MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML22118A7302022-04-28028 April 2022 NRC Operator License Examination Report 05200025/2022301 and 0520026/2022301 ML22070A0892022-03-0707 March 2022 Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301 IR 05000424/20213012022-01-13013 January 2022 NRC Operator License Examination Report 05000424/2021301 and 05000425/2021301 ML21312A1912021-11-0505 November 2021 License Examination Report 5200025/2021301 ML20127H9862020-05-0606 May 2020 NRC Operator License Examination Report 5200025/2020301 IR 05000424/20193012019-08-14014 August 2019 NRC Operator License Examination Report 05000424/2019301 and 05000425/2019301 ML19215A0112019-08-0303 August 2019 Il T22 NRC Post-Exam Comment ML18142B4542018-05-22022 May 2018 NRC Operator License Examination Report 5200025/2018302 ML17289A2332017-10-13013 October 2017 NRC Examination Report 05000424/2017301 and 05000425/2017301 IR 05000424/20153012015-11-24024 November 2015 NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301 IR 05000424/20143012014-07-16016 July 2014 Er 05000424-14-301 & 05000425-14-301, 05/12-15/2014, Vogtle, Units 1 & 2, Operator License Examinations IR 05000424/20133012013-06-27027 June 2013 Er 05000424-13-301, 05000425-13-301; 04/15/2013 & 05/02/2013, and 05/10/2013; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations ML12249A2372012-09-0404 September 2012 Fairness Review (Fje 31AUG12) ML1216302872012-06-0707 June 2012 Er 05000424-12-301, 05000425-12-301, on March 26 - April 13, 2012, and April 20, 2012, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1212805692012-05-0707 May 2012 Vogtle Initial Exam 2012-301 Final SRO Written Exam ML1212805732012-04-26026 April 2012 Initial Exam 2012-301 Post Exam Comments IR 05000424/20113012011-05-12012 May 2011 Er 05000424-11-301, 05000425-11-301, on March 16 - 24, 2011, and April 1, 2011, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1032106432010-11-17017 November 2010 Notification of Licensed Operator Initial Examination 05000424-11-301 and 05000425-11-301 IR 05000424/20093012009-08-0707 August 2009 IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 IR 05000424/20073012007-09-14014 September 2007 Er 05000424-07-301 and 05000425-07-301, on 07/30/2007 - 08/03/2007, and 08/15/2007, Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations 2023-06-30
[Table view] |
Text
ber 14, 2007
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT - NRC EXAMINATION REPORT 05000424/2007301 AND 05000425/2007301
Dear Mr. Tynan:
During the period of July 30 - August 3, 2007, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2. At the conclusion of the examination, the examiners discussed the examination questions and preliminary findings with those members of your staff identified in the enclosed report. The written examination was administered by your staff on August 15, 2007.
Six reactor operator (RO) and five senior reactor operator (SRO) applicants passed both the written and operating examinations. There were no post examination comments submitted.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\RA\\
Robert C. Haag, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81
Enclosure:
(See page 2)
SNC 2 Enclosure: Report Details
REGION II==
Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81 Report No.: 05000424/2007301 and 05000425/2007301 Licensee: Southern Nuclear Operating Company, Inc.
Facility: Vogtle Electric Generating Plant Location: 7821 River Road Waynesboro, GA 30830 Dates: Operating Tests - July 30 - August 3, 2007 Written Examination - August 15, 2007 Examiners: E. Lea, Chief, Senior Operations Examiner G. Laska, Senior Operations Engineer D. Muller, Reactor Engineer, NRR C. Kuntz, Operations Engineer (In training)
Approved by: Robert C. Haag, Chief Operations Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS ER 05000424/2007301, ER 05000425/2007301; 7/30 - 8/3/2007, and 8/15/2007, Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of July 30 - August 3, 2007.
Members of the Vogtle Electric Generating Plant training staff administered the written examination on August 15, 2007. The written examinations and the operating tests were developed by the Vogtle Electric Generating Plant training staff.
Six Reactor Operators (RO) and five Senior Reactor Operators (SRO) passed both the operating test and written examination. All of the applicants were issued operator licenses commensurate with the level of examination administered.
There were no post examination comments.
No findings of significance were identified.
Enclosure
Report Details 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The Vogtle training staff developed the written examinations and the operating tests.
The NRC examination team reviewed the proposed written examinations and operating tests to determine whether they were developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
Examination changes, agreed upon between the NRC and the licensee, were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiners evaluated six RO and five SRO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of July 30 - August 3, 2007. Members of the Vogtle training staff administered the written examinations on August 15, 2007. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2, met the requirements specified in 10 CFR 55, Operators Licenses.
b. Findings No findings of significance were identified.
The NRC determined that the details provided by the licensee for the written examinations and the walkthrough and simulator tests were within the range of acceptability expected for a proposed examination.
Six RO and five SRO applicants passed both the written examinations and operating tests. Each applicant was issued an operator license commensurate with the level of examination administered.
There were no post examination comments concerning the examination. The written examinations, question references, and answers may be accessed in the ADAMS system (ADAMS Accession Numbers ML072540769 and ML072540789).
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.
Enclosure
4OA6 Meetings Exit Meeting Summary On August 3, the examination team discussed generic issues with Mr. R. Brown and members of his staff. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel R. Brown, Training and Emergency Preparedness Manager J. Robinson, Operations Manager D. Scukanec, Training & Emergency Preparedness, Operations Training Supervisor T. Thompson, Operations Training Instructor S. Waldrup, Operations Support Superintendent J. Williams, Site Support Manager NRC Personnel B. Anderson, Resident Inspector Enclosure