order to minimize the number of additional |
| M s. Amanda Sorenson
| | documents requested during the preparation and/or the onsite portions of the inspection. |
| of your regulatory services organization.
| | We have discussed the schedule for these inspection activities with your staff and understand |
| Our inspection dates are subject to change based on your updated schedule of examination
| | that our regulatory contact for this inspection will be Ms. Amanda Sorenson of your regulatory |
| activities. If there are any questions about this inspection or the material requested, please contact the lead inspector
| | services organization. Our inspection dates are subject to change based on your updated |
| Nicholas Hernandez (832
| | schedule of examination activities. If there are any questions about this inspection or the |
| ) 689-9928 (nicholas.hernandez@nrc.gov). This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of | | material requested, please contact the lead inspector Nicholas Hernandez (832) 689-9928 |
| 1995 (44 U.S.C. 3501 et seq.).
| | (nicholas.hernandez@nrc.gov). |
| Existing information collection requirements were approved by the Office of Management and Budget, control number
| | This letter does not contain new or amended information collection requirements subject to the |
| 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
| | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection |
| J. Welsch 2 request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | | requirements were approved by the Office of Management and Budget, control number 3150- |
| In accordance with 10
| | 0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a |
| CFR 2.390 of the NRC's "Agency Rules of Practice
| | |
| & Procedure," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system
| | J. Welsch 2 |
| (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading
| | request for information or an information collection requirement unless the requesting document |
| -rm/adams.html | | displays a currently valid Office of Management and Budget control number. |
| (the Public
| | In accordance with 10 CFR 2.390 of the NRCs "Agency Rules of Practice & Procedure," a copy |
| Electronic Reading Room).
| | of this letter and its enclosure will be available electronically for public inspection in the NRC |
| Sincerely, /RA/ Gregory E. Werner, Chief Operations Branch
| | Public Document Room or from the Publicly Available Records (PARS) component of NRCs |
| Division of Reactor Safety
| | document system (ADAMS). ADAMS is accessible from the NRC web site at |
| Docket Nos.:
| | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| 50-275 , 05-323 License Nos.: DPR-80, DPR-82 Enclosure: | | Sincerely, |
| Request for Information
| | /RA/ |
|
| | Gregory E. Werner, Chief |
| J. Welsch 3 DIABLO CANYON POWER PLANT
| | Operations Branch |
| - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000275/2019002, 05000323/2019002 AND REQUEST FOR INFORMATION DATED FEBRUARY
| | Division of Reactor Safety |
| 20, 2019 DISTRIBUTION: | | Docket Nos.: 50-275, 05-323 |
| SMorris, RA | | License Nos.: DPR-80, DPR-82 |
| MShaffer, DRA | | Enclosure: |
| AVegel, DRP | | Request for Information |
| MHay, DRP RLantz, DRS | | |
| GMiller, DRS | | |
| DCylkowski, RC | | ML19043A945 |
| MMcCoppin, RIV/OEDO | | SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: |
| VDricks, ORA
| | By: NAH Yes No Publicly Available Sensitive |
| JWeil, OCA
| | OFFICE SOE:OB C:OB |
| BSingal, NRR
| | NAME NHernandez GWerner |
| AMoreno, RIV/CAO
| | SIGNATURE /RA/ /RA/ |
| BMaier, RSLO
| | DATE 02/04/2019 02/13/2019 |
| RKellar, IPAT
| | |
| MHaire, DRP
| | BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST |
| RAlexander, DRP
| | Inspection Report: 05000275/2019002, 05000323/2019002 |
| AAthar, DRP
| | Inspection Dates: April 8 to April 12, 2019 |
| LNewman, DRP
| | Inspection Procedure: IP 71111.11B, Licensed Operator Requalification |
| CNewport, DRP
| | Program |
| JReynoso, DRP
| | Lead Inspector: Nicholas Hernandez, Operations Engineer |
| MArel, DRP
| | A. The following information is requested in order to support inspection preparation |
| PJayroe, IPAT
| | activities. These items are listed by section as they appear in the inspection module |
| MHerrera, DRMA
| | (i.e. 2.02, 2.04, etc.). Requested materials should be sent either electronically or by |
| R4Enforcement
| | CD/DVD in order to arrive at the Region IV office no later than March 15, 2019. Do not |
| ADAMS ACCESSION
| | send USB flash drives. |
| NUMBER: ML19043A945
| | * Electronically: To: Nicholas.Hernandez@nrc.gov (lead inspector); |
| SUNSI Review
| | Cc: Clyde.Osterholtz@nrc.gov (inspector) |
| ADAMS: Non-Publicly Available | | * CD/DVD: To: US Nuclear Regulatory Commission, Region IV |
| Non-Sensitive Keyword: By: NAH Yes No Publicly Available
| | ATTN: Clyde Osterholtz |
| Sensitive OFFICE SOE:OB C:OB NAME NHernandez
| | 1600 E. Lamar Blvd |
| GWerner SIGNATURE /RA/ /RA/ DATE 02/04/2019
| | Arlington, TX 76011 |
| 02/13/2019
| | General Requests: |
| OFFICIAL RECORD COPY
| | * List of licensed operators (SRO & RO) by crew (operating & staff) |
|
| | * Training and Operations Department organization charts (with qualified LOR |
| Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
| | evaluators identified) |
| Inspection Report:
| | * Procedures that identify process for revising and maintaining LOR continuing training |
| 05000275/2019002, 05000323/2019002
| | program |
| Inspection Dates:
| | * List of outstanding LOR program changes |
| April 8 to April 12, 2019
| | * List of plant events and industry operating experience incorporated into LOR |
| Inspection Procedure:
| | program since last BRQ |
| IP 71111.11B, "Licensed Operator Requalification Program" Lead Inspector:
| | * Audits and/or self-assessment reports addressing the LOR training program |
| Nicholas Hernandez , Operations Engineer
| | * Last 2 years of simulator review committee (or equivalent) meeting minutes |
| A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module
| | * Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes |
| (i.e. 2.02, 2.04, etc.). Requested materials should be sent either electronically or by CD/DVD in order to arrive at the Region IV office no later than | | Enclosure |
| March 15 , 2019. Do not send USB flash drives.
| | |
| Electronically:
| | 02.03: Biennial Requalification Written Examination Quality |
| To: Nicholas.Hernandez@nrc.gov
| | * The current and approved biennial written examination schedule |
| (lead inspector);
| | * The current requalification cycle written examination results to date |
| Cc: Clyde.Osterholtz@nrc.gov
| | * All written examinations that have been approved for administration up to the date of |
| (inspector)
| | submittal. Include password protection if e-mailed or double envelope protection if |
| CD/DVD: To: US Nuclear Regulatory Commission, Region IV | | mailed per NUREG-1021. |
| ATTN: Clyde Osterholtz
| | * The current requalification cycle examination methodology (sample plan) |
| 1600 E. Lamar Blvd
| | 02.04: Annual Requalification Operating Test Quality |
| Arlington, TX 76011
| | * The schedule for the operating tests to be given the week of April 8, , 2019 |
| General Requests
| | * All operating tests (password protected) that have been approved for administration |
| : List of licensed operators (SRO
| | up to and including the week of the onsite inspection |
| & RO) by crew (operating & staff)
| | * All 2019 NRC-required annual operating tests |
| Training and Operations Department organization charts (with qualified LOR evaluators identified) | | * Current requalification cycle operating test results |
| Procedures that identify process for revising and maintaining LOR continuing training program List of outstanding LOR program changes | | * Current requalification cycle operating test methodology (sample plan) |
| List of plant events and industry operating experience incorporated into LOR program since last BRQ | | * List of time critical operator actions, including USAR references |
| Audits and/or self
| | 02.05: Licensee Administration of Requalification Exams |
| -assessment reports addressing the LOR training program
| | * All procedures used to administer the annual operating test |
| Last 2 years of simulator review committee (or equivalent) meeting minutes Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
| | * All procedures used to assess operator performance |
|
| | * All procedures that describe conduct of simulator training |
| 2 02.03: Biennial Requalification Written Examination Quality | | * All procedures used to test, operate, and maintain the simulator |
| The current and approved biennial written examination schedule
| | 02.06: Requalification Examination Security |
| The current requalification cycle written examination
| | * Tracking tools used to prevent excessive overlap on the written examinations and |
| results to date
| | ensure sampling of required topics on a periodic basis |
| A ll written examinations that have been approved for administration up to the date of submittal. Include password protection if e
| | * Tracking tools used to prevent excessive overlap on the operating tests and ensure |
| -mailed or double envelope protection if mailed per NUREG
| | sampling of all required malfunctions (major events, instrument/component |
| -1021. The current requalification cycle
| | malfunctions, TS calls, etc.) on a periodic basis. |
| examination methodology (sample plan)
| | * All procedures that describe examination security, including procedures used to |
| 02.04: Annual Requalification Operating Test Quality
| | develop the examinations that include guidelines on overlap between examinations |
| The schedule for the operating tests to be given the
| | in current exam cycle tests and prior year examinations |
| week of April 8, , 2019 All operating tests (password protected) that have been approved for administration
| | * List of all condition reports since the last biennial requalification inspection related to |
| up to and including the week of the onsite inspection
| | examination security and overlap |
| All 2019 NRC-required annual operating tests
| | 02.07: Licensee Remedial Training Program |
| Current requalification cycle operating test result s Current requalification cycle operating test methodology (sample plan)
| | * List of remedial training conducted or planned since last biennial requalification |
| List of time critical operator actions, including USAR references
| | inspection (includes remedial training for exam failures and training to correct generic |
| 02.05: Licensee Administration of Requalification Exams All procedures used to administer the annual operating test
| | or individual weaknesses observed during previous requalification exam cycle) |
| All procedures used to assess operator performance
| | * Remediation plans (lesson plans, reference materials, and final documentation) |
| All procedures that describe conduct of simulator training All procedures used to test, operate, and maintain the simulator
| | 02.08: Conformance with Operator License Conditions |
| 02.06: Requalification Examination Security
| | * All procedures and program documentation for maintaining active operator licenses, |
| Tracking tools used to prevent excessive overlap on the written examinations and ensure sampling of required topics on a periodic basis
| | tracking training attendance, and ensuring medical fitness of licensed operators |
| Tracking tools used to prevent excessive overlap on the operating tests and ensure sampling of all required malfunctions (major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
| | * All procedures and associated documentation that supports reactivation of any |
| All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations
| | SRO/RO license (operating or staff crew) since the last biennial inspection |
| List of all condition reports since the last biennial requalification inspection related t
| | 2 |
| o examination security and overlap | | |
| 02.07: Licensee Remedial Training Program
| | 02.09: Simulator Performance |
| List of remedial training conducted or planned since last biennial requalification inspection (includes remedial training for exam failures and training to correct generic or individual weaknesses observed during previous requalification exam cycle)
| | * For the following cases, send the most recent transient test packages, which may be |
| Remediation plans (lesson plans, reference materials, and final documentation) | | electronic or in paper single test packages, and shall be complete with test |
| 02.08: Conformance with Operator License Conditions
| | procedures for each test, the acceptance criteria, and results. For each transient |
| All procedures | | test, the reference chart should be included or an equivalent subject matter expert |
| and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
| | review versus the simulator results with a write-up for any differences beyond the |
| All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection | | ANSI 3.5 standard requirements. |
|
| | o Transient test 3, Simultaneous closure of all main steam isolation valves |
| 3 02.09: Simulator Performance
| | o Transient test 10, Slow primary system depressurization to saturated |
| For the following cases, send the most recent transient
| | condition with pressurizer relief or safety valve stuck open (inhibit activation of |
| test packages, which may be electronic
| | high pressure emergency core cooling system) |
| or in paper single test packages, and shall be complete with test procedures
| | o Steady State tests for low power test |
| for each test, the acceptance
| | * SBT packages for any three scenarios used for the 2018 annual requalification |
| criteria, and results. For each
| | operating test |
| transient test, the reference chart should be included or an equivalent
| | * All simulator management and configuration procedures if not already provided for |
| subject matter expert review versus
| | Section 02.05 above |
| the simulator results
| | * Simulator discrepancy report (DR) summary list for all open DRs. For closed DRs, |
| with a write-up for any differences
| | summary list for those items closed between April 8, 2017 |
| beyond the ANSI 3.5 standard
| | * Two examples of primary parameters tested in order to verify core physics |
| requirements.
| | parameters. The applicable reference graphs from the plant physics data book |
| o Transient test
| | (electronic or other means as available) should also be included as well as the test |
| 3, Simultaneous closure of all main steam isolation valves
| | procedures used and the acceptance criteria with results. |
| o Transient test 10, Slow primary system depressurization to saturated condition with pressurizer relief or safety valve stuck open (inhibit activation of high pressure emergency core cooling system
| | * All simulator modification packages that are on hold, delayed, or just not completed |
| ) o Steady State tests for low power test
| | in the last 2-years |
| SBT packages for any three scenarios used for the
| | * A list of simulator modification packages completed in the last 2-year window |
| 2018 annual requalification operating test
| | 02.10: Problem Identification and Resolution |
| All simulator management
| | * A summary report of all condition reports related to licensed operator actions/errors |
| and configuration
| | in the control room since April 8,2017 |
| procedures
| | * Any revised requalification training that was based on licensed operator performance |
| if not already provided for Section 02.05 above
| | issues since April 8,, 2017 |
| Simulator discrepancy | | B. The following information is requested in order to support the onsite inspection |
| report (DR) summary list for all open DRs. For closed DRs, summary list for those items closed between April 8, 2017
| | activities. Requested materials should be available to the inspection team, either |
| Two examples of primary parameters
| | electronically or hardcopy, upon site arrival on April 8, 2019. |
| tested in order to verify core physics parameters. The applicable
| | 02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality |
| reference graphs from the plant physics data book (electronic
| | * All approved operating tests (password protected) to be administered subsequent to |
| or other means
| | the onsite inspection |
| as available)
| | * All results up to the day the team leaves the site. |
| should also be included as well as the test procedures
| | 02.08: Conformance with Operator License Conditions |
| used and the acceptance
| | * Access to licensed operators records |
| criteria with results. All simulator modification
| | * Access to licensed operators training attendance records |
| packages that are on hold, delayed, or just not completed
| | * Access to licensed operators medical records |
| in the last 2-years A list of simulator modification
| | 02.09: Simulator Performance |
| packages completed in the last 2-year window 02.10: Problem Identification and Resolution
| | * Simulator discrepancies reports (DRs) since April 8, 2017. This should include all |
| A summary report of all condition reports related to licensed operator actions/errors in the control room
| | open and closed DRs, with documentation / justification for closure |
| since April 8, 2017 Any revised requalification training that was based on licensed operator performance issues since April 8,, 2017 B. The following information is requested in order to support the onsite inspection activities. Requested materials should be available to the inspection team, either electronically or hardcopy, upon site arrival on
| | 3 |
| April 8, 2019
| | |
| . 02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test
| | * Acceptance test documentation, including hardware and software model revisions at |
| Quality All approved operating tests
| | the time of acceptance (as available) |
| (password protected)
| | * Documentation that validates current models, including the thermal-hydraulic and |
| to be administered subsequent to the onsite inspection
| | neutronics models, to the actual plant |
| All results up to the day the team leaves the site. | | * All current model deficiencies, including USAR vs design differences in the simulator |
| 02.08: Conformance with Operator License Conditions
| | * Summary list of plant modifications since April 8, 2017 |
| Access to licensed operators' records
| | * Plant modifications (both hardware and software) incorporated onto the simulator |
| Access to licensed operators' training attendance records | | since April 8, 2017. |
| Access to licensed operators' medical records
| | * The complete book of all simulator annual performance test packages (either |
| 02.09: Simulator Performance | | hardcopy or electronic), complete with all transient tests, steady state tests, and |
| Simulator discrepancies reports (DRs) since April 8, 2017. This should include all open and closed DRs, with documentation / justification for closure
| | malfunction tests. This should also include the test procedures for each test, the |
|
| | acceptance criteria, and results. For each transient test, the reference chart should |
| 4 Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available) | | be included or an equivalent subject matter expert review versus the simulator |
| Documentation that validates current models, including the thermal
| | results with an analysis for any differences beyond the ANSI standard requirements |
| -hydraulic and neutronics models, to the actual plant
| | * Simulator reactor core performance test packages used to verify core physics |
| All current model deficiencies, including USAR vs design differences in the simulator
| | parameters (ANSI/ANS 3.5 sections 3.4.3.3 / 4.4.3.3), including applicable reference |
| Summary list of plant modifications since
| | graphs from the plant physics data book, test procedures, acceptance criteria, and |
| April 8, 2017 Plant modifications (both hardware and software) incorporated onto the simulator since April 8, 2017. The complete book of all simulator annual performance test packages (either hardcopy or electronic), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should
| | results |
| be included or an equivalent subject matter expert review versus the simulator results with an analysis for any differences beyond the ANSI standard requirements
| | * All simulator test, configuration management, and related documents available in the |
| Simulator reactor core performance test packages used to verify core physics parameters (ANSI/ANS
| | room for inspectors to review. This includes training needs analysis packages, |
| 3.5 sections 3.4.3.3 / 4.4.3.3), including applicable reference graphs from the plant physics data book, test procedures, acceptance criteria, and results All simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.
| | simulator review committee meeting minutes, etc. |
| Current copy of ANSI 3.5 standard you are committed to for simulator testing
| | * Current copy of ANSI 3.5 standard you are committed to for simulator testing |
| 02.10: Problem Identification and Resolution
| | 02.10: Problem Identification and Resolution |
| All condition reports related to licensed operator actions/errors in the control room.
| | * All condition reports related to licensed operator actions/errors in the control room. |
| All condition reports from the last initial license exam
| | * All condition reports from the last initial license exam |
| C. Diablo Canyon Power Plant
| | C. Diablo Canyon Power Plant is required to send the final results and any remaining |
| is required to
| | written exams and operating tests to the lead inspector for final review and |
| send the final results and any remaining written exams and operating tests
| | comparison against the significance determination tools in order to communicate the |
| to the lead inspector for final review and comparison against the
| | exit results for the inspection. Report results in the format below: |
| significance
| | 1. Total number of licensed operators. |
| determination
| | 2. Number of licensed operators administered a requalification examination |
| tools in order to communicate the exit results for the inspection. Report results in the format below:
| | required by 10 CFR 55.59(a). |
| 1. Total number of licensed operators.
| | 3. Number of individual licensed operators who failed any portion of a |
| 2. Number of licensed
| | requalification examination (written, JPM, or individual simulator scenario |
| operators administered a requalification examination required by 10 CFR 55.59(a).
| | failures). |
| 3. Number of individual licensed operators who failed
| | 3.a. Number of individual licensed operators who failed written exam |
| any portion of a requalification examination (written, JPM, or individual simulator scenario failures).
| | 3.b. Number of individual licensed operators who failed JPM exam |
| 3.a. Number of individual licensed operators who failed written exam
| | 3.c. Number of individual licensed operators who failed simulator |
| 3.b. Number of individual licensed operators who failed JPM exam
| | scenario exam individually |
| 3.c. Number of individual licensed operators who failed simulator scenario exam individually
| | 4. Divide line 3 by line 2 to obtain the individual requalification examination % |
| 4. Divide line 3 by line 2 to obtain the individual requalification examination failure rate.
| | failure rate. |
| % 5. Number of crews administered simulator scenarios as part of a requalification examination required by 10 CFR 55.59(a)
| | 5. Number of crews administered simulator scenarios as part of a |
|
| | requalification examination required by 10 CFR 55.59(a) |
| 5 6. Number of crews who performed unsatisfactorily on the simulator scenarios.
| | 4 |
| 7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate.
| | |
| % 8. Describe the reason for each licensed operator who was not administered an NRC
| | 6. Number of crews who performed unsatisfactorily on the simulator |
| -required requalification exam, or who did not pass an administered requalification exam, and the station's plan to satisfy the requalification exam requirement for each.
| | scenarios. |
| | 7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate. % |
| | 8. Describe the reason for each licensed operator who was not |
| | administered an NRC-required requalification exam, or who did not pass an |
| | administered requalification exam, and the stations plan to satisfy the |
| | requalification exam requirement for each. |
| | 5 |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information IR 05000275/20230052023-08-22022 August 2023 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter IR 05000275/20220062023-03-0101 March 2023 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022006 and 05000323/2022006) ML23005A1732023-01-0909 January 2023 Notification of Commercial Grade Dedication Inspection IR 05000275/20220052022-08-23023 August 2022 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information IR 05000275/20210062022-03-0202 March 2022 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2021006 and 05000323/2021006) ML22019A0412021-12-29029 December 2021 RFI ML21230A3902021-09-0101 September 2021 DC Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21229A2242021-08-17017 August 2021 Notification of NRC Triennial Heat Exchanger/Heat Sink Performance Inspection (05000275/2021004 and 05000323/2021004) and Request for Information ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21069A2102021-03-12012 March 2021 Notification of Inspection (NRC Inspection Report 05000275/2021002, 05000323/2021002) and Request for Information IR 05000275/20200062021-03-0303 March 2021 DC 2020 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 & 2 (Report 05000275/2020006 & 05000323/2020006) ML21061A3302021-02-25025 February 2021 Request for Information: Diablo Canyon Power Plant, Dated January 6, 2021; IR 05000275/323/2021-001 Occupational Radiation Safety Inspection - 2, 4 ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information IR 05000275/20200052020-09-0101 September 2020 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2020005 and 05000323/2020005) ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20055E1082020-03-0303 March 2020 DC 2019006 Annual Assessment Letter IR 05000275/20190052019-08-30030 August 2019 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2, Report 05000275/2019005 and 05000323/2019005 IR 05000275/20180062019-03-0404 March 2019 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018006 and 05000323/2018006) ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information IR 05000275/20180052018-08-31031 August 2018 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005) IR 05000275/20170062018-03-0101 March 2018 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017006 and 05000323/2017006) IR 05000275/20170052017-08-28028 August 2017 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2017005 and 05000323/2017005) ML17243A3022017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 IR 05000275/20160062017-03-0101 March 2017 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016006 and 05000323/2016006) ML17037D1232017-02-0606 February 2017 Notification of Inspection (NRC Inspection Report 05000275/2017002; 05000323/2017002) and Request for Information ML16239A2532016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2016005 and 05000323/2016005) IR 05000275/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2016401 and 05000323/201640) IR 05000275/20150062016-03-0202 March 2016 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015006 and 05000323/2015006) IR 05000275/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2015401 and 05000323/2015401) IR 05000275/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2015005 and 05000323/2015005) IR 05000275/20140012015-03-0404 March 2015 Annual Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2, (Report 05000275/2014001 and 05000323/2014001) IR 05000275/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Number 05000275/2014402 and 05000323/2014402) IR 05000275/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2014006 and 05000323/2014006) IR 05000275/20130012014-03-0404 March 2014 IR 05000275-13-001 & 05000323-13-001, 02/12/2014, Diablo Canyon, Unit 1 & 2, Annual Assessment Inspection Plan ML13246A2882013-09-0303 September 2013 Midcycle Assessment Letter 2013 ML13206A1892013-07-25025 July 2013 IR 05000275-13-004, and 05000323-13-004, Diablo Canyon Power - Notification of NRC Triennial Heat Sink Performance Inspection IR 05000275/20128012013-03-0404 March 2013 Annual Assessment Letter for Diablo Canyon Power Plant Units 1 & 2 (IR 05000275-12-801 and 05000323-12-801) ML13032A3142013-02-0101 February 2013 IR 05000275-13-007, 05000323-13-007, on 05/20/2013, Diablo Canyon - Notification of NRC Component Design Bases Inspection and Initial RAI IR 05000275/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant (05000275/2012006, 05000323/2012006) IR 05000275/20120012012-03-0505 March 2012 Annual Assessment Letter for Diablo Canyon Power Plant - Units 1 and 2 (Report 05000275/2012001 and 05000323/2012001) ML1124401692011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant - Units 1 and 2 ML1029503242010-10-21021 October 2010 Notification of NRC Triennial Heat Exchanger Inspection 05000275-10-005 & 05000323-10-005 ML1024403362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant IR 05000275/20100012010-03-0303 March 2010 Annual Assessment Letter - Diablo Canyon Power Plant (NRC IR 05000275-10-001 and 05000323-10-001 ML0924001372009-09-0101 September 2009 Midcycle Assessment IR 05000275/20090012009-03-0404 March 2009 Annual Assessment Letter and Inspection Plan 2008 (NRC Inspection Reports 05000275-09-001 and 05000323-09-001) 2023-09-06
[Table view] Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24024A2072024-01-24024 January 2024 Inservice Inspection Request for Information IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) ML23249A2782023-09-0606 September 2023 Inservice Inspection Request for Information ML23159A2382023-07-25025 July 2023 Request for Additional Information for the Technical Review of the Application for Renewal of the Diablo Canyon Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2022-RNW-0007) ML23159A2372023-07-25025 July 2023 ISFSI Renewal RAI Transmittal Letter Enclosure ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23047A0062023-02-21021 February 2023 Request for Additional Information Alternative Security Measures for Early Warning System (EPID: L-2022-LLA-0029) (Public Version) ML23041A1862023-02-17017 February 2023 Request for Information Regarding Diablo Canyon Power Plant, Units 1 and 2 - December 8, 2022, Public Meeting ML22258A1112022-09-14014 September 2022 2022 Diablo Canyon PIR Request for Information ML22200A2572022-07-19019 July 2022 Notification of In-service Inspection (Inspection Report 05000323/2022004) and Request for Information ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22152A1502022-06-21021 June 2022 Request for Additional Information Regarding License Amendment Request for Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML22122A1412022-05-0505 May 2022 .02 Doc Request ML22068A2312022-03-17017 March 2022 Notification of NRC Design Bases Assurance Inspection (Team) 05000275/2022011 and 05000323/2022011 and Initial Request for Information ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21363A1692021-12-29029 December 2021 Inservice Inspection Request for Information ML22019A0412021-12-29029 December 2021 RFI ML21215A3432021-08-0303 August 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Request to Revise Technical Specification 3.8.1, AC Sources - Operating to Support Diesel Fuel Oil Transfer System Component Planned Maintenance ML21130A3642021-06-21021 June 2021 DC 2021401 Information Request ML21104A3642021-04-14014 April 2021 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Technical Specifications and Revised License Conditions for the Permanently Defueled Condition ML21062A0642021-03-0202 March 2021 NRR E-mail Capture - Request for Additional Information for Diablo Canyon Generic Letter 2004-02 Submittal (L-2017-LRC-0000) ML20329A0692020-11-23023 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend force-on-force Exercise ML20323A4532020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon COVID-19 Exemption Request to Extend Firearms Requalification ML20301A2212020-10-27027 October 2020 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000275/2021010 and 05000323/2021010) and Request for Information ML20261H4232020-09-17017 September 2020 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Unit 2 Fall 2019 Steam Generator Tube Inspection Report ML20231A2372020-08-17017 August 2020 NRR E-mail Capture - Diablo Canyon Additional Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G EPID: L-2020-LLA-017 ML20230A0732020-08-14014 August 2020 NRR E-mail Capture - Diablo Canyon Request for Additional Information: Exigent License Amendment Request for Application to Provide a New Technical Specification 3.7.5, Auxiliary Feedwater System, Condition G ML20280A5432020-06-0303 June 2020 DC 2020 PIR Request for Information ML20041E6012020-02-10010 February 2020 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information for Post -Shutdown Decommissioning Activities Report (PSDAR) ML19262G7482019-08-0909 August 2019 Request for Information ML19149A6012019-05-28028 May 2019 NRR E-mail Capture - Request for Additional Information (Supplemental) - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19123A2162019-05-0202 May 2019 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant -Request for Exemption from Operator Written Examination and Operating Test - Request for Additional Information ML19084A2572019-03-21021 March 2019 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Emergency Plan Response Organization Staffing and Augmentation ML19043A9452019-02-20020 February 2019 Notification of Inspection (NRC Inspection Report 05000275/2019002, 05000323/2019002 and Request for Information ML17306A9382017-11-0202 November 2017 NRR E-mail Capture - Request for Additional Information - Request for Approval for Application of Full Weld Overlay REP-RHR-SWOL, Diablo Canyon Power Plant, Units 1 and 2 ML17152A3192017-06-0101 June 2017 NRR E-mail Capture - Request for Additional Information (RAI)- Relief Requests NDE-SLH U2, NDE-LSL U2, NDE-LHC U2, NDE-LHM U2, and NDE-ONV U2 (CAC Nos. MF9386 Through MF9390) ML17102B6072017-04-12012 April 2017 NRR E-mail Capture - Request for Additional Information (RAI) - Revised Emergency Action Level Schemes Pursuant to Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16347A0032016-12-0909 December 2016 NRR E-mail Capture - Request for Additional Information (RAI) - Diablo Canyon Power Plant License Amendment Request for Adoption of NEI 94-01 ML16326A3562016-11-21021 November 2016 NRR E-mail Capture - Request for Additional Information - License Amendment Request to Adopt Nuclear Energy Institute (NEI) 94-01, Revision 2-A for Diablo Canyon Power Plant, Units 1 and 2 - CAC Nos. MF7731 and MF7732 ML16048A2322016-02-17017 February 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Met Data Second Round of Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 (TAC Nos. MF6399 and MF640 ML16011A3652016-02-0202 February 2016 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application - Set 39 (TAC Nos. ME2896 and ME2897) ML16011A3172016-01-11011 January 2016 NRR E-mail Capture - Diablo Canyon 1 and 2 - Requests for Additional Information for License Amendment Request 15-03 to Adopt the Alternative Source Term Per 10 CFR 50.67 ML15358A0022015-12-23023 December 2015 Request for Additional Information Email (Follow-up Pra), Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15357A3822015-12-23023 December 2015 Request for Additional Information, Round 4 - Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review ML15287A1652015-10-23023 October 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review - SAMA ML15267A7742015-10-0101 October 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Evaluations ML15217A4812015-09-24024 September 2015 Requests for Additional Information for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application Set-38 TAC Nos. ME2896 and ME2897 ML15238B7742015-08-27027 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML15153A0332015-06-29029 June 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations 2024-01-24
[Table view] |
See also: IR 05000275/2019002
Text
February 20, 2019
Mr. James M. Welsch
Vice President Nuclear Generation
and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000275/2019002, 05000323/2019002 AND
REQUEST FOR INFORMATION
Dear Mr. Welsch:
From April 8 to April 12, 2019, two inspectors from the U.S. Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Diablo Canyon Power Plant, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups. The first group (Section A
of the enclosure) identifies information to be provided prior to the inspection to ensure that the
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
the information the inspectors will need upon arrival at the site. The third group (Section C of
this enclosure) identifies the items which are necessary to close out the inspection and are
usually sent a few weeks after the team has left the site. It is important that all of these
documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Amanda Sorenson of your regulatory
services organization. Our inspection dates are subject to change based on your updated
schedule of examination activities. If there are any questions about this inspection or the
material requested, please contact the lead inspector Nicholas Hernandez (832) 689-9928
(nicholas.hernandez@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a
J. Welsch 2
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs "Agency Rules of Practice & Procedure," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records (PARS) component of NRCs
document system (ADAMS). ADAMS is accessible from the NRC web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Gregory E. Werner, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-275,05-323
License Nos.: DPR-80, DPR-82
Enclosure:
Request for Information
ML19043A945
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: NAH Yes No Publicly Available Sensitive
OFFICE SOE:OB C:OB
NAME NHernandez GWerner
SIGNATURE /RA/ /RA/
DATE 02/04/2019 02/13/2019
BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
Inspection Report: 05000275/2019002, 05000323/2019002
Inspection Dates: April 8 to April 12, 2019
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector: Nicholas Hernandez, Operations Engineer
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e. 2.02, 2.04, etc.). Requested materials should be sent either electronically or by
CD/DVD in order to arrive at the Region IV office no later than March 15, 2019. Do not
send USB flash drives.
- Electronically: To: Nicholas.Hernandez@nrc.gov (lead inspector);
Cc: Clyde.Osterholtz@nrc.gov (inspector)
- CD/DVD: To: US Nuclear Regulatory Commission, Region IV
ATTN: Clyde Osterholtz
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
- List of licensed operators (SRO & RO) by crew (operating & staff)
- Training and Operations Department organization charts (with qualified LOR
evaluators identified)
- Procedures that identify process for revising and maintaining LOR continuing training
program
- List of outstanding LOR program changes
- List of plant events and industry operating experience incorporated into LOR
program since last BRQ
- Audits and/or self-assessment reports addressing the LOR training program
- Last 2 years of simulator review committee (or equivalent) meeting minutes
- Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes
Enclosure
02.03: Biennial Requalification Written Examination Quality
- The current and approved biennial written examination schedule
- The current requalification cycle written examination results to date
- All written examinations that have been approved for administration up to the date of
submittal. Include password protection if e-mailed or double envelope protection if
mailed per NUREG-1021.
- The current requalification cycle examination methodology (sample plan)
02.04: Annual Requalification Operating Test Quality
- The schedule for the operating tests to be given the week of April 8, , 2019
- All operating tests (password protected) that have been approved for administration
up to and including the week of the onsite inspection
- All 2019 NRC-required annual operating tests
- Current requalification cycle operating test results
- Current requalification cycle operating test methodology (sample plan)
02.05: Licensee Administration of Requalification Exams
- All procedures used to administer the annual operating test
- All procedures used to assess operator performance
- All procedures that describe conduct of simulator training
- All procedures used to test, operate, and maintain the simulator
02.06: Requalification Examination Security
- Tracking tools used to prevent excessive overlap on the written examinations and
ensure sampling of required topics on a periodic basis
- Tracking tools used to prevent excessive overlap on the operating tests and ensure
sampling of all required malfunctions (major events, instrument/component
malfunctions, TS calls, etc.) on a periodic basis.
- All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations
- List of all condition reports since the last biennial requalification inspection related to
examination security and overlap
02.07: Licensee Remedial Training Program
- List of remedial training conducted or planned since last biennial requalification
inspection (includes remedial training for exam failures and training to correct generic
or individual weaknesses observed during previous requalification exam cycle)
- Remediation plans (lesson plans, reference materials, and final documentation)
02.08: Conformance with Operator License Conditions
- All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators
- All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection
2
02.09: Simulator Performance
- For the following cases, send the most recent transient test packages, which may be
electronic or in paper single test packages, and shall be complete with test
procedures for each test, the acceptance criteria, and results. For each transient
test, the reference chart should be included or an equivalent subject matter expert
review versus the simulator results with a write-up for any differences beyond the
ANSI 3.5 standard requirements.
o Transient test 3, Simultaneous closure of all main steam isolation valves
o Transient test 10, Slow primary system depressurization to saturated
condition with pressurizer relief or safety valve stuck open (inhibit activation of
high pressure emergency core cooling system)
o Steady State tests for low power test
- SBT packages for any three scenarios used for the 2018 annual requalification
operating test
- All simulator management and configuration procedures if not already provided for
Section 02.05 above
- Simulator discrepancy report (DR) summary list for all open DRs. For closed DRs,
summary list for those items closed between April 8, 2017
- Two examples of primary parameters tested in order to verify core physics
parameters. The applicable reference graphs from the plant physics data book
(electronic or other means as available) should also be included as well as the test
procedures used and the acceptance criteria with results.
- All simulator modification packages that are on hold, delayed, or just not completed
in the last 2-years
- A list of simulator modification packages completed in the last 2-year window
02.10: Problem Identification and Resolution
- A summary report of all condition reports related to licensed operator actions/errors
in the control room since April 8,2017
- Any revised requalification training that was based on licensed operator performance
issues since April 8,, 2017
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on April 8, 2019.
02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality
- All approved operating tests (password protected) to be administered subsequent to
the onsite inspection
- All results up to the day the team leaves the site.
02.08: Conformance with Operator License Conditions
- Access to licensed operators records
- Access to licensed operators training attendance records
- Access to licensed operators medical records
02.09: Simulator Performance
- Simulator discrepancies reports (DRs) since April 8, 2017. This should include all
open and closed DRs, with documentation / justification for closure
3
- Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available)
- Documentation that validates current models, including the thermal-hydraulic and
neutronics models, to the actual plant
- All current model deficiencies, including USAR vs design differences in the simulator
- Summary list of plant modifications since April 8, 2017
- Plant modifications (both hardware and software) incorporated onto the simulator
since April 8, 2017.
- The complete book of all simulator annual performance test packages (either
hardcopy or electronic), complete with all transient tests, steady state tests, and
malfunction tests. This should also include the test procedures for each test, the
acceptance criteria, and results. For each transient test, the reference chart should
be included or an equivalent subject matter expert review versus the simulator
results with an analysis for any differences beyond the ANSI standard requirements
- Simulator reactor core performance test packages used to verify core physics
parameters (ANSI/ANS 3.5 sections 3.4.3.3 / 4.4.3.3), including applicable reference
graphs from the plant physics data book, test procedures, acceptance criteria, and
results
- All simulator test, configuration management, and related documents available in the
room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
- Current copy of ANSI 3.5 standard you are committed to for simulator testing
02.10: Problem Identification and Resolution
- All condition reports related to licensed operator actions/errors in the control room.
- All condition reports from the last initial license exam
C. Diablo Canyon Power Plant is required to send the final results and any remaining
written exams and operating tests to the lead inspector for final review and
comparison against the significance determination tools in order to communicate the
exit results for the inspection. Report results in the format below:
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification examination
required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator scenario
failures).
3.a. Number of individual licensed operators who failed written exam
3.b. Number of individual licensed operators who failed JPM exam
3.c. Number of individual licensed operators who failed simulator
scenario exam individually
4. Divide line 3 by line 2 to obtain the individual requalification examination %
failure rate.
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a)
4
6. Number of crews who performed unsatisfactorily on the simulator
scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate. %
8. Describe the reason for each licensed operator who was not
administered an NRC-required requalification exam, or who did not pass an
administered requalification exam, and the stations plan to satisfy the
requalification exam requirement for each.