Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Status Rept for 880204-24". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • B11936, Forwards Status Rept Re Implementation of Seismic Interaction Program.Tasks Include:Anchorage Adequacy for Nonseismic Equipment in Seismic Category I Bldgs & Structural Integrity of Piping,Per Sser 4 (NUREG-1031)  + (Forwards Status Rept Re Implementation of Seismic Interaction Program.Tasks Include:Anchorage Adequacy for Nonseismic Equipment in Seismic Category I Bldgs & Structural Integrity of Piping,Per Sser 4 (NUREG-1031))
  • ML19351D269  + (Forwards Status Rept Re Implementation of NUREG-0578 Category B Tasks & Util Position Re Addl Requirements of TMI-2 Task Action Plan Per NUREG-0660.Requests Deferral Until Sept 1981 for Related Tasks Requiring Outages)
  • ML20245B976  + (Forwards Status Rept Re Implementation of TMI Action Plan Items.Verification of Actual Implementation of Item Responses Conducted to Fullest Extent Possible Considering Time Constraint Imposed by)
  • NRC-89-0098, Forwards Status Rept Re Implementation of TMI Action Plan Items,Per 890414 Request.List of All TMI Action Plan Items & Implementation Dates Encl  + (Forwards Status Rept Re Implementation of TMI Action Plan Items,Per 890414 Request.List of All TMI Action Plan Items & Implementation Dates Encl)
  • ML20245C601  + (Forwards Status Rept Re Implementation of TMI Action Plan Items for Plant Per NRC 890414 Request.Review of Documentation Indicates That Listed TMI Action Item Not Been Fully Implemented by Util)
  • ML20071N354  + (Forwards Status Rept Re Procurement & Installation of Replica Simulator,Per 820827 Mgt Piping & Instrumentation Diagrams.Second Status Rept Will Be Provided in Oct 1983)
  • BECO-87-070, Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation  + (Forwards Status Rept Re Progress Toward Resolution of Items Identified in NRC ,Per Request.Status Shown as of 870415.Progress & Effectiveness of Actions Monitored,W/ Verification & Validation of Completion Documentation)
  • ML20093N028  + (Forwards Status Rept Re Qa/Qc Activities at Facility to Be Presented at ACRS 274th Meeting on 830210)
  • ML17347B053  + (Forwards Status Rept Re Regulatory Commitments to NRC for LERs & Insp Repts.Three of Six Commitments Identified, Completed & Remaining Three Will Be Completed by 890630)
  • ML20154R473  + (Forwards Status Rept Re Security Issues at Plant.Rept Withheld (Ref 10CFR73.21))
  • ML20212L278  + (Forwards Status Rept Re Selected Licensing Cases for Wk Ending 740727)
  • ML20053A595  + (Forwards Status Rept Re Station Electric Distribution Sys Voltage Analysis & Big Rock Point Plant - Preliminary Study of Station Power Auxiliary Voltages. Analysis Used Computer Simulation to Determine Min & Max Voltages)
  • ML19317E806  + (Forwards Status Rept Re Steam Generator Tube Leak Investigation.W/O Encl)
  • ML17256A352  + (Forwards Status Rept Re Unresolved Safety Issues,Per NRC 820617 Request.Info Includes Description of Problem Based on NRC Documentation)
  • ML20024E768  + (Forwards Status Rept Requesting Addl Info on Proposed Spent Fuel Pool Expansion Program.Conference Call Scheduled for 830824 to Discuss Info Requirements)
  • ML20005B330  + (Forwards Status Rept Stating Promised Date,Actual Submittal Date & Adequacy of Submittals Re 810604 Outline for Closeout of Open Issues in Ser.Ser Will Be Issued by 810706)
  • ML20247E769  + (Forwards Status Rept Summarizing Concerns Re Proposed Change 105 to Tech Specs Covering Reactor Protection Sys Power Supply.Tech Specs Required to Complement Design Mods Made to Protect Reactor Protection Sys from Abnormal Voltage)
  • ML19263C116  + (Forwards Status Rept Which Summarizes NRC Position Re Outstanding Items Existing at Time of Redirection of Safety Review.Provides General Documentation of Status of Review at Time of Suspension Due to Halt in Hearing Schedule)
  • ML19263B666  + (Forwards Status Rept as of 781229 Re Developments in Puerto Rico Water Resources Authoritys Application)
  • ML19263B667  + (Forwards Status Rept as of 781229 Re Developments in Puerto Rico Water Resources Authority'S Application)
  • ML19209B833  + (Forwards Status Rept as of 790831)
  • ML19209B834  + (Forwards Status Rept as of 790831)
  • ML20028E307  + (Forwards Status Rept as of 830112 for Design & Installation of Safe Shutdown Sys Piping Supports Per IE Bulletin 79-14. Completion Date of 830215 Achievable W/No Margin for Any Unforseen Problems)
  • ML20235Z514  + (Forwards Status Rept for 870924-1008.Rept Intended to Provide NRC Mgt & Public W/Overview of Plant Activities & NRC Insp Activities)
  • ML20149L651  + (Forwards Status Rept for 871218-880119 to Provide NRC Mgt & Public W/Highlights of Significant Events at Plant)
  • ML20151R529  + (Forwards Status Rept for 880401-14)
  • ML20153F265  + (Forwards Status Rept for 880414-29.Rept Provides Overview of Plant Activities & NRC Insp Activities)
  • ML20154G760  + (Forwards Status Rept for 880423-0506 Re Licensee Security Mgt Effectiveness & Program to Control Contaminated Equipment During Maint & Testing at Offsite Facilities)
  • ML20043B982  + (Forwards Status Rept for 880504 ACRS Meeting to Review & Discuss Current & Potential Applicability of De Minimis & Below Regulatory Concern Concepts)
  • ML17345A283  + (Forwards Status Rept for 880514-0615 for Turkey Point Units 3 & 4)
  • GO2-89-081, Forwards Status Rept for Apr 1989 in Response to Generic Ltr 88-14 Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. W/Six Oversize Drawings  + (Forwards Status Rept for Apr 1989 in Response to Generic Ltr 88-14 Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. W/Six Oversize Drawings)
  • ML20154E405  + (Forwards Status Rept for Aug 1988 Re Std Plant Design Technical Reviews)
  • ML17285B222  + (Forwards Status Rept for Commitments Made in Re commercial-grade Dedication Process.Resolution of 10 Samples Identified by NRC & 50 Samples Identified by Cynga Completed)
  • ML20217G268  + (Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Mar 1998)
  • ML20198M794  + (Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month of Sept 1997)
  • ML20198H266  + (Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Months of Nov & Dec 1997)
  • ML20211A706  + (Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program for Month Aug 1997)
  • ML20217D284  + (Forwards Status Rept for Ga Tech Research Reactor Decommissioning Program Covering Sept 1999)
  • ML20211Q636  + (Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program Covering Jul & Aug 1999)
  • ML20237B673  + (Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of Jul 1998)
  • ML20202D113  + (Forwards Status Rept for Georgia Tech Research Reactor Deommissioning Program for Month of Oct 1997)
  • ML20236U406  + (Forwards Status Rept for Georgia Tech Research Reactor Decommissioning Program for Month of June 1998)
  • ML20206J764  + (Forwards Status Rept for IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Info in Rept Presented in Accordance W/Action Item F of Bulletin)
  • ML20094G466  + (Forwards Status Rept for Jan 1983.Rept Contains Input from Each Member of Insp Site Team of Ofc of Special Cases)
  • ML20207E960  + (Forwards Status Rept for Jul Re Current Review Milestones for Each Std Plant Project.Requests Notification within 1 Wk of Receipt of Memo If Problems W/Input Dates Encountered)
  • ML20028F894  + (Forwards Status Rept for June 1982 Re Progress of Const Items Listed in Schedule of Chapter 13 of Physical Protection Plan for Snm.Encl Withheld)
  • ML20094G458  + (Forwards Status Rept for Midland Project for Jan 1983.W/o Encl)
  • ML20196B608  + (Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews)
  • ML20101D301  + (Forwards Status Rept for Oct & Nov 1984 Re 10CFR50.55(e) & Part 21 Items)
  • ML20138H685  + (Forwards Status Rept for Performance Enhancement Program for 850603-0930,per SALP 850529 Meeting Commitment)