|
|
Line 3: |
Line 3: |
| | issue date = 08/07/2009 | | | issue date = 08/07/2009 |
| | title = IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 | | | title = IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 |
| | author name = Widmann M T | | | author name = Widmann M |
| | author affiliation = NRC/RGN-II/DRS/OLB | | | author affiliation = NRC/RGN-II/DRS/OLB |
| | addressee name = Tynan T E | | | addressee name = Tynan T |
| | addressee affiliation = Southern Nuclear Operating Co, Inc | | | addressee affiliation = Southern Nuclear Operating Co, Inc |
| | docket = 05000424, 05000425 | | | docket = 05000424, 05000425 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 7, 2009 Mr. Tom Vice President Southern Nuclear Operating Company, Inc. |
| [[Issue date::August 7, 2009]]
| |
|
| |
|
| Mr. Tom Vice President Southern Nuclear Operating Company, Inc.
| | Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2009301 AND 05000425/2009301 |
| | |
| Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 | |
| | |
| SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2009301 AND 05000425/2009301 | |
|
| |
|
| ==Dear Mr. Tynan:== | | ==Dear Mr. Tynan:== |
Line 36: |
Line 31: |
| If you have any questions concerning this letter, please contact me at (404) 562-4550 | | If you have any questions concerning this letter, please contact me at (404) 562-4550 |
|
| |
|
| Sincerely,/RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety | | Sincerely, |
| | /RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety |
|
| |
|
| Docket Nos.: 50-424, 50-425 License Nos.: NPF-68 and NPF-81 cc w/Encl.: (See page 2) | | Docket Nos.: 50-424, 50-425 License Nos.: NPF-68 and NPF-81 cc w/Encl.: (See page 2) |
Line 44: |
Line 40: |
|
| |
|
| _________________________ | | _________________________ |
| G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE SMS /RA/ EXL /RA/ PGC /RA/ CRK /RA/ MTW /RA/ NAME SShaeffer ELea PCapehart CKontz MWidmann DATE 08/07/2009 08/07/2009 08/06/2009 08/07/2009 08/07/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 2 cc w/encl: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. | | G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE SMS /RA/ EXL /RA/ PGC /RA/ CRK /RA/ MTW /RA/ NAME SShaeffer ELea PCapehart CKontz MWidmann DATE 08/07/2009 08/07/2009 08/06/2009 08/07/2009 08/07/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 2 |
| | |
| Electronic Mail Distribution N. J. Stringfellow Manager Licensing Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
| |
| | |
| L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
| |
| | |
| Electronic Mail Distribution Michael A. MacFarlane Southern Nuclear Operating Company, Inc. 40 Inverness Center Parkway P.O. Box 1295 Birmingham, AL 35201-1295 Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution
| |
| | |
| Mr. N. Holcomb Commissioner Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Dr. Carol Couch Director Environmental Protection Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Cynthia Sanders Program Manager Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution
| |
| | |
| Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution (cc w/Encl. continued page 3)
| |
| | |
| SNC 3 cc w/Encl. continued Arthur H. Domby, Esq. Troutman Sanders Electronic Mail Distribution Director Consumers' Utility Counsel Division Govenor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Mr. Robert J. Brown Plant Training and Emergency Preparedness Manager Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road
| |
| | |
| Bin 63030 Waynesboro, GA 30830-2965
| |
| | |
| SNC 4 Letter to Tom from Malcolm T. Widmann dated August 7, 2009
| |
| | |
| SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2009301 AND 05000425/2009301 Distribution w/encl
| |
| : C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtle Resource
| |
|
| |
|
| Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION REGION II Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
| | REGION II== |
| | Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81 |
|
| |
|
| Report No.: 05000424/2009301 and 05000425/2009301 Licensee: Southern Nuclear Operating Company, Inc. | | Report No.: 05000424/2009301 and 05000425/2009301 Licensee: Southern Nuclear Operating Company, Inc. |
|
---|
Category:Inspection Report
MONTHYEARIR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 IR 05000424/20230062024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424-2023006 and 05000425-2023006 IR 05000424/20240102024-02-14014 February 2024 – Fire Protection Team Inspection Report 0500424/2024010 and 05000425/2024010 IR 05000202/20300042024-02-13013 February 2024 Integrated Inspection Report 052000250/2023004 and 05200026/2023004 IR 05000424/20230042024-02-0505 February 2024 Integrated Inspection Report 05000424-2023004 and 05000425-2023004 ML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 (Vegp), Unit 3 - Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 ML22356A2932022-12-23023 December 2022 Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection 2024-08-26
[Table view] Category:Letter
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML22118A7302022-04-28028 April 2022 NRC Operator License Examination Report 05200025/2022301 and 0520026/2022301 ML22070A0892022-03-0707 March 2022 Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301 IR 05000424/20213012022-01-13013 January 2022 NRC Operator License Examination Report 05000424/2021301 and 05000425/2021301 ML21312A1912021-11-0505 November 2021 License Examination Report 5200025/2021301 ML20127H9862020-05-0606 May 2020 NRC Operator License Examination Report 5200025/2020301 IR 05000424/20193012019-08-14014 August 2019 NRC Operator License Examination Report 05000424/2019301 and 05000425/2019301 ML19215A0112019-08-0303 August 2019 Il T22 NRC Post-Exam Comment ML18142B4542018-05-22022 May 2018 NRC Operator License Examination Report 5200025/2018302 ML17289A2332017-10-13013 October 2017 NRC Examination Report 05000424/2017301 and 05000425/2017301 IR 05000424/20153012015-11-24024 November 2015 NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301 IR 05000424/20143012014-07-16016 July 2014 Er 05000424-14-301 & 05000425-14-301, 05/12-15/2014, Vogtle, Units 1 & 2, Operator License Examinations IR 05000424/20133012013-06-27027 June 2013 Er 05000424-13-301, 05000425-13-301; 04/15/2013 & 05/02/2013, and 05/10/2013; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations ML12249A2372012-09-0404 September 2012 Fairness Review (Fje 31AUG12) ML1216302872012-06-0707 June 2012 Er 05000424-12-301, 05000425-12-301, on March 26 - April 13, 2012, and April 20, 2012, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1212805692012-05-0707 May 2012 Vogtle Initial Exam 2012-301 Final SRO Written Exam ML1212805732012-04-26026 April 2012 Initial Exam 2012-301 Post Exam Comments IR 05000424/20113012011-05-12012 May 2011 Er 05000424-11-301, 05000425-11-301, on March 16 - 24, 2011, and April 1, 2011, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1032106432010-11-17017 November 2010 Notification of Licensed Operator Initial Examination 05000424-11-301 and 05000425-11-301 IR 05000424/20093012009-08-0707 August 2009 IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 IR 05000424/20073012007-09-14014 September 2007 Er 05000424-07-301 and 05000425-07-301, on 07/30/2007 - 08/03/2007, and 08/15/2007, Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations 2023-06-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 7, 2009 Mr. Tom Vice President Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECT: VOGTLE ELECTRIC GENERATING PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2009301 AND 05000425/2009301
Dear Mr. Tynan:
During the period June 1 - 8, 2009, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on June 26, 2009.
All applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in the report as Enclosure 2 The draft written examination submitted by your staff failed to meet the guidelines for quality contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1, as described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contact me at (404) 562-4550
Sincerely,
/RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68 and NPF-81 cc w/Encl.: (See page 2)
Enclosure:
1. Report Details 2. Simulator Fidelity Report
_________________________
G SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE SMS /RA/ EXL /RA/ PGC /RA/ CRK /RA/ MTW /RA/ NAME SShaeffer ELea PCapehart CKontz MWidmann DATE 08/07/2009 08/07/2009 08/06/2009 08/07/2009 08/07/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC 2
REGION II==
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
Report No.: 05000424/2009301 and 05000425/2009301 Licensee: Southern Nuclear Operating Company, Inc.
Facility: Vogtle Electric Generating Plant Location: 7821 River Road Waynesboro, GA 30830 Dates: Operating Tests - June 1 - 8, 2009 Written Examination - June 26, 2009
Examiners: E. Lea, Chief, Senior Operations Engineer P. Capehart, Operations Engineer C. Kontz, Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure 1 SUMMARY OF FINDINGS ER 05000424/2009301, ER 05000425/2009301; operating test June 1- 8, 2009 & written exam June 26, 2009; Vogtle Electric Generating Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Vogtle Electric Generating Plant staff developed both the operating tests and the written examination. The draft written examination submittal did not meet the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period June 1 - 8, 2009. Members of the Vogtle Electric Generating Plant training staff administered the written examination on June 26, 2009. All Reactor Operator (RO) and Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered. There were no post-examination comments.
No findings of significance were identified.
Enclosure 1 REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope Members of the Vogtle Electric Generating Plant staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, "Integrity of examinations and tests."
The NRC examiners evaluated two Reactor Operator (RO) and eight Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period June 1 - 8, 2009. Members of the Vogtle Electric Generating Plant training staff administered the written examination on June 26, 2009. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Vogtle Electric Generating Plant, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."
b. Findings The NRC determined that the licensee's draft written examination submittal was outside the range of acceptable quality specified by NUREG-1021. The draft written examination was outside the range of acceptable quality because more than 20% (24) of the 100 questions reviewed contained unacceptable flaws. Individual questions were evaluated as unsatisfactory for the following reasons:
- 14 questions on the RO examination contained two or more implausible distractors.
- 10 questions on the SRO examination were not written at the SRO license level.
There were also several other questions, although not identified as unsatisfactory, that contained unacceptable flaws. The NRC regional office notified the licensee of the issues identified as a result of the examination review. The NRC requested the licensee to perform a review of the draft written examination for rework and correction in accordance with NUREG-1021. Administration of the final written examination was delayed, in part, because the quality of the licensee's draft examination submittal was unacceptable. Future examination submittals need to incorporate lessons learned.
4 Enclosure 1 All applicants passed both the operating test and written examination and were issued licenses.
The licensee did not submit any post-examination comments. A copy of the final written examination and answer key may be accessed in the ADAMS system (ADAMS Accession Numbers ML092160863 and ML092170365.
4OA6 Meetings, Including Exit Exit Meeting Summary On June 8, 2009, the NRC examination team discussed generic issues associated with the operating test and written examination with members of your staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
On August 6, 2009, Malcolm Widmann, Chief, Operations Branch, discussed the initial written examination development issues and lessons learned with Robert Brown, Training Manager, and Rick Brigdon, Operations Training Manager.
KEY POINTS OF CONTACT
Licensee personnel J. Acree, Shift Supervisor - Nuclear R. Brigdon, Nuclear Operations Training Supervisor A. Parton, Operations Support Superintendent D. Scukanec, Nuclear Operations Plant Instructor - Lead T. Thompson, Nuclear Operations Plant Instructor P. Tucker, Nuclear Operations Plant Instructor - Lead T. Tynan, Vice President Vogtle Electric Generating Plant D. Vineyard, Operations Manager J. Williams, Site Support Manager
Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Vogtle Electric Generating Plant
Facility Docket No.: 05000424 and 05000425 Operating Test Administered: June 1-8, 2009 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
No simulator fidelity or configuration issues were identified.