IR 05000352/2016006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 1, 2017
{{#Wiki_filter:[Type here]
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.


==SUBJECT:==
KING OF PRUSSIA, PA 19406-2713 March 1, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2  
 
Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2  
- REPORT NOS
- REPORT NOS
. 05000352/201600 6 AND 05000353/2016 006
. 05000352/201600 6 AND 05000353/2016 006

Revision as of 15:18, 13 July 2019

Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006
ML17055C205
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/01/2017
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Schroeder D
References
IR 2016006
Download: ML17055C205 (5)


Text

[Type here]

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.

KING OF PRUSSIA, PA 19406-2713 March 1, 2017 Mr. Bryan Hanson Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2

- REPORT NOS

. 05000352/201600 6 AND 05000353/2016 006

Dear Mr. Hanson:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Limerick Generating Station (LGS) Units 1 and 2

, reviewing performance indicators (PIs)

, inspection results

, and enforcement actions from January 1, 20 16 through December 31, 20 16. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at LGS Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC

's Reactor Oversight Process (ROP) Action Matrix , because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31

, 20 18. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan.

Additionally, the NRC plans to conduct temporary instruction (TI) 192, Inspection of the Licensee's Interim Compensatory Measures Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC

's Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/ Daniel L. Schroeder, Chief Reactor Projects Branch 4 Division of Reactor Projects

Docket Nos.

50-352 and 50-353 License Nos.

NPF-39 and NPF-85 Enclosure:

Inspection/Activity Plan SUBJECT: ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION UNITS 1 AND 2

- (REPORT NOS

. 05000352/201600 6 AND 05000353/2016 006) DATED MARCH 1, 2017 DISTRIBUTION

(via email)

DDorman, RA DLew, DRA MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS DSchroeder, DRP SBarber, DRP Kevin Heller, DRP SRutenkroger, DRP, SRI MFannon, DRP, RI NEsch, DRP, AA JBowen, RI, OEDO RidsNrrPMLimerick Resource RidsNrrDorlLpl1-2 Resource ROPreports Resource ROPassessment.Resource@nrc.gov RMcKinley, DRS WCook, DRS MGray, DRS DJackson, DRS DTifft, RI. SLO JGreives, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource DOCUMENT NAME:

S:\ROP Assessment Meetings

\ROP-17 EOC Review

\Branch 4\LIM ROP-17 EOC Annual Assessment Letter.docx ADAMS ACCESSION NUMBER:

ML17055C205 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber/SB DSchroeder/DS DATE 2/24/17 2/24/17 OFFICIAL RECORD CO PY LimerickInspection / Activity Plan 01/01/2017-12/31/2018 Unit Number Report 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitle Page 1 of 2 02/03/2017 14:53:06 42/6EXAM-LIMERICK INITIAL OL EXAM 1 01/15/2017 01/19/2017 U01940FY17-LIMERICK INITIAL OPERATOR LICENSING EXAM 3 50.59-EVALS OF CHANGES, TESTS, & EXPERIMENTS 1, 2 03/06/2017 03/10/2017 IP7111117T-5059scrnscreenings and/or applicability determinations 1 HP-RADIATION SAFETY - CLOSEOUT 02,03,04,05 1, 2 03/13/2017 03/17/2017 IP71124.02Occupational ALARA Planning and Controls 1, 2 03/13/2017 03/17/2017 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/13/2017 03/17/2017 IP71124.04Occupational Dose Assessment 1, 2 03/13/2017 03/17/2017 IP71124.05 Radiation Monitoring Instrumentation 17111108G-U2 INSERVICE INSPECTION 2 04/24/2017 04/28/2017 IP7111108G Inservice Inspection Activities - BWR 1 HP-RADIATION SAFETY - RAD HAZARDS 1, 2 04/24/2017 04/28/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 4 12/17EXM-DECEMBER 2017 LIMERICK INITIAL EXAM 1 11/20/201711/24/2017 U01956FY18-LIMERICK INITIAL OPERATOR LICENSING EXAM 1 12/18/2017 12/22/2017 U01956FY18-LIMERICK INITIAL OPERATOR LICENSING EXAM 17111107T-TRIENNIAL HEAT SINK 1, 2 07/17/2017 07/21/2017 IP7111107T Heat Sink Performance 1 HP-RADIATION SAFETY - REMP 1, 2 08/28/2017 09/01/2017 IP71124.07 Radiological Environmental Monitoring Program 27111111B-LIMERICK REQUAL INSP W/ P/F RESULTS 1, 2 10/23/2017 10/27/2017 IP7111111A Licensed Operator Requalification Program - Annual Review 1, 2 10/23/2017 10/27/2017 IP7111111B Licensed Operator Requalification Program 4 EP-EP EXERCISE EVALUATION 1, 2 11/13/201711/17/2017 IP7111401 Exercise Evaluation 1, 2 11/13/201711/17/2017 IP71151Performance Indicator Verification 37111121N-EQ PROGRAM 1, 2 10/23/2017 10/27/2017 IP7111121N Component Design Bases Inspection (Programs)

1, 2 11/06/201711/10/2017 IP7111121N Component Design Bases Inspection (Programs)

1 HP-RADIATION SAFETY - RAD HAZ & PIV 1, 2 12/04/2017 12/08/2017 IP71124.01Radiological Hazard Assessment and Exposure Controls 1, 2 12/04/2017 12/08/2017 IP71151-OR01Occupational Exposure Control Effectiveness 1, 2 12/04/2017 12/08/2017 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

LimerickInspection / Activity Plan 01/01/2017-12/31/2018 Unit Number Report 22 No. of Staff on SitePlanned Dates Start EndInspection ActivityTitle Page 2 of 2 02/03/2017 14:53:06 171124.08-RADWASTE 1, 2 01/08/2018 01/12/2018 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 HP-RADIATION SAFETY - ALARA 1, 2 02/05/2018 02/09/2018 IP71124.02Occupational ALARA Planning and Controls 1 HP-RADIATION SAFETY - RAD HAZ 1, 2 04/02/2018 04/06/2018 IP71124.01Radiological Hazard Assessment and Exposure Controls 1, 2 04/02/2018 04/06/2018 IP71124.02Occupational ALARA Planning and Controls 1, 2 04/02/2018 04/06/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 2 U1 ISI-UNIT 1 INSERVICE INSPECTION 1 04/02/2018 04/06/2018 IP7111108G Inservice Inspection Activities - BWR 411/18EXM-NOVEMBER 18 LIMERICK INITIAL EXAM (FY19)

1 10/22/2018 10/26/2018 U01971FY19- LIMERICK INITIAL OPERATOR LICENSING EXAM 1 11/19/201811/23/2018 U01971FY19- LIMERICK INITIAL OPERATOR LICENSING EXAM 1 HP-RADIATION SAFETY - AIRBORNE 1, 2 05/14/2018 05/18/2018 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 67111121M-DESIGN BASES ASSURANCE INSPECTION (TEAM)

1, 2 06/11/2018 06/15/2018 IP7111121MComponent Design Bases Inspection (Teams)

1, 2 06/25/2018 06/29/2018 IP7111121MComponent Design Bases Inspection (Teams)

171152B-PI&R BIENNIAL 1, 2 10/15/2018 10/19/2018 IP71152B Problem Identification and Resolution 1, 2 10/29/201811/02/2018 IP71152B Problem Identification and Resolution 1 EP-EP PROGRAM INSPECTION 1, 2 12/03/2018 12/07/2018 IP7111402 Alert and Notification System Testing 1, 2 12/03/2018 12/07/2018 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 1, 2 12/03/2018 12/07/2018 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 12/03/2018 12/07/2018 IP71151Performance Indicator Verification 1 HP-RADIATION SAFETY - DOSIMETRY & PIV 1, 2 11/12/201811/16/2018 IP71124.04Occupational Dose Assessment 1, 2 11/12/201811/16/2018 IP71151-OR01Occupational Exposure Control Effectiveness 1, 2 11/12/201811/16/2018 IP71151-PR01RETS/ODCM Radiological Effluent Occurrences Comments: This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.