Line 3: |
Line 3: |
| | issue date = 06/07/2016 | | | issue date = 06/07/2016 |
| | title = NRC Pilot Design Bases Inspection (Programs) Inspection Report 05000315/2016008; 05000316/2016008 (Axd) | | | title = NRC Pilot Design Bases Inspection (Programs) Inspection Report 05000315/2016008; 05000316/2016008 (Axd) |
| | author name = Jeffers M T | | | author name = Jeffers M |
| | author affiliation = NRC/RGN-III/DRS/EB2 | | | author affiliation = NRC/RGN-III/DRS/EB2 |
| | addressee name = Gebbie J | | | addressee name = Gebbie J |
Line 27: |
Line 27: |
|
| |
|
| Sincerely, | | Sincerely, |
| /RA/ Mark T. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74 Enclosure: IR 05000315/2016008; 05000316/2016008 cc w/encl: Distribution via LISTSERV Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-315; 50-316 License No: DPR-58; DPR-74 Report No: 05000315/2016008; 05000316/2016008 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: May 9 - 13, 2016 Inspectors: B. Jose Observers: Approved by: M. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety 2 | | /RA/ Mark T. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74 |
| | |
| | ===Enclosure:=== |
| | IR 05000315/2016008; 05000316/2016008 |
| | |
| | REGION III Docket No: 50-315; 50-316 License No: DPR-58; DPR-74 Report No: 05000315/2016008; 05000316/2016008 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: May 9 - 13, 2016 Inspectors: B. Jose Observers: Approved by: M. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety 2 |
|
| |
|
| =SUMMARY= | | =SUMMARY= |
Line 149: |
Line 154: |
| : EQ FILES Number Description or Title Date or Revision 1-2-EDS-334 Design Standard Number - Typical Mounting of Assembly for Acoustic Monitoring System 10 517-TR-03 Final Qualification Test Report for Environmental and Seismic Testing of the TEC Valve Flow Monitoring System 2 517-TR-10 UpdatedQualifiedLife Study for the | | : EQ FILES Number Description or Title Date or Revision 1-2-EDS-334 Design Standard Number - Typical Mounting of Assembly for Acoustic Monitoring System 10 517-TR-03 Final Qualification Test Report for Environmental and Seismic Testing of the TEC Valve Flow Monitoring System 2 517-TR-10 UpdatedQualifiedLife Study for the |
| : TEC 1414 Valve-Flow Monitoring System Components (Addendum to TEC Qualification Report 517-TR-03, Revision 2) 02/04/87 | | : TEC 1414 Valve-Flow Monitoring System Components (Addendum to TEC Qualification Report 517-TR-03, Revision 2) 02/04/87 |
| : AQR-67368 Qualification Test Report for ASCO Model
| |
| : NP-1 Solenoid Valves 08/19/83 B0058 Limitorque Valve Actuator Qualification Test Report 01/11/80 CEEQ
| |
| : EQ-0060A Material Test Report for Material used in Conax Electrical Penetration Assemblies and Electrical Conductor Seal Assemblies D CEEQ
| |
| : EQ-0557,
| |
| : Environmental Qualification of ASCO Solenoid Valve, Series NP8316, NP8321, and NPEF8300 Installed at Cook
| |
| : 4 CEEQ
| |
| : EQ-0559 Central Equipment Environmental Qualification File: Limitorque Valve Motor Operators Installed at D. C. Cook 3 CEEQ
| |
| : EQ-0564 Central Equipment Environmental Qualification File: NAMCO Controls Limit Switches EA180 Series/EC210 Electrical Receptacle and Connector/Cable Assembly 2 CEEQ
| |
| : EQ-0598 Justification for Current Installed Configuration of Flood Up Tubes 3 CEEQ
| |
| : EQ-0620 Analytical Basis for Environmental Qualification of Equipment 0 CEEQ
| |
| : EQ-0703A Environmental Qualification of Conax Electrical Penetrations (SCEW Sheets 1,2-EP01 AND 1,2-EP02) 0 EQ0043 Qualification Test Report for NAMCO EA180 Series Limit Switches 11/28/79
| |
| : EQ-0587 Environmental Qualification of TEC Charge Converters for (1)2
| |
| : QR 107A, B, C, and D Installed at DC Cook
| |
| : 2
| |
| : EQ-0702 Environmental Qualification of Rosemount 1154 Series H Pressure Transmitters for use at DC Cook
| |
| : 0
| |
| : EQ-0709 Environmental Qualification of Fluid Components (FCI)
| |
| : 0 EQER 2002-005 Reevaluate the Replacement Interval of the Helical Repaired Flood Up Tube Patch 03/28/02 EQER 2004-03 Determine the Replacement Frequency for 250 Vdc Normally Energized ASCO Solenoid Valves 08/27/04 EQER 2011-005 EQ Evaluation of Class 1E Equipment for License Renewal Installed at DC Cook Nuclear Plant, Units 1 and 2 12/27/11 SCEW 1-EP02 600V Containment Penetration 7
| |
| : MISCELLANEOUS
| |
| : Number Description or Title Date or Revision
| |
| : DCC-QA-105-QCN 1-CEP-3C4 SMR Requirements 14
| |
| : DIT-B-00801-00 Bounding Equipment Qualification Radiation Doses 02/16/00
| |
| : PS-1-97534-18 Control Penetration No. 1-3C4 Wiring Diagram 18
| |
| : SCD-2-VRS-2100 and
| |
| : SS-SE-2002-0049-00 Safety Classification of Unit 1 and Unit 2 Normal Range Containment Radiation Monitors as Standard Commercial Grade (QAS) 0 B-00501-04 Design Information Transmittal (DIT) Time-Temperature Profiles for Plant Areas during Normal Conditions 03/31/04
| |
| : MODIFICATIONS
| |
| : Number Description or Title Revision 1-DCP-4902 Containment Penetration Flood Up Tube Repair 0A
| |
| : PROCEDURES
| |
| : Number Description or Title Revision 12-EHP-5025-EQE-001 Preparation and Maintenance of Central Equipment Environmental Qualification (CEEQ) Files and SCEW Sheets 5 12-EHP-5025-EQE-002 Performing EQ Evaluations 6 12-EHP-5043-ERP-001 Engineering Review of Procurement Documents 18 12-EHP-5043-SLE-001 Shelf Life 9 12-MMP-3130-ISPM-001 In-Storage Preventive Maintenance 3 12-QHP-5050-NDE-006 Visual Examination:
| |
| : VT-1,
| |
| : EVT-1, AND
| |
| : VT-3 6
| |
| : LRP-EAMP-01 License Renewal Program Basis Documents Evaluation of Aging Management Programs 4
| |
| : PMI-5025 Environmental Qualification Program 10
| |
| : PMP-2030-REC-001 Records Management 23
| |
| : PMP-5025-EQE-001 Environmental Qualification of Electrical Equipment 5
| |
| : VENDOR MANUALS
| |
| : Number Description or Title Revision
| |
| : VTD-ASCO-0027 ASCO Solenoid Installation Instructions 3
| |
| : VTD-CONA-0013 Conax Buffalo Corp. Installation and Maintenance Manual for Electrical Penetration Assemblies 3
| |
| : VTD-FLCM-0005 Fluid Components Intl Installation and Operation Manual for CL86 Containment Level Monitoring System
| |
| : 0
| |
| : VTD-FLSC-0015 Flowserve Limitorque SMB/SB Series User Instructions 1
| |
| : VTD-NAMC-0040 NAMCO Controls Installation Instructions for EC210 Series Receptacle and Connector Assemblies 1
| |
| : VTD-NAMC-0046 NAMCO Controls EA180 Series Limit Switch Assembly Instructions 1
| |
| : VTD-ROSE-0134 Rosemount Nuclear (Emerson Process Management) Product Manual for Model 1154 Series H Alphaline Nuclear Pressure Transmitter
| |
| : BA
| |
| : VTD-ROSE-0135 Rosemount Quick Disconnect (QDC) Nuclear Electrical Connector
| |
| : 0
| |
| : VTD-TECC-0001 Technology for Energy Corporation Operation and Maintenance Manual for Model 1414-1-(5) Valve-Flow Monitoring System
| |
| : 0
| |
| : VTD-TECC-0022 Technology for Energy Corporation Model 160-2 Transient Shield, Endevco Accelerometers, and Associated Cabling Installation Instructions (Standard)
| |
| : J
| |
| : WORK DOCUMENTS
| |
| : Number Description or Title Date
| |
| : WO 55230886 Replace ASCO Solenoid Valve 1-XSO-294 04/06/13
| |
| : WO 55255087 Replace Control Solenoid 2-XSO-503 04/10/15
| |
| : WO 55255364 Replace Control Solenoid 2-XSO-505 04/10/15
| |
| : WO 55255365 Replace Control Solenoid 2-XSO-507 04/10/15
| |
| : WO 55270905 Refurbish Actuator 2-MRV-241 02/13/10
| |
| : WO 55271872 Replace 1-XSO-503 ASCO Solenoid Valve per
| |
| : DCC-QA-105-QCN 03/17/10
| |
| : WO 55395037 Refurbish MOV Actuator 1-NMO-151 10/22/13
| |
| : WO 55424258 Unit 1 Inspect Flood Up Tube 10/21/14
| |
| : WO 55452503
| |
| : VT-1 Exam of Flood Up Tubes End of Outage 04/22/16
| |
| : J. Gebbie -2- Documents Access and Management System (ADAMS).
| |
| : ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/
| |
| : Mark T. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74 Enclosure:
| |
| : IR 05000315/2016008; 05000316/2016008 cc w/encl:
| |
| : Distribution via LISTSERV
| |
| : Jeremy Bowen
| |
| : Richard Skokowski
| |
| : ROPreports.Resource@nrc.gov
| |
| : ADAMS Accession Number ML16160A063
| |
| : Publicly Available
| |
| : Non-Publicly Available
| |
| : Sensitive
| |
| : Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII
| |
| : RIII
| |
| : RIII
| |
| : RIII
| |
| : NAME ADunlop:cl MJeffers
| |
| : DATE 06/07/16 06/07/16
| |
| : OFFICIAL RECORD COPY
| |
| }} | | }} |
Similar Documents at Cook |
---|
Category:Inspection Report
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 IR 05000315/20224202022-10-19019 October 2022 Cover Letter - Donald C. Cook Nuclear Plant Units 1 and 2 - Security Baseline Inspection Report 05000315/2022420 and 05000316/2022420 IR 05000315/20224012022-09-21021 September 2022 Security Baseline Inspection Report 05000315 2022401 05000316 2022401 Independent Spent Fuel Storage Security Inspection Report 07200072 2022401 IR 05000315/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000315/2022301; 05000316/2022301 IR 05000315/20220052022-08-24024 August 2022 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022005 and 05000316/2022005) IR 05000315/20220022022-08-0808 August 2022 Integrated Inspection Report 05000315/2022002 and 05000316/2022002 IR 05000315/20224022022-07-0505 July 2022 Material Control and Accounting Program Inspection Report 05000315/2022402 and 05000316/2022402 ML22165A2012022-06-14014 June 2022 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220012022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 ML22129A2052022-05-10010 May 2022 Integrated Inspection Report 05000315/2022001 and 05000316/2022001 IR 05000315/20220102022-04-0505 April 2022 Triennial Fire Protection Inspection Report 05000315/2022010 and 05000316/2022010 ML22084A5812022-03-25025 March 2022 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000315/2022011 05000316/2022011 IR 05000315/20210062022-03-0202 March 2022 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021006 and 05000316/2021006) IR 05000315/20210042022-02-0707 February 2022 Integrated Inspection Report 05000315/2021004 and 05000316/2021004 and Exercise of Enforcement Discretion IR 05000315/20210132021-12-0606 December 2021 Inspection Report 05000315/2021013 and 05000316/2021013 IR 05000315/20214032021-11-17017 November 2021 Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403 IR 05000315/20210112021-11-15015 November 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000315/2021011 and 05000316/2021011 IR 05000315/20210032021-10-26026 October 2021 Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 IR 05000315/20214012021-10-21021 October 2021 Cyber Security Inspection Report 05000315/2021401 and 05000316/2021401 IR 05000315/20215012021-10-0606 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2021501 and 05000316/2021501 IR 05000315/20210102021-09-0707 September 2021 Biennial Problem Identification and Resolution Inspection Report 05000315/2021010 and 05000316/2021010 IR 05000315/20210052021-09-0101 September 2021 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2021005 and 05000316/2021005) IR 05000315/20210122021-08-0202 August 2021 Donald Cook Nuclear Plant - NRC Inspection Report 05000315/2021012 and 05000316/2021012 IR 05000315/20210022021-07-22022 July 2021 Integrated Inspection Report 05000315/2021002 and 05000316/2021002 ML21158A1732021-06-0909 June 2021 Review of the Fall 2017 Steam Generator Tube Inspections Report IR 05000315/20214022021-06-0909 June 2021 Donald D. C. Cook Nuclear Plant - Security Baseline Inspection Report 05000315/2021402 and 05000316/2021402 IR 05000315/20210012021-04-28028 April 2021 Integrated Inspection Report 05000315/2021001 and 05000316/2021001 IR 05000315/20200062021-03-0404 March 2021 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020006 and 05000316/2020006) IR 05000315/20200042021-02-0808 February 2021 Integrated Inspection Report 05000315/2020004 and 05000316/2020004 IR 05000315/20204032020-12-16016 December 2020 Security Baseline Inspection Report 05000315/2020403 and 05000316/2020403 IR 05000315/20204022020-11-0404 November 2020 Security Baseline Inspection Report 05000315/2020402 and 05000316/2020402 IR 05000315/20200032020-10-28028 October 2020 Integrated Inspection Report 05000315/2020003 and 05000316/2020003 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 IR 05000315/20200112020-09-17017 September 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000315/2020011; 05000316/2020011 IR 05000315/20200052020-09-0101 September 2020 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2020005 and 05000316/2020005) IR 05000315/20200022020-08-10010 August 2020 Integrated Inspection Report 05000315/2020002 and 05000316/2020002 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000315/20230042024-01-31031 January 2024 Integrated Inspection Report 05000315/2023004 and 05000316/2023004 ML24004A1582024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0039 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) AEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor ML23352A3502023-12-19019 December 2023 Dc. Cook Nuclear Power Plant, Units 1 Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation IR 05000315/20234042023-11-0606 November 2023 Cyber Security Inspection Report 05000315/2023404 and 05000316/2023404 ML23310A1152023-11-0606 November 2023 Notification of the NRC Baseline Inspection and Request for Information, Inspection Report 05000316/2024002 IR 05000315/20234032023-09-19019 September 2023 Security Baseline Inspection Report 05000315/2023403 and 05000316/2023403 IR 05000315/20230112023-08-31031 August 2023 Functional Engineering Inspection - Commercial Grade Dedication Report 05000315/2023011 and 05000316/2023011 ML23242A1832023-08-30030 August 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report05000315/2023004 AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes IR 05000315/20234022023-08-11011 August 2023 Security Baseline Inspection Report 05000315/2023402 and 05000316/2023402 AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation IR 05000315/20230022023-07-24024 July 2023 Integrated Inspection Report 05000315/2023002 and 05000316/2023002 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000315/20230122023-06-22022 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000315/2023012 and 05000316/2023012 IR 05000315/20235012023-06-21021 June 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000315/2023501 and 05000316/2023501 AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report ML23159A0192023-06-13013 June 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report ML23131A3282023-05-11011 May 2023 D.C. Cook Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000315/2023404 and 05000316/2023404 IR 05000315/20230012023-05-0303 May 2023 Integrated Inspection Report 05000315/2023001 and 05000316/2023001 AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report ML23117A0062023-04-27027 April 2023 Review of the Spring 2022 Steam Generator Tube Inspections Report ML23114A1142023-04-25025 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report ML23076A0212023-03-20020 March 2023 Request for Information for NRC Commercial Grade Dedication Inspection; Inspection Report 05000315/2023011; 05000316/2023011 IR 05000315/20234012023-03-16016 March 2023 Security Baseline Inspection Report 05000315/2023401 and 05000316/2023401 ML23066A1882023-03-0707 March 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Donald C. Cook Nuclear Plant IR 05000315/20220062023-03-0101 March 2023 Annual Assessment Letter for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2022006 and 05000316/2022006) IR 05000315/20220042023-02-0101 February 2023 Integrated Inspection Report 05000315/2022004 and 05000316/2022004 and Exercise of Enforcement Discretion AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report IR 05000315/20230102023-01-31031 January 2023 Phase 4 Post-Approval License Renewal Inspection Report 05000315/2023010 and 05000316/2023010 AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation ML22363A5622023-01-0404 January 2023 Relief Request ISIR-5-06 Related to ASME Code Case N-729-6 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in ML22340A1392022-11-30030 November 2022 Submittal of Revision 31 to Updated Final Safety Analysis Report and 10CFR50.71(e) Updated and Related Site Change Reports IR 05000315/20220112022-11-0404 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000315/2022011 and 05000316/2022011 IR 05000315/20220032022-10-28028 October 2022 Integrated Inspection Report 05000315/2022003 and 05000316/2022003 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 2024-01-08
[Table view] |
Inspection Report - Cook - 2016008 |
---|
|
|
Text
June 7, 2016
SUBJECT:
DONALD. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC PILOT DESIGN BASES INSPECTION (PROGRAMS) INSPECTION REPORT 05000315/2016008; 05000316/2016008
Dear Mr. Gebbie:
On May 13, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed the program portion of the pilot Design Bases Inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on May 13, 2016, with yourself, and other members of your staff. Based on the results of this inspection, the NRC inspectors did not identify any findings or violations of more than minor significance. However, inspectors documented a licensee-identified violation which was determined to be of very-low safety significance in Section 4OA7 of this report. The NRC is treating this violation as Non-Cited Violation consistent with Section 2.3.2.a of the Enforcement Policy. If you contest the subject or severity of the Non-Cited-Violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Donald C. Cook Nuclear Power Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations ce," a copy of Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ Mark T. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50315; 50316 License Nos. DPR58; DPR74
Enclosure:
IR 05000315/2016008; 05000316/2016008
REGION III Docket No: 50-315; 50-316 License No: DPR-58; DPR-74 Report No: 05000315/2016008; 05000316/2016008 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: May 9 - 13, 2016 Inspectors: B. Jose Observers: Approved by: M. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety 2
SUMMARY
Inspection Report 05000315/2016008; 05000316/2016008, 05/09/2016 05/13/2016; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Pilot Design Bases Inspection (Programs). The inspection was a 1-week onsite baseline inspection that focused on the implementation of the Environmental Qualification Program. The inspection was conducted by three regional engineering inspectors. No findings were identified by the inspectors. All violations of U.S. Nuclear Regulatory Commission (NRC) requirements are dispositioned in accordance with the February 4, 2015. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-Oversight Process,sion 5, dated February 2014.
NRC-Identified
and Self-Revealed Findings No findings were identified.
Licensee-Identified Violations
A violation of very-low safety significance that was identified by the licensee has been reviewed by the NRC. Corrective actions taken or planned by the licensee have been Corrective Action Program. This violation and Corrective Action Program tracking number is listed in Section 4OA7 of this report.
3
REPORT DETAILS
REACTOR SAFETY
===Cornerstone: Mitigating Systems and Barrier Integrity
1R21 Design Bases Inspection (Programs)
Main article: IP 71111.21N
.1 Introduction
This is a pilot inspection of a licensee program conducted per U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure (IP) 71111.21N. The objective of the Design Bases Inspection (DBI) is to gain reasonable assurance that structures, systems, and components can adequately perform their design basis function. This includes reasonable assurance that electrical equipment important-to-safety for which a qualified life has been established can perform its safety functions without experiencing common cause failures before, during, and after applicable design basis events. This inspection will review the Environmental Qualification (EQ) Program, as required by their license, for maintaining the qualified status of equipment during the life of the plant. The inspection is intended to assess the s effectiveness by sampling a limited number of components. This inspectable area verifies aspects of the Mitigating Systems and Barrier Integrity cornerstones for which there are no indicators to measure performance. The inspectors assessed the implementation of the EQ Program, established to meet the requirements of Title 10, Code of Federal Regulations (CFR), Part 50.49, Environmental Qualification of Electrical Equipment Important to Safety for Nuclear -related equipment relied upon to remain functional during and following design basis events, nonsafety-related equipment whose failure under postulated environmental conditions could prevent safety-related equipment from performing design functions, and certain post-accident monitoring Program implementation through a series of onsite inspections from 1984 1989. The EQ Program at that time established measures to ensure components met the EQ rule through the 40-year operating license period. Since that time, both units have renewed their operating licenses for an additional 20 years, and in 2014 Unit 1 entered its period of extended operation. Specific documents reviewed during the inspection are listed in the Attachment to the report.
.2 Inspection Sample Selection Process The inspectors selected components for review using information provided by the licensee.
This included risk informing the selection based on the Donald C. Cook Nuclear Power Plant probabilistic risk assessment by generally selecting components that had a high Fussell Vesely Importance factor. Additional selection criteria included discussions with plant staff, reviewing procurement, maintenance, and design records, and walking down plant areas susceptible to high energy line breaks. Based on these reviews, the inspectors focused the inspection on EQ Program elements and components repaired, modified, or replaced. Components from each unit were selected and included motor-operated valves, air operated valves (AOVs), electrical containment penetrations, and transmitters (pressure, flow, and level) located both inside and outside===
4 of containment. For each component selected, the inspectors evaluated the environmental qualifications of supporting sub-components including seals, lubricants, connectors, control and power cables, solenoids, transducers, limit switches, and terminal blocks. This inspection constituted seven samples as defined in IP 71111.21N, Attachment 1, Section 02.01. The pilot program DBI, in conjunction with the team portion of the DBI (IP 71111.21M), constitutes completion of the baseline triennial Component Design Bases Inpection (IP 71111.21).
.3 Component Design
a. Inspection Scope
The inspectors assessed the licenseerogram as required by 10 CFR 50.49. The inspectors evaluated whether the licensee staff properly maintained the EQ of electrical equipment important to safety through plant life (repair, replacement, modification, and plant life extension), established and maintained required EQ documentation records, and implemented an effective Corrective Action Program (CAP) to identify and correct EQ-related deficiencies and evaluate EQ-related industry operating experience. This inspection effort included a review of EQ Program-related procedures, component EQ files, EQ test records, equipment maintenance and operating history, maintenance and operating procedures, vendor documents, design documents, and calculations. Additionally, the inspectors performed in-plant walkdowns of accessible components to verify installed equipment was the same as described in the EQ component documentation files, verify components were installed in their tested configuration, determine whether equipment surrounding the EQ component may fail in a manner that could prevent the EQ component from performing its safety function, and verify that components located in areas susceptible to a high-energy line break were properly evaluated for operation in a harsh environment. Components removed from the EQ Program were reviewed to ensure an adequate basis existed to no longer require the components to meet EQ requirements. The inspectors reviewed procurement records and inspected a sample of replacement parts stored in the warehouse to verify EQ parts approved for installation in the plant were properly identified and controlled; and that qualified life or service life. Documents reviewed for this inspection are listed in the Attachment. The following seven EQ components (samples) were reviewed: Containment Quadrant #3 Electrical Control Containment Penetration #4 (1-CEP-3C4); EQ sub-components: electrical penetration and flood up tubes; Pressurizer Relief Valve Upstream Shutoff Motor Operated Valve (1-NMO-151); EQ sub-components: actuator and motor Steam Generator # 2 Feedwater Regulating AOV (1-FRO-220); EQ sub-components: solenoid valve (1-XSO-294); Steam Generator # 4 Stop AOV (2-MRV-240); EQ sub-components: limit switches and solenoid valves (2-XSO-241 and 2-XSO-242); Pressurizer Safety Valve SV-45B Discharge Acoustic Monitor (2-QR-107B); nonsafety-related Regulatory Guide 1.97 instrument; Auxiliary Feedwater to Steam Generator OME-3-1 Flow Indicator Transmitter (1-FFI-210); Regulatory Guide 1.97 instrument; and Lower Containment Train 'B' Water Level Indicator Transmitter (1-NLI-320); Regulatory Guide 1.97 instrument.
b. Findings
No findings were identified.
.4 Operating Experience
a. Inspection Scope
The inspectors reviewed three EQ-related operating experience issues associated with the selected components to ensure that associated generic concerns had been adequately evaluated and addressed by the licensee. The operating experience issues listed below were reviewed as part of this inspection: NRC Information Notice 2014-; NRC Information Notice 2015-the Irradiation Testing and Environmental Qualification of Important-to-Safety ; and OE9884Acoustic Monitoring System Accelerometer Connectors
b. Findings
No findings were identified.
OTHER ACTIVITIES
4OA2 Identification and Resolution of Problems
.1 Review of Items Entered Into the Corrective Action Program
a. Inspection Scope
The inspectors reviewed a sample of the selected component problems identified by the licensee and entered into the CAP. The inspectors reviewed these issues to assess the threshold for identifying issues and the effectiveness of corrective actions related to design issues. In addition, corrective action documents written on issues identified during the inspection were reviewed to verify adequate problem identification and incorporation of the problem into the CAP. The specific corrective action documents sampled and reviewed by the inspectors are listed in the attachment to this report.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary On May 13, 2016, the inspectors presented the inspection results to Mr. J. Gebbie, and other members of the licensee staff.
The licensee acknowledged the issues presented. Several documents reviewed by the inspectors were considered proprietary information and were either returned to the licensee or handled in accordance with NRC policy on proprietary information.
4OA7 Licensee-Identified Violations The following violation of very-low significance (Green) was identified by the licensee and is a violation of NRC requirements which meets the criteria of the NRC Enforcement Policy for being dispositioned as a Non-Cited Violation.
The licensee identified a finding of very low safety significance (Green) with an associated Non-Cited Violation of 10 CFR 50.49(d)form to permit verification that each item of electric equipment that is important to Self-Assessment GT 2015-12352-Program 71111.21P Component Design Bases Inspection Engineering 6, 2016, the licensee identified that contrary to 10 CFR 50.49(d); an excessive number of Equipment Qualification Evaluation Reports had not been incorporated into Central Equipment Environmental Qualification Files;
- (2) the EQ Master List was controlled through a non-quality assurance database; and
- (3) the EQ Evaluation Tracking Log was not being maintained in accordance with Procedure 12-EHP-5025-EQE-0EQ Evaluations Revision 6. In addition, the licensee stated in Action Request (AR) 2016-DCC-QA-105-QCN Has Several Unincorporated Changes 21, 2016, that the large backlog of pending changes made it difficult for plant personnel to identify appropriate EQ requirements for plant equipment. As a result, the licensee entered the self-assessment identified issues into their CAP as follows: AR 2016-not Incorporated into 11, 2016; AR 2016-do not Meet PMP-2030-REC-dated March 15, 2016; and AR 2066--Compliance, 12-EHP-5052-EQE- 11, 2016. The finding was determined to be more than minor because the finding was associated with the Mitigating Systems cornerstone attribute of Design Control and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to maintain EQ files current and to retain the EQ files in an auditable form. The finding screened as Green utilizing Inspection Manual Chapter 7 Determination Process for Findings At-Exhibit 2, for the Mitigating Systemstermined to be a documentation concern and no evidence was found during the assessment to suggest EQ components were not qualified. ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Gebbie, Chief Nuclear Officer
- S. Lies, Site Vice President
- M. Lloyd, Vice President Engineering
- K. Anderson, Engineering Programs Supervisor
- D. Aubrey, Engineering Programs Manager
- K. Baker, Design Engineering Manager
- A. Garrett, Plant Engineering Director
- S. Mitchell, Nuclear Regulatory Affairs Supervisor
- S. Partin, Site Director
- J. Petro, Design Engineering Director
- J. Ross, Plant Manager
- M. Scarpello, Nuclear Regulatory Affairs Manager
- R. Wynegar, Nuclear Regulatory Affairs
- U.S. Nuclear Regulatory Commission M. Jeffers, Chief, Engineering Branch 2
- T. Taylor, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None LIST OF ACRONYMS USED ADAMS Agencywide Document Access Management System AOV Air-Operated Valve AR Action Request CAP Corrective Action Program CFR Code of Federal Regulations DBI Design Bases Inspection EQ Equipment Qualifications IP Inspection Procedure NCV Non-Cited Violation NRC U.S. Nuclear Regulatory Commission PARS Publicly Available Records System
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort.
- Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. CORRECTIVE ACTION DOCUMENTS GENERATED DUE TO THE INSPECTION Number Description or Title Date
- AR 2016-5879 2 dpm Leak from 1-FFI-210-IL 05/10/16
- AR 2016-5973 Vent Line for Valve 2-SV-1B-4 is not Concentric in Drip Pan 05/11/16
- AR 2016-6028 Analytical Qualified Life of 2-XSO-503/505 05/12/16
- CORRECTIVE ACTION DOCUMENTS REVIEWED DURING THE INSPECTION Number Description or Title Date
- AR 2012-2446 EQ PM for 1-XSO-297 Incorrectly Scoped Online 02/23/12
- AR 2012-2545 10 CFR Part 21 Report - Rosemount Pressure Transmitters 02/24/12
- AR 2013-1369 Rosemount Transmitters Need to be Returned for Refurbishment 01/30/13
- AR 2015-4008 2-SV-2A-4 is Leaking by 03/25/15
- AR 2015-5412 Conduit not sealed on 2-FMO-211-ACT 04/15/15
- AR 2016-0841
- DCC-QA-105-QCN has Several Unincorporated Changes Pending 01/21/16
- AR 2016-2842 EQ Procedure Non Compliance, 12
- EHP 5052
- EQE 002 03/11/16
- AR 2016-2844 Excessive Number of EQERs not Incorporated into CEEQ Files 03/11/16
- AR 2016-2950 Some EQ Documents do not Meet
- PMP 2030
- REC 001 03/15/16
- GT 2014-0064 - 3 NRC
- IN 2014-04: Potential for Teflon Material Degradation in Containment Penetrations, Mechanical Seals and Other Components 03/31/14
- GT 2014-0389-22 Part 21 Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms 08/01/14
- GT 2015-0173-18 Part 21 Report - Event Number 50681 for ASCO Solenoids 09/04/15
- GT 2015-12352-4 Self-Assessment of Environmental Qualification Program 03/06/16
- GT 2015-15217 Review NRC Information Notice 2015-12 11/24/15
- GT 2015-16496-4 Part 21 Screening - EPRI Product Number
- 1000867 02/25/16
- EQ FILES Number Description or Title Date or Revision 1-2-EDS-334 Design Standard Number - Typical Mounting of Assembly for Acoustic Monitoring System 10 517-TR-03 Final Qualification Test Report for Environmental and Seismic Testing of the TEC Valve Flow Monitoring System 2 517-TR-10 UpdatedQualifiedLife Study for the
- TEC 1414 Valve-Flow Monitoring System Components (Addendum to TEC Qualification Report 517-TR-03, Revision 2) 02/04/87