Summary of 4/20-23/2015 Audit in Support of Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition)
ML15225A254
Person / Time
Site: Arkansas Nuclear 
(DPR-051)
Issue date: 08/14/2015
From: Andrea George
Plant Licensing Branch IV
To:
George A
References
TAC MF3419
Download: ML15225A254 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 14, 2015 LICENSEE:

Entergy Operations, Inc.

FACILITY:

Arkansas Nuclear One, Unit No. 1

SUBJECT:

SUMMARY

OF ARKANSAS NUCLEAR ONE, UNIT NO. 1, APRIL 20 - 23, 2015, AUDIT ASSOCIATED WITH LICENSE AMENDMENT REQUEST TO TRANSITION TO NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805, "PERFORMANCE-BASED STANDARD FOR FIRE PROTECTION FOR LIGHT WATER REACTOR ELECTRIC GENERATING PLANTS," 2001 EDITION (TAC NO. MF3419)

The purpose of this summary is to document the results of an audit performed at Arkansas Nuclear One, Unit No. 1 (AN0-1) associated with a National Fire Protection Association Standard 805 (NFPA 805) license amendment request (LAR) dated January 29, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14029A438). Subsequent to the audit, the LAR was supplemented by letters dated May 19, June 16, July 21, and August 12, 2015 (ADAMS Accession Nos. ML15139A196, ML15167A503, ML15203A205, and ML15224A729, respectively).

A review team, consisting of U.S. Nuclear Regulatory Commission (NRC) staff and contractors from the Pacific Northwest National Laboratory (PNNL) and Southwest Research Institute (SwRl)/Center for Nuclear Waste Regulatory Analyses (CNWRA), conducted a regulatory audit of AN0-1, located in Russellville, Arkansas, from April 20-23, 2015. The regulatory audit supports the review of the LAR dated January 29, 2014, submitted by Entergy Operations, Inc.

(Entergy, the licensee), to transition the plant's fire protection licensing basis to Title 10 of the Code of Federal Regulations (CFR) 50.48(c), which endorses with exceptions NFPA 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition.

The purpose of the audit was to gain an understanding of the information needed to support the NRC staff's licensing decision regarding the LAR and to develop high quality requests for additional information (RAls), as needed. The information submitted in support of the AN0-1 LAR is under final review, and any additional information needed to support the LAR review will be formally requested by the staff in accordance with Office of Nuclear Reactor Regulation Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures."

The audit team consisted of four NRC, two PNNL, and two CNWRA staff. Enclosure 1 provides the schedule of activities conducted during the audit. Enclosure 2 contains the names of titles of audit team participants from the NRC, PNNL, CNWRA, AN0-1, and its contractors who participated in the audit (including entrance and exit meetings). Enclosure 3 contains a list of documents reviewed by the team.

The audit team held an entrance meeting on Monday, April 20, 2015, with AN0-1 staff and their contractors, as well as the NRC resident inspectors. During the remainder of the audit, team members participated in technical discussions based on their technical review area, according to the audit plan dated March 19, 2015 (ADAMS Accession No. ML15071A151). Technical discussions focused on five major areas: fire protection engineering (FPE), safe shutdown/circuit analyses (SSD/CA), fire probabilistic risk assessment (PRA), fire modeling (FM), and programmatic review. The audit team participated in plant walkdowns, tours, and technical presentations focusing on these topical areas.

At the conclusion of the audit, the audit team participated in a summary exit meeting with AN0-1 staff and management on April 23, 2015. The NRC staff provided details regarding walkdowns, technical presentations, and the completion of the audit team's objectives.

Please direct any inquiries to me at 301-415-1081 or at Andrea.George@nrc.gov.

Docket No. 50-313

Enclosures:

1. Audit Schedule
2. Audit Participants
3. Audit Documents cc w/encls: Distribution via Listserv Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Monday 8:00 am 8:30 am 9:00 am 9:15 am 10:30 am 12:30 am 1:00 pm 1:30 pm 3:00 pm 4:30 pm 4:45 pm Tuesday 8:00 am 8:15 am 1 :00 pm 3:45 pm 4:45 5:00 Schedule of Activities April 20, 2015 Audit team members met onsite at AN0-1 Audit team members completed security forms for the next day's walkdowns Entrance meeting, including introductions and audit overview Site virtual tour Begin technical discussions for fire PRA, FM in support of fire PRA, and SSD/FPE Technical breakout session Continue technical discussions for FM Site Vice President meeting Combined recovery actions meeting, technical discussions NRC debrief meeting ANO briefing April 21, 2015 Pre-tour brief Plant tour Continue technical reviews for fire PRA, FM in support of fire PRA, and SSD/FPE FM breakout session NRC debrief meeting ANO briefing Wednesday April 22, 2015 8:00 am 8:15 am 9:00 am 10:30 am 12:45 pm 1:00 am 1 :30 am 2:00 am 2:30 pm 3:00 pm 4:15 pm Thursday 8:00 am 8:15 am 8:30 am 9:15 am Audit team members met onsite at AN0-1 PRA breakout meeting Modification discussion with AN0-1 RAI timeline meeting Simulator Tour Radiation release meeting Fire brigade meeting Closeout meeting for FM PRA RAI discussion SSD breakout session and closeout FPE breakout session April 23, 2015 AN0-2 Transition Discussion Closeout meeting for PRA Closeout meeting for FPE Exit meeting

List of Participants U.S. Nuclear Regulatory Commission (NRC) Team

  • Alex Klein NRC Branch Chief
  • Harold Barrett NRC FPE/SSD
  • Yutaka Yamada NRC Observer Pacific Northwest National Lab (PNNL) Team
  • Fleur de Peralta
  • Garill Coles PNNL PNNL FPE/SSD FPRA Center for Nuclear Waste Regulatory Analyses (CNWRA) Team
  • Barry Davis
  • Derrick Vest
  • Darci Harrison
  • Larry Young
  • Ronnie Hendrix
  • Chris Little
  • Walter Hill
  • Steve Capehart
  • Thomas Robinson
  • Milton Huff
  • Vern Kinsey
  • Sean Hunt
  • Justin Williamson
  • Jason Hall
  • Usama Farradj
  • Joe Renner
  • Kiang Zee
  • Howard Brodt
  • Steve Stumbaugh ANO ANO ICE Kaly Tech Svs Kaly Tech Svs ICS DP Kaly Tech Svs ICE ICE ICE Jensen Hughes Jensen Hughes Enercon ANO ERIN ERIN ERIN SCP PMI Management Sponsor FP Supervisor NFPA 805 Project Manager Engineering NFPA 805 Lean FP Engineering Safe Shutdown Electrical/Circuit Analysis Safe Shutdown Penetration Seals & Barriers Electrical I Circuit Analysis Safe Shutdown Classical Fire Protection Modifications Scheduling Fire Modeling Fire Modeling PRA PRA PRA PRA PRA PRA AN0-1 Ops
  • John Kinney
  • Chuck Heinzen
  • Carol Couser
  • James Taylor
  • Robert Chandler
  • Stephenie Pyle
  • Dana Millar Kaly Tech Svs Entergy Entergy Entergy Entergy ANO ANO Kaly Tech Svs No industry observers attended this audit. AN0-1 Ops Fire Protection Fire Protection Safe Shutdown Fire Marshal Licensing Lead Manger, Licensing Licensing Support

List of Documents Reviewed

1.

Human Reliability Analysis focused-scope peer review

2.

AN0-2 NFPA 805 Safety Evaluation

3.

Fire Modeling Presentation Slides

4.

Revised Main Control Room (MCR) Abandonment Report

5.

Design Modification Excerpts for Resolving Information Notice 92-18 damaged valves

6.

ANO EAR No 94-0080, Gas filled Transformer

7.

CALC-AN01-FP-09-00011, Evaluation of Unit 1 MCR Abandonment Times

8.

Jensen Hughes Report 21022.001-RP7-01, Evaluation of Control Room Abandonment Times at Arkansas Nuclear One, Unit 1

9.

CALC-AN01-FP-08-00003, Administrative and Turbine Building Separation Analysis

10.

PRA-A 1-05-011, Evaluation of the Development and Timing of Hot Gas Layer Conditions in Selected ANO Fire Zones

11.

PRA-ES-05-007, Timing of Hot Gas Layer in Generic Compartments

ML15071A151). Technical discussions focused on five major areas: fire protection engineering (FPE), safe shutdown/circuit analyses (SSD/CA), fire probabilistic risk assessment (PRA), fire modeling (FM), and programmatic review. The audit team participated in plant walkdowns, tours, and technical presentations focusing on these topical areas.

At the conclusion of the audit, the audit team participated in a summary exit meeting with AN0-1 staff and management on April 23, 2015. The NRC staff provided details regarding walkdowns, technical presentations, and the completion of the audit team's objectives.

Please direct any inquiries to me at 301-415-1081 or at Andrea.George@nrc.gov.

Docket No. 50-313

Enclosures:

1. Audit Schedule
2. Audit Participants
3. Audit Documents cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL4-1 Reading RidsNrrDorllpl4-1 Resource RidsNrrDraAfpb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource ADAMS Accession No. ML15225A254 OFFICE N RR/DORL/LPL4-1 /PM NAME A George DATE 8/14/15 OFFICE NRR/DRA/APRA/BC*

NAME SRosenberg DATE 7/23/15 IRA/

Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation DFrumkin, NRR SDinsmore, NRR HBarrett, NRR LFields, NRR JRobinson, NRR

  • via memo N RR/DORL/LPL4-1 /LA JBurkhardt 8/13/15 N RR/DORL/LPL4-1 /BC MMarkley (LRegner for) 8/14/15 N RR/ORA/ AF PB/BC*

AKlein 7/23/15 NRR/DORL/LPL4-1/PM AGeorge 8/14/15