ML110600265
Letter Sequence Meeting | |
---|---|
TAC:ME4563, (Withdrawn, Closed) | |
Initiation | |
MONTHYEAR1CAN081004, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop2010-08-24024 August 2010
[Table View]Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Request ML1027802872010-10-0505 October 2010 Acceptance Review Email, License Amendment Request, Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Acceptance Review ML1028617242010-10-13013 October 2010 Email, Request for Additional Information Re Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI 1CAN111001, Supplement to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop2010-11-12012 November 2010 Supplement to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop Project stage: Supplement ML1036305522010-12-29029 December 2010 Email, Request for Additional Information on License Amendment Request Extension of Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI ML1102701042011-01-27027 January 2011 E-mail, Request for Additional Information Round 3, Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI ML1103404252011-02-0202 February 2011 Email, Request for Additional Information Round 4, Request to Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: RAI 1CAN021101, Supplemental to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop2011-02-28028 February 2011 Supplemental to License Amendment Request Related to Changes to Technical Specification Completion Times for One Inoperable RCS Cooling Loop Project stage: Supplement ML1106002652011-03-0303 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss License Amendment Request for Arkansas Nuclear One Unit 1, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop. Project stage: Meeting ML1107504162011-03-15015 March 2011 Licensee Slides from 3/15/11 Meeting with Entergy Operations on Technical Specification Change - Testing of Idle RCS Cooling Loop Project stage: Meeting ML1108803712011-03-30030 March 2011 Withdrawal of a License Amendment Request, Which Would Revise Several TSs to Permit a Greater Time Period for One of the Two Required Reactor Coolant System Cooling Loops to Be Inoperable Project stage: Withdrawal ML1108803662011-03-30030 March 2011 Letter, Withdrawal of a License Amendment Request, Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Withdrawal ML1108104672011-04-14014 April 2011 Summary of Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 License Amendment Request to Revise Technical Specifications Related to Completion Times for One Inoperable RCS Cooling Loop Project stage: Meeting 2011-01-27 |
ML110600265 | |
Person / Time | |
---|---|
Site: | Arkansas Nuclear |
Issue date: | 03/03/2011 |
From: | Kalyanam N Plant Licensing Branch IV |
To: | Markley M Plant Licensing Branch IV |
Kalyanam N, NRR/DORL/LPL4, 415-1480 | |
References | |
TAC ME4563 | |
Download: ML110600265 (4) | |
Similar Documents at Arkansas Nuclear | |
---|---|
Category:Meeting Notice
MONTHYEARML24261B9892024-09-17017 September 2024
[Table view]Pre-Application Teleconference with Entergy Operations, Inc. to Discuss an Exemption Request for Use of Decommissioning Funds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LRM-0101) PMNS20240877, Presentation to the Pope County Quorum Court of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at Arkansas Nuclear One2024-06-27027 June 2024 Presentation to the Pope County Quorum Court of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at Arkansas Nuclear One PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request2023-12-19019 December 2023 Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request PMNS20231101, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 32023-10-0202 October 2023 Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 ML23215A1582023-08-0303 August 2023 Pre-Application Teleconference with Entergy Operations, Inc. to Discuss Planned License Amendment Request for Arkansas Nuclear One, Unit 1 (L-2023-LRM-0035) PMNS20230474, NRC Presentation to the Quorum Court of Pope County, Arkansas of the Nuclear Regulatory Commissions 2022 Annual Assessment of Safety Performance at Arkansas Nuclear One2023-04-18018 April 2023 NRC Presentation to the Quorum Court of Pope County, Arkansas of the Nuclear Regulatory Commissions 2022 Annual Assessment of Safety Performance at Arkansas Nuclear One PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet2022-11-0404 November 2022 Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220450, Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Unit 12022-04-27027 April 2022 Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Unit 1 PMNS20220433, Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Units 1 and 22022-04-21021 April 2022 Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Units 1 and 2 ML21337A0872021-12-0303 December 2021 Notice of Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss a Proposed License Amendment Request for Arkansas Nuclear One, Unit 1 ML21232A0402021-08-20020 August 2021 Notice of Teleconference with Entergy Operations, Inc. Concerning Final Response to Generic Letter 2004-02 at Arkansas Nuclear One, Units 1 and 2 ML21141A1822021-05-21021 May 2021 Closed Teleconference with Entergy Operations, Inc. Concerning Proposed Alternative to Allow Use of a Carbon Fiber Reinforced Polymer Composite System at Arkansas Nuclear One, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210347, Partially Closed Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for Arkansas Nuclear One, Unit 12021-03-25025 March 2021 Partially Closed Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for Arkansas Nuclear One, Unit 1 ML20307A5162020-11-0202 November 2020 Presubmittal Teleconference with Entergy Operations, Inc. Regarding Final Response to Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15292A2412015-10-21021 October 2015 October 28, 2015, Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Arkansas Nuclear One, Units 1 and 2 ML15239B3742015-08-27027 August 2015 Notice of Public Meeting Between NRC and Entergy Operations, Inc., to Present and Discuss Entergy'S Progress in Preparing for the Multiple Degraded Cornerstone Inspection Procedure 95003 Inspection for Arkansas Nuclear One ML15103A6812015-04-28028 April 2015 Meeting Notice with Public with Public to Discuss the Nrc'S 2014 End-of-Cycle Assessment of Safety Performance at Arkansas Nuclear One (ANO) ML14269A0312014-09-25025 September 2014 Regulatory Conference with Entergy Operations (ANO) 10-28-14 ML14218A2272014-08-0606 August 2014 Public Meeting with Entergy Operations, Inc to Discuss the Nrc'S Assessment of Safety Performance at Arkansas Nuclear One for the Period of January 1 Through December 31, 2013 ML14184B2432014-07-10010 July 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Arkansas Nuclear One, Units 1 and 2 ML14101A1972014-04-11011 April 2014 Notice of Regulatory Conference with Entergy Operations, Inc. to Discuss an Apparent Violation Affecting Both Units at Arkansas Nuclear One, Related to the Drop of the Unit 1 Main Generator Stator ML13116A1172013-04-26026 April 2013 Notice of Public Exit Meeting with Entergy Operations, Inc., Arkansas Nuclear to Discuss Results of Augmented Inspection Conducted ML12326A9782012-11-21021 November 2012 Public Meeting with Entergy Operations, Inc., to Discuss the Actions Taken by the Licensee to Address the Substantive Crosscutting Issue Identified in Arkansas Nuclear One'S Annual Assessment Letter Dated 03/05/2012 ML12324A4222012-11-14014 November 2012 Meeting Notice with Entergy Operations, Inc. to Discuss the Status of the Revised Application for Arkansas Nuclear One, Unit 2 to Transition to National Fire Protection Association (NFPA) Standard 805 ML12319A1222012-11-14014 November 2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12271A2482012-09-27027 September 2012 10/9/2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12166A1002012-06-18018 June 2012 Forthcoming Meeting on 6/29/12 with Entergy Operations, Inc. to Discuss License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1214600172012-05-30030 May 2012 June 12-13, 2012, Notice of Meeting at the Plant Site in Russellville, AR to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1200500362012-01-0909 January 2012 Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1134801002011-12-19019 December 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1123506752011-08-31031 August 2011 Notice of Meeting with Entergy Operations, Inc. to Discuss a Proposed License Amendment Request for Arkansas Nuclear One, Unit 2, for Its Revised Fuel Handling Accident (Fha) Analysis and Several Technical Specification Task Force Travel ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1108804522011-03-30030 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 ML1109004362011-03-30030 March 2011 Correction Notice of Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Standard (NFPA) 805 License Amendment Request Submittal for Arkansas Nuclear One, Units 1 and 2 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1106002652011-03-0303 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss License Amendment Request for Arkansas Nuclear One Unit 1, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop. ML1106200032011-03-0303 March 2011 3/15/11 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 Planned License Amendment Request for Technical Specification Change Service Water System Related Support Features ML1014001342010-05-20020 May 2010 Notice of Public Meeting to Discuss Fire Protection Screening Criteria Identified at Browns Ferry and Their Implications to Arkansas Nuclear One ML1010302422010-04-13013 April 2010 Nuclear Regulatory Commission Open House, to Discuss Issues Related to Arkansas Nuclear One ML1007505712010-03-16016 March 2010 Meeting with Entergy Operations, Inc. to Discuss the Results of the Safety Culture Workplace Survey Conducted at Each Entergy Nuclear Plant in 2009 ML0932702592009-11-23023 November 2009 Notice of Meeting with Entergy Operations to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML0929204052009-11-13013 November 2009 Notice of Meeting with Entergy Operations, Inc. to Discuss Results of Arkansas Nuclear One, Unit 1, Steam Generator Tube Inspection During Refueling Outage and Issue of Bowed Tie Rods and Tube Support ML0917508322009-06-26026 June 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information for GL-2004-02 Sent to Arkansas Nuclear One, Units 1 and 2 on June 22, 2009 ML0911006852009-04-21021 April 2009 Notice of End-of-Cycle Public Meeting with Entergy to Discuss the Performance Results for Arkansas Nuclear One, Units 1 & 2 ML0821004082008-08-0101 August 2008 Notice of Meeting with Entergy Operations Incorporated to Discuss Steam Generator Inspections Results at Arkansas Nuclear One, Unit 1 (ANO-1) ML0810001142008-04-0808 April 2008 Notice of End-of-cycle Public Meeting Between the NRC and Entergy to Present and Discuss Performance Results of the Arkansas Nuclear One, Units 1 and 2, Facility for the Period of January 1 Though December 31, 2007 ML0814001332008-04-0707 April 2008 ANO EOC Public Invitational Letter 2024-09-17 Category:Meeting Agenda MONTHYEARML24264A1592024-09-30030 September 2024
[Table view]Adtf Exemption Request Pre-submittal Meeting Presentation ML24261B9892024-09-17017 September 2024 Pre-Application Teleconference with Entergy Operations, Inc. to Discuss an Exemption Request for Use of Decommissioning Funds for Arkansas Nuclear One, Units 1 and 2 (L-2024-LRM-0101) PMNS20240877, Presentation to the Pope County Quorum Court of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at Arkansas Nuclear One2024-06-27027 June 2024 Presentation to the Pope County Quorum Court of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at Arkansas Nuclear One PMNS20231406, Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request2023-12-19019 December 2023 Presubmittal Meeting with Entergy Operations, Inc. for a Proposed Online Monitoring License Amendment Request PMNS20231101, Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 32023-10-0202 October 2023 Meeting Notice with Entergy Operations, Inc. Regarding a Presubmittal License Amendment Request for Arkansas Nuclear One, Unit 2 and Waterford Steam Electric Station, Unit 3 ML23215A1582023-08-0303 August 2023 Pre-Application Teleconference with Entergy Operations, Inc. to Discuss Planned License Amendment Request for Arkansas Nuclear One, Unit 1 (L-2023-LRM-0035) PMNS20230474, NRC Presentation to the Quorum Court of Pope County, Arkansas of the Nuclear Regulatory Commissions 2022 Annual Assessment of Safety Performance at Arkansas Nuclear One2023-04-18018 April 2023 NRC Presentation to the Quorum Court of Pope County, Arkansas of the Nuclear Regulatory Commissions 2022 Annual Assessment of Safety Performance at Arkansas Nuclear One PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet2022-11-0404 November 2022 Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet ML22193A0262022-07-12012 July 2022 (ANO) RICT License Amendment Request TSTF-505 NRC Pre-Submittal Meeting Presentation - July 13, 2022 PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commissions 2021 Annual Assessment of Safety Performance at Region IV Plants PMNS20220450, Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Unit 12022-04-27027 April 2022 Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Unit 1 PMNS20220433, Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Units 1 and 22022-04-21021 April 2022 Presubmittal Meeting with Entergy Operations, Inc. for Arkansas Nuclear One, Units 1 and 2 ML21337A0872021-12-0303 December 2021 Notice of Pre-submittal Teleconference with Entergy Operations, Inc. to Discuss a Proposed License Amendment Request for Arkansas Nuclear One, Unit 1 ML21232A0402021-08-20020 August 2021 Notice of Teleconference with Entergy Operations, Inc. Concerning Final Response to Generic Letter 2004-02 at Arkansas Nuclear One, Units 1 and 2 ML21141A1822021-05-21021 May 2021 Closed Teleconference with Entergy Operations, Inc. Concerning Proposed Alternative to Allow Use of a Carbon Fiber Reinforced Polymer Composite System at Arkansas Nuclear One, Units 1 and 2 PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek PMNS20210347, Partially Closed Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for Arkansas Nuclear One, Unit 12021-03-25025 March 2021 Partially Closed Meeting with Entergy Operations, Inc. Regarding Planned License Amendment Request for Arkansas Nuclear One, Unit 1 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20307A5162020-11-0202 November 2020 Presubmittal Teleconference with Entergy Operations, Inc. Regarding Final Response to Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20255A0242020-09-11011 September 2020 (Ano), Pre-Submittal Meeting with NRC - Request to Extend Allowable Outage Time (AOT) for the Emergency Cooling Pond (ECP) ML20211L7052020-08-0404 August 2020 (ANO) Units 1 & 2, Pre-Submittal Slide Presentation for August 4, 2020 Public Meeting ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML15292A2412015-10-21021 October 2015 October 28, 2015, Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Arkansas Nuclear One, Units 1 and 2 ML12324A4222012-11-14014 November 2012 Meeting Notice with Entergy Operations, Inc. to Discuss the Status of the Revised Application for Arkansas Nuclear One, Unit 2 to Transition to National Fire Protection Association (NFPA) Standard 805 ML12319A1222012-11-14014 November 2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12271A2482012-09-27027 September 2012 10/9/2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12166A1002012-06-18018 June 2012 Forthcoming Meeting on 6/29/12 with Entergy Operations, Inc. to Discuss License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1214600172012-05-30030 May 2012 June 12-13, 2012, Notice of Meeting at the Plant Site in Russellville, AR to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1200500362012-01-0909 January 2012 Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1134801002011-12-19019 December 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1123506752011-08-31031 August 2011 Notice of Meeting with Entergy Operations, Inc. to Discuss a Proposed License Amendment Request for Arkansas Nuclear One, Unit 2, for Its Revised Fuel Handling Accident (Fha) Analysis and Several Technical Specification Task Force Travel ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1109004362011-03-30030 March 2011 Correction Notice of Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Standard (NFPA) 805 License Amendment Request Submittal for Arkansas Nuclear One, Units 1 and 2 ML1108804522011-03-30030 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1106200032011-03-0303 March 2011 3/15/11 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 Planned License Amendment Request for Technical Specification Change Service Water System Related Support Features ML1106002652011-03-0303 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss License Amendment Request for Arkansas Nuclear One Unit 1, Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop. ML0929204052009-11-13013 November 2009 Notice of Meeting with Entergy Operations, Inc. to Discuss Results of Arkansas Nuclear One, Unit 1, Steam Generator Tube Inspection During Refueling Outage and Issue of Bowed Tie Rods and Tube Support ML0917508322009-06-26026 June 2009 Notice of Conference Call with Entergy Operations, Inc. to Discuss Draft Request for Additional Information for GL-2004-02 Sent to Arkansas Nuclear One, Units 1 and 2 on June 22, 2009 ML0821004082008-08-0101 August 2008 Notice of Meeting with Entergy Operations Incorporated to Discuss Steam Generator Inspections Results at Arkansas Nuclear One, Unit 1 (ANO-1) ML0722005192007-08-10010 August 2007 Notice of Meeting with Entergy Operations, Inc. Regarding Steam Generator Tube Inspection Results at Arkansas Nuclear One, Unit 1 ML0718004262007-06-29029 June 2007 Summary of Arkansas Nuclear One End-Of-Cycle Public Meeting ML0613600442006-06-0707 June 2006 Agenda for Public Meeting with Entergy Operations Incorporated Regarding Spent Fuel Pool Rack Configuration Changes at ANO-1 and ANO-2 on Wednesday 06/07/2006, TAC Nos. MC1704, MC1705 ML0613701292006-05-22022 May 2006 Forthcoming Meeting with Entergy Operations to Inc. to Discuss Spent Fuel Pool Configuration Changes at ANO-1 and ANO-2 TAC Nos. MD1704 and MD1705 ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions ML0411006652004-04-16016 April 2004 Nrc/Eoi Meeting to Discuss Requests for Alternative ANO1-R&R-005 and ANO1-R&R-006 ML0414101042004-04-0505 April 2004 E-Mail from B. Vaidya on 04/05/04 ANO 1 - Proposed Meeting Agenda for April 16, 2004 Meeting, Relief Requests ML0333810462003-11-24024 November 2003 Ano/Nrc Appendix R Compliance Meeting Agenda 2024-09-30 Category:Memoranda MONTHYEARML24297A6392024-10-30030 October 2024
[Table view]Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24128A2402024-05-0808 May 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22349A5052023-02-0808 February 2023 Results of a Reactor Oversight Process Self Assessment Effectiveness Review of the Recommendations from IP 95003 at Arkansas Nuclear One ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21295A0882021-10-21021 October 2021 Fiscal Year 2021 Research and Test Reactors Inspection Program Completion Status ML21288A0392021-10-18018 October 2021 September 14, 2021, Summary of Public Workshop on Scale/Melcor Source Term Demonstration Project - Pebble-Bed Molten-Salt-Cooled Reactor ML21273A1772021-10-0101 October 2021 Fiscal Year 2021 Research and Test Reactors Inspection Program Completion Status ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML20337A1572020-12-0808 December 2020 Summary of Teleconference Meeting with Entergy Operations, Inc. to Discuss the Forthcoming Supplemental Response Concerning Generic Letter 2004-02 for Arkansas Nuclear One, Units 1 and 2 ML20149K5412020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Entergy Operations, Inc. Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Arkansas Nuclear One I ML20150A4212020-11-23023 November 2020 Memo to File: Environmental Assessment and Finding of No Significant Impact and NRC Financial Analysis for Entergy Nuclear Company, LLC Decommissioning Funding Plan Submitted in Accordance with 10 CFR 72.30(b) and (C) for Grand Gulf ISFSI ML19204A2972019-07-31031 July 2019 Memo to Management Review Board Arkansas Follow-up FY2019 Proposed Final Report ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17153A0012017-06-0606 June 2017 Staff Observations of Testing for Generic Safety Issue 191 During a May 10 to May 11, 2017, Trip to the Alden Test Facility for Control Components Inc. Strainer Tests ML16145A3392016-05-24024 May 2016 NRC Supplemental Inspection Procedure 95003 (Report - 05000313/2016007, and 05000368/2016007) List of Documents Reviewed ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16076A2212016-03-16016 March 2016 NRC Supplemental Inspection Procedure 95003 (Report 05000313/2016007, 05000368/2016007) Request for Information ML16061A3622016-03-0101 March 2016 OEDO-15-00641 DPO-2015-001 on the Significance Determination Process Evaluation for a Finding at Arkansas Nuclear One Involving the March 2013, Unit 1 Stator Drop Event, Redacted-Public ML15292A2412015-10-21021 October 2015 October 28, 2015, Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Arkansas Nuclear One, Units 1 and 2 ML15218A6042015-08-0606 August 2015 Inspection Procedure 95003 Communication Team Charter ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML14356A1722014-12-22022 December 2014 Summary of Site Audit to Support the Review of a License Amendment Request for Arkansas Nuclear One, Unit 2 to Transition to the National Fire Protection Association (NFPA) Standard 805 Fire Protection Licensing Basis ML14351A2602014-12-19019 December 2014 Memo C K Bladey Re Notice of Issuance of Exemption from Holtec Intl CoC No. 1014 Fuel Specification and Loading Conditions at Arkansas Nuclear One ISFSI ML14356A5612014-12-17017 December 2014 Third-Party Assessment of Safety Culture ML14345B0652014-12-11011 December 2014 Memo C Bladey Re Federal Register Notice of Issuance of Environmental Assessment and Finding of No Significant Impact ANO Units 1 & 2 ISFSI 72-12 and 72-1014 ML14213A4272014-09-12012 September 2014 Summary of July 16, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers Nuclear Regulatory Commission, and Entergy Operations Inc. to Discuss Flooding Analysis Associated with Arkansas Nuclear One, Units 1 and 2 ML14184B2432014-07-10010 July 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Arkansas Nuclear One, Units 1 and 2 ML14163A0502014-06-13013 June 2014 Summary of Conference Call with Arkansas Nuclear One, Unit 2, Regarding the Spring Steam Generator Inspections ML13269A2082013-12-12012 December 2013 Cover Memo from B. Caldwell to M. Markley RAI for Arkansas Nuclear One (ANO) Revision 15 Security Plan Review ML13255A4872013-09-10010 September 2013 Request for Additional Information to Entergy Operations, Arkansas Nuclear One-Units 1 and 2, Regarding NTTF Recommendation 9.3 Phase 1 Staffing Assessment Submittal ML12324A4222012-11-14014 November 2012 Meeting Notice with Entergy Operations, Inc. to Discuss the Status of the Revised Application for Arkansas Nuclear One, Unit 2 to Transition to National Fire Protection Association (NFPA) Standard 805 ML12319A1222012-11-14014 November 2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12271A2482012-09-27027 September 2012 10/9/2012 Notice of Forthcoming Meeting with Entergy Operations, Inc. to Discuss Resubmittal of License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML12166A1002012-06-18018 June 2012 Forthcoming Meeting on 6/29/12 with Entergy Operations, Inc. to Discuss License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1214600172012-05-30030 May 2012 June 12-13, 2012, Notice of Meeting at the Plant Site in Russellville, AR to Discuss Entergy Operations, Inc.'S License Amendment Request to Adopt National Fire Protection Association (NFPA) Standard 805 at Arkansas Nuclear One, Unit 2 ML1134801002011-12-19019 December 2011 Notice of Forthcoming Meeting with Exelon Generation Company, LLC, and Entergy Operations, Inc., to Discuss Steam Generator Inspection Results at Three Mile Island, Unit 1, and Arkansas Nuclear One, Unit 1 ML1116101632011-09-0707 September 2011 Review of Amendment 22 of Safety Analysis Report - Period from 10/6/2008 Through 3/18/2010 ML1123506752011-08-31031 August 2011 Notice of Meeting with Entergy Operations, Inc. to Discuss a Proposed License Amendment Request for Arkansas Nuclear One, Unit 2, for Its Revised Fuel Handling Accident (Fha) Analysis and Several Technical Specification Task Force Travel ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11116A0332011-04-29029 April 2011 Monthly Operating Reports for the 1st Quarter of 2011 ML1111009242011-04-29029 April 2011 Summary of 3/15/11 (P.M. Session) Meeting with Entergy Operations, Inc. to Discuss Arkansas Nuclear One, Unit 1 Planned License Amendment Request for Technical Specification Change Service Water System Related Support Features ML1109506462011-04-11011 April 2011 Verbal Authorization of Request for Alternative ANO1-R&R-015, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with Generic Letter 90-05, Fourth 10-Year Interval ML1108804522011-03-30030 March 2011 Notice of Forthcoming Meeting with Entergy Operations, Inc., to Discuss Proposed License Amendment Request to Adopt NFPA 805 for Arkansas Nuclear One, Units 1 and 2 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements 2024-05-08 |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-000:1 March 3, 2011 MEMORANDUM TO: Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC.
DATE & TIME: Tuesday, March 15, 2011 9:30 a.m. -12:00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-8B02 Rockville, Maryland 20852 PURPOSE: Entergy Operations, Inc. (the licensee), has requested this meeting to discuss the License Amendment Request for Arkansas Nuclear One, Unit 1, "Changes to Technical Specification Related to Completion Times for One Inoperable RCS [Reactor Coolant System] Cooling Loop," dated August 24, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102371014).
CATEGORY:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.
M. Markley 2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC Entergy Operations, Inc.
G. Casto A. Ulses B. Ford R. Elliott M. Markley D. Bice D. Harrison R. Grover D. James N. Kalyanam S. Sun et al. et al.
Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below before March 11, 2011, 3:00 p.m.
(Eastern Standard Time) to get the telephone number and the pass code.
MEETING CONTACTS: N. Kalyanam, NRR A. Wang, NRR 301-415-1480 301-415-1445 kaly. kalyanam@nrc.gov alan.wang@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket No. 50-313
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC.
U.S. NUCLEAR REGULATORY COMMISSION ARKANSAS NUCLEAR ONE, UNIT 1 TUESDAY, MARCH 15, 2011 CONFERENCE ROOM O~8B02 9:30 a.m. - 12:00 p.m.
- 1. Introduction
- 2. Discussion on the license amendment request (LAR) pertaining to "Changes to TS
[Technical Specifications] Related to Completion Times for One Inoperable RCS
[Reactor Coolant System] Cooling Loop," dated August 24, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102371014)
(Entergy).
- 3. Questions (NRC staff).
- 4. Public participation 5 Closing remarks Enclosure
' ML110600265 OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME NKalyanam JBurkhardt MMarkley NKalyanam DATE 3/3/11 3/1/11 3/3/11 3/3/11