ML20064L659
| ML20064L659 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/20/1982 |
| From: | Bradley E PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20064L661 | List: |
| References | |
| NUDOCS 8207220309 | |
| Download: ML20064L659 (3) | |
Text
_
a PHILADELPHIA ELECTRIC COMPANY 23O1 M ARKET STREET P.O. BOX 8699 EDWARD G. BAUER, JR.
Eno's"Eu'Ina'L COuasEL (2151841-4000 EUGENE J. BR ADLEY ASSOCIATE GE.NERAL CouN$EL DONALD DLANKEN j
RUDOLPH A. CHILLEMI J
E. C. KIRK H ALL 1
T. H. M AHER CORNELL f
assisIan"T oE=
'^
^"
nal Counsel f
EDWARD J. CULLEN. JR.
l JOHN F. KENNEDY. JR.
ASSISTANT COGNSEL I
l l
July 20, 1982 1
Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Re:
Peach Bottom Atomic Power Station Units 2 & 3 Docket Nos. 50-277 & 50-278
Dear Mr. Denton:
Enclosed for filing with the Commission in accordance with Section 50.71(e)(3)(1) of the Commission's regulations is the Updated Final Safety Analysis Report for Peach Bottom Atomic Power Station, Units 2 & 3.
This filing consists of one original and 12 copies of a certification required by Section 50.71(e)(2) and 13 copies of the nine volume Updated Final Safety Analysis Report.
Very truly yours 7
/
~
Q Euge e J.
radley Enclosure
)
13 e207220 g o g g 7 e
PDR ADO ppR W
J
BEFORE THE U.S. NUCLEAR REGULATORY COMMISSION In the matter of Docket No. 50-277 PHILADELPHIA ELECTRIC COMPANY:
50-278 (Peach Bottom Atomic Power Station, Units 2 & 3)
CERTIFICATION S. L. Daltroff, being first duly sworn, deposes and states as follows:
1.
He is Vice President of Philadelphia Electric Company, Licensee under Facility Operating Licenses DPR-44 and DPR-56 for Peach Bottom Atomic Power Station, Units 2
& 3, and is authorized to make this Certification on behalf of Licensee.
2.
The Updated Final Safety Analysis Report, which is filed herewith, updates the original Final Safety Analysis Report submitted as part of the License Application for Peach Bottom Units 2 & 3 on August 31, 1970, as necessary to reflect information and analyses submitted to the Commis-sion or prepared pursuant to Commission requirement since the submittal of the original Final Safety Analysis Report.
Changes made under the provisions of 10 CFR 550.59 for the period covered by the Updated Final Safety Analysis Report have been previously submitted to the Commission.
3.
The Updated Final Safety Analysis Report brings the Final Safety Analysis Report up to date as of at least
{
et O
i i
l January 22, 1982.
4.
The statements and matters set forth herein are i
I true and correct to the best of his knowledge, information and belief.
I I
9
/
/
/
/
/
btvl -W
S. I[. Daltrcan i
1 l
i Subscribed and sworn to
{
i l
f before me this
/O day of July,1982.
l Notary Public f
PATRICIA D. SCHOLL Netry Publ c. Pinb,*erphia, Phsdc4hia Co.
f.y Cammissian Dp:rcs Icbioary 10, ISES i
i l
l l
i l
}
l 1 1
_ _ _ _ _.