Forwards Nonproprietary WCAP-12913,Rev 1, Structural Evaluation of Salem Nuclear Plant...Pressurizer Surge Lines, Considering Effects of Thermal Stratification, Per 910515 & 0617 Ltrs in Response to NRC Bulletin 88-011
ML18096B149
Person / Time
Site: Salem  
Issue date: 12/10/1992
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096B150 List:
References
IEB-88-011, IEB-88-11, NLR-N92164, NUDOCS 9212170074
Download: ML18096B149 (2)


Text

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236. Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer DEC 1 Q 1992 NLR-N92164 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

NRC BULLETIN 88-11 PRESSURIZER SURGE LINE THERMAL STRATIFICATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 By letters dated May 15, 1991 and June 17, 1991 (ref: NLR-N91083 and NLR-N91100 respectively), Public Service Electric & Gas Company (PSE&G) committed to perform spring hanger modifications on the pressurizer surge line to address the concerns of NRC Bulletin 88-11, Pressurizer Surge Line Thermal Stratification.

Prior to performing any spring hanger modifications, PSE&G contracted Westinghouse Electric Corporation to perform additional analyses to verify the necessity of the modifications.

The analyses were performed in the following areas:

Surge line analysis for thermal stratification with maximum spring hanger travel.

Evaluation of spring hangers with maximum travel.

Determination of system differential temperature at which springs bottomed-out.

These analyses have been completed and are documented in WCAP-12913 Revision 1.

Proprietary WCAP-12914, submitted May 15, 1991 remains in effect.

The conclusions derived from these analyses are summarized below:

The existing configurations indicate that the ASME Code stress limits and cumulative usage factor requirements have been shown to be acceptable for the remainder of the licensed operation for both Salem Units 1 and 2.

No spring travel limit nor ~hip restraint modifications are necessary to show code compliance.

9212170074 PDR ADOCK a

............ r~... :-)

..,..,.,,,....J.J

., J _J 921211 05000272 PDR

Document Control Desk NLR-N92164 2

DEC 1 0 1992 In addition, PSE&G will perform walkdown measurements for the spring hanger travel and pipe whip restraint gaps in 2R7, scheduled for Spring 1993, and lRll, scheduled for Fall 1993, to determine the need for any further actions.

A copy of WCAP-12913 Revision 1 is included as Enclosure 1.

Should there be any questions with regard to this submittal, please do not hesitate to contact us.

Sincerely, Enclosure c

Mr. J. c. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. Kent Tosch, Chief New Jersey Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625