1CAN031101, Withdrawal of License Amendment Request to Revise Completion Times for One Inoperable RCS Cooling Loop

From kanterella
(Redirected from ML110840216)
Jump to navigation Jump to search

Withdrawal of License Amendment Request to Revise Completion Times for One Inoperable RCS Cooling Loop
ML110840216
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/24/2011
From: Schwarz C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
1CAN031101, TAC ME1622
Download: ML110840216 (2)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Christopher J. Schwarz Vice President - Operations Arkansas Nuclear One 1CAN031101 March 24, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Withdrawal of License Amendment Request to Revise Completion Times For One Inoperable RCS Cooling Loop Docket No. 50-313 License No. DPR-51

REFERENCES:

1. Entergy letter dated August 24, 2010, License Amendment Request -

Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop (TAC No. ME1622) (1CAN081004)

2. Entergy letter dated November 12, 2010, Supplement to License Amendment Request - Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop (TAC No.

ME1622) (1CAN111001)

3. Entergy letter dated February 28, 2011, Supplemental to License Amendment Request - Changes to Technical Specification Related to Completion Times for One Inoperable RCS Cooling Loop (TAC No.

ME1622) (1CAN021101)

Dear Sir or Madam:

In Reference 1 as supplemented by References 2 and 3, Entergy Operations, Inc. (Entergy) proposed a change to the Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications (TS).

Specifically, the change would revise several TSs to permit a greater time period for one of two required Reactor Coolant System (RCS) cooling loops to be inoperable. Entergy personnel met with the NRC at the White Flint office in Rockville, Maryland, on March 15, 2011, in order to identify and address any remaining items hindering continued review approval of the proposed change.

In light of information provided by Entergy to date supporting the change and the remaining open items, Entergy believes the projected resources and funding required to gain final approval of the change is no longer justified. Therefore, Entergy respectfully requests the referenced correspondence associated with the proposed change be withdrawn from further review by the NRC.

1CAN031101 Page 2 of 2 If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on March 24, 2011.

Sincerely, Original signed by Christopher J. Schwarz CJS/dbb cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205