Line 1: Line 1:
#REDIRECT [[IR 05000327/2014003]]
{{Adams
| number = ML14245A121
| issue date = 09/02/2014
| title = Mid-Cycle Assessment Letter for Sequoyah, Units 1 and 2, Inspection Report 05000327/2014006, 05000328/2014003
| author name = Bartley J
| author affiliation = NRC/RGN-II/DRP/RPB6
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| license number = DPR-077, DPR-079
| contact person =
| case reference number = IR-2014-003
| document type = Inspection Plan, Letter
| page count = 7
}}
 
{{IR-Nav| site = 05000327 | year = 2014 | report number = 006 }}
 
=Text=
{{#Wiki_filter:September 2, 2014
 
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014006, 05000328/2014006
 
==Dear Shea:==
On August 14, 2014, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined the performance at the Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the fourth quarter of 2013 was within the Degraded Cornerstone Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone input and two White findings in the Mitigating Systems Cornerstone in the first quarter of 2013. On September 27, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area
." The NRC determined that the inspection objectives of inspection procedure (IP) 95001 have been satisfied and the Greater than Green security finding is was closed. On December 13, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." Based on the results of this inspection, the NRC determined that your staff adequately addressed the causes for both White findings. Therefore, both findings were closed and Sequoyah Units 1 and 2, transitioned to the Licensee Response Column of the NRC's ROP Action Matrix on January 1, 2014.
 
J. Shea 2 The NRC identified a cross-cutting theme in the Evaluation component of the Problem Identification and Resolution Area (P.2). Specifically, four findings with the P.2 cross-cutting aspect were identified during the assessment period. The NRC determined that a substantive cross-cutting issue (SCCI) associated with P.2 the cross-cutting aspect does not exist because the NRC does not have a concern with your staff's scope of effort and progress in addressing the cross-cutting theme. This is based on a review of the root cause conducted by your staff and consideration that the corrective action program needs a reasonable amount of time to incorporate these issues into corrective actions. The NRC will continue to monitor your staff's effort and progress in addressing the theme until the theme criteria are no longer met.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan.
 
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
 
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Problem Identification and Resolution , Modifications Inspection, Triennial Heat Sink Inspection, and IP 92702 inspection for follow-up of the December 22, 2009, Confirmatory Order. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyo nd-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.
 
The date for the onsite component at your site is being coordinated with your staff. The onsite component at your site is scheduled to begin December 1, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
 
In accordance with 10 CFR 2.390 of the NRC
's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
J. Shea 3 Please contact me at 404-997-46 07 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Jonathan H. Bartley, Chief Reactor Projects Branch 6
 
Division of Reactor Projects Docket Nos.
 
50-327, 50-328 License Nos.
 
DPR-77, DPR-79 Enclosure: Sequoyah Inspection/Activity Plan (09/01/2014 - 12/31/2015)
cc distribution via ListServ
 
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DR SIGNATURE JDH /RA/ JHB /RA/ NAME JHamman JBartley DATE 08/27/2014 08/26/2014 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 4 Letter to Joseph W. Shea from Jonathan H. Bartley dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014006, 05000328/2014006 DISTRIBUTION: D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 2 09/02/2014 09:42:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteSequoyahInspection / Activity Plan 09/01/2014-12/31/2015 EP-EP EXERCISE 3 1, 2 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event711140711/17/201411/21/2014 1, 2 IP Performance Indicator Verification7115111/17/201411/21/2014OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B 12/01/2014 12/05/2014 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/26/2015 01/30/2015 1, 2 IP Radiological Environmental Monitoring Program71124.07 01/26/2015 01/30/2015 1, 2 IP Performance Indicator Verification71151 01/26/2015 01/30/2015OL EXAM-INITIAL LICENSE EXAM PREP 3 1 SEQUOYAH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V23432 02/02/2015 02/06/2015OL EXAM-INITIAL LICENSE EXAM 3 1 SEQUOYAH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V23432 03/02/2015 03/27/2015 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 IP Inservice Inspection Activities - PWR7111108P 04/20/2015 04/24/2015 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/27/2015 05/01/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution71152B 06/22/2015 06/26/2015 MODS-PLANT MODIFICATION INSPECTION 6 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/13/2015 07/17/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/27/2015 07/31/2015 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 07/20/2015 07/24/2015 EP-EP PROGRAM INSPECTION 2 1, 2 IP A lert and Notification System Testing711140211/02/201511/06/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/02/201511/06/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes711140411/02/201511/06/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/02/201511/06/2015 1, 2 IP Performance Indicator Verification7115111/02/201511/06/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
 
Page 2 of 2 09/02/2014 09:42:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteSequoyahInspection / Activity Plan 09/01/2014-12/31/2015 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/02/201511/06/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/02/201511/06/2015 1, 2 IP Performance Indicator Verification7115111/02/201511/06/2015 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/09/201511/13/2015 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
}}

Revision as of 08:42, 21 June 2019

Mid-Cycle Assessment Letter for Sequoyah, Units 1 and 2, Inspection Report 05000327/2014006, 05000328/2014003
ML14245A121
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/02/2014
From: Bartley J
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
IR-2014-003
Download: ML14245A121 (7)


Text

September 2, 2014

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014006, 05000328/2014006

Dear Shea:

On August 14, 2014, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at the Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the fourth quarter of 2013 was within the Degraded Cornerstone Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because of one or more greater-than-green Security Cornerstone input and two White findings in the Mitigating Systems Cornerstone in the first quarter of 2013. On September 27, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area

." The NRC determined that the inspection objectives of inspection procedure (IP) 95001 have been satisfied and the Greater than Green security finding is was closed. On December 13, 2013, the NRC completed a supplemental inspection in accordance with Inspection Procedure 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area." Based on the results of this inspection, the NRC determined that your staff adequately addressed the causes for both White findings. Therefore, both findings were closed and Sequoyah Units 1 and 2, transitioned to the Licensee Response Column of the NRC's ROP Action Matrix on January 1, 2014.

J. Shea 2 The NRC identified a cross-cutting theme in the Evaluation component of the Problem Identification and Resolution Area (P.2). Specifically, four findings with the P.2 cross-cutting aspect were identified during the assessment period. The NRC determined that a substantive cross-cutting issue (SCCI) associated with P.2 the cross-cutting aspect does not exist because the NRC does not have a concern with your staff's scope of effort and progress in addressing the cross-cutting theme. This is based on a review of the root cause conducted by your staff and consideration that the corrective action program needs a reasonable amount of time to incorporate these issues into corrective actions. The NRC will continue to monitor your staff's effort and progress in addressing the theme until the theme criteria are no longer met.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Problem Identification and Resolution , Modifications Inspection, Triennial Heat Sink Inspection, and IP 92702 inspection for follow-up of the December 22, 2009, Confirmatory Order. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyo nd-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site.

The date for the onsite component at your site is being coordinated with your staff. The onsite component at your site is scheduled to begin December 1, 2014. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRC

's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

J. Shea 3 Please contact me at 404-997-46 07 with any questions you have regarding this letter.

Sincerely,

/RA/

Jonathan H. Bartley, Chief Reactor Projects Branch 6

Division of Reactor Projects Docket Nos.

50-327, 50-328 License Nos.

DPR-77, DPR-79 Enclosure: Sequoyah Inspection/Activity Plan (09/01/2014 - 12/31/2015)

cc distribution via ListServ

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DR SIGNATURE JDH /RA/ JHB /RA/ NAME JHamman JBartley DATE 08/27/2014 08/26/2014 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 4 Letter to Joseph W. Shea from Jonathan H. Bartley dated September 2, 2014 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2, NRC INSPECTION REPORT 05000327/2014006, 05000328/2014006 DISTRIBUTION: D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 09/02/2014 09:42:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteSequoyahInspection / Activity Plan 09/01/2014-12/31/2015 EP-EP EXERCISE 3 1, 2 IP Emergency Action Level and Emergency Plan Changes711140411/17/201411/21/2014 1, 2 IP Exercise Evaluation - Hostile Action (HA) Event711140711/17/201411/21/2014 1, 2 IP Performance Indicator Verification7115111/17/201411/21/2014OL RQ-REQUAL INSP 2 1, 2 IP Licensed Operator Requalification Program7111111B 12/01/2014 12/05/2014 RP-RP PUBLIC RAD SAFETY BASELINE 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 01/26/2015 01/30/2015 1, 2 IP Radiological Environmental Monitoring Program71124.07 01/26/2015 01/30/2015 1, 2 IP Performance Indicator Verification71151 01/26/2015 01/30/2015OL EXAM-INITIAL LICENSE EXAM PREP 3 1 SEQUOYAH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V23432 02/02/2015 02/06/2015OL EXAM-INITIAL LICENSE EXAM 3 1 SEQUOYAH/MARCH 2015 INITIAL EXAM AT POWER FACILITIES V23432 03/02/2015 03/27/2015 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 IP Inservice Inspection Activities - PWR7111108P 04/20/2015 04/24/2015 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 04/27/2015 05/01/2015 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 4 1, 2 IP Problem Identification and Resolution71152B 06/08/2015 06/12/2015 1, 2 IP Problem Identification and Resolution71152B 06/22/2015 06/26/2015 MODS-PLANT MODIFICATION INSPECTION 6 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/13/2015 07/17/2015 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 07/27/2015 07/31/2015 HS-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 IP Heat Sink Performance7111107T 07/20/2015 07/24/2015 EP-EP PROGRAM INSPECTION 2 1, 2 IP A lert and Notification System Testing711140211/02/201511/06/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System711140311/02/201511/06/2015 1, 2 IP Emergency Action Level and Emergency Plan Changes711140411/02/201511/06/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies711140511/02/201511/06/2015 1, 2 IP Performance Indicator Verification7115111/02/201511/06/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Page 2 of 2 09/02/2014 09:42:29 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteSequoyahInspection / Activity Plan 09/01/2014-12/31/2015 RP-RAD HAZARDS ANALYSIS AND TRANSPORTATION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.0111/02/201511/06/2015 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/02/201511/06/2015 1, 2 IP Performance Indicator Verification7115111/02/201511/06/2015 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/09/201511/13/2015 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P11/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.