VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 VICE PRESIDENT November 30, 1988 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NO. 2 RELOAD INFORMATION FOR CYCLE 10 Serial No.88-710 PES/JYR:cdk Docket No.
50-281 License No. DPR-37 Surry Unit No. 2 completed its ninth cycle of operation on September 10, 1988 and is currently in its refueling outage. This letter is to advise you of our plans for the Cycle 10 reload core. This cycle will mark the first use of the Surry Improved Fuel product in Surry Unit 2, approved by your staff in their letter of January 6, 1988.
The Cycle 10 core reload was analyzed in accordance with the methodology documented in the NRC approved Virginia Electric and Power Company Topical
- Report, VEP-FRD-42A, 11Reload Nuclear Design Methodology 11 These analyses were performed and reviewed by our technical staff. The results of these analyses indicated that no key analysis parameters would become more limiting during Cycle 10 operations than the values assumed in the currently applicable Safety Analyses.
In addition, a review has been performed both by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that no unreviewed safety questions as defined in 10 CFR 50.59 will exist as a result of the Cycle 10 reload core.
In addition, no Technical Specifications changes are required as a result of Cycle 10 operation with the reload core loading pattern.
This letter is provided for your information and planning.
However, should you have any questions, please contact us.
Very W. R. Cartwright Vice President - Nuclear
- . - :::812050 :I. 05 E::::1 :l :::W..
PDR ADOCK 05000281
- p P:OC
~
_/ ;.-
cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II