Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19347D828 + (Forwards Revision 3 to Guard Training & Qualification Plan. Revision Withheld (Ref 10CFR2.790))
- ML20003G620 + (Forwards Revision 3 to Guard Training & Qualification Plan. Revision Withheld (Ref 10CFR2.790))
- ML19345F539 + (Forwards Revision 3 to Industrial Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML19206B103 + (Forwards Revision 3 to Industrial Security Program.Encl Withheld (Ref 10CFR2.790))
- ML19323C992 + (Forwards Revision 3 to Inservice Insp Program for Pumps)
- ML19296A997 + (Forwards Revision 3 to Inservice Insp Program for Pumps & Valves)
- ML19296A998 + (Forwards Revision 3 to Inservice Insp Program for Pumps & Valves)
- ML19323C993 + (Forwards Revision 3 to Inservice Insp Program for Pumps.)
- ML20038A454 + (Forwards Revision 3 to Interim Security Plan,Reflecting Addl Info Requested at 771220 Meeting.Encl Withheld (Ref 10CFR2.790))
- ML20009F241 + (Forwards Revision 3 to Jm Farley Nuclear Plant Unit 1 Inservice Testing Program. Revision 3 Incorporates Addition of List of ASME Section XI Category E Valves Per SA Varga 810210 Request.Addl Changes Included)
- ML20009F242 + (Forwards Revision 3 to Jm Farley Nuclear Plant Unit 1 Inservice Testing Program. Revision 3 Incorporates Addition of List of ASME Section XI Category E Valves Per SA Varga 810210 Request.Addl Changes Included)
- ML20039B220 + (Forwards Revision 3 to PGE-1013, Spent Fuel Pool Storage Rack Design Rept)
- ML20039E872 + (Forwards Revision 3 to Physical Security Plan.Revision Withheld (10CFR2.790))
- ML20050A490 + (Forwards Revision 3 to Physical Security Plan.Revision Withheld (Ref 10CFR2.790))
- ML20053A585 + (Forwards Revision 3 to Physical Security Plan.Revision Withheld (Ref 10CFR2.790))
- ML19290C243 + (Forwards Revision 3 to Physical Security Plan. Plan Withheld (Ref 10CFR2.790))
- ML18043A928 + (Forwards Revision 3 to Plant Steam Generator Repair Rept, in Response to 790516 Request for Addl Info)
- ML18043A930 + (Forwards Revision 3 to Plant Steam Generator Repair Rept, in Response to 790516 Request for Addl Info)
- ML19331B537 + (Forwards Revision 3 to Preservice Insp Program Plan. Ack Requested by Signing & Dating Transmittal Control Form)
- ML19331B538 + (Forwards Revision 3 to Preservice Insp Program Plan. Ack Requested by Signing & Dating Transmittal Control Form)
- ML19250C442 + (Forwards Revision 3 to Preservice Insp Program)
- ML20063C381 + (Forwards Revision 3 to Probabilistic Risk Assessment,In Response to NRC)
- ML20050A544 + (Forwards Revision 3 to Procedure 0291A, Meteorological Monitoring Offsite Dose Calculation Program for Emergency Preparedness at Operating Nuclear Power Plants, Per NUREG-0519 Item III.A.2 & NUREG-0654,Revision 1)
- ML20054H688 + (Forwards Revision 3 to Procedure 0291A, Meteorological Monitoring,Offsite Dose Calculation Program for Emergency Preparedness at Operating Nuclear Power Plants & Revision 4 to QA Program for Meteorological Monitoring Programs)
- ML20002D564 + (Forwards Revision 3 to Proprietary Rept BAW-10084P-A, Program to Determine In-Reactor Performance of B&W Fuels - Cladding Creep Collapse. Rept Withheld (Ref 10CFR2.790))
- ML20063B660 + (Forwards Revision 3 to Pump & Valve Inservice Testing Program, Per 10CFR50.55a(g),reflecting Results of 820323-25 Meetings Between Util & Eg&G.Program Upgraded to 1980 Edition of ASME Boiler & Pressure Vessel Code)
- ML17340A514 + (Forwards Revision 3 to QA Manual)
- L-80-410, Forwards Revision 3 to QA Manual + (Forwards Revision 3 to QA Manual)
- ML20079J865 + (Forwards Revision 3 to QA Manual Describing Inservice Pump & Valve Testing Program for Jan 1981-Dec 1990.Revision Provides Clarification & Changes Re Pump Test Frequency & Performance Parameters)
- ML19321A425 + (Forwards Revision 3 to QA Program)
- ML20041E708 + (Forwards Revision 3 to QA Program Description for Design & Const Phase,Based on Revised 10A to ETR-1001, Ebasco Nuclear QA Program Manual & Addendum,In Response to .Affidavit Encl)
- ML19263D008 + (Forwards Revision 3 to QA Program Topical Rept, NU-QA-1 & Responses to Questions in NRC .Revision 3 Replaces Former QA Topical Rept,Submitted 780201)
- ML19257C680 + (Forwards Revision 3 to QA Program for Nuclear Fuel Design & Fabrication)
- ML19341A350 + (Forwards Revision 3 to Radiological Emergency Plan for Morris Operation, NEDO-21894)
- ML20039E832 + (Forwards Revision 3 to Reactor Vessel Support Mod Rept, Documenting Design Concept,Analytical Techniques to Be Used & Completion Schedule for Support Sys Mod,Per 811201 Final Deficiency Rept)
- ML19225C629 + (Forwards Revision 3 to Rept on Reanalysis of Safety-Related Piping Sys. Change Reflects up-to-date Reanalysis & Mod Program)
- ML19225C630 + (Forwards Revision 3 to Rept on Reanalysis of Safety-Related Piping Sys. Change Reflects up-to-date Reanalysis & Mod Program)
- ML19345G219 + (Forwards Revision 3 to Response to IE Bulletin 79-01B,Suppl 3, Environ Qualification of Class IE Equipment. Revision 3 Encompasses Boron Precipitation Control Sys,Ie Pressurizer Heaters Sys & post-TMI Mods.W/O Encl)
- ML19208D801 + (Forwards Revision 3 to Response to IE Bulletin 79-06B. Supercedes Attachments to .Encl 1 of IE Bulletin 79-05 & Sequence of Events Included in Encl 1 to IE Bulletin 79-05A Have Been Reviewed)
- ML20052A811 + (Forwards Revision 3 to SAR for Model CNS 1-13 Cii.Amend Addresses Potential Generation of Combustible Gases & Specifies Shipping Criteria Necessary & Sufficient to Assure Safe Waste Shipment)
- ML20028A873 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR73.21))
- ML20011A257 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790))
- ML20003J270 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790))
- ML20003H637 + (Forwards Revision 3 to Sar,Including Revision C to Drawing. Revision Allows Expanded Honeycomb to Be Replaced by Basic Energy Absorbing Rigid Foam.Requests That Certificate of Compliance 9070 Be Modified Accordingly)
- ML20063K293 + (Forwards Revision 3 to Security Force Qualification & Training Program,Consisting of Minor Miscellaneous Changes on Weapons Training & Complete Revision of App C.Revision Withheld (Ref 10CFR2.790))
- ML20063P334 + (Forwards Revision 3 to Security Force Training & Qualification Manual.Revision Withheld (Ref 10CFR2.790))
- ML20054C703 + (Forwards Revision 3 to Security Plan & Revision 2 to Security Personnel Training & Qualification Plan. Revisions Withheld (Ref 10CFR73.21))
- ML20038A464 + (Forwards Revision 3 to Security Plan,Documenting Resolution of Remaining Six Deficiencies Noted in NRC . Encl Withheld (Ref 10CFR2.790))
- ML19338G629 + (Forwards Revision 3 to Security Plan,Training & Qualification Plan & Safeguards Contingency Plan.Plans Withheld (Ref 10CFR2.790))
- ML19345D407 + (Forwards Revision 3 to Security Plan.Revision Withheld (Ref 10CFR2.790))
- ML20063N062 + (Forwards Revision 3 to Security Plan.Revision Withheld (Ref 10CFR73.21))
- ML20011A689 + (Forwards Revision 3 to Security Training & Qualification Plan.Revision Withheld (Ref 10CFR.2.790))