Forwards Updated FSAR for Kewaunee Nuclear Power Plant,Vols 1-6
ML111750718
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/21/1982
From: Giesler C
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111750719 List:
References
CON-NRC-82-124 NUDOCS 8207270249
Download: ML111750718 (3)


Text

REGULATORY *FORMATION DISTRIBUTION SY M (RIDS)

ACCESSION N8R:8207270249 0OC,DATE: 82/07/21 NOTARIZED: NO DOCKET #

FACIL:50-305 Kewaunee Nuclear Power Plant, Wisconsin Public Servic 05000305 AUTH,NAME AUTHOR AFFILIATION GIESLER,CW, Wisconsin Public Service Corp.

RECIPNAME RECIPIENT AFFILIATION DENTON,H.R. Office of Nuclear Reactor Regulation, Director

SUBJECT:

Forwards 4gggigtd FSAR for Kewaunee Nuclear Power Plant,Vols 1-6.

DISTRIBUTION CODE: A053S COPfYS RECEILEDC 1. ENCL Lb SIZE:

TITLE: Updated FSAR(50,71)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LICCIARDO,R, 01 1 1 INTERNAL: IE 05 1 1 REG FILE 02 1 1 RGN3 06 2 2 EXTERNAL: ACRS 09 1 1 FEMA 10 1 1 LPOR 04 1 1 NRC PDR 03 1 1 NSIC 1 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11I ENCL 11I

  • NRC-82-124 WISCONSIN PUBLIC SERVICE CORPORATION Public) rvice LSe P.O. Box 1200, Green Bay, Wisconsin 54305 ':;i July 21, 1982 Dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Updated Final Safety Analysis Report Pursuant to 10CFR50.71(e), we transmit herewith, one signed orig inal, and twelve copies of the updated Final Safety Analysis Report (FSAR) for the Kewaunee Nuclear Power Plant. Sections of the FSAR which were r equired for the operating license application but which essentially are unch anged (i.e.

Appendix A, Geological and Seismological Studies; Appendix B, Special Design Procedures) are reprinted and included in the submittal for refe rence.

Other sections such as Appendix C Quality Assurance Program, and Appendix G Emergency Plan provide appropriate reference to docketed submitt als rather than the documents themselves.

Additionally, other sections have been revised to reflect comple ted rather than projected events (i.e. Section 13, Initial Test and Operation).

The program to update the FSAR was undertaken by utilization of a consultant who expended approximately 50 man-months of effort over an 18-month period.

WPS was also very involved in the review of draft sections to assure accuracy of the information submitted. With the management attention giv en to the project, WPS believes that the enclosed material accurately repr esents changes made and analyses developed since our last submittal and represe nts the current information and status of the plant as of December 31, 1981, wit h one exception; Section 12 represents our organization as of June 1, 1982.

With the need to also provide management attention to other NRC required projects

  • (i.e. Appendix R, TMI Modifications, Emergency Preparedness), it may be possible that because of the magnitude of the project, some inconsistenci es or errors may have not been identified and corrected. If any of these are identified we 8207270249 920721 PDR ADOCK 05000305 K PDR /

Dr. Harold R. Denton July 21, 1982 Page 2 will correct them during the next annual FSAR revision. If the item is deemed significant, we would discuss the item with our Resident Inspector and/or Project Manager to determine further actions.

Sincerely, C. W. Giesler Vice President - Nuclear Power js Enc.

cc - Mr. J. G. Keppler, Reg Adm US NRC - Region III Mr. Robert Nelson, NRC Senior Resident Inspector RR #1, Box 999, Kewaunee, WI 54216