IR 05000327/2014403
| ML14091A110 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/01/2014 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | James Shea Tennessee Valley Authority |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR-14-403 | |
| Download: ML14091A110 (4) | |
Text
April 1, 2014
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION
REPORT 05000327/2014403, AND 05000328/2014403
Dear Mr. Shea:
On February 27, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. Portions of the inspection associated with Access Authorization, Protection of Safeguards Information, and Fitness for Duty were completed at the Tennessee Valley Authority (TVA) Corporate Office on February 14, 2014. The enclosed Inspection Report documents the inspection results that were discussed on February 27, 2014, with Mr. F. Little and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79
Enclosure:
Inspection Report 05000327/2014403, and 05000328/2014403 w/Attachment: Supplementary Info (OUO)
cc: (See page 3)
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR6 RII:DRS/PSB2
SIGNATURE JDG1 JCS3 via 3-mail JOB2 JHB1 BBD
NAME J.D. Graham J. Shehee J. Brown J. Bartley B. Desai
DATE 3/ 24 /2014 3/ 27 /2014 3/ 24 /2014 3/ 24 /2014 3/ 31/ 2014
E-MAIL COPY YES NO YES NO YES NO YES NO YES NO cc:
Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street LP 3D-C Chattanooga, TN 37402
John T. Carlin, Site Vice President Tennessee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, TN 37384
Michael W. McBrearty, Manager Nuclear Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000
Mark Fencl Director, Security Operations Tennessee Valley Authority 1101 Market Street, EB 10B-C Chattanooga, TN 37402-2801
Frank A. Little, Manager Site Security Operations Sequoyah Nuclear Plant (OPS5N)
Tennessee Valley Authority Sequoyah Road Soddy Daisy, TN 37384