November 4, 2020

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000315/2020402 AND 05000316/2020402

Dear Mr. Gebbie:

On October 7, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2020402 and 05000316/2020402

Enterprise Identifier: I-2020-402-0026

Licensee:

American Electric Power Company

Facility:

Donald C. Cook Nuclear Power Plant

Location:

Bridgman, Michigan

Inspection Dates:

July 6, 2020 to October 7, 2020

Inspector:

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a, d; 02.08 d - I
  • Tier III: 02.10 a

71130.04 - Equipment Performance, Testing, and Maintenance

The inspector evaluated the security equipment testing and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: 02.11 a, b
  • Tier III: 02.14 Events and Logs

71130.09 - Security Plan Changes

The inspector evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Partial)

(1)

(Partial)

Requirements: 02.01 a; 02.01 d; 02.01 e

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On October 7, 2020, the inspector presented the security baseline inspection results to Joel P. Gebbie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

SPP-2060-SFI-

006

Security Requirements for Plant Personnel

SPP-2060-SFI-

206

Security Patrols

SPP-2060-SFI-

209

Protected Area Access/Exit Requirements

SPP-2060-SFI-

214

Security Core, Key and Lock Program

Self-Assessments GT-2020-0525

Access Control Inspection Readiness

71130.04

Procedures

2-OHP-5030-

035-039

Security Diesel Generator Functional Test

DTG-SPS-055

Delta Barrier Maintenance

SPP-2060-SFI-

104

Site Protective Services Inspections

SPP-2060-SFI-

308

Tests of Security Related Equipment

SPP-2060-SFI-

503

Security Firearms and Equipment Maintenance and

Accountability

SPP-2060-SFI-

600

Security Data Sheets

Work Orders

55524779-01

SEC MWZ 6 Month PM Task

04/17/2019

71130.09

Miscellaneous

D.C. Cook Nuclear Power Plant Security Plan

NEI 11-08 Security Plan Change Evaluation, Security Plan

Revision 19

10/23/2019

D.C. Cook Evaluation of the Implementation of NEI 03-12,

Revision 7.1, Section 21

07/26/2019

AEP-NRC-2020-

10 CFR 50.54(p)(2)

Donald C. Cook Nuclear Power Plant Unit 1 and Unit 2

Changes made to the Donald C. Cook Nuclear Power Plant

Security Plan

Procedures

SPP-2060-SFI-

2

Compensatory Measures

SPP-2060-SFI-

Compensatory Measures Risk Assessment

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-1