Text

fx

[

\\ C:mm:nwealth Edisen

-a 1400 Opus Place

( '~' [ Downers Grove, Illinois 00515 o

v March 5, 1991 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn: Document Control Desk

Subject:

Quad Cities Station 6 1'cs I and 2 Update to the Final Safety Analysis Report (FSAR)

HRC_DotheLHom30:25LenL50 265

Reference:

(a) September 11, 1990 Meeting on Commonwealth Edison's Updated final Safety Analysis Report (UFSAR) Rebaseline hittative.

Dr. Murley:

On September 11, 1990 members of the NRC's Region Ill and Nuclear Reactor Regulations (NRR) and Commonwealth Edison's staffs conducted a meeting to discuss Commonwealth Edison's initiative to improve the quality of the Quad Cities Station Updated Final Safety Analysis (UFSAR).

Commonwealth Edison previously committed to identify " target" issues for UFSAR text upgrades.

The systems which were targeted for upgrades are as follows:

Emergency Core Cooling System (ECCS) room toolers Diesel Generator cooling water pump Diesel Generator room ventilation Diesel Generator air start system Outage batteries ECCS corner room flood protection General Design Criteria Safe Shutdown Makeup Pump a

Automatic Depressurization System (ADS)

Scram Dischaige Volume (SDV) 95056($o348 I

91M05 DR ADOCK 0500 4

Y

{

J

__ ~. _ _..

Dr. T.E.lHurley_ March 5, 1991 m.

The attached document'provides the upgraded sections to the UFSAR as well as administrative changes to other sections. Attachment A provides instructions for page removal and insertion.

A brief description of the changes is provided in Attachment B.

The revised pages are contained in Attachment C..

Some major milestones in the UFSAR Rebaseline Project have been achieved.

To date, the existing UFSAR has been reformatted to Regulatory Guide 1.70 standards.

Information gathering is near completion and contracts have been awarded to Architect / Engineer firms to assist in the rewrite of the UFSAR.

Finally. paral _lel efforts to improve the quality of the UFSAR_during the interim period prior to the issuance of rebaselined UFSAR continues.

The responsibility for the UFSAR has been transferred to the Regulatory Assurance i

Department of the. Station,_ procedures have been upgraded and a dedicated individual has been assigned to the update function.

These enhancements

-should further improve the quality of future updates to the Final Safety Analysis Report-(FSAR).

This submittal'is not intended to. satisfy the requirement for an annual I

update to the FSAR which reflects all changes made in the facility or procedures. described in the FSAR during 1990.

The 1991 update to the FSAR will be provided no later than June 30, 1991.

To the best of my knowledge and belief, the submitted changes to the

-UFSAR areLtrue and correct.

In sose respects these statements are not based on:my-personal knowledge but1 upon information furnished in the regular course of business by other Commonwealth L61r.6n employees.

Such informa; ton has been reviewed in accordance with Company prettico and I believe-it to be reliable.

In;accordance with-the_requirdmentife.f 10 CFR 50.4 (b)(6), one signed original and ten (10) additional cople: of the UFSAR revisions are provided.

Please direct any-questions regarding thic submittal to me at 708/515 7283; Very truly yours, i

/

(

Rita Stols Nuclear Licensing Administrator i

I cc; _

A.B. Davis, Regional' Administrator L.N. Olshan, Project Manager (w/o enclosure)

T.E. Taylor, Senior Resident Inspector P.R. Rescheske, Inspector _ Region III (w/o enclosure)