|
|
Line 40: |
Line 40: |
| -2 One of the ways utilities apply NRC Generic Letter 88-17, "Loss of Decay Heat Removal," is calculating TIB for their outage configurations, using this as a surrogate for configuration risk level. The proposed TS elevates the significance of this calculation making it a basis for acceptability of a TS restoration time. Since the licensee wants to put TIB into its licensing basis, the NRC staff's questions on details of the calculation, its basis, and even consideration of local boiling effects and margin levels. Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received. | | -2 One of the ways utilities apply NRC Generic Letter 88-17, "Loss of Decay Heat Removal," is calculating TIB for their outage configurations, using this as a surrogate for configuration risk level. The proposed TS elevates the significance of this calculation making it a basis for acceptability of a TS restoration time. Since the licensee wants to put TIB into its licensing basis, the NRC staff's questions on details of the calculation, its basis, and even consideration of local boiling effects and margin levels. Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received. |
| Subsequently, by letter dated March 24,2011 (ADAMS Accession No. ML 110840216), Entergy requested to withdraw the application from U.S. Nuclear Regulatory Commission review. Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov. IRA! N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. | | Subsequently, by letter dated March 24,2011 (ADAMS Accession No. ML 110840216), Entergy requested to withdraw the application from U.S. Nuclear Regulatory Commission review. Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov. IRA! N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. |
| List of cc w/encl: Distribution via PUBLIC RidsOgcRp LPL4 Reading RidsRgn4MailCenter RidsAcrsAcnw_MailCTR CSteger, RidsNrrDirsltsb VDricks, OPA RidsNrrDorlLpl4 JTrapp, EDO RidsNrrDraApla | | List of cc w/encl: Distribution via PUBLIC RidsOgcRp LPL4 Reading RidsRgn4MailCenter RidsAcrsAcnw_MailCTR CSteger, RidsNrrDirsltsb VDricks, OPA RidsNrrDorlLpl4 JTrapp, EDO RidsNrrDraApla |
| : RGrover, RidsNrrDssSpbp CSchulten, RidsNrrDssSrxb | | : RGrover, RidsNrrDssSpbp CSchulten, RidsNrrDssSrxb |
| : GWaig, RidsNrrPMWaterford | | : GWaig, RidsNrrPMWaterford |
| : SSun, RidsNrrLA.IBurkhardt ADAMS A . os. M . N o f Ice ML 110600265 M ee Ing , an d ou S ML110750416 ccesslon N f ummary ML110810467 H t OFFICE DORLlLPL4/PM DORL/LPL4/LA NRR/DRAIAPLAlBC NRR/DIRS/ITSB/BC SDinsmore for NAME NKalyanam JBurkhardt DHarrison REliiott DATE 3/25/11 3/25/11 4/5111 4/13/11 OFFICE NRR/DSS/SRXB/BC DORLlLPL4/BC DORLlLPL4/PM NAME AUlses IMMarkley NKalyanam DATE 4/5/11 4/14/11 4/14/11 OFFICIAL RECORD COpy}} | | : SSun, RidsNrrLA.IBurkhardt ADAMS A . os. M . N o f Ice ML 110600265 M ee Ing , an d ou S ML110750416 ccesslon N f ummary ML110810467 H t OFFICE DORLlLPL4/PM DORL/LPL4/LA NRR/DRAIAPLAlBC NRR/DIRS/ITSB/BC SDinsmore for NAME NKalyanam JBurkhardt DHarrison REliiott DATE 3/25/11 3/25/11 4/5111 4/13/11 OFFICE NRR/DSS/SRXB/BC DORLlLPL4/BC DORLlLPL4/PM NAME AUlses IMMarkley NKalyanam DATE 4/5/11 4/14/11 4/14/11 OFFICIAL RECORD COpy}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEAR1CAN081004, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop2010-08-24024 August 2010 Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Request ML1027802872010-10-0505 October 2010 Acceptance Review Email, License Amendment Request, Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Acceptance Review ML1028617242010-10-13013 October 2010 Email, Request for Additional Information Re Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI 1CAN111001, Supplement to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop2010-11-12012 November 2010 Supplement to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop Project stage: Supplement ML1036305522010-12-29029 December 2010 Email, Request for Additional Information on License Amendment Request Extension of Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI ML1102701042011-01-27027 January 2011 E-mail, Request for Additional Information Round 3, Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI ML1103404252011-02-0202 February 2011 Email, Request for Additional Information Round 4, Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI 1CAN021101, Supplemental to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop2011-02-28028 February 2011 Supplemental to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop Project stage: Supplement ML1106002652011-03-0303 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss License Amendment Request for Arkansas Nuclear One Unit 1, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop. Project stage: Meeting ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop Project stage: Meeting ML1108803712011-03-30030 March 2011 Withdrawal of a License Amendment Request, Which Would Revise Several TSs to Permit a Greater Time Period for One of the Two Required Reactor Coolant System Cooling Loops to Be Inoperable Project stage: Withdrawal ML1108803662011-03-30030 March 2011 Letter, Withdrawal of a License Amendment Request, Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Withdrawal ML1108104672011-04-14014 April 2011 Summary of Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 License Amendment Request to Revise Technical Specifications Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Meeting 2011-01-27
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23257A2412023-09-19019 September 2023 Summary of August 15, 2023, Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss Proposed License Amendment Request Concerning Pressurizer Heaters for Arkansas Nuclear One, Unit 1 ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22215A1912022-08-0909 August 2022 Summary of July 13, 2022, Teleconference Meeting with Entergy Operations, Inc. to Discuss Planned License Amendment Requests to Adopt Technical Specifications Task Force (TSTF) Traveler 505, Risk-Informed Extended Completion Times ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22151A1302022-06-0202 June 2022 May 10, 2022, Summary of Teleconference Meeting W/Entergy Operations, Inc. to Discuss a Planned Alternative for a One-Time Schedule Extension for the In-Service Examination of Control Rod Drive Mechanism Penetration No. 1 in the Reactor Ves ML22125A2452022-05-0909 May 2022 May 3, 2022, Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for ANO, Units 1 & 2 Regarding Proposed Revision to Emergency Plan and On-Shift Staff Analysis ML22003A0562022-01-10010 January 2022 Summary of December 16, 2021, Presubmittal Teleconference with Entergy Operations, Inc. to Discuss Proposed Amendment Request Concerning TS 3.4.4, RCS Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21117A0262021-05-0505 May 2021 Summary of Teleconference with Entergy Operations, Inc. to Discuss Forthcoming LAR Concerning Reactor Coolant System Primary Activity and Primary-to-Secondary Leak Rate ML20337A1572020-12-0808 December 2020 Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20287A4012020-10-26026 October 2020 Summary of September 17, 2020, Meeting with Entergy to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Request to the Extend Allowable Outage Time for the Emergency Cooling Pond ML20260G9992020-09-16016 September 2020 Summary of August 4, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Arkansas Nuclear One, Units 1 and 2 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20153A2252020-06-0404 June 2020 April 29, 2020, Summary of Meeting with Entergy Operations, Inc. to Discuss a Proposed Relief Request Use of Carbon Fiber Reinforced Polymer Piping for Underground Service Water Piping at Arkansas Nuclear One, Units 1 and 2 ML19182A0332019-07-10010 July 2019 Summary of Teleconference with Entergy Operations, Inc. Regarding Proposed License Amendment Request Revised Fuel Handling Analysis and Adoption of Various TSTF Travelers for Arkansas Nuclear One, Unit 2 ML18176A1312018-06-21021 June 2018 Summary of Annual Assessment Meeting with Entergy Operations, Inc., Regarding 2017 Performance of Arkansas Nuclear One ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML16109A3642016-04-18018 April 2016 Summary of Meeting to Discuss Supplemental Inspection Results and Annual Assessment Meeting with Entergy Operations Inc. Regarding 2015 Performance of Arkansas Nuclear One ML15348A1882016-01-0606 January 2016 Summary of October 28, 2015, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc. to Discuss Flood Analysis Associated with Arkansas Nuclear One, ML15267A4182015-09-24024 September 2015 Summary of Meeting to Discuss Arkansas Nuclear One Performance Improvement ML15225A2542015-08-14014 August 2015 Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML15132A1752015-05-21021 May 2015 Summary of Annual Assessment Meeting with Entergy Operations Inc., Regarding ANO 2014 Performance ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15007A4782015-01-15015 January 2015 Summary of July 15-18, 2013, Arkansas Nuclear One, Unit 2, Audit Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 ML14356A1722014-12-22022 December 2014 Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing Basis ML14197A5832014-09-18018 September 2014 Summary of the June 19, 2014, Category 1 Public Meeting with Entergy to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Tear Task Force Recommendation 2.1 ML14259A5972014-09-16016 September 2014 Summary of Annual Performance Assessment Meeting for Arkansas Nuclear One Performance ML14213A4272014-09-12012 September 2014 Summary of July 16, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers Nuclear Regulatory Commission, and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Arkansas Nuclear One, Units 1 and 2 ML14162A3712014-06-26026 June 2014 5/22/2014 Summary of Meeting with Entergy Operations, Inc. to Discuss Flooding Hazard Reevaluation Extension Request for Arkansas Nuclear One, Units 1 and 2; Near-Term Task Force Recommendation 2.1 ML14170A0602014-06-23023 June 2014 Summary of 5/27/2014 Conference Call Regarding Refueling Outage Steam Generator Inspection ML14163A0502014-06-13013 June 2014 Summary of Conference Call with Arkansas Nuclear One, Unit 2, Regarding the Spring Steam Generator Inspections ML14128A5122014-05-0909 May 2014 Summary of Regulatory Conference to Discuss Safety Significance of Arkansas Nuclear One Unit 1 Dropped Stator ML13172A0292013-07-0909 July 2013 Summary of 5/10/2013 Conference Call with Entergy Operations, Inc., 2013 Steam Generator Tube Inspections at Arkansas Nuclear One, Unit 1 ML13142A2272013-05-22022 May 2013 Summary of Public Meeting to Discuss Results of Augmented Inspection at Arkansas Nuclear One ML13043A6112013-02-26026 February 2013 Summary of 1/25/2013 Conference Call Regarding the Upcoming 2013 Steam Generator Tube Inspections ML12276A3012012-10-12012 October 2012 Summary of October 25, November 8, and November 10, 2011, Conference Calls Related to Fall 2011 Refueling Outage Steam Generator Tube Inspections ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12240A4162012-08-27027 August 2012 Public Meeting with Entergy Operations, Inc to Discuss the Performance of the Subject Facilities and Current Regulatory Issues ML12222A0312012-08-0808 August 2012 Arkansas Monitoring Call Summary ML12171A3662012-07-16016 July 2012 6/12-13/2012 Summary of Meeting at the Plant Site in Russellville, AR, to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1202704162012-02-13013 February 2012 1/26/2012 - Summary of Meeting with Entergy and Exelon to Discuss Recent Once-Through Steam Generator Inservice Inspection Results 2024-04-18
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 April 14, 2011 LICENSEE:
Entergy Operations, Inc. FACILITY:
Arkansas Nuclear One, Unit 1
SUBJECT:
SUMMARY
OF MARCH 15, 2011, MEETING WITH ENTERGY OPERATIONS, INC., ON LICENSE AMENDMENT REQUEST FOR CHANGES TO TECHNICAL SPECIFICATIONS RELATED TO COMPLETION TIMES FOR ONE INOPERABLE REACTOR COOLANT SYSTEM COOLING LOOP AT ARKANSAS NUCLEAR ONE, UNIT 1 (TAC NO. ME4563) On March 15,2011, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operations, Inc. (Entergy, the licensee), for Arkansas Nuclear One, Unit 1 (ANO-1) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The related documents for the subject license amendment request (LAR) are the application dated August 24, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 102371014) and the supplemental letters dated November 12, 2010, and February 28, 2011 (ADAMS Accession Nos. ML 103160175 and ML 110590738, respectively).
A list of attendees is enclosed.
The LAR discusses the licensee's proposal to revise several Technical Specifications (TSs) to permit a greater time period for one of two required decay heat removal (DHR) loops to be inoperable.
The affected TSs are applicable in lower modes of operation (Modes 4, 5, and 6). The licensee offered in defense of the LAR reasons such as 1) the requested 48-hour completion time (CT) is consistent with the same pump, low pressure injection pump TS; 2) the 48-hour CT is conservative with respect to the Mode 3 DHR CT of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; and 3) in Mode 4, other means of heat removal are available.
The licensee's slide presentation is available at ADAMS Accession No. ML 110750416.
The NRC requested that the licensee discuss the following items in its formal response to the requests for additional information (RAls): (1 ) Inadequacy of the information used to support the CT changes from "immediately" to "48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />" in TS 3.4.6, "RCS [Reactor Coolant System] Loops -MODE 4," for conditions with one required DHR system in operation and one DHR system inoperable. RAI response submitted by letter dated February 28, 2011, with a focus on a detailed discussion of the time-to-boil (ITB) estimate regarding worst-case identification and the assumption regarding thermodynamic mixing in the RCS inventory used in the ITB estimate.
-2 One of the ways utilities apply NRC Generic Letter 88-17, "Loss of Decay Heat Removal," is calculating ITS for their outage configurations, using this as a surrogate for configuration risk level. The proposed TS elevates the significance of this calculation making it a basis for acceptability of a TS restoration time. Since the licensee wants to put rrs into its licensing basis, the NRC staff questions details of the calculation, its basis, and consideration of local boiling effects and margin levels. Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received.
Subsequently, by letter dated March 24, 2011 (ADAMS Accession No. ML 110840216), Entergy requested to withdraw the application from U.S. Nuclear Regulatory Commission review. Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov.
N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
List of cc w/encl: Distribution via LIST OF MARCH 15.2011, MEETING WITH ENTERGY OPERATIONS, INC. LICENSE AMENDMENT REQUEST -CHANGES TO TECHNICAL SPECIFICATIONS RELATED TO COMPLETION TIMES FOR ONE INOPERABLE DECAY HEAT REMOVAL LOOP ARKANSAS NUCLEAR ONE, UNIT 1 TAC NO. ME4563 Nuclear Regulatory Commission R. Elliott, NRRIDIRS/ITSB M. Markley, NRRlDORULPL4 S. Sun, NRR/DSS/SRXB A. Howe, NRR/DRAIAPLA R. Grover, NRRlDIRS/ITSB C. Schulten, NRR/DIRSIITSB (Part-time)
G. Waig, NRRIDIRSIITSB (Teleconferenced)
N. Kalyanam, NRR/DORULPL4 Entergy Operations, Inc. Bryan Ford Richard Harris Dan Fouts James Keys Stephanie Pyle David Bice Enclosure
-2 One of the ways utilities apply NRC Generic Letter 88-17, "Loss of Decay Heat Removal," is calculating TIB for their outage configurations, using this as a surrogate for configuration risk level. The proposed TS elevates the significance of this calculation making it a basis for acceptability of a TS restoration time. Since the licensee wants to put TIB into its licensing basis, the NRC staff's questions on details of the calculation, its basis, and even consideration of local boiling effects and margin levels. Members of the public were in attendance via the teleconference bridge. Public Meeting Feedback forms were not received.
Subsequently, by letter dated March 24,2011 (ADAMS Accession No. ML 110840216), Entergy requested to withdraw the application from U.S. Nuclear Regulatory Commission review. Please direct any inquiries to Kaly N. Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov. IRA! N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
List of cc w/encl: Distribution via PUBLIC RidsOgcRp LPL4 Reading RidsRgn4MailCenter RidsAcrsAcnw_MailCTR CSteger, RidsNrrDirsltsb VDricks, OPA RidsNrrDorlLpl4 JTrapp, EDO RidsNrrDraApla
- RGrover, RidsNrrDssSpbp CSchulten, RidsNrrDssSrxb
- GWaig, RidsNrrPMWaterford
- SSun, RidsNrrLA.IBurkhardt ADAMS A . os. M . N o f Ice ML 110600265 M ee Ing , an d ou S ML110750416 ccesslon N f ummary ML110810467 H t OFFICE DORLlLPL4/PM DORL/LPL4/LA NRR/DRAIAPLAlBC NRR/DIRS/ITSB/BC SDinsmore for NAME NKalyanam JBurkhardt DHarrison REliiott DATE 3/25/11 3/25/11 4/5111 4/13/11 OFFICE NRR/DSS/SRXB/BC DORLlLPL4/BC DORLlLPL4/PM NAME AUlses IMMarkley NKalyanam DATE 4/5/11 4/14/11 4/14/11 OFFICIAL RECORD COpy