ML112230773

From kanterella
Jump to navigation Jump to search
Forwards Updated FSAR for Duane Arnold Energy Ctr
ML112230773
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/21/1982
From: Root L
IES Utilities, (Formerly Iowa Electric Light & Power Co)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML112230774 List:
References
LDR-82-205, NUDOCS 8207230426
Download: ML112230773 (3)


Text

REGULATURY 0ORMATION DISTRIBUTION SYS*

(RIDS)

AOCESSION N8R:8207230426 DUC,DATE: 82/07/21 NOTARIZED: YES DOCKET #

FACIL:50-331 Duane Arnold Energy Center, Iowa Electric Light & Pow 05000331 AUTH,NAME AUTHOR AFFILIATION

ROOTrLD, Iowa Electric Li'ght & Power Co, RECIP.NAME RECIPIENT AFFILIATION DENTON,H.R@

Office of Nuclear Reactor Regulation, Director

SUBJECT:

Forwards upda d PSAR Dueae Arnold Energy Ctr.

DISTRIBUTION CODE: Agr53S LO V 0 R

ENCLR SIZE:.

TITLE: Updated FSAR(50.71) x NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ECCLESTONK, 01 1

1 INTERNAL: IE 05 1-1 REG FILE 02 1

1 RGN3 06 2

2 EXTERNAL: ACRS 09 1

1 FEMA 10 1

1 LPDR 04 1

1 NRC PDR 03 1

1 NSIC 1

1 NTIS 1

1, TOTAL NUMBER OF COPIES REUUIRED: LTTR I I ENCL I I

Iowa Electric Light and Power Company Jul 21 1982 L R-8-205 LARRY D. BOOT ASSISTANT VICE PRESIDENT NUCLEAR GENERATION Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

This letter provides the.certification required by 10CFR50.71(e)(2) to be included with the submittal of the Duane Arnold Energy Center (DAEC) Updated Final Safety Analysis Report (UFSAR). The DAEC UFSAR being submitted,is considered accurate to January 22, 1982, six months prior to the submittal of July 22, 1982.

The information contained in the DAEC UFSAR accurately presents changes made since submitting the original DAEC FSAR and amendments, necessary to reflect information and analyses submitted to the NRC or prepared pursuant to NRC requirement. The DAEC UFSAR contains no changes made under the provisions of 10CFR50.59 that have not been previously submitted to the NRC. There were no changes during the period January 1 to 22, 1982. Changes, tests, and experiments for the calendar year 1981 were reported by previous submittal dated February 26, 1982.

During the preparation of the DAEC UFSAR, we have used the opportunity to modify the format such that it essentially follows that outlined in Regulatory Guide 1.70 Revision 3. The content and level of detail in the reformatted document, however, remain that of the original FSAR as updated. We expect this change in format to enhance our responsiveness to future regulatory issues.

IOWA ECTRIC IGHT AND POWER COMPANY BYaPu Larry U. Koot Subscribed and sworn to Bef re Me Un this jy day of 1982.

LDR/BAL/dmh*

Attachment/13 copies, DAEC UFSAR cc:

B. Lacy D. Arnold L. Liu S. Tuthill K. Eccleston NRC Resident Office Commitment Control Ref:

820077 1882 - A CENTURY OF SERVICE - 1982

  • 8207230426 820721 PDR ADOCK 05000331 K

PDR J

P0. Box% 351

  • Cedar Iapids, Iowa 52406
  • 319/398-4411

Iowa Electric Light and Power Company Jul 21 1982 L R-8-205 LARRY D. ROOT ASSISTANT LTCE PRESIDENT NUCLEAR GENERATION Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

This letter provides the certification required by 10CFR50.71(e)(2) to be included with the submittal of the Duane Arnold Energy Center (DAEC') Updated Final Safety Analysis Report (UFSAR). The DAEC UFSAR being submitted is considered accurate to January 22, 1982, six months prior to the submittal of July 22, 1982. The information contained in the DAEC UFSAR accurately presents changes made since submitting the original DAEC FSAR and amendments, necessary to reflect information and analyses submitted to the NRC or prepared pursuant to NRC requirement. The DAEC UFSAR contains no changes made under the provisions of 10CFR50.59 that have not been previously submitted to the NRC. There were no changes during the period January 1 to 22 1982. Changes, tests, and experiments for the calen ar year 1981 were reported by previous submittal dated February 26, 1982.

During the preparation of the DAEC UFSAR, we have used the opportunity to modify the format such that it essentially follows that outlined in Regulatory Guide 1.70, Revision 3. The content and level of detail in the reformatted document, however, remain that of the original FSAR as updated. We expect this change in format to enhance our responsiveness to future regulatory issues.

IOWA ECTRIC IGHT AND POWER COMPANY BY Larry U. Koot Subscribed and sworn to Before Me on this

/

day of 1982.

LNotary Public in and for tne state of lowa LOR/BAL/dmh*

Attachment/13 copies, DAEC UFSAR cc:

B. Lacy D. Arnold L. Liu S. Tuthill K. Eccleston NRC Resident Office Commitment Control Ref:

820077 1882 - A CENTURY OF SERVICE - 1982 General Orfice

  • PO. Box 351
  • Cedar Rapids. lowa 52406
  • 319/398-4411