Provides Confirmation of Reporting Schedule for Response to NRC Bulletin 80-11 Re Masonary Wall Design.Response to Open Item Will Be Provided within 2 Wks of Proposed Conference Call
ML18152B259
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 10/31/1988
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
88-551, IEB-80-11, NUDOCS 8811070096
Download: ML18152B259 (2)


Text

e VIRGINIA ELECTRIC AND _POWER COMPANY RICHMOND, VIRGINIA 23261 October 31, 1988 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washirigton, D. C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 NRC BULLETIN NO. 80-11:

MASONRY WALL DESIGN CONFIRMATION OF REPORTING SCHEDULE Serial No.

NL/RPC:vlh Docket Nos.

License Nos.88-551 R2.

50-280 50-281 50-338 50-339 DPR-32 DPR-37 NPF-4 NPF-7 In your letters dated August 11 and 12, 1988, Virginia Electric and Power Company was requested to address an open item _from the masonry block wa 11 safety eva 1 uat ion that was provided by the NRC.

The response to the open item was to be provided within 60 days.

Late in the response period, we requested additional information to clarify the points made in the safety evaluation reports.

As a result, a two-week extension to the due date was granted.

It was agreed that a conference call would be scheduled with the NRC to resolve our req~est for information.

In recent conversations with the NRC Project Managers, the extension has been modified such that the response to the open item will be provided within two weeks' of the proposed conference call.

W; R. Cartwri ht Vice Presideni*- Nuclear

I ;,

e cc:

U. S. Nuclear Regulatory Commisslon Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Ho 11 and

  • NRC Senior Resident Inspector Surry Power Station Mt. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate II-2 Division of-Reactor Projects Mr. Leon B. Engle

- I/II NRC North Anna Project Manager

  • project Directorate II-2 Division of Reactor Projects -1/11