ML18096B140

From kanterella
Jump to navigation Jump to search
Suppl to Application for Amend to Licenses DPR-70 & DPR-75, Revising Table 4.8-1 Re EDG Test Frequency.Note Would Require EDG W/Seven Day Test Frequency to Undergo Seven Consecutive Failure Free Starts During Specified Period
ML18096B140
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/20/1991
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096B141 List:
References
LCR-87-07, LCR-87-7, NLR-N91149, NUDOCS 9212150161
Download: ML18096B140 (4)


Text

  • Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236. Hancocks Bridge. NJ 08038 609-339-4800 Vice President - Nt..:ciear Operations SEP 2 o 19Q1 NLR-N91149 LCR 87-07,. Rev. 1 Supplement United States Nuclear Requlatory Commission Document control Desk Washington, DC 20555 Gentlemen:

SUPPLEMENT TO REQUEST FOR AMENDMENT SALEM GENERATING STATION UNIT NOS. 1 AND 2 FACILITY OPERATING LICENSES DPR-70 AND DPR-75 DOCKET NOS. 50-272 AND 50-311 In accordance with the requirements of 10CFR50.90, Public Service Electric and Gas Company (PSE&G) hereby transmits a request for amendment of Facility Operating Licenses DPR-70 and DPR-75 for Salem Unit Nos. 1 and 2. PUrsuant to the requirements of 10CFR50.91(b) (1), a copy of this request for amendment has been sent to the State of New Jersey.

This submittal supersedes certain changes proposed in PSE&G letter NLR-N90068, dated March 6, 1991. Technical Specification Table 4.8-1 would be revised to include a note regarding Emergency Diesel Generator (ECG) test frequency. The note would require an ECG with a 7 day test frequency to undergo seven consecutive failure free starts before it is eligible to be placed in the 31 day test frequency. This would keep an ECG in the accelerated (7 day) test category until a confidence level that the ECG has a reliability of greater than or equal to 0.90 is established. The proposed change is consistent with Generic Letter 84-15 regarding ECG reliability.

Changes intended to simplify Table 4.8-1 are also being proposed.

For example, "At least once per 31 days" would be changed to "M",

which is defined in Table 1.2 as "At least once per 31 days."

These changes do not alter the test frequency requirements. i i

Attachment 1 contains the revised Salem Unit No. 1 and 2 . I Technical Specification Table 4.8-1 pages~ which supersede the corresponding pages in the March 6, 1991 letter. All other ~

changes proposed by the March 6, 1991 letter remain in effect.

~---~-----------~--------- -~

' 921215016.1 910920 PDR ADOCK 05000272 P PDR 090081 ~\

Document Control Desk NLR-N91149 SEP 2 O 1gg1 The changes proposed herein do not invalidate PSE&G's Determination pf No Significant Hazards Consideration provided in its letter dated March 6, 1991. PSE&G requests that the _

implementation date for Unit 1 be no. later than upon restart from the first refueling outage subsequent to issuance of the approved License Amendment. This will allow sufficient time for procedure revision and refueling outage planning to account for the changes to the Unit 1 surveillance tests performed on an 18 month cycle.

For Unit 2, implementation within 60 days of issuance of the License Amendment is requested.

Sincerely, Affidavit Attachment c

~~lif~~;~~f&~IMiii!:9£t1 Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. K. Tosch, Chief Bureau of Nuclear Engineering Department of Environmental Protection CN 415 Trenton, New Jersey 08625

REF: NLR-N91149

(

STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

Stanley La.Bruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated SEP 2 O 1Wl , concerning the Salem Generating Station, Unit Nos. 1 and 2, are true to the best of my knowledge, information and belief.

Subscribed and Sworn to before me th.is o.Jo../dt day o~, 1991

--~YX.~*

Notary Public of New Jersey VAfd!TA M. MARSHALL NOT.l\RY PUBLIC OF NEW JERSEY Mv Commission Expires Miy 6, 1993 My Commission expires on ~~~~~~~~~~~~~~-

NLR-N91149 ATTACHMENT 1