ML090630393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML090630393
| number = ML090630393
| issue date = 03/04/2009
| issue date = 03/04/2009
| title = Robinson - Report 22 - 03/01/2009 - 06/30/2010
| title = Report 22 - 03/01/2009 - 06/30/2010
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4

Revision as of 04:49, 17 April 2019

Report 22 - 03/01/2009 - 06/30/2010
ML090630393
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/04/2009
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML090630383 List:
References
Download: ML090630393 (2)


Text

Inspection / Activity Plan Page 1 of 2 03/04/2009 07:28:58 Report 22 03/01/2009

-06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson OL RQ-REQUAL INSPECTION 2 2 IP Licensed Operator Requalification Program 7111111B 03/02/2009 03/06/2009 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE 3 2 IP Exercise Evaluation 7111401 05/18/2009 05/22/2009 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/18/2009 05/22/2009 2 IP Performance Indicator Verification 71151 05/18/2009 05/22/2009 EB3-HS-HEAT SINK 3 2 IP Heat Sink Performance 7111107T 06/01/2009 06/05/2009 OL EXAM-INITIAL EXAM PREP 4 2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 08/17/2009 08/21/2009 ISFSI-ISFSI OPERATIONAL INSPECTION 2 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 09/01/2009 10/15/2009 OL EXAM-INITIAL EXAM - WEEK 1 4 2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/07/2009 09/11/2009 EB1-MODS-MODIFICATIONS-10CFR50.59 2 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/14/2009 09/18/2009 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117 09/28/2009 10/02/2009 OL EXAM-INTIAL EXAM - WEEK2 3 2 ROBINSON/SEPTEMBER 2009 EXAM AT POWER FACILITIES V23310 09/21/2009 09/25/2009 PSB1-RP-RP ACCESS CONTROLS 1 2 IP A ccess Control to Radiologically Significant Areas 7112101 11/16/2009 11/20/2009 LI-POST APPROVAL LR INSPECTION 5 2 IP Post-Approval Site Inspection for License Renewal 71003 01/25/2010 01/29/2010 LI-POST APPROVAL LR INSPECTION 5 2 IP Post-Approval Site Inspection for License Renewal 71003 02/08/2010 02/12/2010 TFPI 805-TRIENNIAL FIRE PROTECTION 1 2 IP Fire Protection [Triennial]

7111105T 03/15/2010 03/19/2010 2 IP Fire Protection [Triennial]

7111105T 03/29/2010 04/02/2010 LI-POST APPROVAL LR CONT INSPECTION 2 2 IP Post-Approval Site Inspection for License Renewal 71003 04/19/2010 04/23/2010 EB3ISI-UNIT 2 INSERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR 7111108P 04/26/2010 04/30/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 2 2 IP A ccess Control to Radiologically Significant Areas 7112101 04/26/2010 04/30/2010 2 IP A LARA - Required 7112102-7112102R 04/26/2010 04/30/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 03/04/2009 07:28:58 Report 22 03/01/2009

-06/30/2010 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Robinson PSB1-RP-RP OCCUPATIONAL BASELINE WEEK1 2 2 IP Radioactive Material Processing and Transportation 7112202 04/26/2010 04/30/2010 2 IP Performance Indicator Verification 71151 04/26/2010 04/30/2010 PSB1-RP-RP OCCUPATIONAL BASELINE WEEK 2 3 2 IP A ccess Control to Radiologically Significant Areas 7112101 05/10/2010 05/14/2010 2 IP A LARA - Required 7112102-7112102R 05/10/2010 05/14/2010 2 IP Radioactive Material Processing and Transportation 7112202 05/10/2010 05/14/2010 2 IP Performance Indicator Verification 71151 05/10/2010 05/14/2010 PSB1EP-EMERGENCY PREPAREDNESS INSPECTION 1 2 IP A lert and Notification System Testing 7111402 05/24/2010 05/28/2010 2 IP Emergency Response Organization Augmentation Testing 7111403 05/24/2010 05/28/2010 2 IP Emergency Action Level and Emergency Plan Changes 7111404 05/24/2010 05/28/2010 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/24/2010 05/28/2010 2 IP Performance Indicator Verification 71151 05/24/2010 05/28/2010 PSB1-RP-RP GROUND WATER PROTECTION 1 2 IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 05/31/2010 06/04/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.