O) One First National Pina, Chictpo, Illinois Commonwrith Edison 1 '
i v
Address Reply to: Post Office Box 767
\\
Chicago, Illinoi* 60690 July 20, 1982 Mr. Harold R. Denton, Direct G r Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, DC 20555
Subject:
Dresden Station Units 2 and 3 Quad Cities Station Units 1 and 2 Zion Station Units 1 and 2 FSAR Update N RC nncket Nos. 50-237/249, (fn-254/253)and 50-295/304 Reference (a):
December 15, 1980 letter from D. G. Eisenhut to All Operating Reactor Licensees.
Dear Mr. Denton:
In accordance with the requirements o f 10 CFR 50.71(e),
Commonwealth Edison hereby submits updated FSAR's for our Dresden, i
Quad Cities, and Zion Stations.
Although Dresden Unit 2 is included in the NRC's Systematic Evaluation Program, and as such, is not subject to the requirement for an FSAR update, a common FSAR update has been prepared for Dresden Units 2 and 3.
The updated FSAR's have been prepared utilizing the guidance provided in the Federal Register Notice of May 9, 1980, and in reference (a).
Consistent with that guidance, the updated FSAR's have been prepared in the same format as the original FSAR's.
The i
level of detail is the same as originally provided.
No attempt has i
been made to revise the format or content to conform with the recom-mendations contained in Regulatory Guide 1.70.
i l
Commonwealth Edison has made every effort to identify all relevant information for inclusion in this first update, including all modifications to the facility as described in the FSAR that have been made since the completion of initial construction.
In our i
judgment, the updated FSAR's accurately reflect the as-built conditions of our Units as of a maximum of six months prior to this date.
In some cases, information and analyses that are no longer directly applicable have Deen included for historical purposes.
In those cases, the currently applicable versions of the analyses have been included and identified as such.
In accordance with the regulations, future updates to the FSAR will be provided on an annual basis.
)gfj$
2
/s 8207270265 820720 PDR ADOCK 05000254 1/ 13 K
^
g H. R. Denton July 20, 1982 To the best of my knowledge and belief, the statements con-tained in the updated FSAR's are true and correct.
In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees.
Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
In accordance with the requirements o f 10 CFR 50.71(e),
twelve (12) copies of each FSAR are provided.
One (1) signed original and thirty-five (35) copies of this letter are provided for your use.
Very truly yours, W
Cordell Reed Vice President 1m SUBSCRIBE 0 and SWORN to before me t,iis of/J:6 day of