ML17285A392: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/31/1989
| issue date = 03/31/1989
| title = Monthly Operating Rept for Mar 1989 for Washington Nuclear Plant 2.W/890410 Ltr
| title = Monthly Operating Rept for Mar 1989 for Washington Nuclear Plant 2.W/890410 Ltr
| author name = HUTCHISON L B, POWERS C M
| author name = Hutchison L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 00:33, 19 June 2019

Monthly Operating Rept for Mar 1989 for Washington Nuclear Plant 2.W/890410 Ltr
ML17285A392
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1989
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8904210099
Download: ML17285A392 (9)


Text

ACCELKRATED DISIQBUTIOY DEMOYSTR+OY SYSTEM REGULATORY INFORMATION D STBIBUTION SYSTEM (RIDS)f fO/v ACCESSXON NBR:8904210099 DOC.DATE:, NOTARIZED:

NO DOCKET FACXL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHXSON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATXON

SUBJECT:

Monthly operating rept for Mar 1989 for WPPS 2.W 90 10 tr.DISTRIBUTXON CODE: IE24D COPXES RECEIVED:LTR (ENCL l SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT XD CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 R RPB 10 FILE 01 EXTERNAL: EGGG SIMPSON, F LPDR NSIC COPIES LTTR ENCL 4 4 1 1 10 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1~h/O f 7g go~@~~3 R I h NOTE'IO ALL"RIDS" RECIPIENTS:

PLEASE HELP US IO REMJCE WASTE.'GNTACI'THE DOQ3MENl'ONIROL DESK, ROOM Pl-37 (EXT.20079)TO SIMHATH YOUR NMB FMH DIPHGBUTIGN LIPIS FOR DOCK6ÃIS YOU DOlN'T NEZDf D S TOTAL NUMBER OF COPIES REQUIRED: LTTR 3 1 ENCL 3 1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 Apr il 10, 1989 U.S.Nuclear,, Regulatory Commission Document Control Desk Washington, D.C.20555 Dean Sir,:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, March 1989 as requir ed by our Technical Specifications 6.9.1.6.Very Truly Yours, 5@4,.~C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr..Mr.Ms.Mr.Mr.J.B.Mantin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington CT INPO NRC, Washington D.C.ys'

~W~~~

OPERATINS DATA REPORT WNP-2 01-Apr-89 i.DOCKET: 50-397 2.REPORT I NG PERIOD: Mar-89 OUTAGE+ON-LINE HOURS UTIL'ITY CONTACT: LEONARD HUTCHI SON (509)377-2486 5 s 6.7 1 8.9.LICENSED THERMAL POWER (MWt,): NAMEPLATE RATING (GROSS MWe): DESIGN ELECTRICAL RATING (NET, MWe): MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): MAXIMUM DEPENDABLE CAPACITY (NET MWe): IF CHANGES OCCUR ABOVE SINCE LAST REPORT>>GIVE REASONS: 332&1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED IF ANY (NET MWe).ii.REASONS FOR RESTRICTIONS>>

IF ANYc ADNIN" NSIV 2Q INgPQQg~12.REPORT PERIOD HOURS 13.HOURS REACTOR CRITICAL 14.RX RESERVE SHTDWN HRS 15 HRB GENERATOR ON LINE 16.UNIT RESERVE SHUTDOWN HOURS 17.GROSS THERMAL ENERGY (MWH)18.GROSS ELECTRICAL ENERGY-(MWH)19.NET ELECTRICAL ENERGY (MWH)20.UNIT SERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22.UNIT CAPACITY FACTOR (MDC NET)23.UNIT CAPACITY FACTOR (DER NET)24~UNIT FORCED OUTAGE RATE 25-FORCED OUTAGE HOURS MONTH 744 744.0 0.0 744.0 0.0 1890960~619490 594887 100.Ol 100.0/73.OX 72.7%0.OX 0 0 YEAR CUMULATIVE 2160 37664.2 2028 2 28245 7 0.0 340.4 1993.4 27158.0 0.0 381.7 5401960 74513165 1785860 24819360 1717629 23885937 92.3/72.1/92.3%73.i.'X 72.6/57.9/72.3X 57.7/4.0/9.3X 83.6 2775.2 26.SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE>>DATE>>DURATION):

REFUELING OUTAGE HAS BEEN RESCHEDULED TO BEGIN 4/28/89 FOR 45 DAYS 27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 85'04210099'9'0331 PDR ADOCK 05000397 PDC

~, ,A I f V I e I I\f I I I'FI II'I Ir I I>I I F p I)I F I I I'I R*, F v I Fr r'I I', s$f I)I' BEPCBT PEBICO~jA 8 19 89 men th, year BK~in~i Fnl>n~BBCBSGH WN1CU lNIT St lUTDOl'INS

/nEDUCTIONS DOCKET NO.50-397 UNIT NN1E DRTE COt tPLETED QY ,TELEPttONE (509)377"2486 89-05P 3/17/89 F-0 89.-'006 AA ZZZZZ REDUCED LOAD DUE TO AN ENGINEERING ANALYSIS WHICH INDICATED POST LOCA POTENTIAL INTEGRATED DOSE RATE TO CONTROL ROOM PERSONNEL THROUGH VENTILATI SYSTEM WOULD EXCEED TECH SPEC LIMITATIONS.

AFTER ADDITIONAL EVALUATION ERRORS WERE DISCOVERED IN CALIBRATION METHODOLOGY WHICH ALLEVIATED THE FINDING OF'PREVIOUS ANALYSIS.Smt.lyly WNP-2 WAS LIMITED ADMINISTRATIVELY TO 78K DURING tORCH DUE TO INOPERABILITY OF MAIN STEAM ISOLATION VALVE 28A.ALSO 1 POWER REDUCTION OCCURED AS DESCRIBED ABOVE.TYPE F-Forced S-Sctlcd R-Equi,p Failure.F-Rdmin 0-Mafnt or Test~0-Oper Error C-Refuel)ng H-Other 0-Regula tory Res triction E-Operator Tratnkng h License Examination t tETt f00 1-manual 2-Manual Sera(A>-Ruto Scram 4-Continued E'I flnduced Load 9-Ott>er SYSTEM h COMPOhCNT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Deport (LER)File (tNBEG-0161)

VERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-397 UNIT WNP-2 MONTH MARCH 1989 DAY AVERAGE DAILY POWER LEVEL (MWE-Net)824 17.DATE 4/1/89 COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY A VER AGE DA IL Y POWER LE VE L (ftwE-Net) 554 2.3.5.6.7.8.9.10.12.13.14.15.16.823 805 819 824 818 821 821 817 810 773 794 807 810 821 724 18.19.20.21.22.23.24.25.26.27.28.29.30.31.782 798 798 802 818 815 815 818 811 817 821 823 819 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

\'II/~~~~l