Forwards Rev 13 to PBAPS PSP, Rev 9 to Security Personnel Training & Qualification Plan & Rev 11 to Safeguards Contingency Plan. Encls Withheld from Public Disclosure Per 10CFR73.21
ML20205A439
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/17/1999
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9903300380
Download: ML20205A439 (2)


Text

_ - _.

John Doering, Jr.

Vco Presdent y +_

Peach Bottom Atomic Power Staca PECO NUCLEAR esco rne,gv e-nv 1848 Lay Road A Unit of PECO Energy Delta. PA 17314 9032 717 456 4000 Pax 717 456 4243 E-mait jdoering@peco-energycom March 17,1999 10CFR50.54(p)

Docket Nos.: 50-277 50-278 l

U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Mail Station P1-137 Washington, DC 20555

Subject:

Peach Bottom Atoraic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan, Plant Security Personnel Training and Qualification Plan j

and Safeguards Contingency Plan

Dear Sir / Madam:

This letter submits, in accordance with 10CFR50.4(b)(4)(iii), four (4) controlled copies each, of the revised Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan, Rev.13, Plant Security Personnel Training and Qualification Plan, Rev. 9, and the Safeguards Contingency Plan, Rev.11. The revisions are detailed for each Plan in their respective Summary of Plan Revisions.

The Manager-Nuclear Security may be reached at 717-456-4915 to address all comments relative to the administrative processing of the security plan revisions.

These revisions are being submitted in accordar.co with 10CFR50.54(p)(2), and have been etermined not to decrease the effectiveness of the PBAPS Physical Security Plan, Plant Security Personnel Training and Qualification Plan, or the Safeguards Contingency Plan.

Ir, accordance with 10CFR73.21, we request that the enclosed revisions to the PBAPS Physical Security Plan, Plant Security Personnel Training and Qualification Plan and the Safeguards Contingency Plan, which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR73.21.

Sincerely

/

s John Doe ing, Jr.

Vice President Peach Bottom Atomic Power Station JD/ MEW /JAS: Jar Enclosure (8) t 9903300380 990317 i

PDR ADOCK O 27 F

~

6 4

cc:

H. J. Miller, Administrator, Region 1 USNRC (Enclosures - 2)

A. C. Mc Murtray, Senior Resident inspector, USNRC (Enclosures - 1)

R. I. McLean, Department of Natural Resources (w/o Enclosures)

R. R. Janati, Director, Bureau of Radiation Protection (w/o Enclosures)

A. F. Kirby, Ill, General Manager, Demarva Power & Light Co. (w/o Enclosures)

N. J. Sproul, Public Service Electric & Gas (w/o Enclosures)

ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION, THIS LETTER IS DECONTROLLED CCN: 99-14026