Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18096B192 + (07:15:38, 6 January 2025)
- ML18096B190 + (07:15:39, 6 January 2025)
- ML18096B188 + (07:15:42, 6 January 2025)
- 05000272/LER-1992-025, :on 921206,identified That Analog Rod Position Indications for CR in Violation of TS 3.0.3.Caused by Equipment Failure.Work Order Has Been Initiated to Replace 2DI & 1D4 Signal Conditioning Modules + (07:15:43, 6 January 2025)
- ML18096B186 + (07:15:45, 6 January 2025)
- ML18096B183 + (07:15:47, 6 January 2025)
- ML18096B182 + (07:15:48, 6 January 2025)
- ML18096B178 + (07:15:49, 6 January 2025)
- ML18096B177 + (07:15:51, 6 January 2025)
- ML18096B176 + (07:15:53, 6 January 2025)
- ML18096B170 + (07:15:54, 6 January 2025)
- 05000272/LER-1992-024, :on 921123,SI Pump Declared Inoperable When Room Cooler Condensate Leakage Observed Leaking Onto Pump Motor.Caused by Design,Mfg,Const/Installation.Drip Bag Installed on Room Cooler Drain + (07:16:18, 6 January 2025)
- ML18096B166 + (07:16:21, 6 January 2025)
- ML18096B164 + (07:16:22, 6 January 2025)
- ML18096B162 + (07:16:25, 6 January 2025)
- 05000311/LER-1992-016-01, :on 921114,CR Operator Identified Analog Rod Position Indications for Control Rods 2C3 & 2C4 Greater than Step Deviation from Group Demand Counter.Caused by Sys Design.Sys May Be Replaced W/Microprocessor + (07:16:57, 6 January 2025)
- ML18096B160 + (07:17:00, 6 January 2025)
- ML18096B159 + (07:17:02, 6 January 2025)
- ML18096B157 + (07:17:04, 6 January 2025)
- ML18096B155 + (07:17:05, 6 January 2025)
- ML18096B154 + (07:17:06, 6 January 2025)
- ML18096B153 + (07:17:08, 6 January 2025)
- ML18096B152 + (07:17:10, 6 January 2025)
- ML18096B151 + (07:17:13, 6 January 2025)
- ML18096B149 + (07:17:14, 6 January 2025)
- IR 05000272/1992017 + (07:17:33, 6 January 2025)
- ML18096B145 + (07:17:37, 6 January 2025)
- ML18096B144 + (07:17:37, 6 January 2025)
- ML18096B143 + (07:17:39, 6 January 2025)
- ML18096B142 + (07:17:40, 6 January 2025)
- ML18096B140 + (07:17:41, 6 January 2025)
- ML18096B139 + (07:17:43, 6 January 2025)
- ML18096B136 + (07:17:45, 6 January 2025)
- ML18096B135 + (07:17:46, 6 January 2025)
- IR 05000272/1992018 + (07:17:48, 6 January 2025)
- ML18096B128 + (07:17:51, 6 January 2025)
- 05000272/LER-1992-023, :on 921102,12 Bast Level Indication Failed High off-scale in Violation to TS 3.0.3.Caused by Design, Manufacturing,Construction/Installation.Design Change in Progress to Replace Bubbler Sys + (07:18:11, 6 January 2025)
- ML18096B125 + (07:18:15, 6 January 2025)
- ML18096B123 + (07:18:16, 6 January 2025)
- ML18096B122 + (07:18:17, 6 January 2025)
- ML18096B120 + (07:18:18, 6 January 2025)
- ML18096B119 + (07:18:20, 6 January 2025)
- ML18096B117 + (07:18:22, 6 January 2025)
- 05000272/LER-1992-022, :on 921027,controlled Shutdown from Mode 2 Commenced in Anticipation of Inability to Meet 72 H TS Time Requirement.Caused by Emergent Work Preventing Return of 12 Svc Water Header to Svc.Pipe Section Replaced + (07:18:26, 6 January 2025)
- ML18096B115 + (07:18:29, 6 January 2025)
- ML18096B113 + (07:18:31, 6 January 2025)
- PMNS20180458, Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (07:18:32, 6 January 2025)
- ML18096B111 + (07:18:35, 6 January 2025)
- ML18096B109 + (07:18:36, 6 January 2025)
- ML18096B108 + (07:18:37, 6 January 2025)
- ML18096B106 + (07:18:38, 6 January 2025)
- ML18096B105 + (07:18:39, 6 January 2025)