Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000280/1988038 + (00:40:41, 6 January 2025)
- ML18152B295 + (00:40:43, 6 January 2025)
- IR 05000280/1988041 + (00:40:58, 6 January 2025)
- ML18152B292 + (00:40:59, 6 January 2025)
- IR 05000280/1988044 + (00:41:01, 6 January 2025)
- ML18152B289 + (00:41:03, 6 January 2025)
- 05000280/LER-1988-014-01, :on 870630,determined That Unique Scenario Could Exist Whereby Auxiliary Feedwater Could Be Lost to Operating Unit.Administrative Controls Established & Safety Analysis Reviewed for high-energy Line Break + (00:41:04, 6 January 2025)
- 05000280/LER-1988-033, :on 881102,discovered Main Control Room Envelope Air Conditioning Sys Inadequate.Caused by Inadequate Design Control Program & Inadequate Preventive Maint.Mods Will Be Implemented + (00:41:09, 6 January 2025)
- ML18152B286 + (00:41:11, 6 January 2025)
- ML18152B284 + (00:41:12, 6 January 2025)
- ML18152B283 + (00:41:12, 6 January 2025)
- IR 05000280/1988039 + (00:41:14, 6 January 2025)
- ML18152B281 + (00:41:15, 6 January 2025)
- ML18152B279 + (00:41:16, 6 January 2025)
- ML18152B277 + (00:41:17, 6 January 2025)
- SECY-18-0064, Weekly Information Report - Week Ending May 25, 2018 + (00:41:17, 6 January 2025)
- ML18152B274 + (00:41:20, 6 January 2025)
- ML18152B272 + (00:41:21, 6 January 2025)
- ML18152B273 + (00:41:21, 6 January 2025)
- ML18152B271 + (00:41:22, 6 January 2025)
- ML18152B270 + (00:41:22, 6 January 2025)
- ML18152B269 + (00:41:23, 6 January 2025)
- ML18152B268 + (00:41:24, 6 January 2025)
- IR 05000280/1988036 + (00:41:25, 6 January 2025)
- ML18152B264 + (00:41:26, 6 January 2025)
- ML18152B263 + (00:41:28, 6 January 2025)
- PNO-II-88-067, on 881031,contractor Received Electrical Shock While Erecting Scaffolding Near 4,160-volt Transformer. Contractor Taken to Hosp & Released.No Contamination or Radiation Involved + (00:41:30, 6 January 2025)
- ML18152B260 + (00:41:30, 6 January 2025)
- ML18152B259 + (00:41:31, 6 January 2025)
- IR 05000280/1988037 + (00:41:33, 6 January 2025)
- ML18152B256 + (00:41:35, 6 January 2025)
- IR 05000280/1988029 + (00:41:36, 6 January 2025)
- 05000280/LER-1988-038, :on 880928,three Recirculation Spray HXs Filled W/Svc Water Discovered.Caused by Leakage Past Normally Closed Recirculation Spray HX Inlet Isolation Valves.Samples Taken + (00:41:39, 6 January 2025)
- ML18152B253 + (00:41:40, 6 January 2025)
- ML18152B252 + (00:41:41, 6 January 2025)
- ML18152B250 + (00:41:42, 6 January 2025)
- ML18152B249 + (00:41:43, 6 January 2025)
- IR 05000280/1988028 + (00:41:45, 6 January 2025)
- 05000280/LER-1988-037, :on 880918,electrical Penetration Not Completely Filled W/Fire Retardant Foam,Surrounding Cables as Required.Fire Watch Not Posted within Hour of Discovery. Caused by Personnel Error.Personnel Counseled + (00:41:47, 6 January 2025)
- ML18152B246 + (00:41:48, 6 January 2025)
- ML18152B245 + (00:41:50, 6 January 2025)
- IR 05000280/1988033 + (00:41:56, 6 January 2025)
- ML18152B242 + (00:41:57, 6 January 2025)
- ML18152B240 + (00:41:58, 6 January 2025)
- ML18152B239 + (00:41:59, 6 January 2025)
- ML18152B238 + (00:42:00, 6 January 2025)
- 05000280/LER-1988-032, :on 880913,three Emergency Diesel Generators Declared Inoperable Due to Design Deficiency.Caused by Incorrect Design Assumption That Worst Case Scenario Was hi-hi Actuation.Design Change Generated + (00:42:01, 6 January 2025)
- ML18152B234 + (00:42:02, 6 January 2025)
- ML18152B233 + (00:42:05, 6 January 2025)
- 05000280/LER-1988-036, :on 880912,charging Pump Component Cooling Water Sys Declared Inoperable When Both Charging Pump CC Pumps Became Air Bound Following Return to Service of a Intermediate Seal Cooler + (00:42:07, 6 January 2025)
- ML18152B231 + (00:42:08, 6 January 2025)
- 05000281/LER-1988-022-01, :on 880910,reactor Trip by Turbine Trip Occurred While Attempting to Maintain Turbine at Synchronous Speed.Caused by Inadequate Procedure & Faulty Valve Position Indication.Testing to Be Performed + (00:42:10, 6 January 2025)