Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Updated FSAR for Vogtle Generating Plant". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20149G066  + (Forwards Updated FSAR for Yankee Nuclear Power Station,Vols 1 & 2. Summary of Listings & Administrative Instructions for Updating Fsar,Encl)
  • ML20199E837  + (Forwards Updated FSAR for Yankee Rowe)
  • SVP-97-242, Forwards Updated FSAR to Quad Cities Nuclear Power Station,Units 1 & 2 & Detailed Change Log Which Identifies & Explains All Changes  + (Forwards Updated FSAR to Quad Cities Nuclear Power Station,Units 1 & 2 & Detailed Change Log Which Identifies & Explains All Changes)
  • ML19326D211  + (Forwards Updated Facility PSAR Per Jr Yore Directive)
  • NUREG/CR-5999, Forwards Updated Fatigue Design Curves for Austenitic Stainless Steels in LWR Environments.Design Curves Being Provided in Advance of Future Update of NUREG/CR-5999 to Facilitate Efforts on Resolution of GSI-190  + (Forwards Updated Fatigue Design Curves for Austenitic Stainless Steels in LWR Environments.Design Curves Being Provided in Advance of Future Update of NUREG/CR-5999 to Facilitate Efforts on Resolution of GSI-190)
  • ML20098E000  + (Forwards Updated Figures to Be Included in Rev 28 to Security Plan Dtd 920427.Encl Withheld (Ref 10CFR73.21))
  • ML19322C203  + (Forwards Updated Final Cost Rept Through 781231,in Response to Util 790110 Request)
  • ML20204A410  + (Forwards Updated Final Employee Evaluations Originally Transmitted on 860428 Per Request.Recipient Will Be Contacted Re 860501 Telcon Questions by Author or D Bauser. W/Certificate of Svc.Related Correspondence)
  • ML20080C621  + (Forwards Updated Final Environ Qualification Status of Equipment Per 830510 Commitment)
  • ML20011D722  + (Forwards Updated Final Hazards Summary Rept for Big Rock Point Plant, Chapters 1-18.Rept Satisfies Commitments Per Discussions at 891205 Meeting W/Nrc)
  • ML20128C563  + (Forwards Updated Final Rule Package on Incineration of Waste Oil at Nuclear Power Plants)
  • ML17180A726  + (Forwards Updated Final Safety Analysis Repts,Volumes 1-7 for Dresden Station Units 2 & 3,developed from Existing UFSAR & Original Fsar,Including Util Responses to Questions Asked by AEC During License Application Review)
  • ML20198L440  + (Forwards Updated Financial Sys Inventory on 3 1/2 Inch Diskette in Response to Radzikowsi 970715 Memo)
  • ML20054L817  + (Forwards Updated Fire Hazard Analysis Rept & App R Section Iii.G Safe Shutdown Evaluation)
  • ML20235Q019  + (Forwards Updated Fire Hazards Analysis Rept. Mods in Rept Based on Proposed Plant Configuration Prior to Upcoming Restart,As Scheduled on 870128.Rept Will Be Ref in Udated SAR Rev to Be Issued in Jul 1988,per Generic Ltr 86-10)
  • ML13309B382  + (Forwards Updated Fire Hazards Analysis,Vols 1-4)
  • ML20140H503  + (Forwards Updated Fire Protection App R Review, Vols 1 & 2. Correspondence Summary Listing Also Encl)
  • ML20206P201  + (Forwards Updated Fire Protection Evaluation Rept, Including Recent 10CFR50,App R Reanalysis Changes,Licensee Safety Evaluations & Analyses of New Safety Issues)
  • ML20207N921  + (Forwards Updated Fire Protection Info & Combustible Loadings.Info Will Be Included in FSAR Amend 39)
  • ML20129H579  + (Forwards Updated Fire Protection Mod Implementation Schedule.Three Altered Items Listed Re Handwheel Chain & Declutch Lever Implementation,Fire Wrapping of Auxiliary Feedwater Pump 2C & Structural Ceiling Beam Fireproofing)
  • ML20244E119  + (Forwards Updated Fnmcp.Program Withheld (Ref 10CFR2.790(d)). Program Does Not Decrease Effectiveness of Currently Approved Program)
  • ML19263D550  + (Forwards Updated Forecast of Resources Needed to Complete Task A-17.Discusses Resources Committed by Organizational Units, & Those Still Unconfirmed)
  • ML20059B529  + (Forwards Updated Fracture Mechanics Analysis of Hpi/Makeup Nozzle,Per 900510 Meeting W/Nrc.Util Believes That Addl Analysis to Assess Structural Integrity of Nozzle Using More Conservative Fracture Model Supports Previous Analysis)
  • ML20024D047  + (Forwards Updated Fsar,Per 10CFR50.71.Update Consists of Revs from 820122-830122.W/o Encl)
  • ML20069J109  + (Forwards Updated Fsar,Providing Complete & Accurate Description of as-constructed Facility)