ML20205A436
| ML20205A436 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/02/1987 |
| From: | Hunter D NEW HAMPSHIRE, STATE OF |
| To: | Zech L NRC COMMISSION (OCM) |
| Shared Package | |
| ML20205A389 | List: |
| References | |
| NUDOCS 8703270430 | |
| Download: ML20205A436 (3) | |
Text
c.
lt; i
STATE OF NEW HAMPSHIRE C
r 8' [. 'N DEPUTY DIRECTOR DIRECTOR
}
SUSAN E. MARSHALL LYNNE M. DENNIS n
N
\\g OFFICE of LEGISLATIVE SERVICES ROOM 109 STATE HOUSE CONCORD, NEW HAMPSHIRE 03301 March 2, 1987 Lando W. Zech, Jr., Chairman Nuclear. Regulatory Commission Matomic Building 1717 H Street, N.W.
Washington, DC 20555
Dear Chairman Zech:
I am writing to you at the direct request of a New Hampshire State Representative who is very interested in the Seabrook nuclear power plant.
The Representative would like answers to the following two questions:
1.
What proof is there that the earthquake-proof design used in the construction of the Seabrook plant will actually protect the plant in the event of an earthquake?
2.
Could activity along the Portsmouth and/or Clinton-Newbury geologic faults have any effect upon the Seabrook power plant?
Copies of any reports, studies, or other relevant information that has any bearing on these issues would be appreciated.
Thank you for your consideration and cooperation in this matter.
Sincerely,
.h&d X eke
(
l Donald R. Hunter Assistant Director for Research DRH/ajs l
l t
O h 43 PDR l
DIRECTOR (603) 271-3432 RESEARCH (603) 271 3326 LEGAL STAFF (603) 271-3435 ADMINISTRATIVE RULES (603) 271-3680 ADMINISTRAT'ON (603) 271 3433 t
-y; v?
a
.m w
______ _._.m__
___..__w_.ma~.sa.A-~.- - --.e~~~~~
a 6-~~A--~~---~&~ ~4 i ~.
I t
,- w.=.-
2 4*(j,4 STATE OF NEW HAMPSHIRE dC 17" I mm v-7 2 t
?
(N1,,(gp$ s 0 2 2 Ej.
017c5 9. --
h.
fl Of FICE OF LEGISLATlvE SEPVICES STATE HOUSE p
b CONCORD 03301 l.-
((
Lando W. Zech, Jr., Chairman j;
Nuclear Regulatory Conmission f
Matomic Building
.d 1717 H Street, N.W.
[
t Washington, DC 20555
. )j
- cp np
- s liililli....l liililiiliiiiillit f
e 4 e " ; +-
i,
.M'
~ _ -
_., _.. _. - ~, _
v.
. p*
th STATE OF NEW HAMPSHIRE DIRECTOR DEPUTY DIRECTOR f.
LYNNE M DENNS SUSAN E. MARSHALL 2
OFFICE of LEGISLATIVE SERVICES ROOM 109 STATE HOUSE CONCORD. NEW HAMPSHIRE 03301 March 2, 1987 Lando W. Zech, Jr., Chairman Nuclear Regulatory Commission Matomic Building 1717 H Street, N.W.
Washington, DC 20555
Dear Chairman Zech:
I am writing to you at the direct request of a New Hampshire State Representative who is very interested in the Seabrook nuclear power plant.
The Representative would like answers to the following two questions:
1.
What proof is there that the earthquake-proof design used in the construction of the Seabrook plant will actually protect the plant in the event of an earthquake?
2.
Could activity along the Portsmouth and/or Clinton-Newbury geologic faults have any effect upon the Seabrook power plant?
Copies of any reports, studies, or other relevant information that has any bearing on these issues would be appreciated.
Thank you for your consideration and cooperation in this matter.
Sincerely, h mDL X. ?h&
Donald R. Hunter Assistant Director for Research DRH/ajs DIRECTOR (603) 271 3432 RESEARCH (603) 271-3326 LEGALS 1 CF (603) 271 3435 ADM:NiSTRATivE RULES (603) 271 3680 ADMINISTRATION (603) 271 3433
.