Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-86-059, on 860806,basement Drain in Medical Educ Bldg Backed Up,Resulting in Water Rising Above Basement Floor Level & Exiting Under Door of Radwaste Compaction/ Consolidation Area.No Radioactive Matl Released + (00:25:26, 8 December 2024)
- ML20205A462 + (00:25:26, 8 December 2024)
- ML20205A459 + (00:25:29, 8 December 2024)
- ML20205A456 + (00:25:30, 8 December 2024)
- ML20205A453 + (00:25:31, 8 December 2024)
- IR 05000322/1985018 + (00:25:33, 8 December 2024)
- ML20205A442 + (00:25:34, 8 December 2024)
- ML20205A441 + (00:25:35, 8 December 2024)
- ML20205A440 + (00:25:36, 8 December 2024)
- ML20205A438 + (00:25:37, 8 December 2024)
- ML20205A439 + (00:25:37, 8 December 2024)
- ML20205A437 + (00:25:38, 8 December 2024)
- ML20205A436 + (00:25:39, 8 December 2024)
- ML20205A433 + (00:25:39, 8 December 2024)
- ML20205A431 + (00:25:40, 8 December 2024)
- ML20205A427 + (00:25:41, 8 December 2024)
- ML20205A426 + (00:25:41, 8 December 2024)
- ML20205A423 + (00:25:44, 8 December 2024)
- ML20205A420 + (00:25:45, 8 December 2024)
- ML20205A422 + (00:25:45, 8 December 2024)
- ML20205A418 + (00:25:46, 8 December 2024)
- ML20205A419 + (00:25:46, 8 December 2024)
- ML20205A417 + (00:25:47, 8 December 2024)
- IR 05000373/1986031 + (00:25:48, 8 December 2024)
- ML20205A413 + (00:25:48, 8 December 2024)
- PNO-III-86-078, on 860806,leakage of Approx 144,000 Gallons of Primary Sys Coolant Water from RWCU Sys Into Torus Bldg Sumps Reported.Cause Undetermined.Rwcu Sys Isolated & Leakage Terminated.Investigation Continuing + (00:25:49, 8 December 2024)
- ML20205A409 + (00:25:50, 8 December 2024)
- ML20205A410 + (00:25:50, 8 December 2024)
- ML20205A404 + (00:25:51, 8 December 2024)
- RBG-20694, Interim Deficiency Rept DR-246 Re Linear Indication & Min Wall Thickness of Bf Shaw Co Weld.Next Rept Will Be Submitted by 850516 + (00:25:51, 8 December 2024)
- ML20205A402 + (00:25:54, 8 December 2024)
- ML20205A401 + (00:25:55, 8 December 2024)
- ML20205A400 + (00:25:55, 8 December 2024)
- ML20205A399 + (00:25:56, 8 December 2024)
- ML20205A396 + (00:25:57, 8 December 2024)
- ML20205A397 + (00:25:57, 8 December 2024)
- ML20205A395 + (00:25:58, 8 December 2024)
- ML20205A394 + (00:25:59, 8 December 2024)
- ML20205A392 + (00:25:59, 8 December 2024)
- IR 05000160/1986002 + (00:26:01, 8 December 2024)
- ML20205A390 + (00:26:01, 8 December 2024)
- ML20205A388 + (00:26:03, 8 December 2024)
- RBG-20636, Revised Final Deficiency Rept DR-75 Re GHOSH-WILSON Computer Program Used in Determining Stiffness of Triangular Elements.Initially Reported on 850110.Program Corrected. Affected Hardware Redesigned or Requalified + (00:26:03, 8 December 2024)
- ML20205A384 + (00:26:04, 8 December 2024)
- ML20205A383 + (00:26:05, 8 December 2024)
- ML20205A382 + (00:26:06, 8 December 2024)
- ML20205A381 + (00:26:06, 8 December 2024)
- ML20205A380 + (00:26:07, 8 December 2024)
- ML20205A376 + (00:26:08, 8 December 2024)
- ML20205A378 + (00:26:08, 8 December 2024)
- 05000457/LER-1988-023-01, :on 880919,Trains 2A & 2B Declared Inoperable. Caused by Inadequate Venting Due to Surveillance Data Sheets Not Providing Complete Guidance & Inadequate Review of Surveillance.Procedures Changed + (00:26:10, 8 December 2024)
- NOC-AE-0474, Forwards four-yr Rept on Plant Simulator Certification for Stp,Units 1 & 2,IAW 10CFR55.45(b)(5)(ii) & (b)(5)(vi) + (00:26:11, 8 December 2024)