ML20138D656

From kanterella
Jump to navigation Jump to search
Forwards Updated FSAR for LACBWR
ML20138D656
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/14/1985
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
Shared Package
ML20138D662 List:
References
LAC-11190, NUDOCS 8510240266
Download: ML20138D656 (2)


Text

~

s D DNRYLAND h [k COOPERAT/VE

  • PO BOX 817
  • 2615 EAST AV SOUTH
  • LA CROSSE WISCONSIN 51601 (608) 788-4000 October 14, 1985 In reply, please refer to LAC-11190 i

DOCKET NO. 50-409 Director of Nuclear Reactor Regulation Attn: John Zwolinski, Chief Operating Reactors Branch #5 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 FULL TERM LICENSE APPLICATION

REFERENCES:

(1) DPC Letter, Madgett to Giambusso, LAC-2788, dated October 9, 1974.

(2) NRR Letter, Denton to Linder, LS05-83-07-036, dated July 20, 1983.

(3) NRC Letter, Zwolinski to Taylor LS05-85-08-026, dated August 21, 1985.

Gentlemen:

Reference 2 sent the Final Integrated Plant Safety Assessment Report, NUREG-0827 for the La Crosse Boiling Water Reactor, and requested that we file pursuant to 10CFR50.71(e)(3)(ii), a complete Final Safety Analysis Report (FSAR), which is up to date as of a maximum of six months prior to the date of filing the revision. Reference (3) extended the deadline for filing the FSAR by 60 days.

Enclosed is one signed original and 12 additional copies of the updated LACBWR FSAR. This revision to the FSAR is to be considered as having no original pages, although most original information remained valid in the revision.

A certification of the accuracy and completeness is in the updated FSAR.

If there are questions concerning this filing, please contact us.

85102402M 851014 '

PDR ADOCM O N _t_

K PDR h

""* ' f, IV

John Zwolinski, Chief October 14, 1985 Operating Reactors Branch #5 LAC-11190 Sincerely,'

DAIRYLAND POWER COOPERATIVE W '

James W. Taylor General Manager JWr: HAT:sks Enclosure ec: J. G. Keppler, Regional Administrator NRC Resident Inspector John Stang, LACBWR Project Manager STATE OF WISCONSIN )

)

COUNTY OF LA CROSSE )

Personaaly came before me this /(e[~// day of h , 1985, the above named, James W. Taylor, to me known to be the person who executed the r

foregoing instrument and acknowledged the same.

O d . Y Y :s NotaryPublit,/LaCrosseCounty Wisconsin v My commission expires February 21, 1988.

r 5

o 2-WPl.3.5

- , , , - - ~ - - , . , - , . r

, , , - . - - - r , .-v-- -