ULNRC-05432, Owners'S Activity Report (Form OAR -1) for Refuel 15

From kanterella
Jump to navigation Jump to search
Owners'S Activity Report (Form OAR -1) for Refuel 15
ML072280067
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/08/2007
From: Graessle L
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05432
Download: ML072280067 (8)


Text

AmerenUE PO Box 620 Callaway Plant Fulton, MO 65251 August 8, 2007 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen: ULNRC-054312 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 WA meren UNION ELECTRIC CO.

OWNER'S ACTIVITY REPORT U1E (FORM OAR-1) FOR REFUEL 15 Attached for submittal is the Owner's Activity Report (Form OAR-I ) for Refuel 15 at Callaway Plant. The report is submitted pursuant to the provisions of ASME Boiler and Pressure Vessel Code Case N-532-1, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."

In accordance with Code Case N-532-1, attached Form OAR-i includes an abstract of applicable Code examinations and tests (Table 1), a listing of items with flaws or relevant conditions that required evaluation for continued service (Table 2) - of which there were none for Refuel 15, and an abstract of repairs, replacements, or corrective measures required for continued service (Table 3).

For any questions regarding the attached information, please contact me at 573-676-8129 or Scott A. Maglio at 573-676-8719.

Sincerely, Luke H. Graessle Manager - Regulatory Affairs TBE/slk Attachment A4q a subsidiary of Ameren Corporation

ULNRC-05432 August 8, 2007 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-7DI Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360

ULNRC-05432 August 8, 2007 Page 3 Index and send hardcopy to QA file(s):

A160.0761 Hardcopy:

Certrec Corporation 4200 South Hulen, Suite 422 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and public disclosed).

Electronic distribution:

C. D. Naslund T. B. Elwood A. C. Heflin L. M. Belsky (NSRB)

T. E. Herrmann G. A. Forster L. H. Graessle J. A. Doughty D. M. Stepanovic M. G. Hoehn II G. A. Hughes S. L. Gallagher (100)

S. A. Maglio Ms. Diane M. Hooper Mr. Dennis Buschbaum Supervisor, Licensing TXU Power WCNOC Comanche Peak SES P.O. Box 411 P.O. Box 1002 Burlington, KS 66839 Glen Rose, TX 76043 Mr. Scott Bauer Mr. Stan Ketelsen Regulatory Affairs Manager, Regulatory Services Palo Verde NGS Pacific Gas & Electric P.O. Box 52034, Mail Stop 104/5/536 Mail Station 7636 P.O. Box 56 Phoenix, AZ 85072-2034 Avila Beach, CA 93424 Mr. Scott Head Mr. John O'Neill Supervisor, Licensing Pillsbury Winthrop Shaw Pittman LLP South Texas Project NOC 2300 N. Street N.W.

Mail Code N5014 Washington, DC 20037 P.O. Box 289 Wadsworth, TX 77483

Attachment to ULNRC-05432 FORM OAR-1 OWNER'S ACTIVITY REPORT FOR REFUEL 15 CALLAWAY PLANT

Callaway Nuclear Plant Form OAR-1 Owner's Activity Report Report Number 15 Owner AmerenUE, P.O. Box 149, St. Louis, MO 63166 (Name and Address of Owner)

Plant Callaway Plant, P.O. Box 620, Fulton, MO 65251 (Name and Address of Plant)

Unit No. 1 Commercial service date 12/19/1984 Refueling outage no. 15 (if applicable)

Current Inspection Interval 3rd (1st, 2nd, 3rd, 4th, other)

Current Inspection Period 1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plan 1998 Edition with 2000 Addenda Date and Revision of inspection plan 3/22/2007 / Rev. 1 Edition and Addenda of Section Xl applicable to replairs and replacements, if different than the inspection plan CERTIFICATE OF CONFORMANCE I certify that the statments made in the Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. N/A Expiration Date N/A (If applicable)

Signed ~

6

,/,$ ~ 7 ~Date 8/7/2007

/ wnerqor Owner's Dbsignee. Title ~ ~ '~'1 j,'JCL/~tA4-.

CERTIFICATE OF INSERVICE INSPECTION I, the Undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by HSBCT of Hartford, CT have inspected the items described in this Owner's Report, during the period 11/20/2005 to 5/10/2007 and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his Employer makes any warranty, expressed or implied, concerning the examinations, tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from the connection with this inspection.

E d__ ___ ___ Commissions MO 0374 A.N.,.

Inspector's Signature National Board, State, Province, and Endorsement Date ' 0 10ý- 20oo:-

8/7/2007 SacheduleWorks V. 8.1 Page 1 - 1

Callaway Nuclear Plant Table 1 I Abstract of Examinations and Tests Interval: 3 Period: I Examination Total Examinations Total Examinations Total Examinations Total Examinations Category Required for The Third Credited for The First Credited (%) for The Credited (%) To Date Remarks Interval Period First Period for The Third Interval B-A 24 6 100% 25%

B-B 8 0 0% 0%

B-D 36 6 100% 17% Note 1 B-G-1 219 154 100% 70%

B-G-2 0 10 100% 0% Note 2 B-K 1 0 0% 0%

B-L-2 0 0 0% 0%

B-M-2 7 1 100% 14%

B-N-1 3 1 100% 33%

B-N-2 6 0 0% 0%

B-N-3 1 0 0% 0%

B-0 4 0 0% 0%

C-A 6 0 0% 0%

C-B 5 0 0% 0%

C-C 13 2 67% 15% Note 3 C-D 1 0 0% 0%

C-G 4 1 100% 25%

D-A 26 5 56% 19%

F-A 163 42 55% 26%

R-A 121 18 51% 15% Note 4 Notes:

Note 1: Two examinations counted as complete pending NRC acceptance of Request for Relief 13R-09.

Note 2: There are 15 groupings of components within B-G-2, including B7.20 (one group), B7.30 (two groups), B7.50 (three groups), B7.60 (one group) and B7.70 (seven groups).

During RF15 the following examinations were credited: Both B7.30 groups, 1 B7.50 group (2-BB-02-8010A-FI-b), and B7.70-1. Therefore 4/15 or 27% are complete as of RF15 breaker closure.

Note 3:13 examinations required by ASME Cede percentages, 16 examinations scheduled for program plan.

Note 4: Four examinations counted as complete pending NRC acceptance of Request for Relief 13R-08.

8/7/2007 ScheduleWorks V. 8.1 Page 1 - 1

Callaway Nuclear Plant Table 2 Items with flaws or relevant conditions that required evaluation for continued service Flaw or Relevant Condition Found Item Description Flaw Characterization (IWA-3300) During Scheduled Section XI Examination or Test (Yes or No)

No No indications were detected in Refuel 15 which required evaluation for continued service.

8/7/2007 ScheduleWorks V. 8.1 Page 1 -1

Table 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE (REFUEL/CYCLE 15)

Flaw or Relevant Repair, Condition Repair/

Code Replacement, Item Description Found Date Replacement Class Or Corrective Description Of Work During Completed Plan Number Measure Scheduled Section XI Examination or Test (Yes/No) 3 Repair/Replacement Pitting Like-kind Piping Replacement No 1/31/2006 06113235 Corrosion in 4/27/2007 06116876 ESW Piping 4/27/2007 06116877 4/14/2007 06116879 5/1/2007 07002379 4/15/2007 07002401 4/27/2007 07002410 4/27/2007 07002411 4/26/2007 07002465 5/4/2007 07003342 4/27/2007 07003482 4/27/2007 07003483 3 Repair Pitting Internal Welded Repair No 5/2/2007 06122059 Corrosion in 5/2/2007 06122060 ESW Piping 4/15/2007 07002615 4/25/2007 07003469 3 Repair Pitting Code Case N-661 Weld Overlay No 5/9/2007 07003196 Corrosion in 5/4/2007 07003342 ESW Piping 5/4/2007 07003395 4/30/2007 07003410 4/27/2007 07003521