ML20205A462

From kanterella
Jump to navigation Jump to search
Part 21 & Seventh Interim Deficiency Rept,Item 101 Re Koppers Co,Inc Defective Isoprene Governor Drive Coupling in Tdi Emergency Diesel Engine Gear Case.Initially Reported on 820909.Final Rept Will Be Submitted by 850612
ML20205A462
Person / Time
Site: Harris 
Issue date: 04/10/1985
From: Parsons R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-348, REF-PT21-85, REF-PT21-85-203-000 101, PT21-85-203, PT21-85-203-000, NUDOCS 8504250522
Download: ML20205A462 (4)


Text

--

Cp&L Carolina Power & Light Company o'h 10 f, Neb billh. C. 27562 P. O.

A pril 10,1985 1

Dr. 3. Nelson Grace NRC-348 United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 - 900,000 KW - UNIT I DEFECTIVE GOVERNOR DRIVE COUPLING PURCHASE ORDER NY-435079, ITEM 101

Dear Dr. Grace:

I Attached is our seventh interim report on the subject item which was deemed reportable per the provisions of 10CFR50.55(e) and 10CFR, Part 21, on September 9,1982. CP&L is pursuing this matter, and it is currently projected that corrective action and submission of the final report will be accomplished by June 12,1985.

Thank you for your consideration in this matter.

Yours very truly, W

R. M. Parsons Project General Manager Completion Assurance Shearon Harris Nuclear Power Plant RMP:sae Attachment cc:

Messrs. G. Maxwell /R. Prevatte (NRC-SHNPP)

Mr. R. C. DeYoung (NRC)

Ck'ah C0?!.,

gs *#0%

gea7 pg 9

Ila#

XEX-rt9/1-OS5

I s

CAROLINA POWER & LIGHT COMPANY SHEARON HARR5 NUCLEAR POWER PLANT UNIT NO.1 SEVENTH INTERIM REPORT April 9,1985 DEFECTIVE GOVERNOR DRIVE COUPLING ITEM 101 (DDR-1056)

REPORTABLE UNDER 10CFR50.55(e) AND 10CFR21 I

i l

l l

l l

XEX-rt9/3-OS5

y v

SUBJECT:

.Shearon Harris Nuclear Power Plant - Unit No. I 10CFR50.55(e) and 10CFR21 Reportable Deficiency. Defective governor drive coupling installed in the emergency diesel engine-generator sets under Purchase Order NY-435079 from Transamerica DeLaval, Inc.

ITEM:

Isoprene governor drive coupling located in the engine's gear case.

Part No. AK-007-000 SUPPLIED BY:

Transamerica DeLaval, Inc., Oakland, California. The governor drive coupling is manufactured by Koppers Co., Inc.

NATURE OF DEFICIENCY:

Transamerica DeLaval,Inc. shipped two diesel engines to the Shearon Harris site on Purchase Order NY-435079 in May and June, 1981.

In June, 1982, Transamerica DeLaval notified CP&L that the engines contain an isoprene governor drive coupling and there is a potential problem since the material, isoprene, is designed for atmospheric use and it is not suitable for use in the high temperature, oil atmosphere encountered in the engine's gear case.

DATE PROBLEM OCCURRED:

Refer to section above.

DATE PROBLEM REPORTED:

September 9,1982 - CP&L (N. 3. Chiangi) notified the NRC Region II (A. Hardin) that this item was reportable under 10CFR50.55(e) and 10CFR21.

SCOPE OF PROBLEM:

The problem involves the two diesel engines shipped on Purchase Order NY-435079.

These engines had isoprene governor drive couplings installed.

SAFETY IMPLICATION:

The diesel-generator sets supply power to the ESF buses in case of a loss of both normal on-site and off-site power sources. In the high temperature, oil atmosphere encountered in the engine's gear case, the rubber deteriorates rapidly and ultimately fails. While the coupling is " fail safe" and will mechanically lock up when the element fails, sufficient frequency instability could be induced that would result in the engine's tripping off lice, thereby affecting engine availability.

REASON DEFICIENCY

~

IS REPORTABLE:

If left uncorrected, failure of the governor drive coupling could result in the loss of the emergency on-site AC power supply.

XEX-rt9/4-OS5

f i:

4-j t,.

CORRECTIVE-ACTION:

The defective coupling drive elements in IA-SA and IB-SB engine governors have now been replaced with new elements. However, all actions required to complete the rework of the couplings has not yet been completed. Additional parts were required and have been received on site but have not been receipt inspected and releaseh'ior installation.

~ FINAL REPORT:

A final report will be issued once the rework on the couplings has been completed. It is currently projected that the submittal date will be June 12,1985.