ML19143A418: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Taylor N
| author name = Taylor N
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| addressee affiliation = Wolf Creek Nuclear Operating Corp
| docket = 05000482
| docket = 05000482
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:May 21, 2019 Mr. Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839


/RA/
==SUBJECT:==


NHT}}
==SUMMARY==
OF PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION
 
==Dear Mr. Heflin:==
 
This refers to the public meeting conducted at the New Strawn Community Center, New Strawn, Kansas, on May 14, 2019, between the Nuclear Regulatory Commission (NRC) and your staff.
Approximately 40 people attended the public meeting. During the meeting, the NRC presented the results of the annual assessment of safety performance at the Wolf Creek Generating Station, Unit 1, for the period of January 1 through December 31, 2018, as documented in NRC Inspection Report 05000482/2018006, issued March 4, 2019 (ADAMS Accession No. ML19058A195). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Licensee Response Column of the NRC Reactor Oversight Process Action Matrix.
A copy of the presentation from the meeting is enclosed.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
 
A. Heflin                                  2 Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
                                            /RA/
Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects Docket No. 50-482 License No. NPF-42
 
==Enclosure:==
 
NRC Presentation cc w/encl:
Electronic Distribution for Wolf Creek
 
ML19143A418 SUNSI Review        ADAMS:        Non-Publicly Available  Non-Sensitive Keyword:
By: NTaylor          Yes  No    Publicly Available      Sensitive    NRC-002 OFFICE        BC:DRP/B NAME          NTaylor SIGNATURE    NHT DATE          5/21/19}}

Latest revision as of 19:34, 19 October 2019

Summary of Public Meeting with Wolf Creek Nuclear Operation Corporation
ML19143A418
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/21/2019
From: Nick Taylor
NRC/RGN-IV/DRP/RPB-B
To: Heflin A
Wolf Creek
References
Download: ML19143A418 (3)


Text

May 21, 2019 Mr. Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

SUMMARY

OF PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION

Dear Mr. Heflin:

This refers to the public meeting conducted at the New Strawn Community Center, New Strawn, Kansas, on May 14, 2019, between the Nuclear Regulatory Commission (NRC) and your staff.

Approximately 40 people attended the public meeting. During the meeting, the NRC presented the results of the annual assessment of safety performance at the Wolf Creek Generating Station, Unit 1, for the period of January 1 through December 31, 2018, as documented in NRC Inspection Report 05000482/2018006, issued March 4, 2019 (ADAMS Accession No. ML19058A195). Your staff presented the stations perspective regarding the issues that contributed to the stations performance in the Licensee Response Column of the NRC Reactor Oversight Process Action Matrix.

A copy of the presentation from the meeting is enclosed.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be made available electronically for public inspection in the NRCs Public Document Room or the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

A. Heflin 2 Should you have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Project Branch B Division of Reactor Projects Docket No. 50-482 License No. NPF-42

Enclosure:

NRC Presentation cc w/encl:

Electronic Distribution for Wolf Creek

ML19143A418 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: NTaylor Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/B NAME NTaylor SIGNATURE NHT DATE 5/21/19